Upload
meagan
View
30
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Water Project of the Year. City of Arlington Mesa Industrial Park Water System. PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School. Project Summary. $2.3 million wate r and sewer system improvements project to the Arlington Airport and new industrial park area - PowerPoint PPT Presentation
Citation preview
PNCWA Operators ConferenceEastern Oregon Region AWWA/PNCWA Short School
Water Project of the YearCity of Arlington
Mesa Industrial Park Water System
Project Summary
• $2.3 million water and sewer system improvements project to the Arlington Airport and new industrial park area
• Water system improvements included two new booster pump station, a 250,000-gallon reservoir, and a full distribution system
• Funded by the City of Arlington and Gilliam County
• The City of Arlington has a shovel-ready industrial park area with full water and sewer system service
Reservoir Construction
Airport Booster Pump Station Piping
250,000-Gallon Steel Storage Reservoir and Booster Pump Station
Mesa Industrial Park Area