Page 1: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 10 plan based on 25 Nov Revised Planand s=200 extended by 1 week

• Dec. 1, Begin cool down to 4.5K • Dec. 4, Cooldown to 4.5K complete in both rings!• Dec. 5, beam setup in RHIC begins.• Dec 16, 20 hr unplanned Maintenance day• Dec 20 (AM)-21(PM), blizzard 09 shut us down• Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late)• Dec 31 (midnight-store 11340), Machine, Physics declared (store 11340) s=200 GeV/n Au-Au• Jan 2 (midnight) STAR in Physics Mode• Jan 8 (0600) PHENIX in Physics Mode• Jan 12, Rebucketing not yet routine, stochastic cooling still to come.• Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on• Mar. 18 (0556), End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup• Mar. 20 19, Begin 4 week s = 62.4 GeV/n run

– Machine physics 19 March for stores ≥11954– PHENIX Physics 19 Mar for stores ≥11955– STAR Physics 22 March for stores ≥11976

• Apr. 17 8, End 4 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup• Apr. 19 9, Begin 1.5 week s = 39 GeV/n run• Apr. 30 20(?), End 1.5 week s = 39 GeV/n Run, finish n= 0.67 studies sometime before polarity switches begin (i.e. this is a

placeholder)• May 1, complete n= 0.67 studies for pp and s = 7.7 GeV/n setup (12 hr pol. switches)• May. 3, Begin 4 week s = 7.7 GeV/n run• May 23 – 28 IPAC (Kyoto)• May 22 Jun 3, Satogata is away• May 31, End 4 week s = 7.7 GeV/n Run, begin s = 11.5 GeV/n setup (4-6 hr polarity switch, if necessary)• Jun 2, begin s = 11.5 GeV/n for STAR• Jun 16, end 2 week s = 11.5 GeV/n run, begin s = 5 GeV/n setup (4-6 hr polarity switch, if necessary)• Jun 18, begin s = 5 GeV development• Jun 21, end 3 days at s = 5 GeV/n • Jun 22 , Begin Cryo Warm-up• Jun 23, Warm-up complete, Run 10 ends – 29.2 CRYO WEEKS

Page 2: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 10 plan based on 25 Nov Revised Planand s=200 extended by 1 week

• Mar. 20 19, Begin 4 week s = 62.4 GeV/n run– Machine physics 19 March for stores ≥11954– PHENIX Physics 19 Mar for stores ≥11955– STAR Physics 22 March for stores ≥11976

• Apr. 17 8, End 4 2.9 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup• Apr. 19 9, Begin 1.5 week s = 39 GeV/n run• Apr. 30 20(?), End 1.5 week s = 39 GeV/n Run, finish n= 0.67 studies for pp sometime

before polarity switches begin (i.e. this is a placeholder)Below schedule TBD• May 1, Begin s = 7.7 GeV/n setup (12 hr pol. switches)• May. 3, Begin 4 week s = 7.7 GeV/n run• May 23 – 28 IPAC (Kyoto)• May 22 Jun 3, Satogata is away• May 31, End 4 week s = 7.7 GeV/n Run, begin s = 11.5 GeV/n setup (4-6 hr polarity

switch, if necessary)• Jun 2, begin s = 11.5 GeV/n for STAR• Jun 16, end 2 week s = 11.5 GeV/n run, begin s = 5 GeV/n setup (4-6 hr polarity

switch, if necessary)• Jun 18, begin s = 5 GeV development• Jun 21, end 3 days at s = 5 GeV/n • Jun 22 , Begin Cryo Warm-up• Jun 23, Warm-up complete, Run 10 ends – 29.2 CRYO WEEKS• Last Week of June – Commission EBIS with He beam to NSRL

Page 3: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 10 Au-Au Goals3/30/10

• STAR– s = 62 GeV/n

• Luminosity Sampled/Delivered = ?/90 mb-1

• 100M Min-bias events

• PHENIX– s = 62 GeV/n

• Luminosity Recorded/Delivered = 64/193 mb-1

• 400M Min-bias events

Page 4: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

PHENIX Goal (400M min-bias events)

STAR Goal (100M min-bias events)19 Mar

8 Apr

Page 5: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Through 0900 hrs, 6 April

Page 6: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

68.0

118.1

64.3

112.0

76.0

123.7

0

24

48

72

96

120

144

0

20

40

60

80

100

120

03/18 to 3/24

3/25 to 3/31

04/01 to 04/07

04/08 to 04/14

hour

s pe

r wee

k at

sto

re

Run 10 (AuAu) -- Integrated Luminosity by week

inte

grat

ed lu

mni

osity

[m

b^-1

]

period

Phenix STAR (lumi) hours at store

thru fill 12085ending 09:00 April 6

Page 7: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

1.3 x 109/bunch

31 x 31 GeV/n Au, 30 March to Present

Page 8: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

31 x 31 GeV/n Au, 30 March to Present

Page 9: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 10: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

45.0%

50.0%

0.8

0.9

1

1.1

1.2

1.3

1.4

1.5

0.8 0.9 1 1.1 1.2 1.3 1.4 1.5

% o

f bea

m lo

st r

amp

plus

reb

ucke

ting

RHIC

Bea

m p

er b

unch

aft

er R

ebuc

ketin

g x

1E9

RHIC accramp Intensity per bunch x1E9

Run 10, 62 GeV AuAu

beginning ramp vs beginning store

% lost ramp and rebucketing

Page 11: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

45.0%

50.0%

0.8

0.9

1

1.1

1.2

1.3

1.4

1.5

0.8 0.9 1 1.1 1.2 1.3 1.4 1.5

% o

f bea

m lo

st r

amp

plus

reb

ucke

ting

RHIC

Bea

m p

er b

unch

aft

er R

ebuc

ketin

g x

1E9

RHIC accramp Intensity per bunch x1E9

Run 10, s = 200 GeV AuAu

beginning ramp vs beginning store

% lost ramp and rebucketing

Page 12: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

45.0%

50.0%

0.8

0.9

1

1.1

1.2

1.3

1.4

1.5

0.8 0.9 1 1.1 1.2 1.3 1.4 1.5

% o

f bea

m lo

st r

ebuc

ketin

g

RHIC

Bea

m p

er b

unch

aft

er R

ebuc

ketin

g x

1E9

RHIC accramp Intensity per bunch x1E9

Run 10, 62 GeV AuAubeginning ramp vs beginning store

% lost in rebucketing

Page 13: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

45.0%

50.0%

0.8

0.9

1

1.1

1.2

1.3

1.4

1.5

0.8 0.9 1 1.1 1.2 1.3 1.4 1.5

% o

f bea

m lo

st r

ebuc

ketin

g

RHIC

Bea

m p

er b

unch

aft

er R

ebuc

ketin

g x

1E9

RHIC accramp Intensity per bunch x1E9

Run 10, s = 200 GeV AuAubeginning ramp vs beginning store

% lost in rebucketing

Page 14: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

y = 3.0x2 + 0.0x - 0.0

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

0.8

0.9

1

1.1

1.2

1.3

1.4

1.5

0.8 0.9 1 1.1 1.2 1.3 1.4 1.5

Initi

al L

umi

RHIC

Bea

m p

er b

unch

acc

ram

p x

1E9

RHIC initial store Intensity per bunch x1E9

Run 10, 62 GeV AuAubeginning ramp vs beginning storeScaling with bunch intensity squaredInitial Lumi [10e-26cm-2s-1]Poly. (Scaling with bunch intensity squared)

Page 15: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

y = 32.9x2 + 0.0x - 0.0

0

10

20

30

40

50

60

70

80

90

100

0.8

0.9

1

1.1

1.2

1.3

1.4

1.5

0.8 0.9 1 1.1 1.2 1.3 1.4 1.5

Initi

al L

umi

RHIC

Bea

m a

ccra

mp

inte

nsity

per

bun

ch x

1E9

RHIC initial store Intensity per bunch x1E9

Run 10, s = 200 GeV AuAubeginning ramp vs beginning storeInitial Lumi [10e-26cm-2s-1]Scaling with bunch intensity squared

Page 16: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

http://www.bnl.gov/cad/esfd

AGS-Booster-Tandem/Linac Startup

RHIC Cryo Cooldown to 45 deg K

RHIC Cryo Cooldown/Warm-up

RHIC Cryo Operation

RHIC Cryo off

RHIC STAR & PHENIX Lattice Sextupole Polarity Swap

RHIC Research with s = 200 GeV /n AuAu IBS NO

RHIC Research with s = 62.4 GeV /n AuAu IBS NO

RHIC Research with s = 39 GeV /n AuAu IBS NO

Complete n ~ 0.67 for pp studies

RHIC Research with s = 7.7 GeV /n AuAu NO YES

STAR Research with s = 11.5 GeV /n AuAu NO NO(or Maybe)

Beam Studies at s = 5 GeV /n AuAu NO YES

IPAC

NSRL (NASA Radiobiology)

Shutdown (RHIC)

C-A Operations-FY10

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2010

9 Mar 10

setup with beams in both rings

Sep

concurrent with RHIC

ramp up luminosity

21 Sep

29.2 weeks

1 Dec

20 Nov

setup as required

10 weeks physics

6/23 End Date

11 weeks

NSRL Schedule TBD

25 cryo weeks

4weeks

1.5wks

4weeks

2wks

with s=200 extended 1 week (budget premitting)

~12 hour overhead to swap Q7's out of IBS lattice and reverse sextupole polarities

4-6 hour overhead to reverse sextupole polarities (if necessary)

Complete before polarity switches

Page 17: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Future Topics• Toward Smaller beta* - new quad triplets – D. Trbojevic

Page 18: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Archive

Page 19: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

BNL Energy Cost

$(20)

$-

$20

$40

$60

$80

$100

$120O

ct-0

0

Oct

-01

Oct

-02

Oct

-03

Oct

-04

Oct

-05

Oct

-06

Oct

-07

Oct

-08

Oct

-09

Oct

-10

$/M

Whr

Billed Cost/MWhrWithout Balanced BillingBalanced Billing ProjectionRHIC ONAGS SEB/FEBNSRL

Through Feb 2010

Page 20: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026

Page 21: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026

Page 22: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026

Page 23: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026

Page 24: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026

Page 25: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026W

CM

Lon

gitu

dal E

mitt

ance

Page 26: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

31 x 31 GeV/n Au horiz and vert emittances

Store 12026

Page 27: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

PHENIX Goal*

* With 20 cm sigma IR diamond

PHENIX Minimum Goal*

STAR Goal

Page 28: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 29: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

560.8629.2665.2

483.2

302.9

541.2526.8

359.5

588.6

178.9

71.3

590.3610651.2

703.0

525.4

335.4

569.2547.5

358.8

599.7

179.4

72.4

92.694.7105.899.183.895.296.076.2107.243.080.30

100

200

300

400

500

600

700

800

12/31 to 1/07

1/08 to 1/14

1/15 to 1/21

1/22 to 1/28

1/29 to 2/04

2/05 to 2/11

2/12 to 2/18

2/19 to 2/25

2/26 to 3/04

3/05 to 3/11

3/12 to 3/18

period

inte

grat

ed lu

mni

osity

[ m

b-1]

0

24

48

72

96

120

Run 10 (AuAu) -- Integrated Luminosity by week

hour

s pe

r wee

k at

sto

re

Phenix STAR (lumi) hours at store

thru fill 11932ending 06:00 March 18

Average hours per week at store = 88.5

Page 30: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Through Jan 2010

BNL Energy Cost

$(20)

$-

$20

$40

$60

$80

$100

$120O

ct-0

0

Oct

-01

Oct

-02

Oct

-03

Oct

-04

Oct

-05

Oct

-06

Oct

-07

Oct

-08

Oct

-09

Oct

-10

$/M

Whr

Billed Cost/MWhrWithout Balanced BillingBalanced Billing ProjectionRHIC ONAGS SEB/FEBNSRL

Page 31: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Through 2/28/10

RHIC Operations FY06-10

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

-30 -10 10 30 50 70 90 110 130 150 170 190

Days since beginning of Run

MW

CAD P ower 06CAD P ower 07CAD P ower 08CAD P ower 09CAD P ower 10

Page 32: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Ring Bunches/Cycles

Avg Bunch in RHIC (10^6 ions)

Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC

Blue 56/56 909 0.836 1.056 0.963 0.992 0.828

Yellow 56/56 990 0.971 1.085 0.962 0.959 0.970

28 Feb Physics Store 11824, 0.7 m b* with some cooling and with rebucketing, STAR 32.7 mb-1, 3.9 hr store

Ring Bunches/Cycles Avg Bunch in RHIC (10^6 ions)

Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC

Blue 111/28 1262 0.917 0.975 0.961 1.001 0.977

Yellow 111/28 1246 0.910 0.961 0.964 0.988 0.994

0.9050.9890.9611.0230.8791168111/29Yellow

0.9270.9990.9611.0240.9111196111/28Blue

Arc to RHIC Wxf to Arc Uxf1 to Wxf XCBM to Uxf1 Avg Efficiency XCBM to RHIC

Avg Bunch in RHIC (10^6 ions) Bunches/Cycles Ring

18 Jan Physics Store 11489, 0.6 m b* No cooling or rebucketing, STAR 22.6 mb-1, 3.9 hr store

Ring Bunches/Cycles Avg Bunch in RHIC (10^6 ions)

Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC

Blue 111/28 1354 0.927 0.990 0.965 1.003 0.968

Yellow 111/28 1377 0.931 0.990 0.964 0.989 0.987

2 Mar Physics Store 11834, 0.7 m b* with some cooling and with rebucketing, STAR 29.4 mb-1,3.9 hr store)

31 Dec 1st Physics Store 11340, 0.6 m b* No cooling or rebucketing, STAR 3.2 mb-1, 2.6 hr store

Page 33: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Through 2/28/10

RHIC Cryo Operations FY06-10

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

-30 -10 10 30 50 70 90 110 130 150 170 190

Days since beginning of Run

MW

RHIC Cryo 06RHIC Cryo 07RHIC Cryo 08RHIC Cryo 09RHIC Cryo 10

Page 34: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Through 2/28/10

BNL Energy Use FY 2009-10

0

5

10

15

20

25

30

35

40

45

501-

Jul-0

8

1-A

ug-0

8

1-S

ep-0

8

1-O

ct-0

8

1-N

ov-0

8

1-D

ec-0

8

1-Ja

n-09

1-Fe

b-09

1-M

ar-0

9

1-A

pr-0

9

1-M

ay-0

9

1-Ju

n-09

1-Ju

l-09

1-A

ug-0

9

1-S

ep-0

9

1-O

ct-0

9

1-N

ov-0

9

1-D

ec-0

9

1-Ja

n-10

1-Fe

b-10

1-M

ar-1

0

Date

Dai

ly A

vera

ge P

ower

(MW

)

RHIC Cryo RHIC otherAGS-Exp BoosterAGS-Mach TandemCAD Bldg less SMD NSRLSite Base BNL Peak-Av

Site total not recorded after 30 Nov

Page 35: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Physics production or beam studies weekssNN (GeV) 25-cryoweek run 27-cryoweek run

200 10 1062.4 4 439 1.5 1.527 0 018 0 0

11.5 @ STAR 0 27.7 4 4

Beam studies @ 5 GeV and @ n 0.67

0.5 0.5

Revised Run 10 Plan, Nov 25, 2009

Page 36: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 10 Au-Au Goals11/19/09

• STAR– s = 200 GeV/n

• Luminosity Sampled/Delivered = 2/4 nb-1

• 250M Central Events• 300M Min-bias events

• PHENIX– s = 200 GeV/n

• Luminosity Recorded/Delivered = 1.4/>6 nb-1

• Minimum Goal: – Luminosity Recorded/Delivered = 1.1/3.9 nb-1

Page 37: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 03 Run 04 Run 05 Run 06 Run 07 Run 08 Run 09 Run 100

1

2

3

4

5

6

7

8

9

Time from start of 4.5 deg cooldown to Physics

Run 10 Actual

Goal

Actual

Wee

ks to

Phy

sics


Recommended