TUTORIAL IPM 8 P-01
Constructing an oil well model
OBJECTIVES
www.ifm-solutions.com© IFM-Solutions
1 / 3
- Familiarize the user with IPM 8 PROSPER and the input of data. - Perform basic calculations in PROSPER.- Construct an oil naturally flowing well and obtain results.
EXPECTED CALCULATIONS
DATA
Considering a well head pressure of 400 psig and actual conditions of reservoir we would like to know: 1. Estimate oil production rate.2. Estimate flowing bottom-hole pressure.3. Estimate well head temperature.
PVT DATA
Variable
Solution GOR
Oil density
Gas gravity
Water salinity
430
34
0.73
85000
Scf/stb
API
ppm
Value Unit
DEVIATION SURVEY
Measured depthm
0
452
489
564
665
790
1896
2736
2885
2930
True vertical depth m
0
443.4
475.7
535
601.2
663.1
1145
1639.9
1706.4
1726.5
Temperature°F
80
163
Deviation Survey Geothermal gradient
www.ifm-solutions.com© IFM-Solutions
2 / 3
“U” (Overall heat transfer coefficient)It is used to calculate the heat transfer between the well and its surroundings.It is obtain from well test when well head temperature is available. In case of lack of well head temperature the following rule of thumb can be used:
Oil and water wells: 8 – 10 Btu/h/ft2/FCondensate wells: 5 – 7 Btu/h/ft2/FDry and wet gas wells: 1 – 3 Btu/h/ft2/F
DOWN-HOLE EQUIPMENT DATA
Description
Xmas tree
Tubing
Restriction
Tubing
Casing
Depth m
0
1000
1000
2700
2930
IDinch
2.992
2.75
2.992
6.366
Roughness inch
0.0006
0.0006
0.0006
0.0006
GEOTHERMAL GRADIENT
Overall heat transfer coefficient “U”: 8 BTU/h/ft2/F
Measure depthm
0
2930
TemperatureºF
80
163
IPR DATA
Variable
Reservoir pressure
Reservoir temperature
Water cut
Productivity Index
2571
163
0
3.5
psig
F
%
Stb/day/psi
Value Unit
www.ifm-solutions.com© IFM-Solutions
3 / 3
For a well head pressure of 400 psig and 0% water cut estimate:
RESULTS
Variable Value Units
Oil Rate
Flowing bottom hole pressure
Well head temperature
Stb/day
Psig
°F
Save the PROSPER file.