SITE COMPOUND(LAUNCH SHAFT)

SITE COMPOUND(RECEPTION SHAFT)

TEMPORARY ACCESSROADS (6m WIDE)

P2 - BH113

P2 - BH114

EXISTING ENTRANCE

SITE COMPOUND(RECEPTION SHAFT)

AV-6

SCV-3

Pipe &GroundCondittions

Ground Level

Invert Level

79.3

5

80.0

6

74.7

5

79.3

5

73.5

1

74.7

5

73.4

9

73.5

1

74.2

1

73.4

9

76.3

7

74.2

1

5+200

79.1

5

5+300

78.9

5

5+400

79.3

3

5+500

80.1

0

5+600

83.1

2

5+700

84.4

4

SITE COMPOUND(LAUNCH SHAFT)

SITE COMPOUND(RECEPTION SHAFT)

TEMPORARY ACCESSROADS (6m WIDE)

P2 - BH113

P2 - BH114

EXISTING ENTRANCE

SITE COMPOUND(RECEPTION SHAFT)

AV-6

SCV-3

NE

E

SE

S

SW

WNW

N

DECLAN CUNNINGHAM 2004

Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland

Client:

Project:

Title:

Scale @ A3:

Prepared by: Checked: Date:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

LOCATION OF CROSSING POINTS,ORBITAL SEWERS/OUTFALL

PIPELINE & MOTORWAYS- N2

As Shown

A. O'Callaghan D. Conneran January 2016

C. O'Keeffe

Draft

Drawing No. 13 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

SITE INVESTIGATIONPHASE 2 - BH113

SITE INVESTIGATIONPHASE 2 - BH114

5.5mØ RECEPTION SHAFT

1,400 mm Rising Main from Abbotstown Pumping Station

Grassland M2/N2Public Road

Grassland

AV-6

SCV-3

PROPOSED ORBITAL SEWERCHAINAGE: 5+100 TO 5+800Scale 1:2,000

PROPOSED ORBITAL SEWERCHAINAGE: 5+100 TO 5+800Scale H-1:1,000 / V-1:100

Grassland

5.5mØ RECEPTION SHAFT

1400mm TRENCHLESS CROSSING

9.0mØ LAUNCH SHAFT

SANDY GRAVELLY CLAY

BEDROCK

BOREHOLE LOCATIONS

SILT

TOPSOIL

LEGEND:

PLANNING BOUNDARY

CONSTRUCTIONCOMPOUNDS

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

PROPOSED ACCESS ROAD

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, ASAPPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFOREANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION,DIAMETER AND INVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND,BEFORE ANY WORK COMMENCES.

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 2: NW SW - assets.gov.ie

TEMPORARY ACCESSROADS (6m WIDE)

P2 - BH124

SITE COMPOUND(RECEPTION SHAFT)

P2 - BH125

SITE COMPOUND(LAUNCH SHAFT)

MH-50

MH-51

MH-49

SITE COMPOUND(LAUNCH SHAFT)

TEMPORARY ACCESSROADS (6m WIDE)

Pipe &GroundCondittions

Ground Level

Invert Level

48.7

4

48.5

4

49.2

3

48.9

7

49.6

1

49.2

3

48.9

7

48.7

4

11+600

57.0

2

11+700

56.2

9

TEMPORARY ACCESSROADS (6m WIDE)

P2 - BH124

SITE COMPOUND(RECEPTION SHAFT)

P2 - BH125

SITE COMPOUND(LAUNCH SHAFT)

MH-50

MH-51

MH-49

SITE COMPOUND(LAUNCH SHAFT)

TEMPORARY ACCESSROADS (6m WIDE)

NE

E

SE

SSW

WNW

N

DECLAN CUNNINGHAM 2004

Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland

Client:

Project:

Title:

Scale @ A3:

Prepared by: Checked: Date:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

LOCATION OF CROSSING POINTS,ORBITAL SEWER/OUTFALL

PIPELINE & ROADS - OLD AIRPORT ROAD

As Shown

A. O'Callaghan D. Conneran January 2016

C. O'Keeffe

Draft

Drawing No. 14 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUE FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

1,800mm Gravity Sewer

Grassland Collinstown Cross Grassland

SITE INVESTIGATIONPHASE 2 - BH125

5.5mØ RECEPTION SHAFT

9.0mØ LAUNCH SHAFT

1800mmØ TRENCHLESS CROSSING

SITE INVESTIGATIONPHASE 2 - BH125

PROPOSED ORBITAL SEWERCHAINAGE: 11+500 TO 11+800Scale 1:2,000

PROPOSED ORBITAL SEWERCHAINAGE: 11+500 TO 11+800Scale H-1:1,000 / V-1:100

SANDY GRAVELLY CLAY

BEDROCK

BOREHOLE LOCATIONS

SILT

TOPSOIL

LEGEND:

PLANNING BOUNDARY

CONSTRUCTIONCOMPOUNDS

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

PROPOSED ACCESS ROAD

9.0mØ LAUNCH SHAFT

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, ASAPPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFOREANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION,DIAMETER AND INVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND,BEFORE ANY WORK COMMENCES.

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 3: NW SW - assets.gov.ie

SITE COMPOUND(LAUNCH SHAFT)

TEMPORARY ACCESSROAD (6m WIDE)

SITE COMPOUND(RECEPTION SHAFT)

P2 - BH127

P2 - BH126

MH-58

MH-57

TEMPORARY ENTRANCETO COMPOUND

Pipe &GroundCondittions

Ground Level

Invert Level

43.1

8

42.8

9

43.8

3

43.4

8

43.4

8

43.1

8

47.2

4

43.8

3

42.8

942

.52

12+400

52.2

9

12+500

51.7

1

12+600

50.6

4

12+700

50.3

9

12+800

49.8

5

12+900

49.2

9

SITE COMPOUND(LAUNCH SHAFT)

TEMPORARY ACCESSROAD (6m WIDE)

SITE COMPOUND(RECEPTION SHAFT)

P2 - BH127

P2 - BH126

MH-58

MH-57

TEMPORARY ENTRANCETO COMPOUND

NE

E

SE

SSW

WNW

N

DECLAN CUNNINGHAM 2004

Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland

Client:

Project:

Title:

Scale @ A3:

Prepared by: Checked: Date:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

LOCATION OF CROSSING POINTS,ORBITAL SEWER/OUTFALL

PIPELINE & MOTORWAYS- M1 MOTORWAY

As Shown

A. O'Callaghan D. Conneran January 2016

C. O'Keeffe

Draft

Drawing No. 15 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

1,800 mm Gravity Sewer

Grassland M1 Motorway and Roundabout Grassland

5.5mØ RECEPTION SHAFT

9.0mØ LAUNCH SHAFT

P2 - BH126

P2 - BH127

1800mmØ TRENCHLESS CROSSING

PROPOSED ORBITAL SEWERCHAINAGE: 12+300 TO 13+000Scale 1:2,000

PROPOSED ORBITAL SEWERCHAINAGE: 12+300 TO 13+000Scale H-1:1,000 / V-1:100

SANDY GRAVELLY CLAY

BEDROCK

BOREHOLE LOCATIONS

SILT

TOPSOIL

LEGEND:

PLANNING BOUNDARY

CONSTRUCTIONCOMPOUNDS

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

PROPOSED ACCESS ROAD

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, ASAPPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFOREANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION,DIAMETER AND INVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND,BEFORE ANY WORK COMMENCES.

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 4: NW SW - assets.gov.ie

WATERMAIN CROSSINGLOCATION 1

WATERMAIN CROSSINGLOCATION 2

WATERMAIN CROSSINGLOCATION 3

WATERMAIN CROSSINGLOCATION 4

PROPOSED ABBOTSTOWNPUMPING STATION

PROPOSED ACCESSROAD

PROPOSED NORTH FRINGESEWER DIVERSION

PROPOSEDEGRESS ROAD

CLONSHAGHWWTP SITE

NE

E

SE

S

SW

W

NW

N

DECLAN CUNNINGHAM 2004

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL PIPELINES & WATERMAINS

- Sheet 1 of 2 -

1:25,000

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 16 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

Galway Dublin

PROPOSEDPROJECTLOCATION

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

TRUNKMAIN(WATERMAIN > 400mm)

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 5: NW SW - assets.gov.ie

0+0000+050

0+100

0+150

0+200

0+250

0+300

0+350

0+400

0+450

0+500

0+550

0+6000+600

Point 1

Point 2

Point 3

CROSSING LOCATION 1SCALE : 1:5,000

CROSSING LOCATION 2SCALE : 1:5,000

CROSSING LOCATION 3SCALE : 1:5,000

CROSSING LOCATION 4SCALE : 1:5,000

Point 4

KEYPLAN

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWERS/OUTFALL

PIPELINE & WATERMAINS - Sheet 2 of 2 -

AS SHOWN

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 17 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

TRUNKMAIN(WATERMAIN > 400mm)

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 6: NW SW - assets.gov.ie

North Dublin

Ringsend WwTP9B Sewer

9C Sewer

WASTEWATERCROSSING LOCATION 1

WASTEWATERCROSSING LOCATION 2

WASTEWATERCROSSING LOCATION 3

CLONSHAGHWWTP SITE

PROPOSED ABBOTSTOWNPUMPING STATION

PROPOSED ACCESSROAD

PROPOSED NORTH FRINGESEWER DIVERSION

PROPOSEDEGRESS ROAD

NE

E

SE

S

SW

W

NW

N

DECLAN CUNNINGHAM 2004

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWERS/OUTFALL PIPELINE & WASTEWATER

- Sheet 1 of 2 -

1:40,000

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 18 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

9B SEWER

9C TRUNK SEWER

NORTH DUBLIN TRUNKSEWERS

SUBMARINE PIPELINE

RINGSEND WWTP

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Galway Dublin

PROPOSEDPROJECTLOCATION

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

Page 7: NW SW - assets.gov.ie

North Dublin

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

CROSSING LOCATION 1SCALE : 1:5,000

CROSSING LOCATION 2SCALE : 1:5,000

CROSSING LOCATION 3SCALE : 1:5,000

Point 1

Point 2 Point 3

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL PIPELINE & WASTEWATER

- Sheet 2 of 2 -

AS SHOWN

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 19 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

WASTEWATERCOLLECTION NETWORK

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 8: NW SW - assets.gov.ie

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

NE

E

SE

S

SW

W

NW

N

DECLAN CUNNINGHAM 2004

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL

PIPELINE & WATERCOURSES- Sheet 1 of 2 -

1:25,000

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 20 E

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REVIEW AOC BD

WATERCOURSE CROSSINGLOCATION 2

(UN-NAMED WATERCOURSE)

WATERCOURSE CROSSINGLOCATION 3

(MAYNE RIVER)

WATERCOURSE CROSSINGLOCATION 4

(CUCKOO STREAM)

WATERCOURSE CROSSINGLOCATION 5

(MAYNE RIVER)

PROPOSED ABBOTSTOWNPUMPING STATION

PROPOSED ACCESSROAD

PROPOSED NORTH FRINGESEWER DIVERSION

PROPOSEDEGRESS ROAD

WATERCOURSE CROSSINGLOCATION 1

(UN-NAMED WATERCOURSE)

Galway Dublin

PROPOSEDPROJECTLOCATION

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

WATERCOURSE

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

E 07.06.18 ISSUED FOR REVIEW AOC BD

Page 9: NW SW - assets.gov.ie

0+0000+050

0+100

0+150

0+200

0+250

0+300

0+350

0+400

0+450

0+500

0+550

0+6000+600

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

CROSSING LOCATION 1 CROSSING LOCATIONS 2 & 3

CROSSING LOCATION 4 & 5SCALE : 1:5,000

Point 2

SCALE : 1:5,000 SCALE : 1:5,000

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL

PIPELINE & WATERCOURSES- Sheet 2 of 2 -

AS SHOWN

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 21 E

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

KEYPLAN

Point 3

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

WATERCOURSE

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD