Transcript
Page 1: STEPS IN SETTING OUT A BUILDING

STEPS IN SETTING OUT A BUILDING

Page 2: STEPS IN SETTING OUT A BUILDING

MINIMUM SIZES FOR FOUNDATIONS

Page 3: STEPS IN SETTING OUT A BUILDING

SETTING OUT CORNER PROFILES

Page 4: STEPS IN SETTING OUT A BUILDING

MARKING OUT FOUNDATION AND WALL THICKNESSES

Page 5: STEPS IN SETTING OUT A BUILDING

MARKING OUT ON THE GROUND FROM THE PROFILES

Page 6: STEPS IN SETTING OUT A BUILDING

EXCAVATION OF FOUNDATION

Page 7: STEPS IN SETTING OUT A BUILDING

SETTING OUT LEVELS FOR THE HEIGHT OF THE CONCRETE

Page 8: STEPS IN SETTING OUT A BUILDING

POURING CONCRETE FOR THE STRIP FOUNDATION

Page 9: STEPS IN SETTING OUT A BUILDING

COMPACTING AND LEVELLING OUT CONCRETE