Page 1: PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School

PNCWA Operators ConferenceEastern Oregon Region AWWA/PNCWA Short School

Water Project of the YearCity of Arlington

Mesa Industrial Park Water System

Page 2: PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School

Project Summary

• $2.3 million water and sewer system improvements project to the Arlington Airport and new industrial park area

• Water system improvements included two new booster pump station, a 250,000-gallon reservoir, and a full distribution system

• Funded by the City of Arlington and Gilliam County

• The City of Arlington has a shovel-ready industrial park area with full water and sewer system service

Page 3: PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School

Reservoir Construction

Page 4: PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School

Airport Booster Pump Station Piping

Page 5: PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School

250,000-Gallon Steel Storage Reservoir and Booster Pump Station

Page 6: PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School

Mesa Industrial Park Area