As shown
MURRINDINDI SHIRE COUNCIL
MU114-00
HZ
LOCATION PLAN AND INDEX OF DRAWINGS
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
LOCATION PLAN
Drawing No. Title
MURRINDINDI SHIRE COUNCILPO Box 138, ALEXANDRA VIC 3714
HDS Australia Pty Ltd21-23 Aristoc Road, GLEN WAVERLEY VIC 3150
INDEX OF DRAWINGS
MU114-00MU114-01MU114-02MU114-03MU114-04MU114-05MU114-06MU114-07MU114-08MU114-09MU114-10MU114-11MU114-12MU114-13MU114-14MU114-15MU114-16MU114-17MU114-18MU114-19MU114-20MU114-21MU114-22MU114-23MU114-24MU114-25MU114-26MU114-27MU114-28MU114-29MU114-30
LOCATION PLAN AND INDEX OF DRAWINGSTYPICAL CROSS SECTIONS, DETAILS AND NOTESGENERAL CONSTRUCTION SHEET 01GENERAL CONSTRUCTION SHEET 02GENERAL CONSTRUCTION SHEET 03GENERAL CONSTRUCTION SHEET 04KERB OUTSTAND LONGITUDINAL SECTIONS MR00 AND MR10KERB OUTSTAND LONGITUDINAL SECTIONS MR01, MR02, MR03, MR04 AND MR05KERB OUTSTAND LONGITUDINAL SECTIONS MR06, MR07, MR08, MR09 AND MR11KERB OUTSTAND LONGITUDINAL SECTIONS MR0A, MR0B, MR0C, MR0D, MR0E AND MR0FKERB OUTSTAND LONGITUDINAL SECTIONS MR0G, MR0H, MR20, MR21 AND MR22SHARED PATH LONGITUDINAL SECTIONS MRF1 AND MRF2SHARED PATH LONGITUDINAL SECTIONS MRF3 AND MRF4SHARED PATH LONGITUDINAL SECTIONS MRF5 AND MRF6SHARED PATH LONGITUDINAL SECTIONS MRF7TRAFFIC CONTROL SHEET 01TRAFFIC CONTROL SHEET 02TRAFFIC CONTROL SHEET 03TRAFFIC CONTROL SHEET 04FINAL SURFACE CONTOURS SHEET 01FINAL SURFACE CONTOURS SHEET 02FINAL SURFACE CONTOURS SHEET 03FINAL SURFACE CONTOURS SHEET 04DRAINAGE LONGITUDINAL SECTIONS SHEET 01DRAINAGE LONGITUDINAL SECTIONS SHEET 02DRAINAGE SCHEDULESETOUT DETAILS SHEET 01 - MR00, MR01, MR02, MR03, MR04 & MR05SETOUT DETAILS SHEET 02 - MR06, MR07, MR08, MR09, MR10, MR11 & MR0ASETOUT DETAILS SHEET 03 - MR0B, MR0C, MR0D, MR0E, MR0F, MR0G & MR20SETOUT DETAILS SHEET 04 - MR0H, MR21, MR22, MRF1, MRF2 & MRF3SETOUT DETAILS SHEET 05 - MRF4, MRF5, MRF6, MRF7 & OTHERS
For Information Only
MU114-SK01MU114-SK02MU114-SK03MU114-SK04
VEHICLE TURNING MOVEMENTSVEHICLE TURNING MOVEMENTSVEHICLE TURNING MOVEMENTSVEHICLE TURNING MOVEMENTS
SITE LOCATION
Safety Design WorksHigh Street, Yea
SAFETY DESIGN WORKS HIGH STREET, YEA
As shown
MURRINDINDI SHIRE COUNCIL
MU114-01
DETAILS AND NOTES
HZ
TYPICAL CROSS SECTIONS,
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
GENERAL NOTES:
1. ALL LANE DIMENSIONS QUOTED ARE TO THE CENTRE OF LINE
MARKING OR INVERT OF KERB.
2. LINE MARK AS SHOWN AND REMOVE REDUNDANT LINE MARKING.
3. INSTALL SIGNS AS SHOWN.
4. UNLESS OTHERWISE SPECIFIED, REMOVE EXISTING KERB AND
CHANNEL AND PAVEMENT THEN REINSTATE WITH TOPSOIL AND
SEED BETWEEN EXISTING KERB LINE AND NEW KERB LINE FOR
ALL NEW KERB OUTSTANDS.
5. SHARED PATH TO BE INSTALLED IN ACCORDANCE WITH
INFRASTRUCTURE DESIGN MANUAL STANDARD DRAWING SD 205.
6. PEDESTRIAN CROSSING TO BE INSTALLED IN ACCORDANCE WITH
INFRASTRUCTURE DESIGN MANUAL STANDARD DRAWING SD 200.
7. KERB AND CHANNEL TO BE INSTALLED IN ACCORDANCE WITH
INFRASTRUCTURE DESIGN MANUAL STANDARD DRAWING SD 100.
2.5m
2.5
%
MA
X
1
:
-
6
M
A
X
1
:
4
M
A
X
SHARED PATH TYPICAL CROSS SECTION
(NOT TO SCALE)
125mm 25Mpa CONCRETE
100mm THICK LAYER OF CLASS 3 FCR
BEDDING COMPACTED TO 97% MODIFIED
EXISTING B2 OR SM2
KERB AND CHANNEL
TO BE REMOVED
PROPOSED SM2
KERB AND CHANNEL
EXISTING SURFACE
PROPERTY
BOUNDARY
EXISTING FOOTPATH
OR VERGE
EXISTING PAVEMENT TO BE REMOVED AND
REINSTATE WITH TOPSOIL AND SEED BETWEEN
EXISTING KERB AND PROPOSED KERB
EXISTING PAVEMENT
SAW CUT LINE
100mm THICK LAYER OF CLASS 3 FCR
BEDDING COMPACTED TO 97% MODIFIED
KERB OUTSTAND TYPICAL CROSS SECTION
(NOT TO SCALE)
SL72 MESH SLAB REINFORCEMENT CENTRAL
NATURE STRIP
40mm SIZE 10 TYPE N ASPHALT
0.6m OR 1.5m AS SHOWN IN KERB
OUTSTAND LONGITUDINAL SECTIONS
CLASS 3 FCR COMPACTED
TO 97% MODIFIED
SAFETY DESIGN WORKS HIGH STREET, YEA
1
5
0
U
P
V
C
1
9
9
4
1
5
0
D
I
C
L
1
9
9
4
1
5
0
D
I
C
L
1
9
8
6
1
5
0
D
I
C
L
1
9
9
4
1
5
0
M
P
V
C
2
0
1
7
1
0
0
M
P
V
C
2
0
1
7
105
101
108
106
104
102
98
969294
881
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 10.5
H 10.5
H 10
H 6
H 7
H 4
1
6
6
.
6
1
6
6
.
9
6
F
L
1
6
9
.
9
G
1
6
7
.
5
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
D
G
E
O
F
B
I
T
U
M
E
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H 10.5
H 10.5
H 10.5
H 10.5
H 4
H 4
H 4
1
7
0
.
6
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
1
4
F
L
S
E
W
E
R
P
I
T
1
6
7
.
4
7
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
GRATED PIT
167.19(TOP)
SEWER PIT
167.21(TOP)
E
L
E
C
T
R
I
C
I
T
Y
P
I
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
S
I
G
N
FLOOD LIGHT
SIGN
S
I
G
N
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
S
IG
N
F
I
R
E
P
L
U
G
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
S
I
G
N
F
I
R
E
H
Y
D
R
A
N
T
S
I
G
N
S
I
G
N
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
B
I
T
U
M
E
N
C
A
R
P
A
R
K
B
I
T
U
M
E
N
C
A
R
P
A
R
K
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
G
R
A
S
S
E
D
A
R
E
A
S
I
G
N
S
I
G
N
S
I
G
N
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
TRAFFIC ISLAND
T
R
A
F
F
IC
IS
L
A
N
D
TRAFFIC ISLAND
E
D
G
E
O
F
B
I
T
U
M
E
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
B
O
L
L
A
R
D
W
I
T
H
L
I
G
H
T
C
O
N
C
R
E
T
E
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
I
S
L
A
N
D
G
I
F
F
A
R
D
S
T
R
E
E
T
M
E
L
B
O
U
R
N
E
R
O
A
D
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
TBM12
RIVET IN KERB
N 5880412.988
E 360032.310
RL 167.20
TBM01
RIVET IN KERB
N 5880434.296
E 359986.322
RL 167.54
S
E
P
1
3
J
B
0
7
J
B
0
8
S
M
2
S
M
3
S
M
2
S
M
2
S
M
2
S
M
2
S
M
2
2.5
MR00
MR10
MR0HMRF1
MR20
MR01
MR02
0.00
5.00 10.00
15.00
20.00
0.00
5.00
10.00
15.00
20.00
25.00
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
0.00
5.00
10.00
15.00
20.00
25.00
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
0.00 5.00
10.00
15.00
S
M
1
S
M
2
SM
2
R
16.0
R
0
.
3
R
6
0
.
0
R
5.0
R
1
.
5
R
7
.
0
R
2
0
.0
R
1
.
5
R
0
.
3
R
1
.
5
R
3
0
.
0
R
0
.9
R5.0
RELOCATE EXISTING
GIVE WAY SIGN
PROPERTY STORMWATER
OUTLET TO BE CONNECTED
INTO SIDE ENTRY PIT SEP13
MAINTAIN EXISTING CHANNEL
FLOW BEHIND KERB OUTSTAND
TRANSITION SM2 TO SM3
OUTFALL KERB AND CHANNEL
BETWEEN CH 40 TO CH 49.3
REMOVE EXISTING SIGN
REMOVE EXISTING SIGN
SERVICE PIT COVER
LEVEL TO BE ADJUSTED
REMOVE EXISTING SIGN
EXISTING KERB AND CHANNEL TO BE RETAINED
AND CONSTRUCT SM1 KERB FOR THE KERB
OUTSTAND NEAR EXISTING KERB AND CHANNEL
IMPORTANT!The location of underground services have been derived from available information, howeveraccuracy cannot be guaranteed. All existing service information should therefore be treated asindicative only, and service locations must be arranged prior to commencement of any excavation.The contractor will be held responsible for any damage caused to underground services. As shown
MURRINDINDI SHIRE COUNCIL
MU114-02
SHEET 01
HZ
GENERAL CONSTRUCTION
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
FO
R C
ON
TIN
UA
TIO
N S
EE
G
EN
ER
AL C
ON
ST
RU
CT
IO
N S
HE
ET
02
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
EX
TE
NT
O
F W
OR
KS
E E
SYMBOL
EXISTING DRAINAGE PIPE
DESCRIPTIONLEGEND
EXISTING OVERHEAD POWER LINE
EXISTING TELECOMMUNICATION SERVICE
EXISTING UNDERGROUND POWER LINE
S SEXISTING UNDERGROUND SEWER PIPE
PROPOSED DRAINAGE PIPE / CULVERT
PROPOSED JUNCTION PIT
PROPOSED SIDE ENTRY PIT
PROPOSED PEDESTRIAN RAMP
W WEXISTING UNDERGROUND WATER PIPE
CONCRETE SHARED PATH
PROPOSED SM2 OR SM3 KERB
EXISTING FOOTPATH TO BE REMOVED
PROPOSED SM1 KERB
SAFETY DESIGN WORKS HIGH STREET, YEA
SIDE ENTRY PIT
167.14(TOP)
1
5
0
D
I
C
L
1
9
8
6
1
5
0
D
I
C
L
1
9
8
6
1
0
0
M
P
V
C
2
0
1
7
1
0
0
D
IC
L
1
9
9
6
46
6365
5254
5660
6264
6668
72
8278
7674
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 8
H 8
H 7.5
H 3
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
7
2
.
9
G
1
7
0
.
1
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
5
4
F
L
1
6
6
.
8
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
4
1
F
L
1
6
7
.
3
8
F
L1
6
7
.
3
8
F
L
1
6
6
.
9
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
5
1
6
9
.
5
G
J
U
N
C
T
I
O
N
P
I
T
1
6
7
.
0
9
(
T
O
P
)
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
8
5
(
T
O
P
)
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
8
4
(
T
O
P
)
S
I
D
E
E
N
T
R
Y
P
I
T
1
6
6
.
9
2
(
T
O
P
)
1
6
6
.
6
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
6
1
6
6
.
9
6
F
L
1
6
7
.
1
1
F
L
S
I
G
N
SIGN
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H 8
H 12
H 10
H 12.5
H 13
H 10
H 11
H 7
H 6
H 13
H 11
H 7
H 6
H 7.5
1
7
0
.
5
G
1
6
7
.
2
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
9
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
1
6
7
.
2
0
F
L
1
7
0
.
1
G
1
6
9
.
6
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
9
1
6
7
.
2
1
F
L
1
6
7
.
0
7
F
L
1
6
7
.
0
6
F
L
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
9
7
F
L
S
E
W
E
R
P
I
T
1
6
6
.
8
5
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
S
I
G
N
S
I
G
N
S
I
G
N
SIGN
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
H
Y
F
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
W
A
T
E
R
S
T
O
P
V
A
L
V
E
F
I
R
E
H
Y
F
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
S
I
G
N
S
I
G
N
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A G
R
A
S
S
E
D
A
R
E
A
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
S
I
G
N
C
A
N
O
P
Y
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
SIGN
SIGN
SIGN
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
P
E
C
H
E
L
L
S
T
R
E
E
T
P
E
C
H
E
L
L
S
T
R
E
E
T
S
T
A
T
I
O
N
S
T
R
E
E
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
TBM11
RIVET IN PATH
N 5880441.189
E 360106.719
RL 167.01
YEA PM 10
N 5880528.155
E 360180.978
RL 166.966
TBM02
RIVET IN PATH
N 5880460.154
E 360059.876
RL 166.98
TBM03
RIVET IN PATH
N 5880479.251
E 360114.212
RL 167.11
TBM04
RIVET IN PATH
N 5880499.518
E 360171.835
RL 167.26
S
E
P
0
1
S
E
P
0
2
S
E
P
0
3
S
E
P
0
7
S
E
P
0
8
S
E
P
0
9
S
E
P
1
0
S
E
P
1
1
S
E
P
1
2
J
B
0
5
S
E
P
2
5
(
E
)
S
E
P
2
0
(
E
)
S
E
P
2
1
(
E
)
S
E
P
2
2
(
E
)
J
B
1
1
(
E
)
J
B
0
6
S
M
2
S
M
2
S
M
2
S
M
2
S
M
2
S
M
2
SM
2
S
M
2
S
M
2
S
M
2
S
M
2
SM
2
S
M
2
S
M
2
S
M
2
S
M
2
2
.
5
2
.
5
2
.
5
2
.
5
MR06
MR0D
MR0E
MR0F
MR0G
MRF2
MRF3
MRF4
MRF5
MR03
MR04
MR05
0.00
5.00
10.00
15.00
20.00
25.00
0.00
5.00
10.00
15.00
0.00
5.00
10.00
15.00
20.00
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0.00
5.00
10.00
15.00
0.00
5.0010
.00
15.00
20.00
25.00
30.00
0.00
5.00
10.0015
.00
20.00
25.00
30.00
35.00
40.00
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00 40.00
45.00
50.00
55.00
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
25.00
30.00
35.00
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
R
0
.
3
R
2
3
.0
R
0
.
3
R
0
.
3
R
0
.
3
R
1
.
2
R
1
.
2
R
0
.
3
R
0
.
3
R
2.5
R
4
.
5
R
1
.
5
R
0
.3
R7.0
R
1
5
.
0
R
1
.
5
R
1
.
5
R
1
.
5
R
1
0
0
.0
R
1
.
5
R
0
.
3
R
1
.
5
R
6
.
0
R
5
.
0
R
1
0
0
.0
R
7
.
0
R
1
.
2
R
0
.
3
R
0
.3
R1.2
R
7
.
0
PROPERTY STORMWATER
OUTLET TO BE CONNECTED
INTO SIDE ENTRY PIT SEP01
PROPERTY STORMWATER
OUTLET TO BE CONNECTED
INTO SIDE ENTRY PIT SEP02
PROPERTY STORMWATER
OUTLET TO BE CONNECTED
INTO SIDE ENTRY PIT SEP03
PROPERTY STORMWATER
OUTLET TO BE CONNECTED
INTO SIDE ENTRY PIT SEP07
CONVERT EXISTING SIDE
ENTRY PIT TO JUNCTION PIT
RELOCATE
EXISTING SIGNS
REMOVE EXISTING PRAM
CROSSING AND REINSTATE
KERB AND CHANNEL
REMOVE EXISTING
PRAM CROSSING
PROPERTY STORMWATER OUTLET
TO BE EXTENDED WEST AS SHOWN
SERVICE PIT COVER
LEVEL TO BE ADJUSTED
REMOVE EXISTING SIDE ENTRY
PIT AND CONNECTED PIPE
REMOVE EXISTING SIDE ENTRY
PIT AND CONNECTED PIPE
REMOVE EXISTING
STOP SIGNS
RELOCATE
EXISTING SIGN
REMOVE EXISTING FOOTPATH
AND PRAM CROSSING
REMOVE EXISTING FOOTPATH
REMOVE EXISTING
PRAM CROSSING
REMOVE EXISTING
FOOTPATH
IMPORTANT!The location of underground services have been derived from available information, howeveraccuracy cannot be guaranteed. All existing service information should therefore be treated asindicative only, and service locations must be arranged prior to commencement of any excavation.The contractor will be held responsible for any damage caused to underground services. As shown
MURRINDINDI SHIRE COUNCIL
MU114-03
SHEET 02
HZ
GENERAL CONSTRUCTION
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
FO
R C
ON
TIN
UA
TIO
N S
EE
G
EN
ER
AL C
ON
ST
RU
CT
IO
N S
HE
ET
03
FO
R C
ON
TIN
UA
TIO
N S
EE
G
EN
ER
AL C
ON
ST
RU
CT
IO
N S
HE
ET
01
E E
SYMBOL
EXISTING DRAINAGE PIPE
DESCRIPTIONLEGEND
EXISTING OVERHEAD POWER LINE
EXISTING TELECOMMUNICATION SERVICE
EXISTING UNDERGROUND POWER LINE
S SEXISTING UNDERGROUND SEWER PIPE
PROPOSED DRAINAGE PIPE / CULVERT
PROPOSED JUNCTION PIT
PROPOSED SIDE ENTRY PIT
PROPOSED PEDESTRIAN RAMP
W WEXISTING UNDERGROUND WATER PIPE
CONCRETE SHARED PATH
PROPOSED SM2 OR SM3 KERB
EXISTING FOOTPATH TO BE REMOVED
PROPOSED SM1 KERB
SAFETY DESIGN WORKS HIGH STREET, YEA
1
2
5
H
D
P
E
2
0
0
9
1
0
0
A
C
1
9
6
4
1
0
0
A
C
1
9
6
4
1
0
0
A
C
1
9
6
8
33
40
3331
29
27
25
232323171719
343436
32
2624
20
18
101010101010
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 12
H 12
H 12
H 12
H 12
H 12
H 6
H 6
H 6
H 6
H 12
H 9
H 9.5
H 11
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
1
6
7
.
5
9
F
L
G
R
A
T
E
D
P
I
T
1
6
7
.
5
8
(
T
O
P
)
1
6
7
.
4
1
6
9
.
0
P
1
7
3
.
7
G
1
7
0
.
7
P
1
6
7
.
8
8
F
L
1
6
7
.
6
5
F
L
1
6
7
.
6
8
F
L
1
6
7
.
5
1
6
7
.
5
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
2
1
6
7
.
6
8
F
L
1
6
7
.
8
8
F
L
1
6
7
.
4
1
F
L
1
6
7
.
4
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
H 12
H 12
H 12
H 6
H 12
H 15
H 8
H 7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
1
1
6
7
.
1
1
6
7
.
2
G
R
A
T
E
D
P
I
T
1
6
7
.
5
2
(
T
O
P
)
G
R
A
T
E
D
P
I
T
1
6
7
.
3
3
(
T
O
P
)
G
R
A
T
E
D
P
I
T
1
6
7
.
3
5
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
7
0
.
4
G
1
6
9
.
8
G
1
7
0
.
4
G
1
7
0
.
3
G
1
7
1
.
2
P
1
7
0
.
7
P
1
6
7
.
6
4
F
L
1
6
7
.
5
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
J
U
N
C
T
I
O
N
P
I
T
1
6
7
.
5
5
(
T
O
P
)
1
6
7
.
7
6
F
L
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
2
1
6
7
.
7
2
F
L
1
6
7
.
5
0
F
L
1
6
7
.
4
0
F
L
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
4
5
°
P
A
R
K
I
N
G
F
I
R
E
P
L
U
G
S
I
G
N
S
I
G
N
4
5
°
P
A
R
K
I
N
G
S
I
G
N
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
G
R
A
S
S
E
D
A
R
E
A
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
B
I
T
U
M
E
N
C
A
R
P
A
R
K
B
I
T
U
M
E
N
C
A
R
P
A
R
K
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
S
I
G
N
S
I
G
N
W
A
T
E
R
S
T
O
P
V
A
L
V
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
S
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
B
U
S
S
H
E
L
T
E
R
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
C
A
N
O
P
Y
C
A
N
O
P
Y
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
C
A
N
O
P
Y
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
S
I
G
N
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
T
H
E
C
R
E
S
C
E
N
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
TBM09
RIVET IN PATH
N 5880570.379
E 360299.095
RL 167.51
TBM07
RIVET IN PATH
N 5880559.350
E 360268.253
RL 167.47
TBM05
RIVET IN PATH
N 5880542.048
E 360219.854
RL 167.36
TBM06
RIVET IN PATH
N 5880524.832
E 360243.884
RL 167.51
TBM08
RIVET IN PATH
N 5880543.524
E 360297.016
RL 167.50
S
E
P
0
4
S
E
P
0
6
S
E
P
0
7
J
B
0
1
J
B
0
2
J
B
0
3
J
B
0
4
S
E
P
2
3
(
E
)
S
E
P
2
4
(
E
)
SM
2
S
M
2
S
M
2
S
M
2
S
M
2
S
M
1
S
M
2
S
M
2
2
.
5
2
.
5
MR07
MR08
MR11
MR0B
MR0C
MR0D
MRF6
MRF7
MR22
0.00
5.00 10.00
15.00
0.00
5.00
10.00
15.00
20.00
25.00
0.00
5.00
0.00
5.00
10.00
15.00
0.00
5.00
10.00
15.00
20.00
5.00
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
0.00
5.00
10.00
15.00
20.00
0.00
S
M
2
R
0
.
3
R
0
.
3
R
0
.
3
R
0
.
3
R2.5
R
1
.
5
R
1
.
5
R
1
.
5
R
1
.
5
R
4
.0
R
1
.
5
R
1
.
5
R
1
.
5
R
1
.
5
R
0
.
3
R
1
.
5
PROPERTY STORMWATER
OUTLET TO BE CONNECTED
INTO JUNCTION PIT JB01
REMOVE EXISTING FOOTPATH
AND PRAM CROSSING
EXISTING KERB AND CHANNEL TO BE RETAINED
AND CONSTRUCT SM1 KERB FOR THE KERB
OUTSTAND NEAR EXISTING KERB AND CHANNEL
IMPORTANT!The location of underground services have been derived from available information, howeveraccuracy cannot be guaranteed. All existing service information should therefore be treated asindicative only, and service locations must be arranged prior to commencement of any excavation.The contractor will be held responsible for any damage caused to underground services. As shown
MURRINDINDI SHIRE COUNCIL
MU114-04
SHEET 03
HZ
GENERAL CONSTRUCTION
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
FO
R C
ON
TIN
UA
TIO
N S
EE
G
EN
ER
AL C
ON
ST
RU
CT
IO
N S
HE
ET
04
FO
R C
ON
TIN
UA
TIO
N S
EE
G
EN
ER
AL C
ON
ST
RU
CT
IO
N S
HE
ET
02
E E
SYMBOL
EXISTING DRAINAGE PIPE
DESCRIPTIONLEGEND
EXISTING OVERHEAD POWER LINE
EXISTING TELECOMMUNICATION SERVICE
EXISTING UNDERGROUND POWER LINE
S SEXISTING UNDERGROUND SEWER PIPE
PROPOSED DRAINAGE PIPE / CULVERT
PROPOSED JUNCTION PIT
PROPOSED SIDE ENTRY PIT
PROPOSED PEDESTRIAN RAMP
W WEXISTING UNDERGROUND WATER PIPE
CONCRETE SHARED PATH
PROPOSED SM2 OR SM3 KERB
EXISTING FOOTPATH TO BE REMOVED
PROPOSED SM1 KERB
SAFETY DESIGN WORKS HIGH STREET, YEA
1
2
5
H
D
P
E
2
0
0
9
1
0
0
A
C
1
9
5
6
1
0
0
A
C
1
9
6
8
293
3
335
7
171719
15
13
11
9
2
1
29
3
2
1
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 12
H 12
H 6
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
8
1
6
7
.
1
7
F
L
1
6
7
.
6
1
F
L
1
6
7
.
6
1
F
L
1
6
7
.
5
9
F
L
H 12
H 12
H 12
H 12
H 12
H 12
H 6
H 6
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
9
4
(
T
O
P
)
SEWER PIT
166.96(TOP)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
SIDE ENTRY PIT
167.18(TOP)
4
5
°
P
A
R
K
I
N
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
G
R
A
S
S
E
D
A
R
E
A
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
S
I
G
N
S
I
G
N
S
I
G
N
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
IG
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
O
N
C
R
E
T
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H
O
O
D
S
T
R
E
E
T
W
H
A
T
T
O
N
P
L
A
C
E
H
I
G
H
S
T
R
E
E
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
H
IG
H
S
T
R
E
E
T
TBM10
RIVET IN PATH
N 5880567.388
E 360458.705
RL 166.97
YEA PM 11
N 5880617.124
E 360429.845
RL 166.830
S
E
P
0
5
S
E
P
2
3
(
E
)
J
B
1
0
(
E
)
S
M
2
S
M
2
S
M
1
MR09
MR0A
MR21
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0.00
5.0010.00
15.00 0.00
5.00
R
2
.
5
R
5
.
0
R
1
.5
R
1
.5
EXISTING KERB AND CHANNEL TO BE RETAINED
AND CONSTRUCT SM1 KERB FOR THE KERB
OUTSTAND NEAR EXISTING KERB AND CHANNEL
IMPORTANT!The location of underground services have been derived from available information, howeveraccuracy cannot be guaranteed. All existing service information should therefore be treated asindicative only, and service locations must be arranged prior to commencement of any excavation.The contractor will be held responsible for any damage caused to underground services. As shown
MURRINDINDI SHIRE COUNCIL
MU114-05
SHEET 04
HZ
GENERAL CONSTRUCTION
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
FO
R C
ON
TIN
UA
TIO
N S
EE
G
EN
ER
AL C
ON
ST
RU
CT
IO
N S
HE
ET
03
E E
SYMBOL
EXISTING DRAINAGE PIPE
DESCRIPTIONLEGEND
EXISTING OVERHEAD POWER LINE
EXISTING TELECOMMUNICATION SERVICE
EXISTING UNDERGROUND POWER LINE
S SEXISTING UNDERGROUND SEWER PIPE
PROPOSED DRAINAGE PIPE / CULVERT
PROPOSED JUNCTION PIT
PROPOSED SIDE ENTRY PIT
PROPOSED PEDESTRIAN RAMP
W WEXISTING UNDERGROUND WATER PIPE
CONCRETE SHARED PATH
PROPOSED SM2 OR SM3 KERB
EXISTING FOOTPATH TO BE REMOVED
PROPOSED SM1 KERB
EX
TE
NT
O
F W
OR
KS
SAFETY DESIGN WORKS HIGH STREET, YEA
4
.
6
3
.9
3
.
5
105
101
108
106
104
102
98
969294
881
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 10.5
H 10.5
H 10
H 6
H 7
H 4
1
6
6
.
6
1
6
6
.
9
6
F
L
1
6
9
.
9
G
1
6
7
.
5
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
D
G
E
O
F
B
I
T
U
M
E
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H 10.5
H 10.5
H 10.5
H 10.5
H 4
H 4
H 4
1
7
0
.
6
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
1
4
F
L
S
E
W
E
R
P
I
T
1
6
7
.
4
7
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
GRATED PIT
167.19(TOP)
SEWER PIT
167.21(TOP)
E
L
E
C
T
R
I
C
I
T
Y
P
I
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
S
I
G
N
FLOOD LIGHT
SIGN
S
I
G
N
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
S
IG
N
F
I
R
E
P
L
U
G
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
S
I
G
N
F
I
R
E
H
Y
D
R
A
N
T
S
I
G
N
S
I
G
N
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
B
I
T
U
M
E
N
C
A
R
P
A
R
K
B
I
T
U
M
E
N
C
A
R
P
A
R
K
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
G
R
A
S
S
E
D
A
R
E
A
S
I
G
N
S
I
G
N
S
I
G
N
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
TRAFFIC ISLAND
T
R
A
F
F
IC
IS
L
A
N
D
TRAFFIC ISLAND
E
D
G
E
O
F
B
I
T
U
M
E
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
B
O
L
L
A
R
D
W
I
T
H
L
I
G
H
T
C
O
N
C
R
E
T
E
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
I
S
L
A
N
D
G
I
F
F
A
R
D
S
T
R
E
E
T
M
E
L
B
O
U
R
N
E
R
O
A
D
2
.
9
5
.
1
3
.
6
3
.
8
2
.
9
5
.
1
3
.
6
3
.
8
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
#4
#4
#4
#2
60º ANGLE PARKING
#4
#11
1
.
5
1
.
5
1
.
5
1
.5
5
.
4
#30
#22#31
#23#30
P
ONLY
P
ONLY
2P
ANGLE
2P
ANGLE
P
PARALLEL
P
PARALLEL
P
ANGLE
P
ANGLE
ZONEBUS
ZONEBUS
AM
1/2P9 5
SAT
9 12AM
00NOON
MON - FRI
PM
AM
1/2P9 5
SAT
9 12AM
00NOON
MON - FRI
PM
As shown
MURRINDINDI SHIRE COUNCIL
MU114-15
SHEET 01
HZ
TRAFFIC CONTROL
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
FO
R C
ON
TIN
UA
TIO
N S
EE
T
RA
FF
IC
C
ON
TR
OL S
HE
ET
02
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
SYMBOL DESCRIPTIONLEGEND
CONTINUITY LINE 100mm WIDE
PROPOSED SM2 OR SM3 KERB
UNBROKEN PAINTED LINE 100mm WIDE
BUS STOP LINE MARKING
GIVE WAY HOLDING LINE 0.6m x 0.6m GAP
300mm WIDE THEN 150mm WIDE
PROPOSED SM1 KERB
GENERAL NOTES:
1. ALL LANE DIMENSIONS QUOTED ARE TO THE CENTRE OF LINE
MARKING OR INVERT OF KERB.
2. LINE MARK AS SHOWN AND REMOVE REDUNDANT LINE MARKING.
3. INSTALL SIGNS AS SHOWN.
4. UPDATE PARKING SIGNS ACCORDINGLY IF REQUIRED.
SAFETY DESIGN WORKS HIGH STREET, YEA
SIDE ENTRY PIT
167.14(TOP)
3
.
6
3
.
6
46
6365
5254
5660
6264
6668
72
8278
7674
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 8
H 8
H 7.5
H 3
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
7
2
.
9
G
1
7
0
.
1
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
5
4
F
L
1
6
6
.
8
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
4
1
F
L
1
6
7
.
3
8
F
L1
6
7
.
3
8
F
L
1
6
6
.
9
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
5
1
6
9
.
5
G
J
U
N
C
T
I
O
N
P
I
T
1
6
7
.
0
9
(
T
O
P
)
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
8
5
(
T
O
P
)
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
8
4
(
T
O
P
)
S
I
D
E
E
N
T
R
Y
P
I
T
1
6
6
.
9
2
(
T
O
P
)
1
6
6
.
6
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
6
1
6
6
.
9
6
F
L
1
6
7
.
1
1
F
L
S
I
G
N
SIGN
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H 8
H 12
H 10
H 12.5
H 13
H 10
H 11
H 7
H 6
H 13
H 11
H 7
H 6
H 7.5
1
7
0
.
5
G
1
6
7
.
2
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
9
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
1
6
7
.
2
0
F
L
1
7
0
.
1
G
1
6
9
.
6
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
9
1
6
7
.
2
1
F
L
1
6
7
.
0
7
F
L
1
6
7
.
0
6
F
L
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
9
7
F
L
S
E
W
E
R
P
I
T
1
6
6
.
8
5
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
S
I
G
N
S
I
G
N
S
I
G
N
SIGN
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
H
Y
F
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
W
A
T
E
R
S
T
O
P
V
A
L
V
E
F
I
R
E
H
Y
F
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
S
I
G
N
S
I
G
N
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A G
R
A
S
S
E
D
A
R
E
A
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
S
I
G
N
C
A
N
O
P
Y
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
SIGN
SIGN
SIGN
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
P
E
C
H
E
L
L
S
T
R
E
E
T
P
E
C
H
E
L
L
S
T
R
E
E
T
S
T
A
T
I
O
N
S
T
R
E
E
T
6
.
5
6
.
2
6
.
2
6
.
5
2
.
3
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
2
.
9
5
.
1
3
.
6
3
.
7
3
.
7
3
.
7
3
.
5
3
.
7
#4
#4
#4
#4
#4
#4
#4
#4
#2
#2
#11
#21
#21
#2
60º ANGLE PARKING
UPGRADE EXISTING ANGLE PARKING
TO PARALLEL PARKING
REINSTATE PARALLEL
PARKING LINEMARKING
1
.
5
1
.
5
1
.
5
1
.
5
1
.
5
#25
#23#24
#22#25
#24
#26
#31
#30
#29
#28
#27
#4
1
.
5
1
.
5
1
.
5
P
ONLY
P
ONLY
2P
ANGLE
2P
ANGLE
P
PARALLEL
P
PARALLEL
P
ANGLE
P
ANGLE
ZONEBUS
ZONEBUS
AM
1/2P9 5
SAT
9 12AM
00NOON
MON - FRI
PM
AM
1/2P9 5
SAT
9 12AM
00NOON
MON - FRI
PM
As shown
MURRINDINDI SHIRE COUNCIL
MU114-16
SHEET 02
HZ
TRAFFIC CONTROL
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
FO
R C
ON
TIN
UA
TIO
N S
EE
T
RA
FF
IC
C
ON
TR
OL S
HE
ET
03
FO
R C
ON
TIN
UA
TIO
N S
EE
T
RA
FF
IC
C
ON
TR
OL S
HE
ET
01
SYMBOL DESCRIPTIONLEGEND
CONTINUITY LINE 100mm WIDE
PROPOSED SM2 OR SM3 KERB
UNBROKEN PAINTED LINE 100mm WIDE
BUS STOP LINE MARKING
GIVE WAY HOLDING LINE 0.6m x 0.6m GAP
300mm WIDE THEN 150mm WIDE
PROPOSED SM1 KERB
GENERAL NOTES:
1. ALL LANE DIMENSIONS QUOTED ARE TO THE CENTRE OF LINE
MARKING OR INVERT OF KERB.
2. LINE MARK AS SHOWN AND REMOVE REDUNDANT LINE MARKING.
3. INSTALL SIGNS AS SHOWN.
4. UPDATE PARKING SIGNS ACCORDINGLY IF REQUIRED.
SAFETY DESIGN WORKS HIGH STREET, YEA
3
.
5
3
.
8
3
.
7
33
40
3331
29
27
25
232323171719
343436
32
2624
20
18
101010101010
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 12
H 12
H 12
H 12
H 12
H 12
H 6
H 6
H 6
H 6
H 12
H 9
H 9.5
H 11
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
1
6
7
.
5
9
F
L
G
R
A
T
E
D
P
I
T
1
6
7
.
5
8
(
T
O
P
)
1
6
7
.
4
1
6
9
.
0
P
1
7
3
.
7
G
1
7
0
.
7
P
1
6
7
.
8
8
F
L
1
6
7
.
6
5
F
L
1
6
7
.
6
8
F
L
1
6
7
.
5
1
6
7
.
5
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
2
1
6
7
.
6
8
F
L
1
6
7
.
8
8
F
L
1
6
7
.
4
1
F
L
1
6
7
.
4
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
H 12
H 12
H 12
H 6
H 12
H 15
H 8
H 7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
1
1
6
7
.
1
1
6
7
.
2
G
R
A
T
E
D
P
I
T
1
6
7
.
5
2
(
T
O
P
)
G
R
A
T
E
D
P
I
T
1
6
7
.
3
3
(
T
O
P
)
G
R
A
T
E
D
P
I
T
1
6
7
.
3
5
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
7
0
.
4
G
1
6
9
.
8
G
1
7
0
.
4
G
1
7
0
.
3
G
1
7
1
.
2
P
1
7
0
.
7
P
1
6
7
.
6
4
F
L
1
6
7
.
5
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
J
U
N
C
T
I
O
N
P
I
T
1
6
7
.
5
5
(
T
O
P
)
1
6
7
.
7
6
F
L
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
2
1
6
7
.
7
2
F
L
1
6
7
.
5
0
F
L
1
6
7
.
4
0
F
L
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
4
5
°
P
A
R
K
I
N
G
F
I
R
E
P
L
U
G
S
I
G
N
S
I
G
N
4
5
°
P
A
R
K
I
N
G
S
I
G
N
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
G
R
A
S
S
E
D
A
R
E
A
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
B
I
T
U
M
E
N
C
A
R
P
A
R
K
B
I
T
U
M
E
N
C
A
R
P
A
R
K
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
S
I
G
N
S
I
G
N
W
A
T
E
R
S
T
O
P
V
A
L
V
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
S
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
B
U
S
S
H
E
L
T
E
R
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
C
A
N
O
P
Y
C
A
N
O
P
Y
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
C
A
N
O
P
Y
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
S
I
G
N
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
T
H
E
C
R
E
S
C
E
N
T
6
.
5
6
.
2
6
.
2
6
.
5
2
.
3
2
.
9
5
.
1
3
.
0
3
.
8
2
.
9
5
.
1
2
.
8
3
.
6
2
.
9
2
.
8
3
.
5
5
.
1
3
.
5
2
.
9
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
#4
#4
#4
#4
3
.
5
60º ANGLE PARKING
60º ANGLE PARKING
60º ANGLE PARKING
UPGRADE EXISTING ANGLE PARKING
TO PARALLEL PARKING
1
.
5
1
.
5
1
.
5
#31#32
#33
#26
#22#27
#23#26
#34
#29
#28 #35
1
.
5
1
.
5
P
ONLY
P
ONLY
2P
ANGLE
2P
ANGLE
P
PARALLEL
P
PARALLEL
P
ANGLE
P
ANGLE
ZONEBUS
ZONEBUS
AM
1/2P9 5
SAT
9 12AM
00NOON
MON - FRI
PM
AM
1/2P9 5
SAT
9 12AM
00NOON
MON - FRI
PM
As shown
MURRINDINDI SHIRE COUNCIL
MU114-17
SHEET 03
HZ
TRAFFIC CONTROL
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
FO
R C
ON
TIN
UA
TIO
N S
EE
T
RA
FF
IC
C
ON
TR
OL S
HE
ET
04
FO
R C
ON
TIN
UA
TIO
N S
EE
T
RA
FF
IC
C
ON
TR
OL S
HE
ET
02
SYMBOL DESCRIPTIONLEGEND
CONTINUITY LINE 100mm WIDE
PROPOSED SM2 OR SM3 KERB
UNBROKEN PAINTED LINE 100mm WIDE
BUS STOP LINE MARKING
GIVE WAY HOLDING LINE 0.6m x 0.6m GAP
300mm WIDE THEN 150mm WIDE
PROPOSED SM1 KERB
GENERAL NOTES:
1. ALL LANE DIMENSIONS QUOTED ARE TO THE CENTRE OF LINE
MARKING OR INVERT OF KERB.
2. LINE MARK AS SHOWN AND REMOVE REDUNDANT LINE MARKING.
3. INSTALL SIGNS AS SHOWN.
4. UPDATE PARKING SIGNS ACCORDINGLY IF REQUIRED.
SAFETY DESIGN WORKS HIGH STREET, YEA
3
.
8
5
.
1
293
3
335
7
171719
15
13
11
9
2
1
29
3
2
1
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 12
H 12
H 6
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
8
1
6
7
.
1
7
F
L
1
6
7
.
6
1
F
L
1
6
7
.
6
1
F
L
1
6
7
.
5
9
F
L
H 12
H 12
H 12
H 12
H 12
H 12
H 6
H 6
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
9
4
(
T
O
P
)
SEWER PIT
166.96(TOP)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
SIDE ENTRY PIT
167.18(TOP)
4
5
°
P
A
R
K
I
N
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
G
R
A
S
S
E
D
A
R
E
A
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
S
I
G
N
S
I
G
N
S
I
G
N
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
IG
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
O
N
C
R
E
T
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H
O
O
D
S
T
R
E
E
T
W
H
A
T
T
O
N
P
L
A
C
E
H
I
G
H
S
T
R
E
E
T
2
.
8
3
.
5
5
.
1
2
.
8
3
.
6
2
.
9
2
.
9
5
.
1
2
.
8
H
IG
H
S
T
R
E
E
T
#4
#2
#4
60º ANGLE PARKING
#20
1
.
5
1
.5
#22#27
#23#26
#22#27
#23#26
#27
3
.
6
1
.
5
1
.
5
#2
P
ONLY
P
ONLY
2P
ANGLE
2P
ANGLE
P
PARALLEL
P
PARALLEL
P
ANGLE
P
ANGLE
ZONEBUS
ZONEBUS
AM
1/2P9 5
SAT
9 12AM
00NOON
MON - FRI
PM
AM
1/2P9 5
SAT
9 12AM
00NOON
MON - FRI
PM
As shown
MURRINDINDI SHIRE COUNCIL
MU114-18
SHEET 04
HZ
TRAFFIC CONTROL
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
FO
R C
ON
TIN
UA
TIO
N S
EE
T
RA
FF
IC
C
ON
TR
OL S
HE
ET
03
SYMBOL DESCRIPTIONLEGEND
CONTINUITY LINE 100mm WIDE
PROPOSED SM2 OR SM3 KERB
UNBROKEN PAINTED LINE 100mm WIDE
BUS STOP LINE MARKING
GIVE WAY HOLDING LINE 0.6m x 0.6m GAP
300mm WIDE THEN 150mm WIDE
PROPOSED SM1 KERB
GENERAL NOTES:
1. ALL LANE DIMENSIONS QUOTED ARE TO THE CENTRE OF LINE
MARKING OR INVERT OF KERB.
2. LINE MARK AS SHOWN AND REMOVE REDUNDANT LINE MARKING.
3. INSTALL SIGNS AS SHOWN.
4. UPDATE PARKING SIGNS ACCORDINGLY IF REQUIRED.
SAFETY DESIGN WORKS HIGH STREET, YEA
4
.
6
3
.9
3
.
5
167.15
167.4
516
7.50
167.50
167.50
167.55
167.55
167.60
167.6
0
167.60
167.60
167.6
0
167.60167.60
167.6
0
167.65
167.70167.70
167.85
167.85
167.85
167.90
167.90
167.90
167.90
167.90
167.95
167.95
167.95
167.95
167.95
167.95
167.95
168.00
168.00
168.00
168.00
168.00
168.05
168.05
167.65
167.65167.65
167.65
167.2
0
167.25
167.75167.75
167.80
167.50167.55
167.6
5
167.70
167.70
105
101
108
106
104
102
98
969294
881
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 10.5
H 10.5
H 10
H 6
H 7
H 4
1
6
6
.
6
1
6
6
.
9
6
F
L
1
6
9
.
9
G
1
6
7
.
5
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
D
G
E
O
F
B
I
T
U
M
E
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H 10.5
H 10.5
H 10.5
H 10.5
H 4
H 4
H 4
1
7
0
.
6
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
1
4
F
L
S
E
W
E
R
P
I
T
1
6
7
.
4
7
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
GRATED PIT
167.19(TOP)
SEWER PIT
167.21(TOP)
E
L
E
C
T
R
I
C
I
T
Y
P
I
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
S
I
G
N
FLOOD LIGHT
SIGN
S
I
G
N
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
S
IG
N
F
I
R
E
P
L
U
G
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
S
I
G
N
F
I
R
E
H
Y
D
R
A
N
T
S
I
G
N
S
I
G
N
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
B
I
T
U
M
E
N
C
A
R
P
A
R
K
B
I
T
U
M
E
N
C
A
R
P
A
R
K
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
G
R
A
S
S
E
D
A
R
E
A
S
I
G
N
S
I
G
N
S
I
G
N
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
TRAFFIC ISLAND
T
R
A
F
F
IC
IS
L
A
N
D
TRAFFIC ISLAND
E
D
G
E
O
F
B
I
T
U
M
E
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
B
O
L
L
A
R
D
W
I
T
H
L
I
G
H
T
C
O
N
C
R
E
T
E
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
I
S
L
A
N
D
G
I
F
F
A
R
D
S
T
R
E
E
T
M
E
L
B
O
U
R
N
E
R
O
A
D
2
.
9
5
.
1
3
.
6
3
.
8
2
.
9
5
.
1
3
.
6
3
.
8
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
#4
#4
#4
#2
60º ANGLE PARKING
#4
#11
1
.
5
1
.
5
1
.
5
1
.5
5
.
4
#30
#22#31
#23#30
As shown
MURRINDINDI SHIRE COUNCIL
MU114-19
SHEET 01
HZ
FINAL SURFACE CONTOURS
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
FO
R C
ON
TIN
UA
TIO
N S
EE
F
IN
AL S
UR
FA
CE
C
ON
TO
UR
S S
HE
ET
02
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
SAFETY DESIGN WORKS HIGH STREET, YEA
SIDE ENTRY PIT
167.14(TOP)
3
.
6
3
.
6
166.7
0
166.70
166.70
167.05
167.05
167.05
167.05
167.05
167.05
166.90166.95167.00167.05
167.05
167.10
167.10
167.15
167.15
167.15
167.15
167.15
167.20
167.35
167.2
5
167.30
167.30
167.35
167.35
166.75
166.75166.75
166.80
167.10
167.1
0
166.80
167.15
167.1
5
167.15
167.20
167.2
0
167.20
167.20
167.40
167.40
167.45
167.45
167.45
167.20
167.2
0
167.25
167.25
167.10
167.10
167.50
167.50
167.10167.10
167.10
167.10
167.10
167.15
167.15
167.15
167.15
46
6365
5254
5660
6264
6668
72
8278
7674
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 8
H 8
H 7.5
H 3
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
7
2
.
9
G
1
7
0
.
1
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
5
4
F
L
1
6
6
.
8
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
4
1
F
L
1
6
7
.
3
8
F
L1
6
7
.
3
8
F
L
1
6
6
.
9
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
5
1
6
9
.
5
G
J
U
N
C
T
I
O
N
P
I
T
1
6
7
.
0
9
(
T
O
P
)
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
8
5
(
T
O
P
)
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
8
4
(
T
O
P
)
S
I
D
E
E
N
T
R
Y
P
I
T
1
6
6
.
9
2
(
T
O
P
)
1
6
6
.
6
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
6
1
6
6
.
9
6
F
L
1
6
7
.
1
1
F
L
S
I
G
N
SIGN
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H 8
H 12
H 10
H 12.5
H 13
H 10
H 11
H 7
H 6
H 13
H 11
H 7
H 6
H 7.5
1
7
0
.
5
G
1
6
7
.
2
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
9
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
1
6
7
.
2
0
F
L
1
7
0
.
1
G
1
6
9
.
6
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
9
1
6
7
.
2
1
F
L
1
6
7
.
0
7
F
L
1
6
7
.
0
6
F
L
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
9
7
F
L
S
E
W
E
R
P
I
T
1
6
6
.
8
5
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
S
I
G
N
S
I
G
N
S
I
G
N
SIGN
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
H
Y
F
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
W
A
T
E
R
S
T
O
P
V
A
L
V
E
F
I
R
E
H
Y
F
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
S
I
G
N
S
I
G
N
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A G
R
A
S
S
E
D
A
R
E
A
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
S
I
G
N
C
A
N
O
P
Y
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
SIGN
SIGN
SIGN
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
P
E
C
H
E
L
L
S
T
R
E
E
T
P
E
C
H
E
L
L
S
T
R
E
E
T
S
T
A
T
I
O
N
S
T
R
E
E
T
6
.
5
6
.
2
6
.
2
6
.
5
2
.
3
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
2
.
9
5
.
1
3
.
6
3
.
7
3
.
7
3
.
7
3
.
5
3
.
7
#4
#4
#4
#4
#4
#4
#4
#4
#2
#2
#11
#21
#21
#2
60º ANGLE PARKING
UPGRADE EXISTING ANGLE PARKING
TO PARALLEL PARKING
REINSTATE PARALLEL
PARKING LINEMARKING
1
.
5
1
.
5
1
.
5
1
.
5
A01
A02
A03
A04
A05
A06
A07
A08
A09
A10
1
.
5
#25
#23#24
#22#25
#24
#26
#31
#30
#29
#28
#27
#4
1
.
5
1
.
5
1
.
5
As shown
MURRINDINDI SHIRE COUNCIL
MU114-20
SHEET 02
HZ
FINAL SURFACE CONTOURS
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
FO
R C
ON
TIN
UA
TIO
N S
EE
F
IN
AL S
UR
FA
CE
C
ON
TO
UR
S S
HE
ET
03
FO
R C
ON
TIN
UA
TIO
N S
EE
F
IN
AL S
UR
FA
CE
C
ON
TO
UR
S S
HE
ET
01
SAFETY DESIGN WORKS HIGH STREET, YEA
3
.
5
3
.
8
3
.
7
167.25
167.25
167.2
5
167.25
167.40
167.40
167.45
167.45
167.30
167.5
0
167.55
167.6
0
167.45 167.50
167.55
33
40
3331
29
27
25
232323171719
343436
32
2624
20
18
101010101010
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 12
H 12
H 12
H 12
H 12
H 12
H 6
H 6
H 6
H 6
H 12
H 9
H 9.5
H 11
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
1
6
7
.
5
9
F
L
G
R
A
T
E
D
P
I
T
1
6
7
.
5
8
(
T
O
P
)
1
6
7
.
4
1
6
9
.
0
P
1
7
3
.
7
G
1
7
0
.
7
P
1
6
7
.
8
8
F
L
1
6
7
.
6
5
F
L
1
6
7
.
6
8
F
L
1
6
7
.
5
1
6
7
.
5
P
R
O
P
E
R
T
Y
O
U
T
L
E
T1
6
7
.
2
1
6
7
.
6
8
F
L
1
6
7
.
8
8
F
L
1
6
7
.
4
1
F
L
1
6
7
.
4
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
H 12
H 12
H 12
H 6
H 12
H 15
H 8
H 7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
1
1
6
7
.
1
1
6
7
.
2
G
R
A
T
E
D
P
I
T
1
6
7
.
5
2
(
T
O
P
)
G
R
A
T
E
D
P
I
T
1
6
7
.
3
3
(
T
O
P
)
G
R
A
T
E
D
P
I
T
1
6
7
.
3
5
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
7
0
.
4
G
1
6
9
.
8
G
1
7
0
.
4
G
1
7
0
.
3
G
1
7
1
.
2
P
1
7
0
.
7
P
1
6
7
.
6
4
F
L
1
6
7
.
5
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
J
U
N
C
T
I
O
N
P
I
T
1
6
7
.
5
5
(
T
O
P
)
1
6
7
.
7
6
F
L
P
R
O
P
E
R
T
Y
O
U
T
L
E
T1
6
7
.
2
1
6
7
.
7
2
F
L
1
6
7
.
5
0
F
L
1
6
7
.
4
0
F
L
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
4
5
°
P
A
R
K
I
N
G
F
I
R
E
P
L
U
G
S
I
G
N
S
I
G
N
4
5
°
P
A
R
K
I
N
G
S
I
G
N
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
G
R
A
S
S
E
D
A
R
E
A
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
B
I
T
U
M
E
N
C
A
R
P
A
R
K
B
I
T
U
M
E
N
C
A
R
P
A
R
K
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
S
I
G
N
S
I
G
N
W
A
T
E
R
S
T
O
P
V
A
L
V
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
S
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
B
U
S
S
H
E
L
T
E
R
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
C
A
N
O
P
Y
C
A
N
O
P
Y
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
C
A
N
O
P
Y
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
S
I
G
N
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
T
H
E
C
R
E
S
C
E
N
T
6
.
5
6
.
2
6
.
2
6
.
5
2
.
3
2
.
9
5
.
1
3
.
0
3
.
8
2
.
9
5
.
1
2
.
8
3
.
6
2
.
9
2
.
8
3
.
5
5
.
1
3
.
5
2
.
9
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
#4
#4
#4
#4
3
.
5
60º ANGLE PARKING
60º ANGLE PARKING
60º ANGLE PARKING
UPGRADE EXISTING ANGLE PARKING
TO PARALLEL PARKING
1
.
5
1
.
5
1
.
5
#31#32
#33
#26
#22#27
#23#26
#34
#29
#28 #35
1
.
5
1
.
5
As shown
MURRINDINDI SHIRE COUNCIL
MU114-21
SHEET 03
HZ
FINAL SURFACE CONTOURS
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
FO
R C
ON
TIN
UA
TIO
N S
EE
F
IN
AL S
UR
FA
CE
C
ON
TO
UR
S S
HE
ET
04
FO
R C
ON
TIN
UA
TIO
N S
EE
F
IN
AL S
UR
FA
CE
C
ON
TO
UR
S S
HE
ET
02
SAFETY DESIGN WORKS HIGH STREET, YEA
3
.
8
166.85166.90
166.95
167.00
167.00167.05
167.0
5
167.10
5
.
1
293
3
335
7
171719
15
13
11
9
2
1
29
3
2
1
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 12
H 12
H 6
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
8
1
6
7
.
1
7
F
L
1
6
7
.
6
1
F
L
1
6
7
.
6
1
F
L
1
6
7
.
5
9
F
L
H 12
H 12
H 12
H 12
H 12
H 12
H 6
H 6
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
9
4
(
T
O
P
)
SEWER PIT
166.96(TOP)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
SIDE ENTRY PIT
167.18(TOP)
4
5
°
P
A
R
K
I
N
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
G
R
A
S
S
E
D
A
R
E
A
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
S
I
G
N
S
I
G
N
S
I
G
N
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
IG
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
O
N
C
R
E
T
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H
O
O
D
S
T
R
E
E
T
W
H
A
T
T
O
N
P
L
A
C
E
H
I
G
H
S
T
R
E
E
T
2
.
8
3
.
5
5
.
1
2
.
8
3
.
6
2
.
9
2
.
9
5
.
1
2
.
8
H
IG
H
S
T
R
E
E
T
#4
#2
#4
60º ANGLE PARKING
#20
1
.
5
1
.5
#22#27
#23#26
#22#27
#23#26
#27
3
.
6
1
.
5
1
.
5
#2
As shown
MURRINDINDI SHIRE COUNCIL
MU114-22
SHEET 04
HZ
FINAL SURFACE CONTOURS
December 2019
31
ISSUED FOR TENDER
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
FO
R C
ON
TIN
UA
TIO
N S
EE
F
IN
AL S
UR
FA
CE
C
ON
TO
UR
S S
HE
ET
03
SAFETY DESIGN WORKS HIGH STREET, YEA
4
.
6
3
.9
3
.
5
105
101
108
106
104
102
98
969294
881
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 10.5
H 10.5
H 10
H 6
H 7
H 4
1
6
6
.
6
1
6
6
.
9
6
F
L
1
6
9
.
9
G
1
6
7
.
5
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
D
G
E
O
F
B
I
T
U
M
E
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H 10.5
H 10.5
H 10.5
H 10.5
H 4
H 4
H 4
1
7
0
.
6
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
1
4
F
L
S
E
W
E
R
P
I
T
1
6
7
.
4
7
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
GRATED PIT
167.19(TOP)
SEWER PIT
167.21(TOP)
E
L
E
C
T
R
I
C
I
T
Y
P
I
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
S
I
G
N
FLOOD LIGHT
SIGN
S
I
G
N
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
S
IG
N
F
I
R
E
P
L
U
G
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
S
I
G
N
F
I
R
E
H
Y
D
R
A
N
T
S
I
G
N
S
I
G
N
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
B
I
T
U
M
E
N
C
A
R
P
A
R
K
B
I
T
U
M
E
N
C
A
R
P
A
R
K
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
G
R
A
S
S
E
D
A
R
E
A
S
I
G
N
S
I
G
N
S
I
G
N
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
TRAFFIC ISLAND
T
R
A
F
F
IC
IS
L
A
N
D
TRAFFIC ISLAND
E
D
G
E
O
F
B
I
T
U
M
E
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
B
O
L
L
A
R
D
W
I
T
H
L
I
G
H
T
C
O
N
C
R
E
T
E
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
I
S
L
A
N
D
G
I
F
F
A
R
D
S
T
R
E
E
T
M
E
L
B
O
U
R
N
E
R
O
A
D
Single U
nit T
ruck/B
us (12.5 m
)
Single U
nit T
ruck/B
us (12.5 m
)
Single U
nit T
ruck/B
us (12.5 m
)
Sin
gle
U
nit Truck/B
us (12.5 m
)
Sin
gle
U
nit Truck/B
us (12.5 m
)
Sin
gle
U
nit Truck/B
us (12.5 m
)
2
.
9
5
.
1
3
.
6
3
.
8
2
.
9
5
.
1
3
.
6
3
.
8
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
#4
#4
#4
#2
60º ANGLE PARKING
#4
#11
1
.
5
1
.
5
1
.
5
1
.5
5
.
4
#30
#22#31
#23#30
Serv
ice V
ehic
le (
8.8
m)
Serv
ice V
ehic
le (
8.8
m)
Serv
ice V
ehic
le (
8.8
m)
Prim
e m
over and sem
i-trailer (19 m
)
Prim
e m
over and sem
i-trailer (19 m
)
Prim
e m
over and sem
i-trailer (19 m
)
Prim
e m
over a
nd s
em
i-tr
ailer (
19 m
)
Prim
e m
over a
nd s
em
i-tr
ailer (
19 m
)
Prim
e m
over a
nd s
em
i-tr
ailer (
19 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
As shown
MURRINDINDI SHIRE COUNCIL
MU114-SK01
HZ
VEHICLE TURNING MOVEMENTS
December 2019
31
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
12.5
2.2 6.2 1.3
Single Unit Truck/Bus (12.5 m)Overall Length 12.500mOverall Width 2.500mOverall Body Height 4.300mMin Body Ground Clearance 0.490mTrack Width 2.500mLock-to-lock time 6.00sCurb to Curb Turning Radius 12.500m
FOR INFORMATION
8.8
1.5 5
Service Vehicle (8.8 m)Overall Length 8.800mOverall Width 2.500mOverall Body Height 4.300mMin Body Ground Clearance 0.427mTrack Width 2.500mLock-to-lock time 4.00sCurb to Curb Turning Radius 12.500m
13.7
8.11
Max 72° Horiz
Max 6° Vert
8.2 1.3 1.3 1.5
6.7
1.6 4.65 1.3
Prime mover and semi-trailer (19 m)
Overall Length 19.000m
Overall Width 2.500m
Overall Body Height 4.300m
Min Body Ground Clearance 0.540m
Track Width 2.500m
Lock-to-lock time 6.00s
Curb to Curb Turning Radius 12.500m
5.2
0.95 3.05
Passenger vehicle (5.2 m)
Overall Length 5.200m
Overall Width 1.940m
Overall Body Height 1.804m
Min Body Ground Clearance 0.295m
Track Width 1.840m
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 6.300m
SAFETY DESIGN WORKS HIGH STREET, YEA
SIDE ENTRY PIT
167.14(TOP)
10111
6365
6062
6466
6872
969294
88
8278
7686
74
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 8
H 7.5
H 3
H 10.5
H 10.5
H 6
1
7
2
.
9
G
1
7
0
.
1
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
3
8
F
L1
6
7
.
3
8
F
L
1
6
6
.
9
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
5
1
6
9
.
5
G
J
U
N
C
T
I
O
N
P
I
T
1
6
7
.
0
9
(
T
O
P
)
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
8
5
(
T
O
P
)
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
8
4
(
T
O
P
)
S
I
D
E
E
N
T
R
Y
P
I
T
1
6
6
.
9
2
(
T
O
P
)
1
6
6
.
6
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
6
1
6
6
.
9
6
F
L
1
6
7
.
1
1
F
L
1
6
9
.
9
G
S
I
G
N
SIGN
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H 10
H 12.5
H 13
H 10
H 11
H 7
H 6
H 13
H 11
H 7
H 6
H 7.5
H 10.5
H 10.5
H 10.5
1
6
7
.
0
1
7
0
.
1
G
1
6
9
.
6
G
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
9
1
6
7
.
2
1
F
L
1
6
7
.
0
7
F
L
1
6
7
.
0
6
F
L
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
9
7
F
L
1
7
0
.
6
G
S
E
W
E
R
P
I
T
1
6
6
.
8
5
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
1
4
F
L
S
E
W
E
R
P
I
T
1
6
7
.
4
7
(
T
O
P
)
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
SIGN
S
I
G
N
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
H
Y
F
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
F
I
R
E
H
Y
D
R
A
N
T
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
B
I
T
U
M
E
N
C
A
R
P
A
R
K
B
I
T
U
M
E
N
C
A
R
P
A
R
K
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A G
R
A
S
S
E
D
A
R
E
A
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
S
IG
N
C
A
N
O
P
Y
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
I
S
L
A
N
D
S
T
A
T
I
O
N
S
T
R
E
E
T
B-Double (26.0m)
B-Double (26.0m)
B-Double (26.0m)
B-D
ouble
(26.0
m
)
B-D
ouble
(26.0
m
)
B-D
ouble
(26.0
m
)
Sin
gle
Unit T
ruck/B
us (
12.5
m)
Sin
gle
Unit T
ruck/B
us (
12.5
m)
Sin
gle
Unit T
ruck/B
us (
12.5
m)
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
#4
#4
#4
#4
#4
B-Double (26.0m)
B-Double (26.0m)
B-Double (26.0m)
A05
A06
A07
A08
#25
#23#24
#22#25
#24
#26
#30
#22#31
#23#30
#31
#29
#28
Serv
ice V
ehic
le (
8.8
m)
Serv
ice V
ehic
le (
8.8
m)
Serv
ice V
ehic
le (
8.8
m)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
As shown
MURRINDINDI SHIRE COUNCIL
MU114-SK02
HZ
VEHICLE TURNING MOVEMENTS
December 2019
31
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
12.511.31 0
7.11
Max° HorizMax° Vert
7.85 1.3 1.3 1.68.05
Max° HorizMax° Vert
6.75 1.3 1.3 0.56
5.91.4 3.85 1.3
B-Double (26.0m)Overall Length 26.000mOverall Width 2.500mOverall Body Height 4.300mMin Body Ground Clearance 0.540mTrack Width 2.500mLock-to-lock time 6.00sCurb to Curb Turning Radius 15.000m
12.5
2.2 6.2 1.3
Single Unit Truck/Bus (12.5 m)Overall Length 12.500mOverall Width 2.500mOverall Body Height 4.300mMin Body Ground Clearance 0.490mTrack Width 2.500mLock-to-lock time 6.00sCurb to Curb Turning Radius 12.500m
FOR INFORMATION
5.2
0.95 3.05
Passenger vehicle (5.2 m)
Overall Length 5.200m
Overall Width 1.940m
Overall Body Height 1.804m
Min Body Ground Clearance 0.295m
Track Width 1.840m
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 6.300m
SAFETY DESIGN WORKS HIGH STREET, YEA
SIDE ENTRY PIT
167.14(TOP)
5
3
1
33
4044
46
6365
248
5254
3331
29
343436
32
26
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 12
H 9
H 9.5
H 11
H 8
H 8
G
R
A
T
E
D
P
I
T
1
6
7
.
5
8
(
T
O
P
)
1
6
7
.
4
1
7
0
.
7
P
1
6
7
.
8
8
F
L
1
6
7
.
6
5
F
L
1
6
7
.
6
8
F
L
1
6
7
.
5
1
6
7
.
5
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
2
1
6
7
.
6
8
F
L
1
6
7
.
8
8
F
L
1
6
7
.
4
1
F
L
1
6
7
.
4
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
5
4
F
L
1
6
6
.
8
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
4
1
F
L
1
6
7
.
3
8
F
L
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H 12
H 15
H 8
H 7
H 8
H 12
H 12.5
G
R
A
T
E
D
P
I
T
1
6
7
.
3
5
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
7
0
.
4
G
1
6
9
.
8
G
1
7
0
.
4
G
1
7
0
.
3
G
1
7
0
.
5
G
1
7
1
.
2
P
1
6
7
.
6
4
F
L
1
6
7
.
5
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
2
J
U
N
C
T
I
O
N
P
I
T
1
6
7
.
5
5
(
T
O
P
)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
2
1
6
7
.
7
2
F
L
1
6
7
.
5
0
F
L
1
6
7
.
4
0
F
L
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
9
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
1
6
7
.
2
0
F
L
W
A
T
E
R
S
T
O
P
V
A
L
V
E
F
I
R
E
H
Y
F
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
4
5
°
P
A
R
K
I
N
G
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
G
R
A
S
S
E
D
A
R
E
A
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
C
O
N
C
R
E
T
E
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
G
R
A
S
S
E
D
A
R
E
A
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
S
I
G
N
W
A
T
E
R
S
T
O
P
V
A
L
V
E
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
C
A
N
O
P
Y
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
B
U
S
S
H
E
L
T
E
R
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
C
A
N
O
P
Y
T
E
L
S
T
R
A
P
I
T
SIGN
SIGN
SIGN
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
G
R
A
S
S
E
D
N
A
T
U
R
E
S
T
R
I
P
P
E
C
H
E
L
L
S
T
R
E
E
T
T
H
E
C
R
E
S
C
E
N
T
P
E
C
H
E
L
L
S
T
R
E
E
T
B-D
ouble
(26.0
m
)
B-D
ouble
(26.0
m
)
B-D
ouble
(26.0
m
)
S
e
rv
ic
e
V
e
h
ic
le
(8
.8
m
)
S
e
rv
ic
e
V
e
h
ic
le
(8
.8
m
)
S
e
rv
ic
e
V
e
h
ic
le
(8
.8
m
)
Sin
gle
Unit T
ruck/B
us (
12.5
m)
Sin
gle
Unit T
ruck/B
us (
12.5
m)
Sin
gle
Unit T
ruck/B
us (
12.5
m)
Service V
ehicle (8.8 m
)
Service V
ehicle (8.8 m
)
Service V
ehicle (8.8 m
)
H
I
G
H
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
#4
#4
#4
#4
#4
#4
#2#2
#11
#21
#21
#2
Prim
e m
over
and s
em
i-tr
ailer
(19 m
)
Prim
e m
over
and s
em
i-tr
ailer
(19 m
)
Prim
e m
over
and s
em
i-tr
ailer
(19 m
)
#30
#31#32
#33
#34
#29
#28
#28
#27
Prim
e m
over a
nd s
em
i-tr
ailer (
19 m
)
Prim
e m
over a
nd s
em
i-tr
ailer (
19 m
)
Prim
e m
over a
nd s
em
i-tr
ailer (
19 m
)
Serv
ice V
ehic
le (
8.8
m)
Serv
ice V
ehic
le (
8.8
m)
Serv
ice V
ehic
le (
8.8
m)
Service V
ehicle (8.8 m
)
Service V
ehicle (8.8 m
)
Service V
ehicle (8.8 m
)
#4
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
As shown
MURRINDINDI SHIRE COUNCIL
MU114-SK03
HZ
VEHICLE TURNING MOVEMENTS
December 2019
31
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
12.5
2.2 6.2 1.3
Single Unit Truck/Bus (12.5 m)Overall Length 12.500mOverall Width 2.500mOverall Body Height 4.300mMin Body Ground Clearance 0.490mTrack Width 2.500mLock-to-lock time 6.00sCurb to Curb Turning Radius 12.500m
8.8
1.5 5
Service Vehicle (8.8 m)Overall Length 8.800mOverall Width 2.500mOverall Body Height 4.300mMin Body Ground Clearance 0.427mTrack Width 2.500mLock-to-lock time 4.00sCurb to Curb Turning Radius 12.500m
FOR INFORMATION
13.7
8.11
Max 72° Horiz
Max 6° Vert
8.2 1.3 1.3 1.5
6.7
1.6 4.65 1.3
Prime mover and semi-trailer (19 m)
Overall Length 19.000m
Overall Width 2.500m
Overall Body Height 4.300m
Min Body Ground Clearance 0.540m
Track Width 2.500m
Lock-to-lock time 6.00s
Curb to Curb Turning Radius 12.500m
5.2
0.95 3.05
Passenger vehicle (5.2 m)
Overall Length 5.200m
Overall Width 1.940m
Overall Body Height 1.804m
Min Body Ground Clearance 0.295m
Track Width 1.840m
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 6.300m
SAFETY DESIGN WORKS HIGH STREET, YEA
3
335
7
27
25
232323171719
15
13
11
9
101010101010
2
101010
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
T
A
H 12
H 12
H 12
H 12
H 12
H 12
H 12
H 6
H 6
H 6
H 6
H 6
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
7
1
6
6
.
7
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
6
.
8
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
0
1
6
7
.
1
7
F
L
1
6
7
.
6
1
F
L
1
6
7
.
6
1
F
L
1
6
7
.
5
9
F
L
H 12
H 12
H 12
H 12
H 12
H 12
H 12
H 12
H 6
H 6
H 6
J
U
N
C
T
I
O
N
P
I
T
1
6
6
.
9
4
(
T
O
P
)
SEWER PIT
166.96(TOP)
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
P
R
O
P
E
R
T
Y
O
U
T
L
E
T
1
6
7
.
1
1
6
7
.
1
1
6
7
.
2
SIDE ENTRY PIT
167.18(TOP)
G
R
A
T
E
D
P
I
T
1
6
7
.
5
2
(
T
O
P
)
1
6
7
.
3
3
(
T
O
P
)
1
7
0
.
7
P
F
I
R
E
P
L
U
G
S
I
G
N
S
I
G
N
S
I
G
N
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
4
5
°
P
A
R
K
I
N
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
G
R
A
S
S
E
D
A
R
E
A
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
4
5
°
P
A
R
K
I
N
G
P
A
R
A
L
L
E
L
P
A
R
K
I
N
G
B
I
T
U
M
E
N
C
A
R
P
A
R
K
B
I
T
U
M
E
N
C
A
R
P
A
R
K
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
W
A
T
E
R
S
T
O
P
V
A
L
V
E
S
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
I
G
N
F
I
R
E
P
L
U
G
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
O
N
C
R
E
T
E
C
R
O
S
S
I
N
G
C
A
N
O
P
Y
C
A
N
O
P
Y
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
T
E
L
S
T
R
A
P
I
T
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
C
O
N
C
R
E
T
E
C
O
N
C
R
E
T
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
E
L
E
C
T
R
I
C
I
T
Y
P
O
L
E
H
O
O
D
S
T
R
E
E
T
H
I
G
H
S
T
R
E
E
T
H
IG
H
S
T
R
E
E
T
#4
#2
#4
#4
#4
#20
#26
#22#27
#23#26
#22#27
#23#26
#22#27
#23#26
#27
#35
#2
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
Passenger vehicle (5.2 m
)
As shown
MURRINDINDI SHIRE COUNCIL
MU114-SK04
HZ
VEHICLE TURNING MOVEMENTS
December 2019
31
Client
Project
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.ALL DIMENSIONS TO BE CHECKED ON SITE.DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THESUPERINTENDENT.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THESPECIFICATION.
Approved (Manager)
Date
Scales:
Drawn:
Sheets in Set:
Checked:
Drawing Number:
Letter REVISIONS DateLicensed Surveyor
Designed and Documented by
Telephone:
Email:
03 9550 1858
Glen Waverley VIC 3150
21-23 Aristoc Road
Waverley Business Centre
AUSTRALIA
ENGINEERS
Daniel M Ahrens
MIEAust
Member No. 2493718
Chartered Professional Engineer
RM
JCA Land Consultants
THE SUBDIVISION SPECIALISTS
Surveying Engineering Town Planning
Suite 9, 303 Maroondah Highway Ringwood Vic, Australia 3134
Phone 03 9735 4888 Email [email protected] www.jcalc.com.au
FOR INFORMATION
5.2
0.95 3.05
Passenger vehicle (5.2 m)
Overall Length 5.200m
Overall Width 1.940m
Overall Body Height 1.804m
Min Body Ground Clearance 0.295m
Track Width 1.840m
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 6.300m
SAFETY DESIGN WORKS HIGH STREET, YEA