Transcript
Page 1: St Lucie Plant, Unit 1 - Drawing 8770-B-327, Rev. 53, 'St ... · Title: St Lucie Plant, Unit 1 - Drawing 8770-B-327, Rev. 53, "St Lucie Plant-Extension-Unit 1 Control Wiring Diagram

SHEETNO

311

312

314

315

316

317

318

319

320

321

322

329

331

339

I 346

349

350

351

352

354

355

REVNO

REACTOR CONTAINMENT AIR RECIRC UNIT FAN HVS-1A

REACTOR CONTAINMENT AIR RECIRC UNIT FAN HYS-18

REACTOR CONTAINMENT AIR RECIRC UNIT FAN HVS-1C

REACTOR CONTAINMENT AIR RECIRC UNIT FAN HYS-10

MAIN STEAM ISOL BYPASS MY-08—1A

MAIN STEAM ISOL VALVE HCV-08-lA OPENING & CLOSING

MAIN STEAM ISOL VALVE HCV-08—1A TESTING

MAIN STEAM ISOL BYPASS MV-08-18

MAIN STEAM ISOL VALVE HCV—08-18

MAIN STEAM ISOL VALVE HCV-08-1B

INSTRUMENT AIR ISOLATION VALYE MV-18-1

STEAM GEN BLOWDOWN ISOL YALVES FCV-23-3. FCY-23-5

STEAM GEN SLOWDOWN ISOL VALVES FCY-23—4, FCV-23-6

CONTAINMENT SAMPLE ISOLATION VALVES

S I T SAMPLING VALVES

S I T SAMPLiNG VALVES

MSIS "A" & "8" ISOLATION RELAYS

CONT ISOL CH A — MAN RESET & MAIN STM ISOL VLV BLOCK A

CONT ISOL CH 8 — MAN RESET & MAIN STM ISOL VLV BLOCK 8

RADIATION MONITOR CHANNELS 43, 56 & 57

RADIATION MONITOR CABINETS ANNUNOATOR

PROCESS RADIATION MONITORING CH 64

AREA RADIATION MONITOR CHANNELS 52 & 53

PROCESS RADIATION MONITOR CHANNELS 46 & 47

PROCESS RADIAllON MONITOR CHANNELS 48 & 50

— YOID SUPSO BY SH 348

PROCESS RADIATION MONITOR CHANNELS 46 & 47 PUMP CONTROL

0 A I CHANNELS 46 & 47 SAMPLE SELECTOR SYSTEM

PROCESS RADIATION MONITOR CHANNELS 48 & 50 PUMP CONTROL

PROCESS RADIATION MONITOR FHB CHANNELS 49, 51 & 55

SGBD TANK VENT RAD MONITOR CH 54

RAD MONITOR PANEL REFLASH UNITS

PROCESS RADIATION MONITOR 0 A S — RESERVED

CONDENSATE RECOVERY RADIATION MONITOR CH 34 — RESERVED

CCW RADIATION MONITOR CHANNEL 56 & 57

CONTAINMENT Hl-RANGE RAD MONITOR CH 58 & 59

NOBLE GAS RADIATION MONITORS (CT 2)

SHEET REVNO NO

357

359

364

370

371

372

373

374

375

376

378

379

384

390

391

394

395

399

NOBLE GAS RADIATION MONITORS (CT 1)

AREA RADIATION MONITORING LIQUID RADWASTE SYS

RADIATION MONITOR PANEL ANN "X" CABINET E

NOBLE GAS RADIATION MONITORS (OAM-3)CH 62 & 63

ENGINEERED SAFEGUARDS ANNUNOATOR "S" SH 1 RTGB-106

ENQNEERED SAFEGUARDS ANNUNOATOR "S" SH 2 RTGB-106

ENQNEERED SAFEGUARDS ANNUNOATOR R" SH 1 RTGB-106

ENGINEERED SAFEGUARDS ANNUNOATOR "R" SH 2 RTGB-106

ENQNEERED SAFEGUARDS ANNUNOATOR "Q" SH 1 RTGB-106

ENQNEERED SAFEGUARDS ANNUNOATOR "Q" SH 2 RTGB-106

ENQNEERED SAFEGUARDS ANNUNOATOR "P" SH 1 RTGB-106

ENQNEERED SAFEGUARDS ANNUNCIATOR "P" SH 2 RTGB—106

SUBCOOUNG MARQN MONITOR CH "A — RESERYED

SUBCOOUNG MARQN MONITOR CH "8 — RESERVED

PRESSURIZER PRESSURE P-1102A MEASUREMENT LOOP

PRESSURIZER PRESSURE P-1102B MEASUREMENT LOOP

PRESSURIZER PRESSURE P-1102C MEASUREMENT LOOP

PRESSURIZER PRESSURE P-1102D MEASUREMENT LOOP

STEAM GENERATOR 1A LEVEL

STEAM GENERATOR 18 LEVEL

STEAM GENERATOR 1A PRESSURE

STEAM GENERATOR 18 PRESSURE

STEAM GEN lA & 18 LEVEL WIDE RANGE

REACTOR COOLANT TEMP CHANNEL T-1112A, T-1122A

REACTOR COOLANT TEMP CHANNEL T-11128, T-11228

REACTOR COOLANT TEMP CHANNEL T-1112C, T-1122C

REACTOR COOLANT TEMP CHANNEL T-1112D, T-1122D

REACTOR COOLANT DELTA FLOW CH P-1101A

REACTOR COOLANT DELTA FLOW CH P-11018

REACTOR COOLANT DELTA FLOW CH P-1101C

REACTOR COOLANT DELTA FLOW CH P-1101D

REACTOR COOLANT PUMPS lA1, 181, 1A2 & 1B2 INTERLOCKS

REACTOR PROTECTlON SYSTEM CHANNEL TRIP

—VOID

RTGB-103 & 104, 120V AC & 125V DC DISTRIBUTION

RTG8-103, 120V AC MEASUREMENT CHANNEL DISTRIBUTION

CEA ANNUNCIATOR "K" RTGB—104

REACTOR PROTECTlON ANNUNOATOR L RTGB-104

SHEETNO

404

406

409

410

411

412

413

414

415

416

417

418

419

422

423

424

426

427

428

429

431

432

434

435

436

437

439

444

446

REVNO

CEA DRIYE MG SET 1A

CEA DRIVE MG SET 18

RRS CONTROL UNIT SELECTOR SW SH 1

RRS CONTROL UNIT SELECTOR SW SH 2

RRS CONTROL UNIT SELECTOR SW SH 3

REACTOR PROTECTION SYSTEM ALARMS

CEA MIMIC DISPLAY—1

CEA DRIVE MG SET 1A PANEL

CEA DRIVE MG SET 18 PANEL

REACTOR TRIP BKR TCB-1

REACTOR TRIP BKR TCB—5

REACTOR TRIP BKR TCB-2

REACTOR TRIP BKR TCB-6

REACTOR TRIP BKR TCB-3

REACTOR TRIP BKR TCB-7

REACTOR TRIP BKR TCB—4

REACTOR TRIP BKR TCB-8

REACTOR TRIP CKT BKR TCB-9

REACTOR TRIP SWGR UNDERCURRENT DEVICES IN CAB 8

REACTOR TRIP SWGR UNDERCURRENT DEVICES IN CAB C

REACTOR TRIP SWGR & CPP CONT CTRS 120VAC & 125VDC DISTR

CEAPOS SH 1

CEAPOS SH 2

CEAPDS SH 3

CEAPDS SH 4

CEAPDS SH 5

—VOID

CEA GROUP OPERATION AND DEYIATION UGHTS SH 1

CEA GROUP OPERATION AND DEVIATION UGHTS SH 2

CEA MIMIC DISPLAY -2CEA MIMIC DISPLAY -3CEA MIMIC DISPLAY -4CEA MIMIC DISPLAY -5

RADIATION MONITORING PNL 120V AC, 125V DC & 120V AC MEAS CH S DISTR

AREA RADIATION MONITOR CHANNELS 3 & 4

AREA RADIATION MONITOR CHANNELS 1, 2 & 7

AREA RADIATION MONITOR CHANNELS 8, 9 & 12

AREA RADIATION MONITOR CHANNELS 15, 19 & 21

AREA RADIATION MONITOR CHANNELS 10, 11 & 13

AREA RADIATION MONITOR CHANNELS 16, 17 & 18

AREA RADIATION MONITOR CHANNELS 14, 20 & 22

AREA RADIATION MONITOR CHANNELS 25. 26 & 27

—VOID SUPSO BY SH 355

VOID SUPSD BY SH 356

REV DATE BY APPROVED

53

52

51

50

REV

10/IB/94

7/2B/93

9/21/92

DATE BY

RJF

EBASCO SERVICES INCORPORATEDNEW YORK

APPROVED

R C HAEKLER

V.O. M.M.

RSC DIV: I&C DR: BT

CAAVJCJPP RM

DATE: '6 72APPROVED

FLORIDA POWER 8c LIGHT COMPANY

ST LUCIE PLANT—EXTENSION—UNIT 1

CONTROL WIRING DIAGRAM

INDEX

8770- B-327

SHEET 3

FILE: USC00016

Recommended