Rig Stacking Strategies Ship & Offshore Finance Forum
Oslo 25 May 2016
Chip Keener Integrated Rig Stacking Solutions LLC
www.keener-consulting.com 1
Industry Cycles The Risks Warm Stack vs Cold Stack The Cost of Responsibly Stacking
Rig Stacking Strategies
0
10
20
30
40
50
60
70
80
90
100
19
70
19
71
19
72
19
73
19
74
19
75
19
76
19
77
19
78
19
79
19
80
19
81
19
82
19
83
19
84
19
85
19
86
19
87
19
88
19
89
19
90
19
91
19
92
19
93
19
94
19
95
19
96
19
97
19
98
19
99
20
00
20
01
20
02
20
03
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
20
13
20
14
20
15
20
16
20
17
20
18
20
19
20
20
Oil Price vs Industry Build
Jackup
Floater
$/bbl Inflation adjusted
3
1. Corrosion – hull, machinery, piping, electrical systems • VCI’s, dehumidification, cathodic protection
2. Mold – accommodations 3. Weather Events – particularly cyclonic storms 4. Certification – dates of reference
• IMO MODU Code / Flag State – keel laying • CLASS – shipyard contract … or reactivation
5. Control Systems – drilling, well control, vessel management, power management, dynamic positioning • 1000’s of parameters (software & several 100 PLC’s) • 3-6 months of commissioning with the OEM’s
Layup Risks – Startup Time / Asset Valuation
Rig Systems – A Holistic View
Anchor Winches
Bulk Controls
Cement Controls
Mud Controls
Drilling Switch Gear
Load & Stability
Safety & Automation
Gyros & Transducers
SCR Monitoring
Riser Tensioners
Blowout Preventers
Dynamic Positioning
Power Mgmt
Drilling VFD/VSD
CCTV Drilling Controls
Drawworks Top Drive Rotary Power Slips Pipe Handler Fingerboard Roughneck Manipulator Guide Arm Tongs Trolleys Riser Catwalk
Rig Systems – Software & Integrations
Stewart & Stevenson GE Siemens
Cables & Terminations
Networks & Protocols
Dependencies, Interconnections, Configurations
Engines RTDS Multillin Controller
PLC Controller
Remote Console
Bridge Panel / PC
L-3
1. Documentation 2. Inventory & Capital Spares 3. System Commissioning & Validation 4. Infant Mortality
Added Burdens & Risks – New Construction
Warm Stacking correlates with a sustained crew component, and expectation of vessel readiness … though not always. Cold Stacking implies unmanning of a vessel, and presumption of neglect … though not necessarily.
Cold Stack vs Warm Stack
Responsible Stacking – Jackups
~ $600,000 Setup Cost (excludes ~ 4 wks crew participation) • Intake Survey, Dehumidification, VCI’s, Monitoring
Equipment, Accommodation Module
~ $4,800 Daily Run Cost • Labor (3 rotators), Generator, Fuel, R&M, Insurance,
Class - COC Compliance , Local Permits
Incremental Nested Jackups ~ $500,000 Setup Cost ~ $2,400 Daily Run Rate
~ $1,100,000 Setup Cost (excludes ~ 6 wks crew participation) • Intake Survey, Dehumidification, VCI’s, Monitoring
Equipment, Accommodation Module
~ $6,000 Daily Run Cost • Labor (4 rotators), Generator, Fuel, R&M, Insurance,
Class - COC Compliance , Local Permits
Incremental Unmanned Semis in Proximity ~ $1,200,000 Setup Cost (includes SOLUS boat & davit) ~ $3,000 Daily Run Rate
Responsible Stacking – Moored Semis
~ $1,800,000 Setup Cost (excludes ~ 6 wks crew participation) • Intake Survey, Dehumidification, VCI’s, Monitoring
Equipment, Accommodation Module
~ $20,000 Daily Run Cost • Labor (8 rotators), Generator, Fuel, R&M, Insurance,
Class - COC Compliance , Local Permits • ~ $3,500/day additional for tri-catenary moorings
Incremental Unmanned DP Rigs in Proximity
~ $2,000,000 Setup Cost (includes SOLUS boat & davit) ~ $7,500 Daily Run Rate (inclusive of tri-catenary moorings)
Responsible Stacking – DP Floaters
DP Floaters – Warm vs Cold Stack
Months
$’s millions
Assumptions – Cold Stacking $ 3,000,000 setup fee per rig (VCIs, dehumidification, monitoring, mooring) $ 3,500/day mooring rental per rig $ 1,800/day insurance per rig $ 18,000/day 8 man response team & services amortized across all the rigs
Assumptions – Warm Stacking $ 50,000/day per rig
$36.5
$20.6
$10.7
$14.0
12
Management & support services:
• project management & staffing • guidance in maintaining sensitive equipment
(e.g. volatile memory, software management) • counsel in the maintenance & suspension of
class & flag state certification • underwriter engagement on insurance risk • commissioning services on startup
Comprehensive Integrated Services
13