Progress Energy
PLS-CADD -> THOR
Next Steps (Issues)
● Conductor span lengths
● Type of conductor deadends (wire size)
● Modified standards (changing materials inside plates within PLS, then sending to THOR).
● Attaching non site-specific labor (mobilization, pilot lines, etc).
Recommended