SECURING WATER FOR TODAY AND TOMORROW…
ENGINEERING/OPERATIONS COMMITTEE
Operations & Maintenance UpdateMay 3, 2021
• R³
• Well 4 out of service
• Well pump motor was shutting down due to high temperature
• Motor was tested and reconditioning was recommended
• Well 6 back in service
Operation & Maintenance Update
2Well 4
• Mojave River Pipeline Air Vacuum Valve & Blowoff Maintenance
• Over 100 have been inspected, exercised & cleaned up
• Inspection results are showing more frequent maintenance is needed
Operation & Maintenance Update
3
• Mojave River Pipeline Programmable Logic Controller and Telemetry Upgrade Project
• All panels are wired up
• Programmable logic controller input and output testing nearly complete
Operation & Maintenance Update
6White Rd.
• Mojave River Pipeline Programmable Logic Controller and Telemetry Upgrade Project
• All radios & antennas are installed
• Full scale testing coming soon
Operation & Maintenance Update
7Daggett
• Warren Vista Meter Vault Maintenance
• Replaced damaged section of sump pump piping
• Replaced aged plug receptacle covers
• Performed general vault cleanup
Operation & Maintenance Update
8
• Moss Screen Cathodic Protection System Inspection
• Inspections performed by Corrpro on moss screens for Morongo Basin & Oro Grande Wash pipelines
• All systems are working properly
Operation & Maintenance Update
9
Antelope Siphon
395 Turnout