11.05.2017
1
EDUARDO ALMEIDA10th MAY 2017
REDUCING MAJOR ACCIDENT RISK
ROLLING OUT INTERVENTIONS TO STRENGTHEN THE ORGANIZATION
WHAT IS A DRILLING CONTRACTOR DOING?
• ACTIVELY ADVERTISE THE ASSETS IN THE MARKET TO WHOMEVER IS BEING LICENSED FROM AUTHORITIES TO EXPLOIT A WELL OR FIELD AND WILLING TO CONTRACT THESE ASSETS
5/11/2017#1696832
2
11.05.2017
2
PREPARATION FOR OPERATION – GAP ANALYSIS
AUTHORITY REQUIREMENTS
CONTRACT REQUIREMENTS
INTERNAL REQUIREMENTS
RIG TECHNICAL
SPECIFICATION
#169632
Page 3
THE CLIENT HAS THE INFORMATION OF THE OIL/GAS WELL/FIELD
MARKET IMPLICATIONS - CHALENGES
• THE BUSINESS MODEL CHANGES DUE TO THE MARKET FLOTATIONS
• SAME AMOUNT OF WORK ON PREPARATION FOR OPERATION NO MATTER THE DURATION OF THE CONTRACT
• PUTS EMPHASIS ON THE ORGANIZATIONAL ASPECTS
• ALSO OTHER GEOGRAPHICAL AREAS OF OPERATION WITH DIFFERENT REQUIREMENTS, ARE PART OF THE DAILY CONTRACT/OPERATIONAL SCENARIO
• TYPICALLY NORWAY AND UK ARE LOOKED AS «ONE MARKET»
• DIFFERENT REQUIREMENTS FOR THE SAME NAMING OR VICE VERSA
5/11/2017#1696832
4
11.05.2017
4
5/11/2017#1696832
Page 7
AnalysisSafety
Case / AoC
Written Verificatio
n
Scheme
Test regime and
planned maintenanc
e
A governing process
5/11/2017#1696832
Page 8
Written Verificati
on Scheme
SECEPerformance Standards
Test regime and
planned maintenan
ce
A governing process
Actions
11.05.2017
5
PS: Connects Risk Assessments, Design and Maintenance
Risk Assessments(design, construction& operational phases)
Design input to barriers throughFunction, criteriaand assurancedocumentation
PerformanceStandard (PS):
- Function- Criteria
- Assurance- Verification
Maintenance activities
Test regime: TBAMI
As assurance activities
MAH / Bowtie
Verificationregime: class,
authority & tech.
support
Criticality / FMECA
5/11/2017#1696832
9
5/11/2017#1696832
Page 10
11.05.2017
6
5/11/2017#1696832
Page 12
Test regime and
planned maintenance on the rig
KPIs follow up
onshore
Verifier
audit on the rig
Verifier issues potenti
al actions
Synergicase for recommendation
s
A governing process
Verification Scheme – How it works
11.05.2017
7
Connection between Risk studies and Barrier ManagementTechnical barriers - systems & resources
Industry MAH
knowledge
Unit SECE list
Risk studies (QRA, CORA, bowties, etc)
Nsfi codes (tech.
hierarchy
Consecc
classif &
fmeca’s
Maint. Activ.
& tests
Unit specific performance
standards
Verification activities
Quality assurance or MOC5/11/2017
#1696832
13
Safety Case and
Verification scheme
Safety Case and
Verification scheme
Bow-TiesBow-Ties
Barrier Management
Barrier Management Maintenance
Management system
11.05.2017
8
BOW-TIE: Identification of barriers & Pperformance shaping factors
5/11/2017#1696832
15
Both technical, organizational and
operational
Overview – Common barrier impact
5/11/2017#1696832
16
How: Drill on the risk leading to an Top Event such a blowout, collision, etc. (Left hand side of the BowTie’s)
11.05.2017
10
SAFETY CRITICAL TASKS
5/11/2017#1696832
19
OnshoreInduction;
DepartmentGtC
Offshore InductionSafety Tour
(MODU)Buddy System
Systematic Familiarization
Equipment Familiarization
.
Training matrix
Competence Assurance
Need of resources based on
Competence requirements
5/11/2017#1696832
20
11.05.2017
11
Connection between Risk studies and Barrier ManagementOperational & organizational barriers - systems &
resources
Operational context
Risk studies (QRA, CORA, bowties, etc)
Systematic Familiarization
and unit specific equipment
familiarization
Competence Assurance System
Verification activities
Quality assurance
5/11/2017#1696832
21
MOC
Industry MAH
knowledge
Safety criticaltasks
5/11/2017#1696832
22