9
SITE COMPOUND (LAUNCH SHAFT) SITE COMPOUND (RECEPTION SHAFT) TEMPORARY ACCESS ROADS (6m WIDE) P2 - BH113 P2 - BH114 EXISTING ENTRANCE SITE COMPOUND (RECEPTION SHAFT) AV-6 SCV-3 Pipe &Ground Condittions Ground Level Invert Level 79.35 80.06 74.75 79.35 73.51 74.75 73.49 73.51 74.21 73.49 76.37 74.21 5+200 79.15 5+300 78.95 5+400 79.33 5+500 80.10 5+600 83.12 5+700 84.44 SITE COMPOUND (LAUNCH SHAFT) SITE COMPOUND (RECEPTION SHAFT) TEMPORARY ACCESS ROADS (6m WIDE) P2 - BH113 P2 - BH114 EXISTING ENTRANCE SITE COMPOUND (RECEPTION SHAFT) AV-6 SCV-3 NE E SE S SW W NW N Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland Client: Project: Title: Scale @ A3: Prepared by: Checked: Date: Project Director: Drawing No.: Revision: Rev Date Description By Chkd. Drawing Status: LOCATION OF CROSSING POINTS, ORBITAL SEWERS/OUTFALL PIPELINE & MOTORWAYS - N2 As Shown A. O'Callaghan D. Conneran January 2016 C. O'Keeffe Draft Drawing No. 13 D A 23.05.16 ISSUED FOR REPORT AOC DC B 28.08.17 ISSUED FOR REPORT AOC DC C 18.12.17 ISSUED FOR REPORT AOC JF D 04.05.18 ISSUED FOR REPORT AOC BD SITE INVESTIGATION PHASE 2 - BH113 SITE INVESTIGATION PHASE 2 - BH114 5.5mØ RECEPTION SHAFT 1,400 mm Rising Main from Abbotstown Pumping Station Grassland M2/N2 Public Road Grassland AV-6 SCV-3 PROPOSED ORBITAL SEWER CHAINAGE: 5+100 TO 5+800 Scale 1:2,000 PROPOSED ORBITAL SEWER CHAINAGE: 5+100 TO 5+800 Scale H-1:1,000 / V-1:100 Grassland 5.5mØ RECEPTION SHAFT 1400mm TRENCHLESS CROSSING 9.0mØ LAUNCH SHAFT SANDY GRAVELLY CLAY BEDROCK BOREHOLE LOCATIONS SILT TOPSOIL LEGEND: PLANNING BOUNDARY CONSTRUCTION COMPOUNDS PROPOSED ORBITAL SEWER ROUTE (GRAVITY) PROPOSED OUTFALL PIPELINE ROUTE (LAND BASED SECTION) PROPOSED OUTFALL PIPELINE ROUTE (MARINE SECTION) PROPOSED ORBITAL SEWER ROUTE (RISING MAIN) PROPOSED ACCESS ROAD N O T E S : 1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION, DIAMETER AND INVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES. 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

NW SW - assets.gov.ie

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NW SW - assets.gov.ie

SITE COMPOUND(LAUNCH SHAFT)

SITE COMPOUND(RECEPTION SHAFT)

TEMPORARY ACCESSROADS (6m WIDE)

P2 - BH113

P2 - BH114

EXISTING ENTRANCE

SITE COMPOUND(RECEPTION SHAFT)

AV-6

SCV-3

Pipe &GroundCondittions

Ground Level

Invert Level

79.3

5

80.0

6

74.7

5

79.3

5

73.5

1

74.7

5

73.4

9

73.5

1

74.2

1

73.4

9

76.3

7

74.2

1

5+200

79.1

5

5+300

78.9

5

5+400

79.3

3

5+500

80.1

0

5+600

83.1

2

5+700

84.4

4

SITE COMPOUND(LAUNCH SHAFT)

SITE COMPOUND(RECEPTION SHAFT)

TEMPORARY ACCESSROADS (6m WIDE)

P2 - BH113

P2 - BH114

EXISTING ENTRANCE

SITE COMPOUND(RECEPTION SHAFT)

AV-6

SCV-3

NE

E

SE

S

SW

WNW

N

DECLAN CUNNINGHAM 2004

Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland

Client:

Project:

Title:

Scale @ A3:

Prepared by: Checked: Date:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

LOCATION OF CROSSING POINTS,ORBITAL SEWERS/OUTFALL

PIPELINE & MOTORWAYS- N2

As Shown

A. O'Callaghan D. Conneran January 2016

C. O'Keeffe

Draft

Drawing No. 13 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

SITE INVESTIGATIONPHASE 2 - BH113

SITE INVESTIGATIONPHASE 2 - BH114

5.5mØ RECEPTION SHAFT

1,400 mm Rising Main from Abbotstown Pumping Station

Grassland M2/N2Public Road

Grassland

AV-6

SCV-3

PROPOSED ORBITAL SEWERCHAINAGE: 5+100 TO 5+800Scale 1:2,000

PROPOSED ORBITAL SEWERCHAINAGE: 5+100 TO 5+800Scale H-1:1,000 / V-1:100

Grassland

5.5mØ RECEPTION SHAFT

1400mm TRENCHLESS CROSSING

9.0mØ LAUNCH SHAFT

SANDY GRAVELLY CLAY

BEDROCK

BOREHOLE LOCATIONS

SILT

TOPSOIL

LEGEND:

PLANNING BOUNDARY

CONSTRUCTIONCOMPOUNDS

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

PROPOSED ACCESS ROAD

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, ASAPPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFOREANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION,DIAMETER AND INVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND,BEFORE ANY WORK COMMENCES.

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 2: NW SW - assets.gov.ie

TEMPORARY ACCESSROADS (6m WIDE)

P2 - BH124

SITE COMPOUND(RECEPTION SHAFT)

P2 - BH125

SITE COMPOUND(LAUNCH SHAFT)

MH-50

MH-51

MH-49

SITE COMPOUND(LAUNCH SHAFT)

TEMPORARY ACCESSROADS (6m WIDE)

Pipe &GroundCondittions

Ground Level

Invert Level

48.7

4

48.5

4

49.2

3

48.9

7

49.6

1

49.2

3

48.9

7

48.7

4

11+600

57.0

2

11+700

56.2

9

TEMPORARY ACCESSROADS (6m WIDE)

P2 - BH124

SITE COMPOUND(RECEPTION SHAFT)

P2 - BH125

SITE COMPOUND(LAUNCH SHAFT)

MH-50

MH-51

MH-49

SITE COMPOUND(LAUNCH SHAFT)

TEMPORARY ACCESSROADS (6m WIDE)

NE

E

SE

SSW

WNW

N

DECLAN CUNNINGHAM 2004

Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland

Client:

Project:

Title:

Scale @ A3:

Prepared by: Checked: Date:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

LOCATION OF CROSSING POINTS,ORBITAL SEWER/OUTFALL

PIPELINE & ROADS - OLD AIRPORT ROAD

As Shown

A. O'Callaghan D. Conneran January 2016

C. O'Keeffe

Draft

Drawing No. 14 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUE FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

1,800mm Gravity Sewer

Grassland Collinstown Cross Grassland

SITE INVESTIGATIONPHASE 2 - BH125

5.5mØ RECEPTION SHAFT

9.0mØ LAUNCH SHAFT

1800mmØ TRENCHLESS CROSSING

SITE INVESTIGATIONPHASE 2 - BH125

PROPOSED ORBITAL SEWERCHAINAGE: 11+500 TO 11+800Scale 1:2,000

PROPOSED ORBITAL SEWERCHAINAGE: 11+500 TO 11+800Scale H-1:1,000 / V-1:100

SANDY GRAVELLY CLAY

BEDROCK

BOREHOLE LOCATIONS

SILT

TOPSOIL

LEGEND:

PLANNING BOUNDARY

CONSTRUCTIONCOMPOUNDS

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

PROPOSED ACCESS ROAD

9.0mØ LAUNCH SHAFT

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, ASAPPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFOREANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION,DIAMETER AND INVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND,BEFORE ANY WORK COMMENCES.

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 3: NW SW - assets.gov.ie

SITE COMPOUND(LAUNCH SHAFT)

TEMPORARY ACCESSROAD (6m WIDE)

SITE COMPOUND(RECEPTION SHAFT)

P2 - BH127

P2 - BH126

MH-58

MH-57

TEMPORARY ENTRANCETO COMPOUND

Pipe &GroundCondittions

Ground Level

Invert Level

43.1

8

42.8

9

43.8

3

43.4

8

43.4

8

43.1

8

47.2

4

43.8

3

42.8

942

.52

12+400

52.2

9

12+500

51.7

1

12+600

50.6

4

12+700

50.3

9

12+800

49.8

5

12+900

49.2

9

SITE COMPOUND(LAUNCH SHAFT)

TEMPORARY ACCESSROAD (6m WIDE)

SITE COMPOUND(RECEPTION SHAFT)

P2 - BH127

P2 - BH126

MH-58

MH-57

TEMPORARY ENTRANCETO COMPOUND

NE

E

SE

SSW

WNW

N

DECLAN CUNNINGHAM 2004

Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland

Client:

Project:

Title:

Scale @ A3:

Prepared by: Checked: Date:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

LOCATION OF CROSSING POINTS,ORBITAL SEWER/OUTFALL

PIPELINE & MOTORWAYS- M1 MOTORWAY

As Shown

A. O'Callaghan D. Conneran January 2016

C. O'Keeffe

Draft

Drawing No. 15 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

1,800 mm Gravity Sewer

Grassland M1 Motorway and Roundabout Grassland

5.5mØ RECEPTION SHAFT

9.0mØ LAUNCH SHAFT

P2 - BH126

P2 - BH127

1800mmØ TRENCHLESS CROSSING

PROPOSED ORBITAL SEWERCHAINAGE: 12+300 TO 13+000Scale 1:2,000

PROPOSED ORBITAL SEWERCHAINAGE: 12+300 TO 13+000Scale H-1:1,000 / V-1:100

SANDY GRAVELLY CLAY

BEDROCK

BOREHOLE LOCATIONS

SILT

TOPSOIL

LEGEND:

PLANNING BOUNDARY

CONSTRUCTIONCOMPOUNDS

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

PROPOSED ACCESS ROAD

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, ASAPPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFOREANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION,DIAMETER AND INVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND,BEFORE ANY WORK COMMENCES.

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 4: NW SW - assets.gov.ie

WATERMAIN CROSSINGLOCATION 1

WATERMAIN CROSSINGLOCATION 2

WATERMAIN CROSSINGLOCATION 3

WATERMAIN CROSSINGLOCATION 4

PROPOSED ABBOTSTOWNPUMPING STATION

PROPOSED ACCESSROAD

PROPOSED NORTH FRINGESEWER DIVERSION

PROPOSEDEGRESS ROAD

CLONSHAGHWWTP SITE

NE

E

SE

S

SW

W

NW

N

DECLAN CUNNINGHAM 2004

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL PIPELINES & WATERMAINS

- Sheet 1 of 2 -

1:25,000

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 16 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

Galway Dublin

PROPOSEDPROJECTLOCATION

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

TRUNKMAIN(WATERMAIN > 400mm)

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 5: NW SW - assets.gov.ie

0+0000+050

0+100

0+150

0+200

0+250

0+300

0+350

0+400

0+450

0+500

0+550

0+6000+600

Point 1

Point 2

Point 3

CROSSING LOCATION 1SCALE : 1:5,000

CROSSING LOCATION 2SCALE : 1:5,000

CROSSING LOCATION 3SCALE : 1:5,000

CROSSING LOCATION 4SCALE : 1:5,000

Point 4

KEYPLAN

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWERS/OUTFALL

PIPELINE & WATERMAINS - Sheet 2 of 2 -

AS SHOWN

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 17 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

TRUNKMAIN(WATERMAIN > 400mm)

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 6: NW SW - assets.gov.ie

North Dublin

Ringsend WwTP9B Sewer

9C Sewer

WASTEWATERCROSSING LOCATION 1

WASTEWATERCROSSING LOCATION 2

WASTEWATERCROSSING LOCATION 3

CLONSHAGHWWTP SITE

PROPOSED ABBOTSTOWNPUMPING STATION

PROPOSED ACCESSROAD

PROPOSED NORTH FRINGESEWER DIVERSION

PROPOSEDEGRESS ROAD

NE

E

SE

S

SW

W

NW

N

DECLAN CUNNINGHAM 2004

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWERS/OUTFALL PIPELINE & WASTEWATER

- Sheet 1 of 2 -

1:40,000

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 18 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

9B SEWER

9C TRUNK SEWER

NORTH DUBLIN TRUNKSEWERS

SUBMARINE PIPELINE

RINGSEND WWTP

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Galway Dublin

PROPOSEDPROJECTLOCATION

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

Page 7: NW SW - assets.gov.ie

North Dublin

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

CROSSING LOCATION 1SCALE : 1:5,000

CROSSING LOCATION 2SCALE : 1:5,000

CROSSING LOCATION 3SCALE : 1:5,000

Point 1

Point 2 Point 3

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL PIPELINE & WASTEWATER

- Sheet 2 of 2 -

AS SHOWN

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 19 D

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

WASTEWATERCOLLECTION NETWORK

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Page 8: NW SW - assets.gov.ie

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

NE

E

SE

S

SW

W

NW

N

DECLAN CUNNINGHAM 2004

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL

PIPELINE & WATERCOURSES- Sheet 1 of 2 -

1:25,000

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 20 E

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REVIEW AOC BD

WATERCOURSE CROSSINGLOCATION 2

(UN-NAMED WATERCOURSE)

WATERCOURSE CROSSINGLOCATION 3

(MAYNE RIVER)

WATERCOURSE CROSSINGLOCATION 4

(CUCKOO STREAM)

WATERCOURSE CROSSINGLOCATION 5

(MAYNE RIVER)

PROPOSED ABBOTSTOWNPUMPING STATION

PROPOSED ACCESSROAD

PROPOSED NORTH FRINGESEWER DIVERSION

PROPOSEDEGRESS ROAD

WATERCOURSE CROSSINGLOCATION 1

(UN-NAMED WATERCOURSE)

Galway Dublin

PROPOSEDPROJECTLOCATION

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

WATERCOURSE

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

E 07.06.18 ISSUED FOR REVIEW AOC BD

Page 9: NW SW - assets.gov.ie

0+0000+050

0+100

0+150

0+200

0+250

0+300

0+350

0+400

0+450

0+500

0+550

0+6000+600

Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland

CROSSING LOCATION 1 CROSSING LOCATIONS 2 & 3

CROSSING LOCATION 4 & 5SCALE : 1:5,000

Point 2

SCALE : 1:5,000 SCALE : 1:5,000

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked:

Project Director:

Drawing No.:

Revision:

Rev Date Description By Chkd.

Drawing Status:

Date:

LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL

PIPELINE & WATERCOURSES- Sheet 2 of 2 -

AS SHOWN

A. O'Callaghan D. Conneran May 2016

C. O'Keefe

REPORT

Drawing No. 21 E

A 23.05.16 ISSUED FOR REPORT AOC DC

B 28.08.17 ISSUED FOR REPORT AOC DC

C 18.12.17 ISSUED FOR REPORT AOC JF

D 04.05.18 ISSUED FOR REPORT AOC BD

KEYPLAN

Point 3

LEGEND:

PROPOSED ORBITALSEWER ROUTE(GRAVITY)

PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)

PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITALSEWER ROUTE(RISING MAIN)

WATERCOURSE

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES

5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

Point 1

Point 4

Point 5

E 07.06.18 ISSUED FOR REVIEW AOC BD