See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/341829755
GHANA INSTITUTE OF MANAGEMENT AND PUBLIC ADMINISTRATION (GIMPA)
ASSESSING THE EFFECTIVENESS OF E-PROCUREMENT IN THE PRIVATE
SECTOR OF GHANA: A CASE STUDY OF COCA- COLA GHANA PRESEN...
Thesis · January 2018
DOI: 10.13140/RG.2.2.21047.75686
CITATIONS
0READS
439
6 authors, including:
Some of the authors of this publication are also working on these related projects:
EVOLUTION OF OPERATIONS MANAGEMENT View project
LEADERSHIP AS A SHARED RESPONSIBILITY OR SPECIALIZED ROLE View project
Enoch Nyame
Ghana Institute of Management and Public Administration
1 PUBLICATION 0 CITATIONS
SEE PROFILE
Justice Ako
Ghana Institute of Management and Public Administration
3 PUBLICATIONS 0 CITATIONS
SEE PROFILE
All content following this page was uploaded by Justice Ako on 02 June 2020.
The user has requested enhancement of the downloaded file.
GHANA INSTITUTE OF MANAGEMENT AND
PUBLIC ADMINISTRATION
(GIMPA)
TOPIC:
ASSESSING THE EFFECTIVENESS OF E-PROCUREMENT IN
THE PRIVATE SECTOR OF GHANA: A CASE STUDY OF COCA-
COLA GHANA
PRESENTED BY
ENOCH NYAME
PRISCILLA BOTWE
JUSTICE AKO LARBI
JULIANA ASANTEWAA YEBOAH
SAMUEL ADJETEY SOWAH
A LONG ESSAY SUBMITTED TO GHANA INSTITUTE OF MANAGEMENT
AND PUBLIC ADMINISTRATION (GIMPA), BUSINESS SCHOOL IN
PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE AWARD OF
BACHELOR OF SCIENCE (BSc) DEGREE IN PROCUREMENT
MANAGEMENT
APRIL, 2018
ASSESSING THE EFFECTIVENESS OF E-
PROCUREMENT IN THE PRIVATE SECTOR OF
GHANA: A CASE STUDY OF COCA-COLA GHANA
PRESENTED BY
ENOCH NYAME 217003834
PRISCILLA BOTWE 217000703
JUSTICE AKO LARBI 217000800
JULIANA ASANTEWAA YEBOAH 217000762
SAMUEL ADJETEY SOWAH 217004687
A LONG ESSAY SUBMITTED TO GHANA INSTITUTE OF MANAGEMENT
AND PUBLIC ADMINISTRATION (GIMPA), BUSINESS SCHOOL IN
PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE AWARD OF
BACHELOR OF SCIENCE (BSc) DEGREE IN PROCUREMENT
MANAGEMENT
APRIL, 2018
i
DECLARATION
We hereby declare that this submission is our own work in pursuit of BSc Procurement
Management. To the best of our knowledge, it does not contain any material previously
published by another person, nor materials which have been accepted for another award within
this institution or elsewhere, except for those which acknowledgement has been duly made
within the text.
NAME OF STUDENTS INDEX № SIGNATURE DATE
Enoch Nyame (217003834) ________________ _____________
Priscilla Botwe (217000703) ________________ _____________
Justice Ako Larbi (217000800) ________________ _____________
Juliana Asantweaa Yeboah (217000762) ________________ _____________
Samuel Adjetey Sowah (217004687) ________________ _____________
ii
CERTIFICATION
This is to certify that this project work entitled: Assessing the effectiveness of e-procurement
in the private sector of Ghana. A case study of Coca-Cola Company Limited, Ghana was
carried out by Enoch Nyame, Priscilla Botwe, Justice Ako Larbi, Juliana Asantewaa Yeboah
and Samuel Adjetey Sowah and was supervised in line with the guidelines for the supervision
of project work laid down by Ghana Institute Management and Public Administration
(GIMPA).
NAME OF SUPERVISOR: MR. DANIEL GAMETI
SIGNATURE: _________________________ DATE: _____________
iii
ACKNOWLEDGEMENT
We give thanks to the Almighty God for his protection and guidance throughout this work. We
wish to acknowledge with thanks, to our supervisor, Mr. Daniel Gameti for his time, warm
reception, constructive suggestions, and encouragement in making this project work a success.
We would also like to thank the entire management and staff of Coca-Cola Company Limited,
Ghana, for their co-operation and response to our questionnaires that aided in the writing of
this piece of work.
Finally, we wish to express our gratitude to our families and friends for their prayers, their
moral and financial support throughout our education and the writing of this project work.
iv
ABSTRACT
E-procurement is a strategy that uses technology to drive out waste and speed up the
procurement cycle. Some companies over the period have succeeded in implementing e-
procurement while others have failed at it. This study assessed the effectiveness of e-
procurement in the private sector of Ghana, using Coca-Cola Ghana as a case study. Specific
objectives that emanated from the study were to identify problems that end users and buyers
faced before the inception of e-procurement, assess the deployment of e-procurement and its
impact on Coca-Cola Ghana, ascertain the effects of e-procurement on the general performance
of Coca-Cola Ghana and develop possible measures and alternatives that can make e-
procurement fully effective. The study used qualitative and descriptive research design. The
sampling technique adopted was the purposive Sampling technique. A sample size of 40 was
used of which 23 were retrieved. The collected data were analyzed using Microsoft excel and
presented in tables, pie and bar charts. The discussion of findings was based on the
aforementioned research objectives of the study. It revealed difficulties in identifying and
tracing contract documents, large volume of paper work, delays in contract processing,
difficulty in modifying contracts as some of the challenges Coca-Cola faced before the
inception of e-procurement. Again, Coca-Cola deploys e-tendering and e-sourcing as the major
procurement activities undertaken electronically. E-procurement has improved record keeping,
communication, compliance to procurement processes and efficiency within Coca-Cola. The
study recommends that the management of Coca-Cola should consider employing e-
procurement experts, using software with user-friendly interface, actively engaging suppliers
in e-procurement training and having a reliable backup system to ensure continuity of
procurement activities.
v
TABLE OF CONTENT
Contents
DECLARATION...................................................................................................................... i
CERTIFICATION .................................................................................................................. ii
ACKNOWLEDGEMENT ..................................................................................................... iii
ABSTRACT ............................................................................................................................ iv
TABLE OF CONTENT .......................................................................................................... v
LIST OF TABLES ............................................................................................................... viii
LIST OF FIGURES ............................................................................................................... ix
CHAPTER ONE: INTRODUCTION ................................................................................... 1
1.1 Background of the Study ................................................................................................. 1
1.2 Statement of the Problem ................................................................................................ 2
1.3 Research Questions ......................................................................................................... 4
1.4 Research Objectives ........................................................................................................ 4
1.5 Significance of the Study ................................................................................................ 4
1.6 Scope of the Study........................................................................................................... 5
1.7 Organization of the Study ............................................................................................... 5
CHAPTER TWO: LITERATURE REVIEW ...................................................................... 7
2.0 Introduction ..................................................................................................................... 7
2.1 Procurement .................................................................................................................... 7
2.2 E-Procurement ................................................................................................................. 8
2.3 Deployment of e-procurement ...................................................................................... 11
2.4 Risks Associated with E-Procurement .......................................................................... 11
2.5 Impacts of E-Procurement ............................................................................................. 14
2.5.1 Compliance ............................................................................................................. 14
2.5.2 Efficiency ................................................................................................................ 15
2.5.3 Communication ...................................................................................................... 19
2.5.4 Transparency .......................................................................................................... 19
vi
2.6 Keys to E-Procurement Success ................................................................................ 20
2.7 Empirical Literature Review on E-Procurement ........................................................... 21
CHAPTER THREE: METHODOLOGY .......................................................................... 24
3.0 Introduction ................................................................................................................... 24
3.1 Research Design ............................................................................................................ 24
3.2 The Research Population ............................................................................................... 24
3.3 Sample and Sampling Procedure................................................................................... 25
3.4 The Research Instruments ............................................................................................. 25
3.4.1 Primary Data ........................................................................................................... 25
3.4.2 Secondary Data ....................................................................................................... 26
3.5 Data Collection Procedure ............................................................................................ 26
3.6 Tools for Data Analysis ................................................................................................ 26
CHAPTER FOUR: RESULTS AND DISCUSSION ......................................................... 27
4.0 Introduction ................................................................................................................... 27
4.1 Data Interpretation......................................................................................................... 27
4.2 Discussion of Findings. ................................................................................................. 53
4.2.1 Problems with procurement prior to the implementation of e-procurement .......... 53
4.2.2 E-procurement deployment in Coca-Cola and its perceived impacts ..................... 54
4.2.3 Effects of e-procurement on Coca-Cola’s general performance ............................ 54
4.2.4 Making e-procurement fully effective .................................................................... 58
CHAPTER FIVE: SUMMARY OF FINDINGS, CONCLUSION AND
RECOMMENDATIONS ...................................................................................................... 60
5.0 Introduction ................................................................................................................... 60
5.1 Summary of Findings .................................................................................................... 60
5.2 Conclusion ..................................................................................................................... 61
5.3 Recommendations ......................................................................................................... 62
vii
REFERENCES ...................................................................................................................... 64
APPENDIX ............................................................................................................................ 69
QUESTIONNAIRE ............................................................................................................. 69
viii
LIST OF TABLES
Table 4. 1: Administration and receipt of questionnaires ....................................................... 28
Table 4. 2: How training helps employees operationalize e-procurement .............................. 46
Table 4. 3: Challenges in contract processing contracts before e-procurement implementation
in Coca Cola ............................................................................................................................ 47
Table 4. 4: Challenges in contract development and maintenance before e-procurement
implementation in Coca Cola.................................................................................................. 48
Table 4. 5: Has e-procurement resolved existed procurement problems ................................ 49
Table 4. 6: Measures to improve e-procurement effectiveness in Coca-Cola ........................ 50
Table 4. 7: Positive effects of e-procurement on Coca-Cola Company Limited .................... 52
ix
LIST OF FIGURES
Figure 4. 1: Procurement's position within the organization .................................................. 29
Figure 4. 2: Department in which respondents work .............................................................. 30
Figure 4. 3: Procurement system employed by Coca Cola ..................................................... 31
Figure 4. 4: Procurement areas where Coca-Cola is actively involved .................................. 32
Figure 4. 5: Effect of e-procurement on volume of paper work ............................................. 33
Figure 4. 6: Effect of e- procurement on repetition of administrative procedures ................. 34
Figure 4. 7: Mistakes which would have occurred in the old paper base system ................... 35
Figure 4. 8: Effect of e-procurement on buyers' efforts to achieve same results as compared to
paper-based system ................................................................................................................. 36
Figure 4. 9: Effects of E-procurement on Buyer's time to concentrate on their core activities
................................................................................................................................................. 37
Figure 4. 10: Effect of e-procurement on the ease of retrieval of documents ........................ 38
Figure 4. 11: Effects of e-procurement on time spent in procuring ........................................ 39
Figure 4. 12: Results of e-procurement processes in planning for services required under
procurement as compared to paper based system ................................................................... 40
Figure 4. 13: Effects of e-procurement on completing request for contracts ......................... 41
Figure 4. 14: Effects of e procurement on getting approvals compared to paper-based system
................................................................................................................................................. 42
Figure 4. 15: Effects of e-procurement on processing invoice for payment ........................... 43
Figure 4. 16: Effects of e procurement on buyer's compliance in Coca-Cola's procurement
processes ................................................................................................................................. 44
Figure 4. 17: Organizing of e-procurement workshop for suppliers and employees.............. 45
Figure 4. 18: Has e-procurement affected Coca-Cola in a positive way? .............................. 51
1
CHAPTER ONE
INTRODUCTION
1.1 Background of the Study
E-procurement is the business to business or business to consumer or business to government
purchase and sale of supplies, works and services through the internet as well as other
information and networking systems such as electronic data interchange (EDI) (Lysons &
Farrington, 2012).
Organizations procure goods, services and sometimes work in its operations. Today, the advent
of the Internet as a business systems platform has been a catalyst for major changes, in the
operations and status of organizational procurement. Current trends in Information
Technologies have changed the way businesses operate. Many organizations have turned their
attention to Electronic Commerce technologies to improve the efficiency of their business
practices. The most prominent form of e-commerce system concerning interactions between
businesses that have recently received attention is Electronic Procurement System (Hawking
& Stein, 2004).
In order to reduce the total costs spent on the purchasing process, ICT aided technologies are
used and e-procurement is prevalent to implement in recent times by both public and private
enterprises. Although the opportunities for improvement seem abound, both private and public
sectors are still cautious as far as the adoption of electronic technologies is concerned (Zheng,
et al., 2004).
2
According to Subramaniam and Shaw (2002), e-procurement in businesses automates an
organization’s purchasing process, reduces transaction costs, improves inter-organizational co-
ordination within the supply chain, improves relationship with business partners and offers
competitive sourcing opportunities for the buyer organizations.
There are numerous identified benefits of e-procurement. Transparency International (2011)
and Handfield (2011) opine that e-procurement makes it easier to handle contracts, increases
integrity in procurement systems, reduces the time between need recognition, release and
receipt of an order, improves communication both within the buyer company and with
suppliers and minimizes total overhead costs in the purchasing area .
However, not much work and research has been done to look at the effectiveness of e-
procurement in Ghana. It is in this light that this research was conducted to assess the
effectiveness of e-procurement on procurement practices using Coca cola Ghana Limited as a
case study.
1.2 Statement of the Problem
The procurement function like every other functional department in an organization is prone
to difficulties or challenges. Such challenges cited by Ameyaw et al (2012) include corruption,
detection of maverick procurement and weak enforcement of procurement rules. Trkman and
McCormark (2010) share the opinion that there are positive impacts such as improving
transparency and ensuring compliance to procurement processes when it has been implemented
in organizations. Aberdeen Group (2005) advocated that these benefits provide answers to
most of the problems that have been identified in procurement. Osei-Owusu (2013) encourages
3
the use of e-procurement in Ghana companies due to some benefits accompanied by the
technology. These benefits include reducing delivery and ordering times, improving efficiency
and ability to achieve low prices. Shalle et al (2013) lauds good e-procurement software
systems in organizations as it positively impacts time and effort required to complete
purchasing transactions through the eradication of traditional paper chain requisitions,
approvals and payments.
However, the procurement process is still facing challenges and more so it is still done
manually in many organizations. e-security used in the electronic procurement systems, the
quality of software that is being used, the level at which training of staff as well as the
continuous upgrade of the system have impacted the effectiveness of e-procurement among
organizations implementing it at a very large extent (Waruguru & Kiruri, 2015).
Also e-procurement ineffectiveness is as a result of inadequate the funds to install software
systems that are right for their business activities and also the lack of knowledge and skills on
the side of workers on how to operate these electronic systems. In some cases, the firms have
to train their suppliers.
However, not much work and empirical research has been done to look at the effectiveness of
e-procurement in Ghana. It is in this light that this research would be conducted to assess and
measure the effectiveness of e-procurement practices so as to identify problems in the process
and establish better e-procurement practice alternatives if there are any. In view of this study
will be undertaken using Coca Cola Ghana as a case-study.
4
1.3 Research Questions
In the process of assessing the effectiveness of e-procurement in Coca Cola Ghana, the findings
of this study are expected to answer the following questions;
1. What problems did end-users and buyers face before the inception e-procurement in
Coca Cola?
2. How is e-procurement deployed in Coca cola and what was its perceived impact?
3. What are the effects of e-procurement on Coca cola’s general performance?
4. What possible measures can be put in place to make e-procurement fully effective?
1.4 Research Objectives
The overall objective of the study is to assess the effectiveness of e-procurement in Ghana.
Hence, the specific objectives of this study are;
1. Identify problems that end-users and buyers faced before the inception e-procurement
2. Assess the deployment of e procurement and its impact on Coca Cola Company
3. Ascertain the effects of e procurement on the general performance of the organization
4. Develop possible measures and alternatives that can make e procurement fully effective
1.5 Significance of the Study
The study would establish the effects e-procurement has impacted on Coca Cola’s procurement
practices to know whether Coca Cola’s perceived benefits for implementing e-procurement
has been achieved and if not, will be used in identifying possible corrective actions to make e
procurement effective.
5
Also, challenges encountered by end-users and buyers would be of great importance for
continuous and effective improvement in procurement practices of coca cola.
This study, when completed, would serve as a reference material in the library for further
research concerning effectiveness of e-procurement practices. Additionally, as students, the
research is in partial fulfilment of the requirement for award of a Bachelor of Science in
Procurement Management.
1.6 Scope of the Study
Coca-Cola Company Limited Ghana will be used as the area of study. The study is limited to
the e procurement practices of Coca-Cola Company Limited, Ghana. The subject matter of the
research is on assessing the effectiveness of e procurement practices in the organization. The
population was drawn from the staff and management of Coca-Cola Company Limited, Ghana.
1.7 Organization of the Study
The project work is organised into five chapters which are as follows;
Chapter one (1) contains introduction that gives the background and portray the subject matter
of the project. Chapter two (2) contains the literature review. It is made up of relevant concepts,
theories ideas and statements written by authors covering areas of electronic procurement
practices and its effects. Chapter three (3) sets out the methodology of the study, that gives
details about the population, sampling methods used, instruments for data collection, the
research design employed and the procedures for data analysis for the study. Chapter four (4)
encompasses data presentations and analysis of the study, that is, the analysis of data obtained
6
from questionnaire and interviews. Chapter five (5) contains the summary, recommendation
and conclusion of the entire research work.
7
CHAPTER TWO
LITERATURE REVIEW
2.0 Introduction
This chapter reviews the related literature on the topic under study. It considers the theoretical
literature involved in the subject matter and also provides a synopsis of the opinions expressed
in professional publications, academic journals and books. In this chapter the researchers’ areas
under review includes; procurement, electronic procurement, deployment of e-procurement,
risks associated with e procurement, impact of e-procurement and keys to e-procurement
success.
2.1 Procurement
Procurement is the business management function that ensures identification, sourcing, access
and management of external resources that an organization may need to fulfill its strategic
objectives (Kidd, 2005). The Public Procurement Authority (Act 663, 2003) also defines
procurement as the process of acquiring goods, works and services, covering both acquisitions
from third parties. The process involves options, appraisal and the critical “make or buy”
decision which may result in the provision of goods and services in appropriate circumstances.
Mulch (2009), defines procurement as a “formal process by which many organizations obtain
goods and services”. Her view of procurement was epitomized by Kidd (2006) as the business
management function that ensures identification, sourcing, access and management of the
external resources that an organization needs or may need to fulfill its strategic objectives. He
further opined that procurement exists to explore supply market opportunities and to
8
implement resourcing strategies that deliver the best possible supply outcome to the
organization, its stakeholders and customers. The opinions espoused above undeniably
underscore the importance of effective procurement function in every organization and the
need to undertake strategic procurement to ensure effective and efficient utilization of available
resources.
2.2 E-Procurement
E- Procurement is strongly related to concepts such as logistics, supply chain management
(SCM) as well as e- commerce. Although some definitions are suggested to distinguish
between these concepts, the problems faced are similar .They all require financial,
transportation, legal, and communication infrastructure (Ohmae, 2000). “An e-procurement
system is a web-based client/server application that is used to replace a manual procurement
process and is said to function horizontally and vertically” (Soares-Aguiar & Palma-dos-Reis,
2008). Vertically, e-procurement systems support the demand side, supply side and inter-
organizational modules. In the past, the purchasing function was seen as a way to execute a
transaction between a buyer and a seller. Nowadays, purchasing function needs to be executed
on broader level. This means connecting different partners and helping them come up to the
mark (Shah, 2002). Podloger (2007) explains e-procurement as linking and incorporating inter
organization business processes and systems with the automation of the requisitioning, the
approval purchased order management and the accounting processes through internet-based
protocol. Again, e-procurement is the electronic management of all procurement activities. To
begin with, the buyer has to log into an application system on the computer and send
information to the supplier. This process concludes when goods are supplied and the invoice
9
issued for the goods are paid for. This includes the user’s requisition, placing order,
transportation, warehousing, and in-bound receiving processes (Presutti, 2003).Tomkins
(2000) proposed the supply chain synthesis (SCS) which he claimed to be the next step to
SCM. If SCS can be implemented, procurement activities throughout the supply chain can be
streamlined. Raisch (2001) saw the future of SCM and e- Procurement as B2B marketplaces
and stressed the importance of content management and community building. Bovet and
Martha (2000) use the term “value net” as almost the equivalent of B2B e- marketplaces.
E-Procurement Models
E-procurement models are differentiated based on the application and functions that merges
sales and purchasing business models making up the e-procurement. Parida and
Sophonthummapharn, (2008) identify three model applications of e-procurement as;
The buy-side procurement – This refers to an organization using electronic means to
purchase goods and services from contracted suppliers who also use e-procurement
systems for managing all processes relating to the purchase. This model is generally
driven by the specific requirements of the buying organizations and it is used
extensively in business to employees (B2E) applications.
Sell Side Procurement – This model is used to describe one supplier selling to a
number of buying organizations using electronic systems such as e-procurement
systems and e-commerce technology. This model is used extensively in business to
consumers (B2C). This model attracts big supplier firms that have a stronger position
in relationship with their buyers.
10
E-Marketplace and Trading Hubs – This is a combination of industry consortium and
trading exchanges. According to Jonsson (2008), an electronic marketplace or
exchange is “an internet based solution which enables purchasing and selling activities
between companies and other companies” and which “operates as a hub, around which
one or more purchasers and one or more vendors collect to exchange information and
do business” (p.417).
An electronic marketplace must take into consideration the needs and conditions of the buyers
and sellers and may mean sellers uploading product catalogue information to an exchange and
buyers searching the site to identify products to buy and complete the purchase. Exchanges
also enable identification of possible suppliers, execution of tendering and closing of business
deals. There are two classifications of electronic market place namely; the vertical and
horizontal marketplaces. A vertical marketplace co-ordinates and permits the exchange of
information and transactions between numerous sellers and buyers from the same industry. A
horizontal marketplace on the other hand focuses on co-ordination of buyers and sellers from
different industries aiming primarily at decreasing total costs for purchasing commodities,
indirect materials and services (Jonsson, 2008). The most popular e-marketplace function is
auctions (Parida & Sophonthummapharn, 2008).
Chrashekar et al (2007) defines an auction as a mechanism used to allocate a set of goods to a
set of bidders. Again they identify four types of auctions namely;
Open cry or English auction, Dutch auction, First price sealed bid auction and the second price
sealed bid auction also known as Vickrey auction.
11
2.3 Deployment of e-procurement
According to (Bialy 2008), e- Procurement is done with a software application that includes
features for supplier management and complex auctions. The new generation of e- procurement
is currently on demand or software as a service (SaaS). The e- procurement value chain
comprises indent management, e- tendering, e- auctioning, vendor management, catalogue
management and contract management. Indent management is the workflow involved in the
preparation of tenders. This part of value chain is optional, with each procuring department
defining its indenting process. As concerns works procurement, administrative approval and
technical sanction are obtained in electronic format. On the other side, in goods procurement,
indent generation activity is done online. The end result of the stage is taken as inputs for
issuing the NIT (Peter, 2012). e- Procurement (or Business- to- Business networks) is an online
system by which companies can be connected directly to suppliers for the purpose of buying
products and services at the lowest cost possible. e- Procurement essentially replaces its offline
version, called tender (Moon, 2005). The advantages and disadvantages of e- Procurement
mostly parallel the universal benefits and disadvantages of the internet. The public sector
organizations use e- Procurement for contracts to achieve benefits for example increased
efficiency and cost savings, faster and cheaper in government procurement (Archer, 2005) and
improved transparency, to reduce corruption, in procurement services. e- Procurement in the
public sector has seen rapid growth in recent years.
2.4 Risks Associated with E-Procurement
Risk is bound to occur regardless. It is therefore important to know the risks associated with e-
procurement implementation in substitution to the traditional procurement system. This would
12
inform the organization to fathom whether e-procurement would a successful strategic tool or
not.
Parida and Sophonthummapharn (2008) identify the following risks associated with
implementing e-procurement;
The organization stands the risk of losing chances to implement strategies which
improve procurement management without the need for investing in e-procurement.
Organizations’ procurement problems can be resolved without necessarily introducing
e-procurement as a solution. For instance, maverick buying in an organization can be
resolved by putting in place measures to ensure that value for money is achieved rather
than e-procurement being implemented.
The risk of investing too much in e-procurement tools that may not even deliver the
expected results and benefits. This mostly happens in instances where due diligence
and enough evaluation is not done on the implications of adopting or enhancing the e-
procurement system.
The tendency of suppliers refusing to co-operate with the use of e-procurement tools
or system is a risk associated with e-procurement. E-procurement systems implemented
need not interact only with the implementing firm’s internal information system, but
must also collaborate with external constituencies and stakeholders who are mainly the
customers and suppliers. External constituencies need to develop internal systems that
facilitate the communication through electronic means which requires technology
investment (Boadu, 2014). For e-procurement technologies to be successful, suppliers
of the entity must be accessible via the internet and must provide sufficient catalogue
13
choices to satisfy the requirements of their customers. This risk is particularly great
when key suppliers insist on the traditional paper based procurement. Reasons why
some suppliers may refuse to adapt e-procurement include lack of capacity of suppliers
to operate the system or some suppliers might just not express interest to switch to e-
procurement.
Risk in-built in the uncertainty of a company having the appropriate resources to
successfully implement an e-procurement solution which integrates with the
company’s existing information infrastructure while performing the purchasing
processes. E-procurement systems need to be compatible to the greatest possible extent
with the existing technologies.
Risk associated with determining which e-procurement technology best suits the needs
of the Company and the possible lack of a widely accepted standard which can facilitate
inter-organization e-procurement technologies. Without widely accepted standards for
coding, technical and process specifications, an e-procurement technology adoption
would be slow and would result in a failure to deliver the desired benefits.
Risks associated with the security and control of the e-procurement process itself. Here,
Organizations must be confident, for example, that unauthorized actions will not
disrupt production or other supply chain activities when committing to e-procurement
technologies. This risk is usually not a bother to large companies as they often are not
concerned with security issues related with e-procurement.
14
2.5 Impacts of E-Procurement
There are numerous effects of e-procurement in form of benefits or disadvantages. The benefits
generated by e-procurement however vary depending on the implementation context and
carrying out 100% of procurement activities online may not necessarily result in maximizing
e-procurement performance benefits (Gardenal, 2013). In many cases where e-procurement is
used, the real benefits are not identified resulting in the companies not spotting its true value
(Trkman & McCormarck, 2010), but e-procurement’s value effect when applied intelligently
is unquestionable (Aberdeen Group, 2005). Several studies have explored the impact of e-
procurement as;
2.5.1 Compliance
Compliance is one of the numerous benefits of e-procurement commonly identified by many
authors. Effective deployment of e-procurement results in a greater control over procurement
spending (less maverick buying) and better employee compliance(Moon, 2005). One key
factor about “maverick” spending in an organization is that, it always results in an element of
insecurity and uncertainty when goods or services are purchased from suppliers with whom
the organization does not have any formal relationship (Parida & Sophonthummapharn, 2008).
Compliance issues has been cited as one of the key factors behind the revival of e-procurement
after e-procurement developed a well-deserved bad reputation some years ago when the
dot.com bubble burst which resulted in backlash response from solution providers and end-
users to the hype about e-procurement’s value ( Aberdeen Group, 2005). Here, it is noted that
e-procurement drives compliance with negotiated contracts, reduces or prevents “leakage” of
15
negotiated prices and results in better spend visibility allowing firms to easily comply with
new legislations such as the Sarbanes-Oxley Act (Aberdeen Group, 2005).
Again, Aberdeen Group (2005) has noted that there is an increase in contract compliance and
reduction in “maverick spending” as effects of e-procurement deployment in their research on
ten enterprises recognized for demonstrating best practices in e-procurement. Despite the
confirmation of increased contract compliance and reduced maverick spending as benefits of
e-procurement from various studies, McCue and Roman (2012) affirms that the
implementation of e-procurement will not automatically lead to higher levels of efficiency or
contract and system compliance.
2.5.2 Efficiency
Efficiency measures the usage of resources during a process (Gardenal, 2013). E-procurement
impacts efficiency in the following ways;
Lead or Cycle Times
Effective deployment of e-procurement results in reduced cycle times (Aberdeen Group,
2005). Osei-Owusu (2013) in his study on assessing the role of e-procurement on supply chain
management in a mining area discovered reduced delivery and ordering times and efficiency
in the procurement process as some of the benefits of e-procurement to organizations. Shalle
et al (2013) included that there is a reduction in time and effort required to complete purchasing
transactions as a result of using an e-procurement software system.
Trkman and McCormark (2010) in estimating the benefits and risks of implementing e-
procurement noted a reduction in lead time in their findings of six companies studied. Gardenal
16
(2013) in proposing a practical and customizable model to measure e-procurement impacts on
organizational performance included efficiency as one of the impact dimension in his
framework. Here the indicator for efficiency was a reduced procedure lead time. He noted that
e-procurement impacts efficiency by allowing employees to achieve at least the same results
of a traditional “paper-based” procedure but with less time as a result of the automation of
certain activities.
MacManus (2002) reiterates time and money savings (efficiency) as the biggest reasons for the
rush for e-procurement implementation. She stated that forty-three percent (43%) of
respondents of a Forrester Research Inc. survey of thirty-five state and local government
purchasing directors experienced quicker response or turnaround time as a result of e-
procurement deployment.
Volume of Paper Work and Repetitious Procedures
Deployment of e-procurement has an impact on paperwork. Neef (2001) suggested less
paperwork and fewer repetitious administrative procedures as one of the potential benefits of
e-procurement.
The model to measure e-procurement impacts on organizational performance developed by
Gardenal (2013) includes dematerialization as an impact dimension using reduced paper
consumption as the metric for this impact dimension. He noted that though the volume of
consumed paper is usually not considered relevant when evaluating a procurement procedure,
an enormous volume of documents and bundles pile up in most contracting authority offices
resulting in an increase in archiving cost. He continued that e-procurement could completely
cut down paper usage as a result of the substitutive document retention in e-procurement
platforms, use of digital signatures, certified mails amongst others. He further asserts the
17
environmental and financial values of dematerialization to reduced paper usage and reduced
archiving cost respectively.
Study findings of Shalle et al (2013) on the role of e-Procurement strategy in enhancing
procurement performance in state corporations in Kenya also indicated that e-procurement
service level significantly reduces paperwork and increases productivity of clerical staff.
Parida and Sophonthummapharn (2008) also note increase in process efficiency as a result of
e-procurement deployment through reduced paperwork, fewer mistakes and reduction of
suppliers used for procurement.
Cost Savings
Most studies exploring the effects of e-procurement often cite the impact on cost reduction. E-
procurement allows firms to source for supplies online enabling them to choose suppliers who
provide the best value of service or product required. As a result unit cost, materials
procurement costs and transaction cost decrease. The advantage of the internet streamlining
and automating the procurement process results in a reduction in manpower costs,
administrative and paperwork costs and operating and inventory cost (Teo & Lai, 2009).
Operational and cost efficiency are perceived as the primary advantage of e-procurement.
Scholars emphasize on the employment of tools such as e-notice, e-auction, e-catalogue, e-
dossier, e-submission and e-signatures reduces costs and improves buyer-vendor relationships
whilst web-based purchasing offers a capability to reduce transaction costs (McCue & Roman,
2012).
E-Procurement is noted to promote competitiveness and ensure higher level of supplier
participation in tendering procedures, allow increased discounts because it makes it possible
18
to access larger markets and make use of advanced instruments for negotiations such as e-
auctions (Gardenal, 2013). Trkman and McCormark (2010) mentioned an increase in a firm’s
competitiveness as a benefit of e-procurement implementation through reduction in;
purchasing transaction cost, order fulfillment and cycle times, number of suppliers, bid prices
and administrative staff to support the transactions. Compliance is also closely linked to prices
as it enforces negotiated pricing levels. Price reductions from suppliers are one of the principal
targets in the adoption of e-procurement systems. In a study of Australian organizations,
Williams and Hardy (2007) identified that the most important factor for buyers in e-
procurement adoption was reduction of prices. The study by Tanner et al (2008) found that
reduction in purchasing price was the highest priority among twelve cited goals for e-
procurement adoption. Smart (2010) in his propositions from his industrial case study findings
on the impact of e-procurement on supply management noted that whilst successful e-
procurement projects focus on creating spend leverage with a smaller supply base, reverse
auctions are used principally as mechanisms to specifically drive price reduction. Salkute and
Manager (2013) argued that tangible cost benefits are the drivers for companies to implement
e-procurement solution and justified this assertion by the identification of tangible cost savings
by all their research respondents as the main motivator for them to implement e-procurement.
Osei-Owusu (2013) also reported less labour or clerical cost and lower transaction cost as some
of the benefits of e-procurement to organizations in Ghana in his study on role of e-
procurement on supply chain management in a mining area.
Personnel Efforts and Time to Concentrate on Core Roles
Gardenal (2013) asserts that whilst e-procurement is expected to free up more time for
contracting personnel to study more precise documentations and strategies, a driver of
19
personnel effectiveness is being able to achieve the same goals while minimizing the effort
required by the human resource. Shalle et al (2013) notes an increase in productivity of clerical
staff as a result of e-procurement implementation. E-Procurement improves procurement
personnel efficiency (Smart, 2010).
2.5.3 Communication
Developing e-commerce technologies have a considerable impact on patterns of
communication between supply chain members (McIvor et al., 2003). According to Ageshin
(2001), e-procurement leads to extensive information sharing and quicker information flows
across the supply chain. Similarly, McIvor and Humphreys (2004) reiterates that web
technology can improve the communication flow in the supply chain as it facilitates
information exchange between trading partners. Carr and Smelter (2002) found that interaction
frequency increased as IT improved ease of communication. In a study of e-procurement in
public sector organizations in the UK, Croom and Brandon-Jones (2007) found that increases
in communication between customers and suppliers assisted knowledge sharing.
2.5.4 Transparency
Internet based purchasing creates absolutely different economics characterized by price
transparency (Ageshin, 2001). Croom and Brandon-Jones (2007) concluded in their study on
the impact of e-procurement in UK public sector by attributing price reductions accrued as a
result of e-procurement implementation to increased compliance, management information,
demand aggregation, increased leverage as well as increased visibility. Osei-Owusu (2013)
further reported transparency and efficiency as benefits of e-procurement to organizations. The
20
benefits of e-procurement cited by Trkman and McCormark (2010) include collaborative and
transparency in reducing inventory levels and lead times. Salkute and Manager (2013) assert
that e-procurement increases transparency in processes.
2.6 Keys to E-Procurement Success
Today, due to innovative technology-based applications introduced in various areas of
businesses, firms must note that the simple introduction of information and communication
technologies to procurement will not on its own result in cost savings (Price Water House
Coopers, 2001) which has been identified as a benefit of e-procurement which means that
certain standards or conditions must be met or firms who desire to reap the full benefits and
impact of e-procurement must be ready to undertake and invest in certain activities.
One major key to e-procurement success within organizations is training. Pasiopoulos et al
(2013) identifies employee training as a critical aspect to guarantee a perception of ease of use
and acceptance of e-procurement as lack of knowledge creates anxiety, negative attitude and
resistance to use e-procurement technology.
Mose and Magutu (2013) conducted a study on critical success factors related to manufacturing
firms in Kenya. They concluded that the five critical success factors that have impact on e-
Procurement success are: management and employees’ commitment toward acceptance,
consistency of information technology, reliability and performance of supplier, performance
monitoring and acceptance of consumers towards e-procurement systems and support by senior
management.
21
According to Trkman and McCormark (2010), properly improving existing traditional
methods of working or business process before automating or supporting with e-procurement
solution and further continuously measuring and analyzing the processes by defining and
implementing performance measures and key performance indicators is one sure way to realize
the benefits of e-procurement.
The Aberdeen Group (2005) identified the following key strategies used by companies that
have achieved best practice status in e-procurement;
Top management support is implored to help drive the e-procurement system compliance. It
is also identified that these companies ensured sufficient funding and resources were made
available for supporting the system.
Focus of ease of use to improve end users’ acceptance of the system
Change management is not underestimated. They noted that insufficient focus on
change management has held back acceptance of many e-procurement systems.
Making sure processes are efficient before applying automated changes.
Metrics for measuring costs, process efficiency and performance of e-procurement
technologies and processes are clearly defined and reinforced. Where possible
incentives for both procurement and business units are linked to these metrics.
2.7 Empirical Literature Review on E-Procurement
A study has been conducted by Boadu (2014) on the “Impact of e-procurement on procurement
practices”, using Newmont Ghana Gold Limited – Ahafo as a case study. The study used both
qualitative and quantitative approach. Sampling techniques employed in this study included a
22
census for the first stage and purposive sampling for the second stage. Whilst the primary and
secondary sources of data were used, questionnaires and interviews were used as data
collection instruments. Relative importance index and descriptive statistics were used as data
analytical tools. She established that e-procurement was used by organizations to achieve
strategic goals and not necessarily change in trend. Also her study revealed that e-procurement
has improved communication by making information flow quicker and easier, positively
affected compliance to procurement processes whilst it goes ahead to reduce maverick
spending improve transparency into processes, improve record keeping, planning and
forecasting.
Also, Agboyi and Ackah (2015) conducted a research on “the impact of e-procurement on the
improvement of an organization”. Their study was about the role of e-procurement on supply
chain management. The purpose of their study was to investigate the role that electronic
procurement has played on supply chain management. They used descriptive and explanatory
research designs where both qualitative and quantitative methods were used to gather data from
employees of Coca Cola Company limited. Data was collected from the procurement
department, IT department, field staff/employees and the marketing department. Their study
used a sample size of 60 respondents who were purposive to the study was selected.
Questionnaires, interviews and documentary reviews were the instruments of the study and
data was analyzed using narration and tabulation formats. Their study findings revealed that
electronic procurement had not yet been given much attention in most organizations. In Ghana,
but all the same those that have embraced it such as Coca Cola company limited, it has had
23
great impacts on purchasing in organizations such as short lead time, cost reduction, electronic
payment, supplier selection, placing orders among others.
Adams Siita (2014) carried out a study to assess the potential of e-procurement in the public
sector of Ghana using the Accra Metropolis as the study area. His study focused on ascertaining
the challenges the current paper based procurement system posed, the prospects of e-
procurement in the public sector and its potential challenges if implemented. His research
involved a survey of only public entities in the Accra Metropolis targeting 50 respondents of
which 30 valid questionnaires were completed and retrieved.
The study revealed that the paper based procurement system was suffering challenges in the
following areas including process, compliance, technology/data and people. There were further
revelations that the e-procurement system is also not without challenges seeing as how
technology would be a limitation to its implementation. The recommendations that emanated
from the study were that the Public Procurement Act 2003, Act (663) be reviewed to include
elements of e-procurement so as to start incorporating aspects of technology aided procurement
practices in public sector procurement.
He further recommended that, procurement entities should endeavor to establish corporate
procurement units to promote continuity of public procurement as well as achieving value for
money and the independence of procurement entities should be upheld and freed from
government interference.
24
CHAPTER THREE
METHODOLOGY
3.0 Introduction
This chapter introduces and focuses attention on the various tools employed in gathering data
for the research work. It touches on and deals with the main type of research employed,
population, sample and sampling procedures, research instruments used, data collection
procedures and tools for data analysis.
3.1 Research Design
The study used qualitative and descriptive study designs. This method was used to help
carry out self-report data collection from the interested sample and allowing a thorough and
easy analysis of the respondents’ opinion. Also, the survey design adequately leads to
collection of reliable information by description of the effectiveness of e-procurement on
Coca Cola Bottling Company Limited.
3.2 The Research Population
The target population that was used for the study are the staff and management of the Coca
Cola Ghana Limited, Ghana, which has a population of about 300 members. The
departments chosen were the Procurement Department and other related departments
involved in the use of the electronic procurement system.
25
3.3 Sample and Sampling Procedure
A sample size of 23 was used. The sampling method used in selecting the respondents for
this study is purposive sampling technique, the purposive sampling technique was used
because researchers used sample elements (respondents) that are most readily available to
participate in the study and who can provide the information required to complete the study.
Seven (7) respondents were from the procurement department, three (3) were staff from the
Accounting/finance department, eight (8) respondents were from the stores/warehouse
department and Five (5) from the operations department within the organization.
3.4 The Research Instruments
The main instrument used for the collection of data was questionnaire. The designed
questionnaires were administered to obtain information from respondents of the Coca Cola
Bottling Company Limited. A set of questionnaire was administered to both the staff and
management of Coca Cola Bottling Company Limited. In designing the questionnaire, both
close-ended and open-ended questions were used. This allowed the respondents to choose
from the list of alternative questions as well as having the opportunity to express their views
on specific topics.
3.4.1 Primary Data
Primary data refers to original data collected for the research problem at hand and captured
at the point where it is generated. However, for the purpose of this research, the primary
data used were questionnaires.
26
Questionnaires
The questionnaire was used to collect information on the organization and assess the
effectiveness of e-procurement practices in the organisation. In all, both close and open
ended questions were used. This made it easier for the respondents to have a variety of
answers to choose from. The questionnaire was designed and administered to the
procurement department and other closely related departments within the organization.
3.4.2 Secondary Data
Secondary data refers to data collected and processed by others for a purpose other than the
problem at hand. However in understanding this study, the internet and the library were the
major areas where secondary data collected. Significantly, different books, journals and
articles were obtained for reference purposes.
3.5 Data Collection Procedure
Questionnaires were submitted to the procurement, operations, and other related
departments of coca cola by respondents. The collection of questionnaire was done two
weeks after questionnaire had been administered.
3.6 Tools for Data Analysis
In analysing data that were obtained from the administering of the questionnaire, MS Excel
was used to present details of data collected in the form of pictorial representations. Data was
analysed using descriptive and statistical analysis in the form of tables, charts and graphs. Each
question in the questionnaire was presented and analysed separately.
27
CHAPTER FOUR
RESULTS AND DISCUSSION
4.0 Introduction
This chapter gives a presentation on the results of the data, discussion and analysis of the results
and the major findings that were discovered from the analysis.
4.1 Data Interpretation
With regards to this research work, the following data was obtained from the field investigation
undertaken by the researchers through the administration of questionnaires at Coca-Cola
Company Limited, Ghana. The data were numerically or significantly collected from particular
departments of the organization. The data is presented in simple tallies, graphs, charts and the
corresponding response converted into percentages (%). The findings seek to assess the
effectiveness of e procurement in private organizations. The questions asked were based on
identifying the problems that end users, suppliers and buyers faced before use of e
procurement, how e-procurement is deployed in the organization, impact of e procurement on
the organization and to identify possible measures that can make e-procurement fully effective.
The organization returned the entire questionnaire given to them. The details of the
questionnaires administered are as follows:
28
Table 4. 1: Administration and receipt of questionnaires
Sample Area Expected Actual
Procurement Department 20 7
Other related departments 20 16
Total 40 23
Source: Field Survey, 2018.
Out of the Forty (40) questionnaires administered, twenty-three (23) of them were retrieved
which represents 58% of the total questionnaire administered. 17 questionnaires were not
answered, which represents 42% of the total questionnaires administered. This high response
rate authenticates the study and makes its findings reliable as such high response rate was out
of the entire population. The organization returned the entire questionnaire given to them. The
details of the questionnaires administered are illustrated in tables, graphs and pie charts below.
29
Figure 4. 1: Procurement's position within the organization
Source: Field survey, 2018.
Figure 4.1 indicates that, 20 respondents agrees that the procurement function falls within the
middle management level which represents 87%, 3 respondents also ticked that procurement
falls within the top management level which also represents 13% whiles no respondents
representing 0% also approved that the procurement department falls within the lower
management level.
13%
87%
Top management level Middle management level Lower management level
30
Figure 4. 2: Department in which respondents work
Source: Field Survey, 2018.
Figure 4.2 depicts that, 7 of the respondents are from the procurement department which
represents 30%, 3 respondents from the Accounting department which represents 13% of our
respondents, 8 respondents representing 35% from the stores department whiles 5 respondents
representing 22% are from the operations department of the organization. Most respondents
for this study were from the stores and procurement department respectively.
30%
13%
35%
22%
0P R O C U E M E N T A C C O U N T I N G S T O R E S O P E R A T I O N S O T H E R
Procuement Accounting
Stores Operations
Other
31
Figure 4. 3: Procurement system employed by Coca Cola
Source: Field Survey, 2018.
Figure 4.3 indicates the findings on procurement system employed by Coca Cola Company
Limited. 11 out of the 23 respondents said that the organization adopts the centralized
procurement which represents 48%, 5 respondents also said that the organization adopts the
decentralization system which also represents 22%. 6 respondents representing 26% also
indicated that the organization employs both centralization and decentralization systems. A
respondent left this question unanswered representing 4% of respondents.
48%
22%
26%
4%
Centralized Decentralized Both Unanswered
32
Figure 4. 4: Procurement areas where Coca-Cola is actively involved
Source: Field Survey, 2018.
From figure 4.4, it reveals that 19 respondents ticked e-sourcing as the most prominent
activities of procurement that the organization is actively involved representing 31% of the
responses received. Again, 19 respondents also ticked e-tendering as the most prominent e-
procurement activity representing 31% 8 respondents were also of the view that, e-ordering
was the most active e-procurement activity which the organization uses representing 13% of
the responses received. 4 respondents however said that, the organization’s active e-
procurement activity was e- contract management representing 7% of the responses received.
9 respondents representing 15% of the respondents indicated that e-market was the active e-
procurement activity of the organization. 2 respondents representing 3% claimed that e-
auction was an active e-procurement activity used within the organization. Here, it is clear that
0
2
4
6
8
10
12
14
16
18
20
E- Sourcing E- Tendering E- Ordering E- ContractManagement
E- Markets E- Autions
31% 31%
15%
7%
17%
3%
E- Sourcing E-Tendering E- Ordering E- Contract Management E- Markets E- Auctions
33
the most active e-procurement activities used by the organization are e sourcing and e-
tendering.
Figure 4. 5: Effect of e-procurement on volume of paper work
Source: Field Survey, 2018.
As can be seen from figure 4.5, 9 respondents were in support of the view that e-procurement
has greatly reduced the volume of paper work representing 39% of the total respondents. Also,
14 respondents were of the view of the view that, e-procurement has reduced the volume of
paper work within the organization representing 61% of the total respondents.
39%
61%
0 0 00
2
4
6
8
10
12
14
16
Greatly Reduced Reduced No Effect at all Increased Greatly Increased
Greatly Reduced Reduced No effect at all Increased Greatly Increased
34
Figure 4. 6: Effect of e- procurement on repetition of administrative procedures
Source: Field Survey, 2018.
Figure 4.6 indicates that, 6 respondents constituting 26% of the total respondents were of the
view that, e-procurement has greatly reduced the repetition of administrative procedures within
the organization. 15 respondents constituting 65% of total respondents support the view that
e-procurement has reduced the repetition of administrative procedures within the organization.
Also, 2 respondents constituting 9% of the total respondents were of the view that, there has
been no effect of e-procurement on repetition of administrative procedures after e-procurement
being implemented.
26%
65%
9%
0 0G R E A T L Y R E D U C E D R E D U C E D N O E F F E C T A T A L L I N C R E A S E D G R E A T L Y
I N C R E A S E D
Greatly Reduced Reduced No effect at all Increased Greatly Increased
35
Figure 4. 7: Mistakes which would have occurred in the old paper base system
Source: Field Survey, 2018.
As indicated in figure 4.7, 8 respondents were in support of the view that mistakes which could
have occurred has greatly reduced after e-procurement being implemented representing 35%
of the respondents. 14 respondents representing 61% were also of the view that mistakes have
reduced after e-procurement being implemented. A respondent representing 4% of the
respondents on the other hand said there has not been any effect on mistakes that occur even
after the implementation of e-procurement within the organization.
35%
61%
4%
0 00
2
4
6
8
10
12
14
16
Greatly Reduced Reduced No Effect at all Increased Greatly Increased
Greatly Reduced Reduced No effect at all Increased Greatly Increased
36
Figure 4. 8: Effect of e-procurement on buyers' efforts to achieve same results as
compared to paper-based system
Source: Field Survey, 2018.
Figure 4.8 above shows that a respondent who represents 4% of respondents affirms that
buyers’ effort to achieve same results as compared to the paper based system has greatly
reduced. Again 12 respondents were of the view that efforts of buyers have reduced as
compared to the paper based system representing 53%. Also 1 respondent stated that e
procurement has had no effect on the buyers’ effort within the organization. 9 respondents on
the other hand affirm that buyers’ effort has increased after the implementation of e-
procurement within the firm representing 39%.
4%
53%
4%
39%
00
2
4
6
8
10
12
14
Greatly Reduced Reduced No Effect at all Increased Greatly Increased
Greatly Reduced Reduced No effect at all Increased Greatly Increased
37
Figure 4. 9: Effects of E-procurement on Buyer's time to concentrate on their core
activities
Source: Field Survey, 2018.
Figure 4.9 above shows that 2 respondents are of the view that buyers’ time to concentrate on
their core activities are greatly reduced representing 9%. 8 respondents who represent 35% are
of the view that buyers’ time to concentrate on core activities has been reduced. A respondent
said that there is no effect on buyers’ time to concentrate on their core activities. 11 respondents
who represent 48% said that the buyers’ time to concentrate on core activities is increased.
Also a respondent representing 4% affirms that buyers’ time to concentrate on their core
activities has greatly increased.
9%
35%
4%
48%
4%
0
2
4
6
8
10
12
Greatly Reduced Reduced No Effect at all Increased Greatly Increased
Greatly Reduced Reduced No effect at all Increased Greatly Increased
38
Figure 4. 10: Effect of e-procurement on the ease of retrieval of documents
Source: Field Survey, 2018.
Figure 4.10 illustrates that 1 respondent was of the view that the ease in retrieval of documents
has greatly increased representing 9%. 10 respondents who represent 44% were of the view
that ease in the retrieval of documents been reduced. 6 respondents representing 26% affirmed
that there is an increase on retrieval of documents as compared to the paper-based system.
Again, 6 respondents who represent 26% supported the view that ease in retrieval of documents
has greatly increased.
4%
44%
0%26%
26%
Greatly Reduced Reduced No effect at all Increased Greatly Increased
39
Figure 4. 11: Effects of e-procurement on time spent in procuring
Source: Field Survey 2018.
The above diagram depicts that 9 respondents said that e-procurement has greatly reduced the
time spent on procuring within the organization which represents 39% of the total respondents,
11 other respondents specified that time spent on procuring has reduced representing 48% of
the total respondents. One respondent was of the view that there was no effect of e-procurement
on the time spent to procure representing 4% of the total respondents. Also, 2 respondents said
that time spent on procurement has increased after e-procurement being introduced,
representing 9% of the total respondents.
39%
48%
4%
9%
0
2
4
6
8
10
12
Greatly Reduced Reduced No Effect at all Increased Greatly Increased
Greatly Reduced Reduced No effect at all Increased Greatly Increased
40
Figure 4. 12: Results of e-procurement processes in planning for services required under
procurement as compared to paper based system
Source: Field Survey, 2018
Figure 4.12 establishes that, 10 respondents representing 43% are of the view that e-
procurement ensures that planning for services required is done within a much shorter time as
compared to the paper based system. 11 respondents who represent 49% of the respondents
support that planning for service required under electronic procurement is done within a shorter
time than the paper based system. A respondent representing 4% said that, there has been no
effect on time in planning for service required. Also, another respondent representing 4% said
that planning for services required is done within a longer time as compared to the paper based
system.
Within a much shorter time 44%
Within a shorter time48%
No effect on time4%
Within a longer time0%
Within a much longer time0%
Unanswered4%
Within a much shorter time Within a shorter time No effect on time
Within a longer time Within a much longer time Unanswered
41
Figure 4. 13: Effects of e-procurement on completing request for contracts
Source: Field Survey, 2018.
In completing requests for contracts, 9 respondents who constitute 39% of respondents said e-
procurement had allowed requests for contracts to be completed within a much shorter time.
13 respondents constituting 57% said that completion of request for contract is done within a
shorter time and a respondent constituting 4% left this question unanswered.
39%
57%
0 0 0
4%
0
2
4
6
8
10
12
14
Within a muchshorter time
Within a shortertime
No effect on time Within a longertime
Within a muchlonger time
Unanswered
Within a much shorter time within a shorter time No effect on time
Within a longer time Within a much longer time Unanswered
42
Figure 4. 14: Effects of e procurement on getting approvals compared to paper-based
system
Source: Field Survey, 2018.
8 respondents representing 35% support the view that under e-procurement, getting approvals
takes a much shorter time. Also, 12 respondents representing 52% affirmed that getting
approvals was done within a shorter time. 2 respondents constituting 9% said there was no
effect on time at all in getting approvals. A respondent representing 4% left the question
unanswered.
35%
52%
9%
0 0
4%
0
2
4
6
8
10
12
14
Within a muchshorter time
Within a shortertime
No effect on time Within a longertime
Within a muchlonger time
Unanswered
Within a much shorter time within a shorter time No effect on time
Within a longer time Within a much longer time Unanswered
43
Figure 4. 15: Effects of e-procurement on processing invoice for payment
Source: Field Survey, 2018.
Figure 4.15 depicts the effect of e procurement on processing of invoices for payments to be
made. 5 respondents representing 22% were of the view that processing of invoices for
payment was done in a much shorter time. 13 respondents representing 56% acknowledged
that e-procurement had made the period of processing invoices for payment shorter. Also, 2
respondents constituting 9% were of the view that there has been no effect on the period used
for processing invoices for payment after the introduction of e-procurement. However, 3
respondents left this question unanswered representing 13% of the respondents.
22%
56%
9%
0 0
13%
0
2
4
6
8
10
12
14
Within a muchshorter time
Within a shortertime
No effect on time Within a longertime
Within a muchlonger time
Unanswered
Within a much shorter time within a shorter time No effect on time
Within a longer time Within a much longer time Unanswered
44
Figure 4. 16: Effects of e procurement on buyer's compliance in Coca-Cola's
procurement processes
Source: Field Survey, 2018.
Figure 4.16 shows the effect of e -procurement on buyers’ compliance. 3 respondents
representing 14% were of the view that e-procurement on buyers’ compliance was very good.
13 respondents representing 59% held that the effect of e-procurement on buyers’ compliance
was good. Again, 4 respondents who made up 18% were of the view that buyers’ compliance
on e-procurement was normal. However, 2 respondents representing 9% left the question
unanswered.
14%
59%
18%
0%0%9%
Very Good Good Normal Bad Very Bad Unanswered
45
Figure 4. 17: Organizing of e-procurement workshop for suppliers and employees
Source: Field Survey, 2018.
Figure 4.17 show that, 20 respondents affirm that e-procurement training and workshops are
being organized for employees and suppliers representing 87% of the total respondents. On the
other hand, 2 respondents held that e-procurement training was not organized for employees
and suppliers representing 9% of the total response received. However, a respondent left this
question unanswered representing 4% of total respondents.
87%
9%4%
Yes No Unanswered
46
Table 4. 2: How training helps employees operationalize e-procurement
Response Number of
Response(s)
Percentage
(%)
Reduced Errors and Saved Time 3 14
Easy to use due to better understanding and
technical know-how of the electronic system
13 56
Unanswered 7 30
Total 23 100
Source: Field Survey, 2018.
Table 4.2 sought to ascertain how training helps employees operationalize e-procurement. Out
of the 23 responses that emanated from the study, 3 of the respondents who constitute 14%
response rate confirmed that e-procurement has reduced errors and saved time. Another group
of 13 respondents who forms 56% of the total response rate are of the view that e-procurement
is easy to use when one has better understanding and technical knowhow of the electronic
system. Finally, 7 respondents who made up 30% of the total respondents left the question
unanswered.
47
Table 4. 3: Challenges in contract processing contracts before e-procurement
implementation in Coca Cola
Response Number of
Response(s)
Percentage
(%)
Delay/Slow down Processes 8 35
Too much volume of paperwork 9 39
Difficulty in retrieving documents 3 13
Unanswered 3 13
Total 23 100
Source: Field Survey, 2018.
Table 4.3 shows the challenges faced by Coca Cola in contract processing prior to the
implementation of e-procurement. Out of the 23 respondents, 8 respondents representing 35%
were of the view that, there was delay in processing contracts with the traditional procurement
system causing the entire process to be slow. Again, 9 respondents representing 39% stated
that, too much volume of paper work was a challenge in contract processing. Also, 3
respondents representing 13% attributed the difficulty in retrieving contract documents as
challenging. However, 3 respondents representing 13% left the question unanswered.
48
Table 4. 4: Challenges in contract development and maintenance before e-procurement
implementation in Coca Cola
Response Number of
Response(s)
Percentage
(%)
Difficulty in identifying and tracing contract
documents
3 13
Too much time spent on processes 6 26
Delay in modification of contracts when the need
arises
2 9
Inability to assess suppliers and do proper
evaluation
2 9
Large volume of paperwork 2 9
Unanswered 8 34
Total 23 100
Source: Field Survey, 2018.
Table 4.4 shows the challenges faced by Coca Cola in contract development and maintenance
prior to the implementation of e-procurement. Out of the 23 total responses, 3 of the
respondents representing 13% were of the view that, there was difficulty in identifying and
tracing contract documents. Again, 6 respondents representing 26% stated that, too much spent
on the process was a challenge in contract development and processing. Also, 2 respondents
representing 9% attributed the inability to assess suppliers and do proper evaluation as a
challenge affecting transparency in the process. Finally, 2 respondents representing 9% stated
that large volume of paper work was a challenge. However, 8 respondents representing 34%
left the question unanswered.
49
Table 4. 5: Has e-procurement resolved existed procurement problems
Source: Field Survey, 2018.
Table 4.5 explicates the views of respondents on whether e-procurement has resolved problems
which existed in procuring prior to its implementation. 16 out of the 23 respondents
constituting 70% supported the statement that e-procurement implementation in Coca Cola has
resolved problems which it was implemented to resolve. Again, 3 respondents constituting
13% of the total respondents were of the view that e-procurement has partially resolved
problems for which it was implemented. However, 4 respondents representing 17% of the total
respondents left the question unanswered.
Response Number of
Response(s)
Percentage
(%)
Yes 16 70
No - -
Partially 3 13
Unanswered 4 17
Total 23 100
50
Table 4. 6: Measures to improve e-procurement effectiveness in Coca-Cola
Response Number of
Response(s)
Percentage
(%)
Suppliers should be allowed to operate on the e-
procurement system
1 4
Management should ensure constant training of
employees to get them abreast with the e-
procurement system
11 49
E-procurement system should be more user-friendly 1 4
There should be fast flow of information 2 9
Management should employ experts in the e-
procurement field to assist
1 4
Unanswered 7 30
Total 23 100
Source: Field Survey, 2018.
Table 4.6 suggests how e-procurement can be improved to become effective at Coca-Cola. 11
respondents who represent 49% of the total respondents asserted that management should
constantly train employees in order to grab a knack on the use of e-procurement systems. 1
respondent making up 4% of the total respondents urged that e-procurement should be more
user- friendly. Again, 2 respondents who make up 9% asserted that fast flow of information
can make e-procurement more effective. Also, a respondent representing 4% indicated that the
management of Coca Cola should consider employing e-procurement experts to boost the
effectiveness of their activities. However, 7 respondents representing 30% of the total
respondents left the question unanswered.
51
Figure 4. 18: Has e-procurement affected Coca-Cola in a positive way?
Source: Field Survey, 2018.
As shown from figure 4.18, these are responses to whether e-procurement has affected Coca
Cola in a positive way. 19 respondents representing 83% of the total respondents supported
the view that e-procurement has affected Coca Cola in a positive way. However, 4 respondents
representing 17% of the total respondents left this question unanswered. This establishes that
e-procurement has positively impacted Coca Cola as an organization. It is obvious e-
procurement is not deployed in Coca Cola because it is simply the new trend in procurement
but rather a tactical tool purposely used to support its strategic goals.
Yes…
Unanswered17%
Yes No Unanswered
52
Table 4. 7: Positive effects of e-procurement on Coca-Cola Company Limited
Response Number of
Response(s)
Percentage
(%)
E-procurement has enhanced process efficiency
(easier and faster)
10 43
E-procurement has reduced cost incurred in
procuring.
5 22
E-procurement implementation has improved the
skills and development of employees
2 9
E-procurement aids in maintaining accurate database
and processes
2 9
E-procurement has caused stress minimization
amongst employees
1 4
Unanswered 3 13
Total 23 100
Source: Field Survey, 2018.
As illustrated in Table 4.7, 10 respondents representing 43% of the respondents stated that e-
procurement has enhanced process efficiency. Also, 5 respondents representing 22% were of
the view that e-procurement has minimized cost as well as paper work. 2 respondents
representing 9% indicated that e-procurement has enhanced the development and sharpened
the skills of employees. Again, 2 respondents representing 9% were of the view that e-
procurement has maintained accurate data base and processes. A respondent stated that e-
procurement has reduced stress of employees in carrying out procurement activities. However,
3 respondents left this question unanswered.
53
4.2 Discussion of Findings.
This section entails the discussion of findings is based on the various research objectives and
questions of this research. The section is divided into four sections where each section
discusses the results obtained under every single research objective.
4.2.1 Problems with procurement prior to the implementation of e-procurement
The researchers wanted to ascertain the problems which existed in procurement processes prior
to the implementation of e-procurement in Coca-Cola Ghana limited.
Contract Processing
The findings established that delay in process, large volume of paper work and difficulty in
retrieval of documents were some problems with respect to contract processing prior to the
implementation of electronic procurement. Electronic procurement is seen by Coca-Cola as a
problem solving tool since theoretical and empirical literature on e-procurement has identified
electronic procurement to be attached with benefits such as efficiency (Gardenal, 2013),
reduction or elimination of paper work (Neef, 2001; Boadu, 2014) and using minimum efforts
to achieve same results (Smart, 2010; Gardenal, 2013) among others.
Contract Development and Maintenance
The study findings of this work revealed that difficulty in identifying and tracing contract
documents, large volume of paperwork and time spent on the contract process, difficulty in
modifying a contract when the need arises as well as difficulty in assessing and evaluating
suppliers properly to ensure transparency were some challenges in developing and maintaining
contracts at Coca-Cola prior to the implementation of electronic procurement.
54
4.2.2 E-procurement deployment in Coca-Cola and its perceived impacts
Procurement’s position within Coca-Cola
The findings of this study revealed that the position of procurement on the organizational
structure of the organization falls within the middle management level. This was significantly
shown in the response rate of 87% as compared to Top management level with 13% response
rate.
Procurement system employed by Coca-Cola
The researchers wanted ascertain the procurement system employed by Coca-Cola. The
findings surfaced that procurement is a centralized function within the organization.
Procurement areas where Coca-Cola is actively involved
Coca-Cola is actively involved in various e-procurement activities. The findings bear that the
most dominating e-procurement functions in Coca-Cola are e-sourcing and e-tendering.
However other areas of e-procurement such as e-ordering, e-contract management, e-markets
and e-auctions are as well deployed.
4.2.3 Effects of e-procurement on Coca-Cola’s general performance
Volume of paperwork
The findings from the study revealed the impact of e-procurement with regards to volume of
work of which two extremes of responses were obtained. One extreme which represents 39%
of responses indicated that e-procurement has reduced volume of paperwork greatly while the
other which constitutes 61% indicated that the volume of paper work has been reduced. A
simple implication of these responses is that, the burden to handle and study voluminous
documents has been eradicated and as a result, time efficiency is enhanced with regards to
55
procurement processes. This goes ahead to augment the view of Neef (2001), on e-
procurement’s potentials of reducing paperwork. Again, in study findings of Shalle et al (2013)
on, “The role of e-procurement strategy in enhancing procurement performance in state
corporations in Kenya” pointed out the significant reduction in paperwork and increased
productivity of clerical staff due to e-procurement implementation.
Repetition of administrative procedures
There has been a significant reduction in the repetition of administrative procedures after the
implementation of e-procurement at Coca-Cola Ghana. Neef (2001) and Gardenal (2013)
conclude that one benefit of e-procurement has got to do with the reduction in repetitive
processes. Boadu (2014) conducted a study on the impact of e-procurement practice using
Newmont Ghana Gold limited as a case study. She also revealed in her study that e-
procurement positively impact efficiency with regards to volume of paperwork and
administrative procedures as well efforts required to complete a similar task.
Mistakes which would have occurred in the old paper base system
It is established from the study findings that mistakes which were common under the paper
base procurement system of Coca-Cola Ghana such as minor typing errors, have been reduced
upon the inception of e-procurement. Parida and Sophonthummapharn (2008) also notes an
increase in process efficiency as a result of e-procurement deployment which includes reduced
paperwork, fewer mistakes.
56
Buyers’ efforts to achieve same results as compared to the paper base system.
The launch of e-procurement at Coca-Cola Ghana has helped to reduce the efforts required by
buyers to accomplish same tasks as with the traditional procurement system.
Gardenal (2013) sees e-procurement to be a driver of personnel effectiveness which enables
individuals to achieve the same goals while minimizing the efforts required.
Concentration on core activities
E- Procurement implementation at Coca-Cola Ghana has improved buyers’ time to concentrate
on core activities. E-procurement when used in organizations is expected to free up more time
for staff to study more precise documents, make them effective and minimize efforts required
on those duties (Smart 2010; Gardenal 2013; Shalle et al 2013).
Ease of retrieval of documents
Per the findings of this study, there has been great ease with regards to retrieving contract
documents as a result of e-procurement use at Coca-Cola Company Limited. This as well
contributes to the efficiency of the procurement processes within the firm. Boadu (2014), in
her study she emphasized that ease in retrieving contract details is an efficiency role of e-
procurement.
Impact of e-procurement on time
E-procurement has tremendously reduced the procuring time of Coca-Cola. The results of the
study established that there has been a great change with regards to the time buyers would need
to procure. Osei-Owusu (2013) in his study on, “Assessing the role of e-procurement on supply
chain in the mining industry” established that e-procurement reduced delivery and ordering
times as well as improving efficiency in the procurement process. Other study findings of
57
Trkman and McCormark (2010) in, “Estimating the benefits and risks of implementing e-
procurement” noted a reduction in the lead-time as an impact of e-procurement.
Again further findings revealed that for buyers in Coca Cola Ghana to achieve same results as
compared to the traditional system with respect to planning for services, completing requests
for contracts and processing invoices for payment were accomplished within a short time as
compared to the traditional paper base system. MacManus (2002) reaffirms time and money
savings as the biggest reasons for the rush for e-procurement implementation. In her study, she
highlighted that 43% of respondents of a Foresterr Research Incorporation survey involving
thirty-five state and local government purchasing directors discovered quicker response time
as a result of e-procurement deployment.
Buyers Compliance in Coca Cola’s procurement processes
The findings of the study have shown that e-procurement’s impact on buyers’ compliance to
Coca Cola’s procurement processes is good. This implies further that, e-procurement
deployment facilitates transparency, competition and fairness at Coca Cola Ghana.
Compliance is one benefit of e-procurement commonly identified by many authors. The
Aberdeen Group (2005) cited compliance as a key reason why e-procurement was revived after
it had developed a well-deserved bad reputation some years ago. It was noted that e
procurement drives compliance with negotiated contracts, reduces or prevents leakage of
negotiated prices and results in better spend visibility, allowing firms to comply with new
legislations such as the Sarbanes-Oxley Act.
Positive effects of e-procurement on Coca-Cola
The finding of this study also revealed that e-procurement has had positive impact on Coca-
Cola. Revelations from the study show that there has been an enhancement of process
58
efficiency, reduction in costs incurred in procuring, improvement in skills and development of
Coca-Cola employees, improvement in maintaining accurate database and processes as well as
stress minimization among Coca-Cola employees as a result of the implementation of
electronic procurement. This asserts to the compliance and efficiency benefits of e-
procurement opined by Trkman & Coleman (2010). These benefits of electronic procurement
however vary depending on the implementation context and also carrying out 100% of
procurement activities online may not necessarily result in maximizing e-procurement
performance benefits (Gardenal, 2013). Even though Coca-Cola employees see e-procurement
to have positive impacts on the organization, Sophonthummapharn (2008) argues that
organizations which implement e-procurement stands the risk of losing opportunities to
implement strategies which improve procurement management without the need for investing
in e-procurement because simple improvements in the traditional procurement can result in
same benefits without necessarily implementing e-procurement.
4.2.4 Making e-procurement fully effective
Organizing training and workshops for suppliers and employees
It was established in the study findings that Coca-Cola organizes training and workshop with
respect to electronic procurement for its employees as well as buyers.
Training of employees and its impact on operations in Coca-Cola
The study affirmed further established that training has developed employees in their various
roles and has also improved the technical know-how of employees in handling e-procurement
activities. This has also caused a significant reduction in time spent on activities by these
trained employees.
59
Has e-procurement resolved challenges in procurement?
The study findings of this research has made it clear that even though e-procurement has been
able to solve most of the challenges in procurement, not all of these problems have been
resolved. These affirm some risks which Parida and Sophonthummapharn (2008) identified to
be associated with implementing e-procurement. These risks are mentioned as losing
opportunities to implement strategies which improve procurement management without the
need for investing in e-procurement and also lack of willingness on the part of users to accept
and comply with the system. He argues that most of the benefits known to be achieved from
e-procurement could equally be attained by simple improvements in existing procurement
practices.
Improving e-procurement effectiveness in Coca-Cola
The findings of this study suggested some possible measures that the management of Coca-
Cola can adopt in making e-procurement fully effective. Some suggestions were based on
engaging suppliers on the e-procurement software. This might make sharing of information
more swift as well as minimizing time spent. Again, some respondents suggested that the e-
procurement software should be user friendly. Others were of the view that management
should consider engaging e-procurement experts since it can improve e-procurement in Coca-
Cola. There is the need for management to ensure constant training of employees so as to get
them abreast with the e-procurement system as well as current trends in procurement.
60
CHAPTER FIVE
SUMMARY OF FINDINGS, CONCLUSION AND RECOMMENDATIONS
5.0 Introduction
This chapter provides the summary of findings drawn from the analysis of data, conclusion on
the study and recommendations to the management of Coca Cola Company Limited based on
the data gathered.
5.1 Summary of Findings
The study focused on assessing the effectiveness of e-procurement activities in private
organizations. The study’s objectives were to identify problems that end-users and buyers
faced before the inception e-procurement, assess the deployment of e procurement and its
impact on Coca Cola Ghana, ascertain the effects of e procurement on the general performance
of the organization and lastly develop possible measures and alternatives that can make e-
procurement fully effective.
From the study findings, the responses gathered have proved that Coca-Cola deploys e-
tendering and e-sourcing as the major procurement activities undertaken electronically. The
study further confirmed that e-procurement has improved record keeping, communication,
compliance to procurement processes, and efficiency(in terms of reduced; lead times, volume
of paperwork, efforts required to complete similar task as old paper-based system and
mistakes) within the organization.
61
The study findings likewise confirmed that e-procurement does not automatically result in
reduced prices paid for services intrinsically but instead, constant training of buyers and other
end users of the e-procurement system may significantly enhance efficiency.
Despite the aforementioned positive effects that accompany the implementation of electronic
procurement, the study findings however revealed that, Coca Cola Company Limited, Ghana
does not actively engage suppliers in e-procurement training. Furthermore, the study also
revealed some suggestions from respondents in respect to possible ways to curb problems of
e-procurement activities within the organization. Respondents were of the view that the
organization should consider employing e-procurement experts, e-procurement software
should have a user-friendly interface and having a reliable backup system to enable the
procurement unit of the organization carry out its duties without difficulties as well as ensuring
that the overall objective of the organization is achieved.
5.2 Conclusion
The main objective for this study was to critically assess the effectiveness of e-procurement in
the private sector of Ghana, using Coca Cola Company Limited, Ghana, as a case study. The
conduct of procurement activities is a very important aspect in the running of organizations.
This study therefore, concludes that Coca Cola Company Limited, Ghana has recognized the
important role played by procurement in relation to ensuring effectiveness and efficiency in
achieving the organizations set goals. Also, e-procurement in Coca Cola has positively
impacted efficiency through a reduction in; time spent on procuring, volume of paper work,
administrative procedures, mistakes, level of effort of staff whilst increasing employee time to
concentrate on their core technical roles.
62
Coca Cola’s approach to e-procurement followed a strategic intent to resolve some identified
challenges of their traditional procurement practice. These challenges as identified by the
organization included difficulty in modifying contracts, poor compliance, and difficulty in
tracing contract documents, voluminous paper work and delay in contract administration
processes across all activities.
From the discussions, it is obvious e-procurement is not deployed in organizations because it
is simply the new trend in procurement but rather a tool which is used particularly to support
strategic goals of a function which in the case of Coca-Cola Company Limited, was to resolve
the identified challenges of the traditional or paper based procurement system.
5.3 Recommendations
Findings of this study revealed that, Coca Cola Company continue to face some challenges
associated with procurement even after implementation of electronic procurement. Some
identified challenges included; inadequate e-procurement experts, e-procurement software not
being user-friendly, an unreliable backup system and frequently extricating suppliers during e-
procurement trainings.
In making e-procurement fully operational and effective in Coca-Cola, the researchers
recommend to the management of Coca Cola Ghana to consider supplier and employee training
as a major key to e-procurement success. Management should actively provide support which
would contribute to the acceptance of the system through its influence on different ways such
as employees’ involvement and customized training. E-procurement related training should
include suppliers since they play a very significant role in the success of the e-procurement
system as Pasiopoulos et al (2013) has established that training is a critical aspect to guarantee
63
a perception of ease of use and acceptance of e-procurement as lack of knowledge creates
anxiety, negative attitude and resistance to use e-procurement technology. Again, management
of Coca-Cola should consider using e-procurement software that has the ability to ensure a
reliable backup system installed to support the e-procurement system.
Also, the Aberdeen Group (2005) suggests that the following key strategies can be used by the
management of companies that have achieved best practice status in e-procurement. In doing
this, top management of Coca Cola should support the initiative to help drive the e-
procurement system compliance. Management needs to ensure;
Focus of ease of use to improve end users’ acceptance of the system
Change management is not underestimated. They noted that insufficient focus on change
management has held back acceptance of many e-procurement systems.
Making sure processes are efficient before applying automated changes.
Metrics for measuring costs, process efficiency and performance of e-procurement
technologies and processes are clearly defined and reinforced. Where possible incentives
for both procurement and business units are linked to these metrics.
64
REFERENCES
Aberdeen Group Inc. (2005). Best practices in e-procurement: Reducing costs and increasing
value through online buying, Boston Massachusetts: Aberdeen Group
Archer, N., Wang, S., & Zheng, W. (2005). The impact of internet-based electronic
marketplaces on buyer-supplier relationships. Journal of Internet Commerce, 4. 41-67.
doi: 10.1300/J179v04n03_04
Agboyi, M.R., & Ackah, D. (2015). The impact of e-procurement on the improvement of an
organization. Worldwide Journal of Multidisciplinary Research and Development
Ageshin, E.A. (2001). E-procurement at work: A case study. Production and Inventory
Management Journal 1, 48 – 53.
Ameyaw, C., Mensah, S. & Osei-Tutu E. (2011). Challenges facing the smooth implementation
of Act 663, 2003 of Ghana. West African Built Environment Research (WABER)
Conference, University of Reading.
Baily, P. J. H. (2008). Procurement principles and management. Harlow, England: Prentice
Hall Financial Times.
Boadu, A. B., (2014). Impact of e-procurement on procurement practice; Case study of
Newmont Ghana Gold Limited.
Bovet, D., & Martha, J. (2000). Value nets: Reinventing the rusty supply chain for competitive
advantage. Strategy & Leadership,28(4), 21-26. doi:10.1108/10878570010378654
Carr, A. & Smeltzer, L. (2002). The relationship between information technology use and
buyer-supplier relationships: An exploratory analysis of the buying firms’ perspective.
IEEE Transactions on Engineering Management, 49(3), 143 – 155.
65
Chandrashekar, T.S,, Narahari, Y., Rosa, C.H., Kulkarni, D.M, Tew, J.D., & Dayama, P.
(2007). Auction based mechanisms for electronic procurement. IEEE Transactions on
Automation Science and Engineering, 4(3), 297-321.
Croom, S. R., & Johnston, R. (2007). E- Service; Enhancing internal customer service through
e- procurement. International Journal of Service Industry management.
Gardenal, F. (2013). A model to measure e-procurement impacts on organizational
performance. Journal of Public Procurement, 13(2), 215-242.
Handfield, R. (2011). The Procurement process – e-procurement, Supply Chain Resource
Cooperative, 3.
Kidd, A. (2006). The definition of procurement. CIPS Australia.
Jonsson, P. (2008), Logistics and Supply Chain Management, Berkshire, McGraw-Hill
Education.
Lysons K., & Farrington B. (2012). Purchasing and supply chain management. Harlow:
Pearsons.
MacManus, S.A. (2002). Understanding the incremental nature of e-procurement
implementation at the state and local level. Journal of Public Procurement, 2(1), 5-28.
McCue, C. & Roman, A.V. (2012). E-procurement: Myth or reality. Journal of Public
Procurement, 12(2), 212 – 238.
McIvor, R., Humphreys, P., & McCurry, L. (2003). Electronic commerce: Supporting
collaboration in the supply chain. Journal of Materials Processing Technology, 139(3),
147-152.
66
McIvor, R., & Humphreys, P. (2004). The implications of electronic B2B intermediaries for
the buyer-supplier interface. International Journal of Operations and Production
Management, 24(3), 241-269.
Moon, M.J. (2005). E-procurement management in state governments: Diffusion of e-
procurement practices and its determinants. Journal of Public Procurement, 5(1), 54 –
72.
Mose, J. M., & Magutu, P.O. (2013). The critical success factors and challenges in e-
procurement adoption among large scale manufactures in Kenya. European Scientific
Journal.
Neef, D. (2001). E-procurement: From strategy to implementation. Englewood Cliffs,
NJ: Prentice-Hall.
Osei-Owusu, J.Y. (2013), Assessing the role of e-procurement in supply chain management in
a mining area-the case of AngloGold Ashanti- Iduapriem (Tarkwa) Limited. African
Development and Resource Research Institute (ADRRI) Journal, 3(3), 64 -83.
Parida, V., & Sophonthummapharn, K. (2008). The effects of benefits and risks on e-
procurement implementation: An exploratory study of Swedish and Indian firms.
Interscience Management Review, 1(1), 38-49.
Podlogar, M. (2007). Chapter III e-Procurement Success Factors: Challenges and
Opportunities for a Small Developing Country.
Presutti, W. D. (2003) Supply management and e-procurement: Creating value added in the
supply chain. Industrial Marketing Management.
Pasiopoulos, A., Siskou, O., Galanis, P., Prezerakos, P., Moisoglou, I., Theodorou, M., &
Kaitelidou, D. (2013). The implementation of e-procurement in health sector in Greece:
67
Attitudes of potential users and implications for hospital management. International
Journal of Health Research and Innovation, 1(1), 15 – 23.
Price Water House Coopers (2001). Strategy for Implementation of E-Procurement in the Irish
Public Sector. London: Price Water House Coopers.
Public Procurement Board (2007). Procurement planning; Short term training manual on the
Public Procurement Act.
Raisch, W., Milley, D., & Kane, W.J. (2001). The e-market place: Strategies for success in
B2B commerce. New York, USA: McGraw-Hill.
Salkute, R. & Manager, Z. (2013). Exploratory study of e-procurement adoption in Indian and
Chinese companies: Case study with innovation approach. American Journal of
Economics and Business Administration, 5(3), 107-115.
Shah, M. (2002). International Journal of Computer Vision,50(2), 103-110.
doi:10.1023/a:1020323930790
Shalle, N.I., Guyo, W., & Amuhaya, I.M. (2013). Role of e-procurement strategy in enhancing
procurement performance in state corporations in Kenya. International Journal of
Science and Research, 2(11), 421-426.
Siita, A. (2014). Assessing the Potential of Electronic Procurement in the Public Sector of
Ghana: The case of Accra metropolis.
Smart, A. (2010). Exploring the business case for e-procurement. International Journal of
Physical Distribution and Logistics Management, 40(3), 181 – 201.
Soares-Aguiar, A. & Palma-dos-Reis, A. (2008). Why do firms adopt e-procurement systems:
Using logistic regression to empirically test a conceptual model. IEEE Transactions on
Engineering Management, 55(1), 120-133.
68
Subramanian, C., & Shaw, M. J. (2004). The effects of process characteristics on the value of
B2B e-procurement. Information Technology and Management, 5.
Tanner, C., Wolfle, R., Schubert, P. & Quade, M. (2008). Current trends and challenges in
electronic procurement: An empirical study. Electronic Markets, 18(1), 6 – 18.
Teo, T. S., & Lai, K. (2009). Usage and performance impact of electronic
procurement. Journal of Business Logistics,30(2), 125-139. doi:10.1002/j.2158-
1592.2009.tb00115.x
Transparency International (2011). E-Procurement reduces the opportunities for Corruption
and Bribery, Brussels: Transparency International.
Trkman, P., & McCormark, K. (2010). Estimating the benefits and risks of implementing e-
procurement. IEEE Transactions on Engineering Management, 57(2), 338 – 349.
Waruguru, E. and Kiruri, S.N. (2015). Factors affecting effectiveness of e-procurement in
business organizations: A survey of safaricom dealers in Nakuru CBD-Kenya.
International Journal of Economics, Finance and Management Sciences. 3(3), 303-
310. doi: 10.11648/j.ijefm.20150303.27
Williams, S., & Hardy, C. (2007). E-procurement: current issues and future challenges.
Proceedings of the European Conference on Information Systems, 131 – 142.
Zheng, J., Caldwell, N., Harland, C., Powell, P., Woerndl, M. & Xu, S. (2004). Small
firms and e-business: cautiousness, contingency and cost-benefits. Journal of
Purchasing
& Supply Management, 10(1).
69
APPENDIX
QUESTIONNAIRE
GHANA INSTITUTE OF MANAGEMENT AND PUBLIC ADMINISTRATION
RESEARCH QUESTIONNAIRE
ASSESSING THE EFFECTIVENESS OF E-PROCUREMENT IN PRIVATE
ORGANIZATIONS; A CASE STUDY OF COCA COLA GHANA LIMITED
Introduction: You are kindly requested to complete this questionnaire which is to collect data
for academic purposes only. All information would be kept confidential. The study is to assess
the effectiveness of e procurement in Coca Cola Ghana Limited.
PART I
Instruction: Please tick (√) in the appropriate box. Thank you.
1. What is procurement position within your organisational structure?
a. Top management level
b. Middle management level
c. Lower management level
2. Which department do you work?
a) Procurement
b) Accounting
c) Stores
d) Operations
e) Other………………………………………………..
3. What type of procurement system do you employ?
a) Centralized b) Decentralized c) Both
70
4. Which areas of e procurement is your organization actively involved in
E procurement activity Tick as many as possible
E- sourcing
E-tendering
E-ordering
E-contract management
E-markets
E-autions
PART II
Effects of using electronic
processes
Greatly
reduced
Reduced No effect
at all
increased Greatly
Increased
5. Volume of Paperwork 1 2 3 4 5
6. Repetition of administrative
procedures
1 2 3 4 5
7. Mistakes which could have
occurred in the old paper-
based system
1 2 3 4 5
8. Buyer efforts to achieve
same results as old paper-
based system
1 2 3 4 5
9. Buyers time to concentrate
on their core activities
1 2 3 4 5
10. Ease in retrieval of
Documents
1 2 3 4 5
11. Time spent on procuring 1 2 3 4 5
71
Instruction: Please indicate by encircling the extent to which you perceive the following
Effects of using electronic processes for procurement on the following ;
Use of e-procurement allows End-Users to achieve the same results as the old paper-based
system in the following;
Same Results of
e-procurement
processes as
compared to Old
Paper-Based
System
Within a
much
shorter time
Within a
Shorter time
No effect on
time at all
Within a
longer time
Within a
much longer
time
12. Planning for
Services
required
1 2 3 4 5
13. Completing
request for
contracts
1 2 3 4 5
14. Getting
approvals
1 2 3 4 5
15. Processing
invoices for
payments
1 2 3 4 5
16. What is the effect of e procurement on Buyer’s compliance with Coca Cola’s procurement
processes?
a) Very Good
b) Good
c) Normal
d) Bad
e) Very Bad
72
17. Does the company organize e-procurement workshops/training for its employees and
suppliers?
Yes No
18. If yes, how often is training done?
a. Monthly
b. Quarterly
c. Yearly
d. State if any…………………………………………………………….
19. If yes, how does the training help employees to operationalize e procurement?
…………………………………………………………………………………………………
…………………………………………………………………………………………………
……………………………………………………………………………………
20. What challenges did you face in processing contract request prior to the implementation of
e procurement in your organization?
…………………………………………………………………………………………………
…………………………………………………………………………………………………
……………………………………………………………………………………
21. What challenges did you have in contract development and maintenance (preparation of
contract documents and forwarding to contractors) prior to e procurement implementation?
………………………………………………………………………………………
………………………………………………………………………………..……
………………………………………………………………………………..……
22. Has the implementation of e procurement resolved these problems?
a) Yes b) No c) Partially
73
23. If No or Partially, Please indicate the problems which remain unsolved
………………………………………………………………………………………
………………………………………………………………………………..……
………………………………………………………………………………..……
24. In your view, what measures can be put in place to make electronic procurement effective
in Coca Cola Ghana?
………………………………………………………………………………………
………………………………………………………………………………..……
………………………………………………………………………………..……
25. Apart from the challenges faced in the deployment of e procurement department, has e
procurement affected the organisation in any positive way?
Yes No
26. If yes, state any positive effect that procurement has had on the organisation as a whole.
…………………………………………………………………………………………
…………………………………………………………………………………………
…………………………………………………………………………………………
Thank You.