Twisted welding rod wedged on the jogging button for the hypochlorite transfer pump
CULTIVATING PERFORMANCE. DELIVERING VALUE.2
CULTIVATING PERFORMANCE. DELIVERING VALUE.3
Investigation
• Failure of whole system:
– Inadequate initial/update training
• Roll out not done with all Operators
• Procedures not updated
– Improper attempt to save time and effort
CULTIVATING PERFORMANCE. DELIVERING VALUE.4
Biggest lessons for myself
• Explain why you are changing something
– Simple right? Wrong! Explaining and rolling out a change takes time and effort.
• Listen more
– When someone says “it’s taking to long to…” that might mean they are taking a short cut and the short cut might not be safe.
Agrium Inc.
13131 Lake Fraser Drive SE
Calgary, Alberta, Canada T2J 7E8
Telephone (403) 225-7000
Agrium U.S. Inc.
4582 South Ulster Street, Suite 1700
Denver, Colorado, U.S. 80237
Telephone (303) 804-4400
NYSE and TSX: AGU
agrium.com