Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week. Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings! Dec. 5, beam setup in RHIC begins. Dec 16, 20 hr unplanned Maintenance day Dec 20 (AM)-21(PM), blizzard 09 shut us down - PowerPoint PPT Presentation
Citation preview
Run 10 plan based on 25 Nov Revised Planand s=200 extended by 1 week
• Dec. 1, Begin cool down to 4.5K • Dec. 4, Cooldown to 4.5K complete in both rings!• Dec. 5, beam setup in RHIC begins.• Dec 16, 20 hr unplanned Maintenance day• Dec 20 (AM)-21(PM), blizzard 09 shut us down• Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late)• Dec 31 (midnight-store 11340), Machine, Physics declared (store 11340) s=200 GeV/n Au-Au• Jan 2 (midnight) STAR in Physics Mode• Jan 8 (0600) PHENIX in Physics Mode• Jan 12, Rebucketing not yet routine, stochastic cooling still to come.• Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on• Mar. 18 (0556), End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup• Mar. 20 19, Begin 4 week s = 62.4 GeV/n run
– Machine physics 19 March for stores ≥11954– PHENIX Physics 19 Mar for stores ≥11955– STAR Physics 22 March for stores ≥11976
• Apr. 17 8, End 4 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup• Apr. 19 9, Begin 1.5 week s = 39 GeV/n run• Apr. 30 20(?), End 1.5 week s = 39 GeV/n Run, finish n= 0.67 studies sometime before polarity switches begin (i.e. this is a
placeholder)• May 1, complete n= 0.67 studies for pp and s = 7.7 GeV/n setup (12 hr pol. switches)• May. 3, Begin 4 week s = 7.7 GeV/n run• May 23 – 28 IPAC (Kyoto)• May 22 Jun 3, Satogata is away• May 31, End 4 week s = 7.7 GeV/n Run, begin s = 11.5 GeV/n setup (4-6 hr polarity switch, if necessary)• Jun 2, begin s = 11.5 GeV/n for STAR• Jun 16, end 2 week s = 11.5 GeV/n run, begin s = 5 GeV/n setup (4-6 hr polarity switch, if necessary)• Jun 18, begin s = 5 GeV development• Jun 21, end 3 days at s = 5 GeV/n • Jun 22 , Begin Cryo Warm-up• Jun 23, Warm-up complete, Run 10 ends – 29.2 CRYO WEEKS
Run 10 plan based on 25 Nov Revised Planand s=200 extended by 1 week
• Mar. 20 19, Begin 4 week s = 62.4 GeV/n run– Machine physics 19 March for stores ≥11954– PHENIX Physics 19 Mar for stores ≥11955– STAR Physics 22 March for stores ≥11976
• Apr. 17 8, End 4 2.9 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup• Apr. 19 9, Begin 1.5 week s = 39 GeV/n run• Apr. 30 20(?), End 1.5 week s = 39 GeV/n Run, finish n= 0.67 studies for pp sometime
before polarity switches begin (i.e. this is a placeholder)Below schedule TBD• May 1, Begin s = 7.7 GeV/n setup (12 hr pol. switches)• May. 3, Begin 4 week s = 7.7 GeV/n run• May 23 – 28 IPAC (Kyoto)• May 22 Jun 3, Satogata is away• May 31, End 4 week s = 7.7 GeV/n Run, begin s = 11.5 GeV/n setup (4-6 hr polarity
switch, if necessary)• Jun 2, begin s = 11.5 GeV/n for STAR• Jun 16, end 2 week s = 11.5 GeV/n run, begin s = 5 GeV/n setup (4-6 hr polarity
switch, if necessary)• Jun 18, begin s = 5 GeV development• Jun 21, end 3 days at s = 5 GeV/n • Jun 22 , Begin Cryo Warm-up• Jun 23, Warm-up complete, Run 10 ends – 29.2 CRYO WEEKS• Last Week of June – Commission EBIS with He beam to NSRL
Run 10 Au-Au Goals3/30/10
• STAR– s = 62 GeV/n
• Luminosity Sampled/Delivered = ?/90 mb-1
• 100M Min-bias events
• PHENIX– s = 62 GeV/n
• Luminosity Recorded/Delivered = 64/193 mb-1
• 400M Min-bias events
PHENIX Goal (400M min-bias events)
STAR Goal (100M min-bias events)19 Mar
8 Apr
Through 0900 hrs, 6 April
68.0
118.1
64.3
112.0
76.0
123.7
0
24
48
72
96
120
144
0
20
40
60
80
100
120
03/18 to 3/24
3/25 to 3/31
04/01 to 04/07
04/08 to 04/14
hour
s pe
r wee
k at
sto
re
Run 10 (AuAu) -- Integrated Luminosity by week
inte
grat
ed lu
mni
osity
[m
b^-1
]
period
Phenix STAR (lumi) hours at store
thru fill 12085ending 09:00 April 6
1.3 x 109/bunch
31 x 31 GeV/n Au, 30 March to Present
31 x 31 GeV/n Au, 30 March to Present
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
50.0%
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
% o
f bea
m lo
st r
amp
plus
reb
ucke
ting
RHIC
Bea
m p
er b
unch
aft
er R
ebuc
ketin
g x
1E9
RHIC accramp Intensity per bunch x1E9
Run 10, 62 GeV AuAu
beginning ramp vs beginning store
% lost ramp and rebucketing
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
50.0%
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
% o
f bea
m lo
st r
amp
plus
reb
ucke
ting
RHIC
Bea
m p
er b
unch
aft
er R
ebuc
ketin
g x
1E9
RHIC accramp Intensity per bunch x1E9
Run 10, s = 200 GeV AuAu
beginning ramp vs beginning store
% lost ramp and rebucketing
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
50.0%
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
% o
f bea
m lo
st r
ebuc
ketin
g
RHIC
Bea
m p
er b
unch
aft
er R
ebuc
ketin
g x
1E9
RHIC accramp Intensity per bunch x1E9
Run 10, 62 GeV AuAubeginning ramp vs beginning store
% lost in rebucketing
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
50.0%
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
% o
f bea
m lo
st r
ebuc
ketin
g
RHIC
Bea
m p
er b
unch
aft
er R
ebuc
ketin
g x
1E9
RHIC accramp Intensity per bunch x1E9
Run 10, s = 200 GeV AuAubeginning ramp vs beginning store
% lost in rebucketing
y = 3.0x2 + 0.0x - 0.0
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
Initi
al L
umi
RHIC
Bea
m p
er b
unch
acc
ram
p x
1E9
RHIC initial store Intensity per bunch x1E9
Run 10, 62 GeV AuAubeginning ramp vs beginning storeScaling with bunch intensity squaredInitial Lumi [10e-26cm-2s-1]Poly. (Scaling with bunch intensity squared)
y = 32.9x2 + 0.0x - 0.0
0
10
20
30
40
50
60
70
80
90
100
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
Initi
al L
umi
RHIC
Bea
m a
ccra
mp
inte
nsity
per
bun
ch x
1E9
RHIC initial store Intensity per bunch x1E9
Run 10, s = 200 GeV AuAubeginning ramp vs beginning storeInitial Lumi [10e-26cm-2s-1]Scaling with bunch intensity squared
http://www.bnl.gov/cad/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldown to 45 deg K
RHIC Cryo Cooldown/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC STAR & PHENIX Lattice Sextupole Polarity Swap
RHIC Research with s = 200 GeV /n AuAu IBS NO
RHIC Research with s = 62.4 GeV /n AuAu IBS NO
RHIC Research with s = 39 GeV /n AuAu IBS NO
Complete n ~ 0.67 for pp studies
RHIC Research with s = 7.7 GeV /n AuAu NO YES
STAR Research with s = 11.5 GeV /n AuAu NO NO(or Maybe)
Beam Studies at s = 5 GeV /n AuAu NO YES
IPAC
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY10
Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
FY 2010
9 Mar 10
setup with beams in both rings
Sep
concurrent with RHIC
ramp up luminosity
21 Sep
29.2 weeks
1 Dec
20 Nov
setup as required
10 weeks physics
6/23 End Date
11 weeks
NSRL Schedule TBD
25 cryo weeks
4weeks
1.5wks
4weeks
2wks
with s=200 extended 1 week (budget premitting)
~12 hour overhead to swap Q7's out of IBS lattice and reverse sextupole polarities
4-6 hour overhead to reverse sextupole polarities (if necessary)
Complete before polarity switches
Future Topics• Toward Smaller beta* - new quad triplets – D. Trbojevic
Archive
BNL Energy Cost
$(20)
$-
$20
$40
$60
$80
$100
$120O
ct-0
0
Oct
-01
Oct
-02
Oct
-03
Oct
-04
Oct
-05
Oct
-06
Oct
-07
Oct
-08
Oct
-09
Oct
-10
$/M
Whr
Billed Cost/MWhrWithout Balanced BillingBalanced Billing ProjectionRHIC ONAGS SEB/FEBNSRL
Through Feb 2010
First Store Monday, 29 March, Store 12026
First Store Monday, 29 March, Store 12026
First Store Monday, 29 March, Store 12026
First Store Monday, 29 March, Store 12026
First Store Monday, 29 March, Store 12026
First Store Monday, 29 March, Store 12026W
CM
Lon
gitu
dal E
mitt
ance
31 x 31 GeV/n Au horiz and vert emittances
Store 12026
PHENIX Goal*
* With 20 cm sigma IR diamond
PHENIX Minimum Goal*
STAR Goal
560.8629.2665.2
483.2
302.9
541.2526.8
359.5
588.6
178.9
71.3
590.3610651.2
703.0
525.4
335.4
569.2547.5
358.8
599.7
179.4
72.4
92.694.7105.899.183.895.296.076.2107.243.080.30
100
200
300
400
500
600
700
800
12/31 to 1/07
1/08 to 1/14
1/15 to 1/21
1/22 to 1/28
1/29 to 2/04
2/05 to 2/11
2/12 to 2/18
2/19 to 2/25
2/26 to 3/04
3/05 to 3/11
3/12 to 3/18
period
inte
grat
ed lu
mni
osity
[ m
b-1]
0
24
48
72
96
120
Run 10 (AuAu) -- Integrated Luminosity by week
hour
s pe
r wee
k at
sto
re
Phenix STAR (lumi) hours at store
thru fill 11932ending 06:00 March 18
Average hours per week at store = 88.5
Through Jan 2010
BNL Energy Cost
$(20)
$-
$20
$40
$60
$80
$100
$120O
ct-0
0
Oct
-01
Oct
-02
Oct
-03
Oct
-04
Oct
-05
Oct
-06
Oct
-07
Oct
-08
Oct
-09
Oct
-10
$/M
Whr
Billed Cost/MWhrWithout Balanced BillingBalanced Billing ProjectionRHIC ONAGS SEB/FEBNSRL
Through 2/28/10
RHIC Operations FY06-10
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
-30 -10 10 30 50 70 90 110 130 150 170 190
Days since beginning of Run
MW
CAD P ower 06CAD P ower 07CAD P ower 08CAD P ower 09CAD P ower 10
Ring Bunches/Cycles
Avg Bunch in RHIC (10^6 ions)
Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC
Blue 56/56 909 0.836 1.056 0.963 0.992 0.828
Yellow 56/56 990 0.971 1.085 0.962 0.959 0.970
28 Feb Physics Store 11824, 0.7 m b* with some cooling and with rebucketing, STAR 32.7 mb-1, 3.9 hr store
Ring Bunches/Cycles Avg Bunch in RHIC (10^6 ions)
Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC
Blue 111/28 1262 0.917 0.975 0.961 1.001 0.977
Yellow 111/28 1246 0.910 0.961 0.964 0.988 0.994
0.9050.9890.9611.0230.8791168111/29Yellow
0.9270.9990.9611.0240.9111196111/28Blue
Arc to RHIC Wxf to Arc Uxf1 to Wxf XCBM to Uxf1 Avg Efficiency XCBM to RHIC
Avg Bunch in RHIC (10^6 ions) Bunches/Cycles Ring
18 Jan Physics Store 11489, 0.6 m b* No cooling or rebucketing, STAR 22.6 mb-1, 3.9 hr store
Ring Bunches/Cycles Avg Bunch in RHIC (10^6 ions)
Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC
Blue 111/28 1354 0.927 0.990 0.965 1.003 0.968
Yellow 111/28 1377 0.931 0.990 0.964 0.989 0.987
2 Mar Physics Store 11834, 0.7 m b* with some cooling and with rebucketing, STAR 29.4 mb-1,3.9 hr store)
31 Dec 1st Physics Store 11340, 0.6 m b* No cooling or rebucketing, STAR 3.2 mb-1, 2.6 hr store
Through 2/28/10
RHIC Cryo Operations FY06-10
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
-30 -10 10 30 50 70 90 110 130 150 170 190
Days since beginning of Run
MW
RHIC Cryo 06RHIC Cryo 07RHIC Cryo 08RHIC Cryo 09RHIC Cryo 10
Through 2/28/10
BNL Energy Use FY 2009-10
0
5
10
15
20
25
30
35
40
45
501-
Jul-0
8
1-A
ug-0
8
1-S
ep-0
8
1-O
ct-0
8
1-N
ov-0
8
1-D
ec-0
8
1-Ja
n-09
1-Fe
b-09
1-M
ar-0
9
1-A
pr-0
9
1-M
ay-0
9
1-Ju
n-09
1-Ju
l-09
1-A
ug-0
9
1-S
ep-0
9
1-O
ct-0
9
1-N
ov-0
9
1-D
ec-0
9
1-Ja
n-10
1-Fe
b-10
1-M
ar-1
0
Date
Dai
ly A
vera
ge P
ower
(MW
)
RHIC Cryo RHIC otherAGS-Exp BoosterAGS-Mach TandemCAD Bldg less SMD NSRLSite Base BNL Peak-Av
Site total not recorded after 30 Nov
Physics production or beam studies weekssNN (GeV) 25-cryoweek run 27-cryoweek run
200 10 1062.4 4 439 1.5 1.527 0 018 0 0
11.5 @ STAR 0 27.7 4 4
Beam studies @ 5 GeV and @ n 0.67
0.5 0.5
Revised Run 10 Plan, Nov 25, 2009
Run 10 Au-Au Goals11/19/09
• STAR– s = 200 GeV/n
• Luminosity Sampled/Delivered = 2/4 nb-1
• 250M Central Events• 300M Min-bias events
• PHENIX– s = 200 GeV/n
• Luminosity Recorded/Delivered = 1.4/>6 nb-1
• Minimum Goal: – Luminosity Recorded/Delivered = 1.1/3.9 nb-1
Run 03 Run 04 Run 05 Run 06 Run 07 Run 08 Run 09 Run 100
1
2
3
4
5
6
7
8
9
Time from start of 4.5 deg cooldown to Physics
Run 10 Actual
Goal
Actual
Wee
ks to
Phy