• Valley Metro System
• Project overview
• Utilities & roadway
• Track construction
• Noise & vibration reducing products
• Other innovative products
Key Presentation Take-Aways
Project Schedule
• $161 Million
• CM@Risk Contract
• Ground Breaking January 2013
• 1st Track Pour July 2014
• Start Integrated Testing January 2016
• Revenue Service March 19, 2016
Project Stats
• 3.24 Miles
• Utility Relocation
• Roadway Widening (average 40 foot)
• Embedded Double Track
1 Double Crossover
2 Single Crossovers
• 3 Traction Power Substations/3 Signal Buildings
• 3 Stations
• 1 Park and Ride
Utility Construction
15,000LF 12” Waterline
6,200LF 18” VCP Sewer
4,400LF 15” RCP Storm
1,500LF 18” Casing
5,800LF 6” Waterline
2,300LF 12” VCP Sewer
2,000LF 48” RCP Storm
1,300LF 20” Casing
2,600LF 36” Waterline
2,000LF 8” VCP Sewer
1,900LF 36” RCP Storm
1,700LF 16” Waterline
Pri
vate
Irri
gati
on
:1
8-i
nch
(R
GR
CP
) =
3,0
00
-fe
et
Sou
thw
est
Gas
:2
-in
ch P
E =
1,1
00
-fe
et
4-i
nch
PE
= 1
2,0
65
-fe
et
8-i
nch
Ste
el H
P =
9,1
00
-fe
et
SRP Water (Irrigation):24-inch RGRCP = 7,100-feet30-inch RGRCP = 5,100-feet36-inch RGRCP = 900-feet