The mission of the Stillaguamish Watershed Council (SWC) is to maintain a healthy, functioning Stillaguamish Watershed by
providing a local forum in which agencies, organizations, communities, and the public
can engage in a collaborative watershed based process of decision making and coordination.
This slideshow highlights the work of the SWC
Location
Scope of Work
Old Dike Restoration
Old Dike Before
Old Dike During
Old Dike After
West Dike Restoration
West Dike Before
West Dike During
West Dike After
East Dike Restoration
East Dike Before
East Dike During
East Dike After
New Dike Construction
New Dike Before
New Dike During
New Dike After
Aerial View of Arlington’s StormwaterWetland Near Haller Park
Volunteers planting native vegetation at the wetland
Pulling Weeds
Pulling Weeds
Documenting Knotweed
Culvert Before
During
Bridge After
Bank Before
Bank During
Bank After
Restoration overview
Kline Farm Planting?
Photos of some before, during, and after projecto.
Pilchuck Park Schematic
Pilchuck Park Before
Pilchuck Park Kiosk
Kiosk during construction Kiosk finished
Pilchuck Park Planting
Left: Containers awaiting planting
Right: Inmate Crew Planting
Above: Emergent Plants
Left: Students Planting
Right: Natural Resources Team
Planting
Pilchuck Park Large Woody Debris