Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Bicycle/Pedestrian Trail Vicinity of Route 123 & I-495 Tysons Public Information Meeting Westgate Elementary School, 7500 Magarity Road, Falls Church, VA
Wednesday, May 17, 2017
Fairfax County
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Agenda
Project overview
Previous efforts
Previously considered options
Current options
Evaluation and preferred option
Schedule
Next steps
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Need for enhanced bicycle and pedestrian connectivity in Tysons Connections to either side of
Capital Beltway/I-495
Fairfax County Comprehensive Plan and Countywide Bicycle Master Plan includes multiple crossings of I-495
Objective of this project: Identify a preferred approach for the first of the bike/ped projects connecting each side of I-495
Project Overview
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Previous Efforts
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
HOT Lanes Project – Public Hearing 2014 Concept Design
Path crosses ramp at grade Path crosses
ramp at grade
Path passes under Beltway
Path passes under Westpark Drive
Legend
Path
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Summary of HOT Lanes Project 2014 Public Hearing
Two Options shown for off-street facility Wide right lane in both directions on Route 123 (on-street)
At-grade (not elevated) crossings at I-495 Ramps
Public comments: Safety concerns about at-grade ramp crossings
Safety concerns about wide right lane on Route 123
Requests for grade separations and/or flashing signage
Requests for full trail connections to the Tysons Corner Center development and Metrorail station
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Financial Considerations
Available Project Budget Approximately $7.6 million allocated for:
Preliminary Engineering
Right-of-way
Construction
Construction Oversight
Contingencies
Potential additional funding through development proffers
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
VDOT Planning Workshop – June 2015 Route 123 Bicycle and Pedestrian Access
Objectives
Understand priorities, concerns, and constraints
Develop initial options
Refine, evaluate, and cost options
Present and receive input on refined options
Document findings
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
VDOT Planning Workshop – June 2015 Comments
Grade separation at ramp crossings
Direct connections to: Tysons Corner Center
Existing neighborhoods to south of Route 123
Proposed development in Tysons East
Strong support for multiple multimodal bridge connections over I-495 in the area
Support for short bridge type connection south of Route 123
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
VDOT Planning 2015-2016 – Options A through G Route 123 Bicycle and Pedestrian Access
Option A Option B Option C
Option D
Option E Option F
Option G
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
VDOT Planning 2017 – Build Options Route 123 Bicycle and Pedestrian Access
Options B and G emerged as feasible
Completing study to select Preferred Option
Option B Option 1
Option G Option 2
Option B 1 Option G 2
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Option 1 – Shared-use Path along Route 123 Old Meadow Road to Westpark Drive
Bike/ped bridge to Westpark Drive
Crosswalk across ramp to I-495
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Option 2 – Shared-use Path along Old Meadow Road Route 123 to Tysons One Place
Bike/ped bridge over I-495
Path behind Dolley Madison Apartments
Old Meadow Road path connection
Screening by sound wall and mature trees
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Option 2 – Bike/Ped Bridge Concept Route 123 to Tysons One Place
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Build Options – Evaluation Route 123 Bicycle and Pedestrian Facility
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Build Options – Evaluation Criteria Route 123 Bicycle and Pedestrian Facility
General bicycling quality
General walking quality
Protection from intersecting traffic
Direct access to existing places
Direct access to future places
Right-of-way impacts
Ease of construction
Preliminary project cost
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Build Options – Evaluation Scoring Route 123 Bicycle and Pedestrian Facility
General bicycling quality
General walking quality
Protection from
intersecting traffic
Direct access to existing
places
Direct access to future
places
Right-of-way impacts
Ease of construction
Preliminary project cost
Total Score
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Preferred Option Option 2 - Route 123 to Tysons One Place
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Schedule
Public Info Meeting May 17, 2017
Selection of Preferred Option June 2017
Design Public Hearing Late 2017
Final Design 2018
Right-of-Way Acquisition 2018/2019
Utility Relocations 2019
Construction Complete 2020
Bicycle/Pedestrian Facility Vicinity of Route 123 & I-495 – Tysons
Questions?
For more information, contact: Abi Lerner, Project Manager, at