MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
PGRP Project No.: 413.B Addenda No. 2 PGRP Project Title: Marine Research Facility – Building Package 00 91 13 - 1 Architect: Eley Guild Hardy Architects PA Issued – November 17, 2016
SECTION 00 91 13
ADDENDA ADDENDUM NUMBER TWO – ISSUED NOVEMBER 17, 2016
DATE: November 17, 2016 PROJECT TITLE: Marine Research Facility – Building Package PROJECT NUMBER: 413.B OWNER: Mississippi State Port Authority ARCHITECT OF RECORD: Eley Guild Hardy Architects PA TO: Prospective Bidders This Addendum forms a part of the Contract Documents and modifies the October 26, 2016 Issued for Bid - Rebid documents with amendments and additions noted below. Acknowledge receipt of this Addendum in the space provided in the Bid Form. Failure to do so may disqualify the Bidder. This Addendum consists of three pages and nine pages of attachments as follows: SPECIFICATION CHANGES:
1. Section 01 30 00 Administrative Requirements:
a. Under Paragraph 1.2F: Change to read, “Submit copy of site drawing and completed Final Construction Elevation Certificate, both signed by Land Surveyor certifying elevations and locations of the Work are in conformance with the Contract Documents. Use 2015 Edition (or most current at time of project completion) of the FEMA NFIP Elevation Certificate”.
2. Section 08 14 16 Flush Wood Doors:
a. Under Paragraph 2.3.C – Cut: Change paragraph to read: “Cut: Plain Sliced (flat
sliced).”
3. Section 10 14 00 – Signage:
a. Under Paragraph 1.1.A - Summary: Add subparagraph 8 to read:
8. Area of Refuge Signage.
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
PGRP Project No.: 413.B Addenda No. 2 PGRP Project Title: Marine Research Facility – Building Package 00 91 13 - 2 Architect: Eley Guild Hardy Architects PA Issued – November 17, 2016
b. Under Paragraph 2.4 Manufactured Units: Add subparagraph D to read:
D. Area of Refuge Signage Call Box Signage:
1. Reference Specification Section 27 30 00.
2. System shall consist of a minimum of two “location” and “instruction”
signs (Part #7049 - Raised Letter and Braille Instructional Wall Sign
“Directions for Call Box Use) to clearly indicate location of designated
area.
3. Manufacturer: Rath Signs or equal.
4. Section 12 93 00 Site Furnishings:
a. Under Paragraph 2.2.A.3 - Material: Change sub-paragraph a to read: “Horizontal
steel tubing and horizontal steel slat seating with skateboard guards. Provide two
skateboard guards on each bench, one on each side, centered on the bench.”
5. Section 27 30 00 Area of Refuge/Elevator Landing – Two Way Communication System
Base Station, Call Boxes and Signage (4 pages):
a. Add the attached Section in its entirety. This section describes the requirements for
Area of Refuge base station and call boxes.
DRAWING CHANGES:
1. Sheet A342 – Wall Sections (1 sheet):
a. Delete Detail 2/A342 in its entirety. The new Detail 2/A342 shall be as shown on the
attached A342R. A drafting error has been corrected with the revised detail.
2. Sheet FA001- Fire Alarm Riser/Matrix (1 sheet):
a. Delete the original Sheet FA001 and replace with the attached FA001. b. Note 27 was added to the Fire Alarm General Notes. c. Area of Refuge Failure options were added to Input/Output Schedule. d. Area of Refuge device was added to the Fire Alarm Riser.
3. Sheet FA100 – Fire Alarm Ground Floor (1 sheet):
a. Delete the original Sheet FA100 and replace with the attached FA100. b. Area of Refuge base station was added to the Lobby 100. c. Area of Refuge base station was added to the Fire Alarm Legend.
4. Sheet E111 – Ground Floor Power Plan
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
PGRP Project No.: 413.B Addenda No. 2 PGRP Project Title: Marine Research Facility – Building Package 00 91 13 - 3 Architect: Eley Guild Hardy Architects PA Issued – November 17, 2016
a. Provide a dedicated 20 ampere, 120 volt circuit and connection to the Area of
Refuge Base Station in Lobby 100 as located on Sheet FA100 (per Revision #1). Route 2-12,1-12 G in ½” EMT to Panel P1. Label as circuit P1-57. Provide and label a 20A/1P circuit breaker in space P1-57 to protect this circuit.
5. Sheet T001 – Technology Symbols and Abbreviations (1 sheet):
a. Delete the original Sheet T001 and replace with the attached T001. b. Area of Refuge symbols were added to the Telecommunications Symbols Legend.
6. Sheet T111 – Technology Plan 1st Floor (1 sheet):
a. Delete the original Sheet T111 and replace with the attached T111. b. Note Revision 1 at Lobby 200 and Receiving 216. An area of refuge wall mounted
analog voice outlet with area of refuge faceplate has been added at each of these locations (two total).
END OF SPECIFICATION CHANGES FOR ADDENDUM NO. 2
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
PGRP Project No.: 413.B Area of Refuge/Elevator Landing – Two Way Communication System PGRP Project Title: Marine Research Facility – Building Package 27 30 00 - 1 Architect: Eley Guild Hardy Architects PA Document Status: Addendum #2 – November 18, 2016
Section 27 30 00
Area of Refuge/Elevator Landing - Two-Way Communication System
Base Station, Call Boxes and Signage – ADDENDUM #2 Part 1 - General 1.0 Summary
1.1 The Base Station is to be located at a central control point on the first floor as shown on
the drawings. Call Boxes are to be located on all floors above the first floor, as shown on
the plans.
1.2 The Base Station must be capable of handling a minimum of 5 Call Boxes. Visual
indicators on the Base Station allow rescue personnel to know which Call Box needs assistance. The Base Station must allow rescue personnel to speak to all Call Boxes or individual Call Boxes.
1.3 The emergency communication hardware shall comply with the Americans with Disabilities
Act (ADA). The Call Box shall have the ability to be programmed with up to 5 emergency phone numbers. Upon activation of the emergency push button, a call will be automatically placed to the Base Station. If no one answers at the Base Station, the Call Box must dial a secondary location outside the building to activate two-way off-site person to person voice communications.
2.0 Submittals
2.1 Submit product data sheets. Include operation manuals.
2.2 Wiring or shop diagrams detailing wiring schematics, cabling.
3.0 Construction 3.1 The Base Station must have a Stainless Steel or powder coated steel housing,
red coil cord emergency handset, be 24vdc or 120vac powered and include a
rechargeable battery to maintain backup power for a minimum of 4 hours of talk time.
120vac must be on a dedicated circuit.
3.2 The Call Boxes must be in full compliance with ADA requirements. Call
Boxes require a hands-free speakerphone with an LED to indicate status of call.
3.3 The Call Boxes must allow the programming in of a specific location message of the Call
Box. This allows rescue personnel to know the location of the activated Call Box.
3.4 The Call Boxes are to be located no higher than 48” front reach, or 54” side reach to
the center of the push button above ground level to ensure conformance with the ADA requirements.
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
PGRP Project No.: 413.B Area of Refuge/Elevator Landing – Two Way Communication System PGRP Project Title: Marine Research Facility – Building Package 27 30 00 - 2 Architect: Eley Guild Hardy Architects PA Document Status: Addendum #2 – November 18, 2016
3.5 The Area of Refuge Call Boxes must have a Braille faceplate to ensure conformance with the ADA requirements.
3.6 The Base Station must provide an audible and visual indicator that a Call Box has
been activated.
3.7 The 24vdc Power Supply must be capable of supplying power to a minimum of 10
Call Boxes and the Base Station.
4.0 Mounting
4.1 The Base Station is to be mounted on a wall, flush mounted.
4.2 Call Boxes are to be wall, flush mounted.
5.0 Electrical
5.1 Call Boxes and Base Station are to be powered by 24vdc Power Supply. Base Station
to have option of 120vac power.
5.2 Wiring from the Base Station to the Call Boxes shall be in strict accordance with the
manufacturer’s recommendations or requirements.
5.3 Call Boxes must have built-in battery backup and include a rechargeable battery to
maintain backup power for a minimum of 4 hours of talk time.
5.4 Base Station must have a built-in battery backup and include a rechargeable
battery to maintain backup power for a minimum of 4 hours of talk time.
5.5 System shall be in compliance with all state and local Electrical Codes.
6.0 Communications
6.1 The Call Boxes shall have an ADA compliant and vandal resistant speakerphone.
6.2 The Call Boxes shall be hands-free and be a push-button-once to talk system. Once the
button has been pushed, the Call Box will call the Base Station. If no answer at the Base Station, it will automatically call preprogrammed emergency numbers the first of which must be 911. The Call Box must be capable of being programmed with up to 5 emergency numbers.6.3 Call Box shall have location message capability. Call Box must have a minimum 18 second recordable message capability, programmable to play 1 or 2 times. Call Box shall notify called party of the location of the call upon being received at the emergency dispatch center.
6.4 Call Box shall be capable of allowing the called party to replay the location
message if necessary to ensure an understanding of the caller location.
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
PGRP Project No.: 413.B Area of Refuge/Elevator Landing – Two Way Communication System PGRP Project Title: Marine Research Facility – Building Package 27 30 00 - 3 Architect: Eley Guild Hardy Architects PA Document Status: Addendum #2 – November 18, 2016
6.5 If system is not attended 24 hours a day, the Call Box must dial a secondary location outside the building to activate two-way off-site person to person voice communications.
6.6 Once call has been made (button pushed), the call can only be terminated by the called party.
6.7 Call Box must have a red LED that will light up upon push of the button. The light shall be
a solid color when the Call Box is activated, and will flash when call has been answered.
6.8 The Call Box must be capable of being programmed and reprogrammed on-site and
remotely.
6.9 Standard Call Box features:
6.9.1 Five number programming.
6.9.2 Operating temperature of between -40 F to +150 F (-40 to + 65 C). 6.9.3 Programmable passwords. 6.9.4 On-Site or remote programmable. 6.9.5 EEPROM memory to protect programming.
7.0 Signage
7.1 System shall consist of a minimum of two “location” and “instruction” signs (Part
#7049 - Raised Letter and Braille Instructional Wall Sign “Directions for Call Box
Use) to clearly indicate location of designated area.
7.2 Reference Addendum #2. Signage to be furnished under Section 10 14 00 Signage.
8.0 Graphics
8.1 Base Station must include wording identifying the location of each Call Box and light an
LED when a particular Call Box has been activated.
8.2 Call Box wording must include “Emergency Phone”, International Phone Symbol and raised
Braille lettering.
9.0 Cabling
9.1 Cabling for two-way communication system shall meet the applicable requirements for Level 1 pathway survivability.
10.0 Warranty
10.1 The Base Station and Call Boxes shall be warranted for a period of three years.
END OF SECTION
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
PGRP Project No.: 413.B Area of Refuge/Elevator Landing – Two Way Communication System PGRP Project Title: Marine Research Facility – Building Package 27 30 00 - 4 Architect: Eley Guild Hardy Architects PA Document Status: Addendum #2 – November 18, 2016
THIS PAGE INTENTIONALLY LEFT BLANK
GROUND LEVEL12'-0"
FIRST FLOOR30'-8"
BFE22'-0"
9
B.O. SOFFIT26'-0"
A5003
A5014
DFE24'-0"
A6061
OVERHEAD COILINGDOOR AS SCHED
A6071
1'-6"
57'-2"A.M.S.L.
40'-8"A.M.S.L.
CONC SLAB -SEE STRUCT
MODIFIED BITUMENROOFING SYSTEM
STL BEAM -SEE STRUCT
MTL DECKING- SEE STRUCT
FRAME & GLAZINGAS SCHED
22'-8"HEAD
A.M.S.L.
A.M.S.L.
A.M.S.L.
A.M.S.L.
A.M.S.L.
HEAD
A.M.S.L.
A6079
PARAPET
5/8" GYP BDTIGHT TO DECK
NOTE: 3/4" MARINEGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR LEVELDOWN. 3/4" EXTGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR UP.
3/4" EXT GRADEPLYWOOD
3/4" MARINEGRADE PLYWOOD
STL GIRT -SEE STRUCT
GROUND LEVEL12'-0"
FIRST FLOOR30'-8"
BFE22'-0"
9
B.O. SOFFIT26'-0"
DFE24'-0"
A5015
DRY JOINT ACMRAIN SCREEN MTLPANEL SYSTEM
LIQUID APPLIEDWATERPROOFINGMEMBRANE ON 3/4"PLYWD SHEATHING
CONT. BATT INSUL
8" MTL STUDS @16" O.C.
1/2" CONT SPRAYFOAM INSUL
C.I.P. CONC WALL- SEE STRUCT
49'-2"PARAPET
A.M.S.L.
A.M.S.L.
A.M.S.L.
A.M.S.L.
A.M.S.L.
A.M.S.L.
NOTE: 3/4" MARINEGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR LEVELDOWN. 3/4" EXTGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR UP.
3/4" MARINEGRADE PLYWOOD
3/4" EXT GRADEPLYWOOD
PT FINISHOVERSMOOTHRUBBEDCONC ASSCHED
5/8" GYP ON3 5/8" MTLSTUDS @CEILING
C.I.P.CONCROOFCAP - SEESTRUCT
A5034
8" GROUND LEVEL12'-0"
A6058
A5001
A.5
A60510
18'-0"
8"
14'-8"
A.M.S.L.
A.M.S.L.
50'-8"
SILL
HEAD
A.M.S.L.
PROJECTINGACM TRIM BYND- SEE ELEV
DRY JOINT ACMRAIN SCREEN MTLPANEL SYSTEM
LIQUID APPLIEDWATERPROOFINGMEMBRANE ON 3/4" EXTGRADE PLYWOOD
2" RIGID INSUL
2" GALV "Z" FURRINGCHANNEL @ 16" O.C. W/CLOSURE CHANNELS @PERIMETER
59'-2"PARAPET
A.M.S.L.
FRAME & GLAZINGAS SCHED
A5032
8"
CONC STAIRLANDING -SEE STRUCT
CONC SLAB -SEE STRUCT
5/8" GYP BD ON1 1/2" FURRINGCHANNELS @16" O.C.
5/8" GYP ON2 1/2" MTL STUDS@ UNDERSIDEOF LANDING
5/8" GYP ON3 5/8" MTL STUDS@ CEILING
5/8" GYP BD ON1 1/2" FURRINGCHANNELS @16" O.C.
8"
8"
GRADE - SEE CIVIL
CONT.VAPORBARRIER,TYP.
BASE ASSCHED
A.M.S.L.
A.M.S.L.
DECK15'-0"
3/4" EXT GRADEPLYWOOD
NOTE: 3/4" MARINEGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR LEVELDOWN. 3/4" EXTGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR UP.
C.I.P. CONCROOF CAP -SEE STRUCT
22'-10"A.M.S.L.
CONT. W.P.SHEETMEMBRANE
PROTECTIONBOARD
NOTE: CONCRETEHATCH DRAFTINGERROR REMOVED.
GROUND LEVEL12'-0"
FIRST FLOOR30'-8"
B
B.O. SOFFIT26'-0"
DFE24'-0"
A5002
2'-0
"6"
6"
27'-6"
A5025
A5026
3'-9 5/8"
DRY JOINT ACMRAIN SCREEN MTLPANEL SYSTEM
LIQUID APPLIEDWATERPROOFINGMEMBRANE ON 3/4"PLYWD SHEATHING
CONT. BATT INSUL
8" MTL STUDS @16" O.C.
6" MTL STUDS@ 16" O.C.
C.I.P. CONC COL - SEESTRUCT
BENT PLATE - NOTCHAROUND COLUMN - SEESTRUCT
2'-0
"
CONC SLAB -SEE STRUCT
CEILINGAS SCHED
MODIFIED BITUMENROOFING SYSTEM
1/2" RECOVERY BD
4" RIGID INSUL
MTL DECKING -SEE STRUCT
STL BEAM -SEE STRUCT
1/2" CONT SPRAYFOAM INSUL
3 5/8" MTL STUDFRAMING @ 16"O.C. - EXTENDTIGHT TO DECK
ROOF DRAINLEADERBYND
2" CONT SPRAYFOAM INSUL
OPP
MTL SOFFIT
DRY JOINT ACMRAIN SCREEN MTLPANEL SYSTEM
LIQUID APPLIEDWATERPROOFINGMEMBRANE ON 3/4"PLYWD SHEATHING
CONC PAVERS - SEESITE PLAN
8"
MTL DECKING- SEE STRUCT
TOP OF COL
A.M.S.L.
A.M.S.L.
A.M.S.L.
A.M.S.L.
SOFFIT
A.M.S.L.
PARAPET
8"
ROOF DRAIN BEYOND
NOTE: 3/4" MARINEGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR LEVELDOWN. 3/4" EXTGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR UP.
2 1/2" MTL STUDS@ 16" O.C.
A5038
CONC PAVERS -SEE SITE PLAN
2", 16 GA GALVSUPPORT "Z"
40'-8"
49'-2"
A.M.S.L.
A.M.S.L.
A5037
CONC SLAB W/REBAR -SEE CIVIL
CHECKED:DRAWN:
NUMBER:DATE:
1091
TO
MM
Y M
UN
RO
DR
IVE
, BIL
OX
I, M
S 3
9532
228.
594.
2323
P...
..228
.594
.222
3 F
A R C H I T E C T S
eleyguildhardy.com
A R
C H
I T
E C
T S
DA
TE
/ D
ES
CR
IPT
ION
:R
EV
:
BAM, DSHMEL
Oct 26, 201615-036
MA
RIN
E R
ES
EA
RC
H F
AC
ILIT
YF
INA
L C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S -
IFB
RE
BID
WA
LL
SE
CT
ION
S
A342R 15-0
36M
ARIN
E R
ESEA
RC
H F
ACIL
ITY
FIN
AL C
ON
STR
UC
TIO
N D
OC
UM
ENTS
- IF
BR
EBID
3/4" = 1'-0"A110A342R
4 WALL SECTION @ OHC 3/4" = 1'-0"A403A342R
1 WALL SECTION @ EAST STAIR 3/4" = 1'-0"A402A342R
2 WALL SECTION @ WEST STAIR 3/4" = 1'-0"A110A342R
3 WALL SECTION THRU COL
1 2
016-
11-1
4 H
AT
CH
RE
MO
VE
D
FACP
BATTERIES
SURGESUPPRESSION
120 VACDEDICATED
1ST FLOOR NAC
6" WIRE GUTTER
FCPS
GROUND FLOOR SLC
1ST FLOOR SLC
J
DACT
(AS REQD.)
GROUND FLOORNAC
T FTT
TTRRRT
T F T F
AOR
1
FOR CEILING HEIGHTS LESS THAN 86",THE VISUAL LENS MOUNTING HEIGHT SHALL BE
WITHIN 6" OF THE CEILING.
AUDIBLE/VISUAL& VISUAL ONLY
APPLIANCES
SYNCHRONIZE MORE THANTWO APPLIANCES IN ANY
FIELD OF VIEW.
NOTE:REFER TO THE PROPER DEVICEINSTALLATION INSTRUCTIONS FORBACKBOX MOUNTING HEIGHT.
80" MIN
AUDIBLE ONLY
96" MAX (NFPA)ABOVE FINISHED FLOOR
ALERTALERTALERT
FINISHED FLOOR
MANUAL PULLSTATION
NFPA 72 AUDIBLE APPLIANCE 6"MIN BELOWFINISHED CEILING
90" MINABOVE FINISHED FLOOR(OTHER MOUNTING HEIGHTS SHALL BEPERMITTED BY THE AHJ PROVIDING IT MEETS THESOUND LEVEL OUTPUT REQUIRED.)
TO EXIT DOOR5' (MAX)
DOOR WIDTHLESS 3"
45" TO 48" MAX
A/C SUPPLYOR RETURNDIFFUSER
36" (MIN)
CEILING
NFPA 72 2012 EDITION
4" NOTE: MEASUREMENTSSHOWN ARE TO THECLOSEST EDGE OF THEDETECTOR.
4"
12" (MAX)
NFPA 72 2010 EDITION(SECTION 17.7.3.2.1)
WALL-MOUNTED SMOKE / HEAT DETECTOR
HEAT DETECTORS NEVER HERE
ACCEPTED HERE
CEILING-MOUNTED SMOKE/ HEAT DETECTOR
MAGNETICDOORHOLDER 5"
FINISHED WALL
SIDE WALL
DEVICE MOUNTING HEIGHTS (PER NFPA 72)
FIRE ALARM GENERAL NOTES1. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY EQUIPMENT & FIELD DEVICES. EXACT
ROUTING OF CONDUITS TO BE DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO SUITCONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE RECORD DRAWINGS.
2. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING APPROVAL FOR ALL NECESSARY ADJUSTMENTIN CIRCUITING AS REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT AND/OR DEVICES WHICHARE AFFECTED BY ANY AUTHORIZED CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THERECORD DRAWINGS.
3. A STAMPED SET OF APPROVED FIRE ALARM SHOP DRAWINGS SHALL BE AT THE JOB SITE AND SHALL BEUSED FOR INSTALLATION.
4. THE POWER CIRCUIT TO THE FACP AND TO THE FIRE ALARM POWER SUPPLIES SHALL BE ON A DEDICATED120V, 20A BRANCH CIRCUIT BREAKER, AND SHALL HAVE A RED MARKING, LOCK-ON PROVISION AND SHALL BEIDENTIFIED AS "FIRE ALARM CIRCUIT CONTROL." THE LOCATION OF THE CIRCUIT DISCONNECT MEANS(CIRCUIT BREAKER) SHALL BE PERMANENTLY IDENTIFIED AT THE FIRE ALARM CONTROL UNIT.
5. THE CONTRACTOR WILL MAINTAIN ALL AREAS OF THE BUILDING IN A NEAT AND WORKMAN LIKE MANNER.6. ANY SMOKE DETECTOR HEAD INSTALLED BEFORE THE BUILDING IS CLEANED AND ACCEPTED SHALL BE
COVEREDTO PROTECT FROM DUST. ANY FALSE ALARMS DUE TO DIRT CONTAMINATED HEADS SHALL BE THERESPONSIBILITY OF THE FIRE ALARM INSTALLER.
7. THE FIRE ALARM INSTALLER WILL MAINTAIN THE FIRE RESISTANCE INTEGRITY OF ALL WALL, CEILING, ANDROOF ASSEMBLIES ANY TIME THAT WORK IS NOT ACTIVELY BEING PERFORMED.
8. INSTALLATION OF DEVICES SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. POWERLIMITED AND NON-POWER LIMITED FIELD WIRING MUST BE INSTALLED WITHIN THE FACP ENCLOSURE INACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND NEC.
9. ALL WIRING SHALL BE INSTALLED ACCORDING TO NFPA 70 (NEC).10. FIRE ALARM CIRCUITS SHALL BE IDENTIFIED IN ACCORDANCE WITH APPROPRIATE SECTION OF NEC 760.
MARK ALL FIRE ALARM WIRES IN ACCORDANCE WITH NEC 760 SECTIONS FOR POWER LIMITED AND NON-POWER LIMITED WIRE.
11. FIRE ALARM CABLE INSTALLED IN DUCTS, PLENUM, AND OTHER SPACES USED FOR ENVIRONMENTAL AIRSHALL BE TYPE FPLP.
12. FIRE ALARM CABLE INSTALLED IN THE VERTICAL RUNS AND PENETRATE MORE THAN ONE FLOOR OR CABLESINSTALLED IN VERTICAL RUNS IN SHAFTS SHALL BE TYPE FPLR.
13. FIRE ALARM CABLE INSTALLED IN UNDERGROUND CONDUIT OR OTHER WET LOCATIONS SHALL BE UL LISTEDFOR WET LOCATIONS.
14. FIRE ALARM CIRCUITS EXTENDING BEYOND ONE BUILDING AND RUN OUTDOORS SHALL BE INSTALLED INACCORDANCE WITH NFPA 70 ARTICLES 760, 770, 725 AND 800 WHERE APPLICABLE.
15. ALL WIRING, INCLUDING SHIELDS MUST BE DRY AND FREE OF SHORTS AND GROUNDS.16. ALL SHIELDED WIRE MUST HAVE SHIELD CONTINUITY AT FULL LENGTH OF THE WIRE.17. ONLY SYSTEM WIRING CAN BE RUN IN THE SAME CONDUIT.18. 120VAC IS NOT PERMITTED IN THE SAME CONDUIT WITH LOW VOLTAGE WIRING.19. MAINTAIN 40 PERCENT CONDUIT FILL RATIO AS PER NEC REQUIREMENTS.20. ALL WIRING TO BE IN CONDUIT WITH FACTORY APPLIED RED FINISH.21. PROVIDE DUCT DETECTORS IN SUPPLY AIR SYSTEMS. SEE MECH. PLANS FOR LOCATIONS.22. SHUTDOWN OF HVAC SYSTEMS FOR COMPLIANCE WITH NFPA 90A BY MECH.23. PRE-FINAL & FINAL FIRE ALARM TESTING SHALL BE COORDINATE WITH ARCH/ENGINEER.24. ALL WIRING TO BE SOLID COPPER.25. SMOKE DETECTION REQUIRED ABOVE ALL CONTROL PANELS TO INCLUDE NAC EXTENDER PANELS.26. CONTRACTOR TO PROVIDE ALL MEANS AND METHODS TO COMPLY WITH THE EMERGENCY RADIO SYSTEM
COVERAGE ORDINANCE SECTIONS 10-115 THROUGH 10-132 OF THE CITY OF GULFPORT'S CODE ANDORDINANCE.
27. SUPERVISE POWER SUPPLY FOR AREA OF REFUGE SYSTEM.
1
MANUAL PULL STATIONSPRINKLER WATER FLOWELEVATOR MACHINE ROOM WATER FLOW
ELEVATOR MACHINE ROOM DETECTORFIRST FLOOR ELEVATOR LOBBY SMOKE DETECTOR
GROUND FLOOR ELEVATOR LOBBY SMOKE DETECTORSMOKE DETECTOR
DUCT DETECTORVALVE POSITION MONITOR SWITCH
FACP OR FCPS TROUBLE SIGNAL
DISP
LAY
ADDR
ESS
MES
SAG
E O
N TH
E M
AIN
FACP
AND
ANN
UNCI
ATO
RS
RECO
RD T
HE E
VENT
IN T
HE H
ISTO
RY L
OG
BRO
ADCA
ST F
IRE
ALAR
M O
N AL
L CI
RCUI
TS IN
AFF
ECTE
D BU
ILDI
NGAC
TIVA
TE A
LERT
STR
OBE
S TH
ROUG
HOUT
AFF
ECTE
D BU
ILDI
NG
ACTI
VATE
EXT
ERIO
R W
ATER
FLO
W B
ELL
STO
P AI
R HA
NDLI
NG U
NIT
AT D
ETEC
TOR
IN A
LARM
INIT
IATE
PRI
MAR
Y RE
CALL
TO
FIR
ST F
LOO
R
INIT
IATE
SEC
OND
ARY
RECA
LL T
O T
HE 2
ND F
LOO
RIN
ITIA
TE E
LEVA
TOR
POW
ER S
HUT
TRIP
TRAN
SMIT
WAT
ER F
LOW
ALA
RM
TRAN
SMIT
MAN
UAL
PULL
STA
TIO
N AL
ARM
SIG
NAL
TRAN
SMIT
SM
OKE
DET
ECTO
R AL
ARM
SIG
NAL
TRAN
SMIT
DUC
T DE
TECT
OR
SUPE
RVIS
ORY
SIG
NAL
TRAN
SMIT
TAM
PER
ACTI
VATI
ON
SUPE
RVIS
ORY
SIG
NAL
TRAN
SMIT
FAC
P/FC
PS S
UPER
VISO
RY/T
ROUB
LE S
IGNA
L
TRAN
SMIT
ELE
VATO
R DE
TECT
OR
OR
WAT
ERFL
OW
ALA
RM S
IGNA
L
INPUTOUTPUT
LOCAL OUTPUT SIGNAL OUTPUT BASE
FLOW SWITCH
AREA OF REFUGE POWER FAILURE1
NOT TO SCALEFA001
1 FIRE ALARM RISERNOT TO SCALEFA001
2 FA SCHEMATIC - DEVICE MOUNTING HEIGHTSCHECKED:DRAWN:
NUMBER:DATE:
DA
TE
/ D
ES
CR
IPT
ION
:R
EV
:
1091
TO
MM
Y M
UN
RO
DR
IVE
, BIL
OX
I, M
S 3
9532
228.
594.
2323
P...
..228
.594
.222
3 F
A R C H I T E C T S
eleyguildhardy.com
A R C H I T E C T S
FIN
AL
CO
NST
RU
CTI
ON
DO
CU
MEN
TS-IF
B R
EBID
MAHJTW
09/19/201615-036
MA
RIN
E R
ES
EA
RC
H F
AC
ILIT
Y
FIR
E A
LAR
M R
ISE
R/M
ATR
IX
FA001 15-0
36M
ARIN
E R
ESEA
RC
H F
ACIL
ITY
11/10/16 .
1A
DD
ED
AR
EA
OF R
EFU
GE P
HO
NE
2 3 4 5 6 7
A
B
C.2
8
D
9
E
1
C
6.1
A.5
COVEREDSTORAGE
103 RECEIVING
104
FREIGHTELEVATOR
105
STAIR
106
STAIRS
101
R R R T
RR
TR
110cd
110cd
WP
WP
110cd
110cd
WP
WP
110cdWP
110cdWP
LOBBY
100
ELEVATOR
102
1
AO
R
FIRE ALARM LEGEND
HORN STROBE
SMOKE DETECTOR
F
T
R CONTROL RELAY
TAMPER SWITCH
FLOW SWITCH
FAAP
FACP
PULL STATION
FIRE ALARMANNUNCIATORPANEL
FIRE ALARMCONTROL PANEL
STROBE ONLY
DUCT SMOKEDETECTOR
1
AOR AREA OF REFUGEBASE STATION
1/8" = 1'-0"T201FA100
1 FIRE ALARM GROUND FLOOR
CHECKED:DRAWN:
NUMBER:DATE:
DA
TE
/ D
ES
CR
IPT
ION
:R
EV
:
1091
TO
MM
Y M
UN
RO
DR
IVE
, BIL
OX
I, M
S 3
9532
228.
594.
2323
P...
..228
.594
.222
3 F
A R C H I T E C T S
eleyguildhardy.com
A R C H I T E C T S
FIN
AL
CO
NST
RU
CTI
ON
DO
CU
MEN
TS-IF
B R
EBID
MAHJTW
09/19/201615-036
MA
RIN
E R
ES
EA
RC
H F
AC
ILIT
Y
FIR
E A
LAR
M G
RO
UN
D F
LOO
R
FA100 15-0
36M
ARIN
E R
ESEA
RC
H F
ACIL
ITY
NO
RTH
SCALE: 1/8"=1'-0"
0' 16'8'8'
11/10/16 .
1A
DD
ED
AR
EA
OF R
EFU
GE P
HO
NE
BASE STATION REQUIRES 120V
POWER SUPPLY. SEE SHEET
T110 FOR ADD'L INFO.
TELECOMMUNICATIONS SYMBOLS
CABLE TRAY TYPE, SIZE AND MOUNTING HEIGHT ASINDICATED IN CONSTRUCTION DOCUMENTS
REA
R
FR
ON
T
R1 2-POST FLOOR MOUNTED TELECOMMUNICATIONS RACK
VERTICAL WIRE MANAGER
WAP1D WAP = WIRELESS ACCESS POINT, MOUNTED FLUSH IN
FINISHED CEILING. 1D = 1 DATA JACK
TELECOMMUNICATIONS OUTLET1V = 1 VOICE JACK (ANALOG), 3D = 3 DATA JACKS
1V3D
1VANALOG VOICE OUTLET, 1V = 1 VOICE JACK
J-HOOK PATHWAY, TYPE, SIZE AND MOUNTING HEIGHTAS INDICATED IN CONSTRUCTION DOCUMENTS
J
MAIN GROUNDING BUSBAR, TYPE, SIZE AND MOUNTINGHEIGHT AS INDICATED IN CONSTRUCTION DOCUMENTS
TELECOMMUNICATIONS/AV/POWER FLOOR BOX,MOUNTED FLUSH IN FINISHED FLOOR. AV = AUDIO VISUAL,2D = 2 DATA JACK
2D
AV
2D
TELECOMMUNICATIONS/AV/POWER FLUSH WALL BOX.MOUNTING HEIGHT FROM FINISHED FLOOR TO CENTER OFBOX, AS INDICATED ON PLANS. AV = AUDIO VISUAL,2D = 2 DATA JACK
AV
+XX"
2D
TELECOMMUNICATIONS/POWER FLUSH WALL BOX.MOUNTING HEIGHT FROM FINISHED FLOOR TO CENTER OFBOX, AS INDICATED ON PLANS. 2D = 2 DATA JACK
+XX"
S SPEAKERS MOUNTED FLUSH IN FINISHED CEILING.
M MICROPHONES MOUNTED ON FINISHED CEILING.
AREA OF REFUGE WALL MOUNTED ANALOG VOICE OUTLET.PROVIDE AREA OF REFUGE FACEPLATE.
1
AREA OF REFUGE CALL BOX WITH ANALOG VOICE OUTLET -AREA OF REFUGE BASE STATION.B
LINETYPES
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
NEW
FUTURE
UNDERGROUND
DENOTES DETAIL OR ENLARGED PLAN
MISCELLANEOUS SYMBOLS
JUNCTION BOX, CEILING MOUNTEDF = FLUSH MOUNTED IN CEILING, C = MOUNTED ABOVE CEILING
JUNCTION BOX, WALL MOUNTED, MOUNTING HEIGHT ASINDICATED ON PLANSF = FLUSH MOUNTED, S = SURFACE MOUNTED
J
JC
ACCESS PANEL. SEE ARCHITECTURAL PLANS FORADDITIONAL INFORMATION
UNDERGROUND CONCRETE MANHOLE. SEE PLANS FOR SIZE.
+XX"
UNDERGROUND PULLBOX. SEE PLANS FOR SIZE.
F
SECURITY SYMBOLS
MD SECURITY ALARM MOTION DETECTOR, WALL MOUNTED. SEESPECIFICATIONS FOR TYPE.
MD SECURITY ALARM MOTION DETECTOR, CEILING MOUNTED. SEESPECIFICATIONS FOR TYPE.
POE
VIDEO SURVEILLANCE CAMERA WITH DOME ENCLOSURE, CEILINGMOUNTED, POE = POWER OVER ETHERNET.
CARD READERCR
ELECTRIC DOOR STRIKEES
ACCESS DOOR POWER SUPPLYDP
VIDEO SURVEILLANCE CAMERA WITH DOME ENCLOSURE, WALLMOUNTED, MOUNTING HEIGHT 9'-0" AFF OR AS NOTED ONDRAWINGS. POE = POWER OVER ETHERNETPOE
ABBREVIATIONS ABBREVIATIONS
OC ON CENTEROD OUTSIDE DIAMETEROSP OUTSIDE PLANT
PB PULLBOXPDU POWER DISTRIBUTION UNITPNL PANELPOE POWER OVER ETHERNETPOTS PLAIN OLD TELEPHONE SERVICEPR PAIRPRI PRIMARYPS POWER SUPPLYPTR PRINTERPVC POLYVINYL CHLORIDEPWR POWER
REC RECEPTACLEREQ REQUIREDRFI RADIO FREQUENCY INTERFERENCERGS RIGID GALVANIZED STEELRM ROOMRX RECEIVER
SB SMARTBOARDSCC SATELLITE COMMUNICATIONS CABINET;SCP SECURITY CONTROL PANELSHT SHEETSM SINGLE MODESPEC SPECIFICATIONSPKR SPEAKERSQ SQUARE
TB TERMINAL BLOCKTBD TO BE DETERMINEDTEL TELEPHONETEMP TEMPERATURETGB TELECOMMUNICATIONS GROUNDING BUSBARTIA TELECOMMUNICATIONS INDUSTRY ASSOCIATIONTMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBARTMH TELECOMMUNICATIONS MANHOLETO TELECOMMUNICATIONS OUTLETTP TAMPER PROOFTTB TELEPHONE TERMINAL BOARDTV TELEVISIONTX TRANSMITTERTYP TYPICAL
UG UNDERGROUNDUGPB UNDERGROUND PULLBOX, WEATHERPROOFUL UNDERWRITERS LABORATORYUON UNLESS OTHERWISE NOTEDUPS UNINTERRUPTIBLE POWER SUPPLYUTP UNSHIELDED TWISTED PAIR
W/ WITHW/O WITHOUTWAN WIDE AREA NETWORKWAP WIRELESS ACCESS POINTWP WEATHER PROOF
AC ABOVE COUNTER HEIGHTAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEANT ANTENNAAUTO AUTOMATICAWG AMERICAN WIRE GAUGE
BFG BELOW FINISHED GRADE
CAT CATEGORYcd CANDELACLG CEILINGCMP COMMUNICATIONS MEDIA PLENUMCOAX COAXIAL CABLECPU CENTRAL PROCESSING UNITCTR CENTERCU COPPER
dB DECIBELDEMARC DEMARCATIONDWG DRAWING
EA EACHEL ELEVATIONELEC ELECTRICALEMT ELECTRICAL METALLIC TUBINGEOL END OF LINE DEVICE(E) EXISTING
FA FIRE ALARMFAAP FIRE ALARM ANNUNCIATOR PANELFACP FIRE ALARM CONTROL PANELFBO FURNISHED BY OTHERSFIXT FIXTURE
GA GAUGEGRS GALVANIZED RIGID STEEL CONDUITGND GROUND
HT HEIGHT
IDF INTERMEDIATE DISTRIBUTION FRAMEIEEE INSTITUTE OF ELECTRICAL & ELECTRONICS ENGINEERS
J-BOX, JB JUNCTION BOX
LAN LOCAL AREA NETWORKLOMM LASER OPTIMIZED MULTI MODE
MAX MAXIMUMMDF MAIN DISTRIBUTION FRAMEMFR MANUFACTURERMIN MINIMUMmm MILLIMETERMTD MOUNTEDMTG MOUNTING
N/A NOT APPLICABLENEC NATIONAL ELECTRICAL CODENEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNFPA NATIONAL FIRE PROTECTION ASSOCIATIONNIC NOT IN CONTRACTNTS NOT TO SCALE
NOT ALL SYMBOLS AND ABBREVIATIONSMAY APPLY TO THIS PROJECT.
CHECKED:DRAWN:
NUMBER:DATE:
DA
TE
/ D
ES
CR
IPT
ION
:R
EV
:
1091
TO
MM
Y M
UN
RO
DR
IVE
, BIL
OX
I, M
S 3
9532
228.
594.
2323
P...
..228
.594
.222
3 F
A R C H I T E C T S
eleyguildhardy.com
A R C H I T E C T S
FIN
AL
CO
NST
RU
CTI
ON
DO
CU
MEN
TS-IF
B R
EBID
MAHATV
09/19/201615-036
MA
RIN
E R
ES
EA
RC
H F
AC
ILIT
Y
TEC
HN
OLO
GY
SY
MB
OLS
AN
D A
BB
RE
VIA
TIO
NS
T001 15-0
36M
ARIN
E R
ESEA
RC
H F
ACIL
ITY
11/10/16 .
1A
DD
ED
AR
EA
OF
REFU
GE P
HO
NE
2 3 4 5 6 7
A
B
C.2
8
D
9
E
1
C
6.1
A.5
LOBBY
200
ELECTRONICSSHOP
231
CONFERENCE
230
ELEC ROOM
222
IT
224
JAN CLOSET /LAUNDRY
223
BOILER
221
MECH COMBINED
219
OUTDOORPLATFORM
220
STORAGE
218
RECEIVING 2
216
MACHINE SHOP
213
LOUNGE
208
CLASSROOM 2
207
CLASSROOM 1
206
PORT/MARINEOFFICE
205
FREIGHTELEVATOR
215
STAIR
217
STAIRS
201
2D2D
2D
2D
MARINE TECHOFFICE 2
228
MARINE TECHOFFICE 1
226
MARINE TECHLAB
225
ELEV MACHINEROOM
229
STOR
227
ELEVATOR
202
WOMENS
209
MENS
211
SHOWER
212
SHOWER
210
2D
AV AV2D 2D
WAP
WAP
2D
2D
AV AV2D
2D
WAP2D
T2016
T2015
+60"AFF
+60"AFF
CORRIDOR
235 CORRIDOR
236
WAP2D
AV2D
+60"AFF
ELEV MACHINEROOM
214
SEATING AREA
203
MENS
238
WOMENS
237
COPY RM
204
WAP2D
AVAV 2D2D
2D
2D
2D
2D
+41"AFF
+41"AFF
+41"AFF
+41"AFF
2V
2V
AV
2D
+41"AFF
2D
+41"AFF
2D+41"AFF
2D+41"AFF
2D +41"AFF
2D +41"AFF
2D
2D
2D2D
2D+41"AFF
2D2D
2D
2D
2D
2D
1
1. PROVIDE 12" X4" WIRE TRAY ABOVE ACCESSIBLE CEILING. COORDINATE PLACEMENT WITH OTHER DISCIPLINES.2. PROVIDE (2) 2-1/2" CONDUITS FROM ELECTRONICS SHOP THROUGH ROOF TO (2) 12'X12"X8" NEMA 3R PULLBOXES AT GPS ANTENNA
RACK. SEE ARCHITECTURAL SHEET 2/A504 FOR ADDITIONAL INFORMATION. COORDINATE EXACT LOCATION BEFORE INSTALL.3. PROVIDE 12"X12"X8" NEMA 1 PULLBOX ABOVE ACCESSIBLE CEILING.4. ROUTE (2) 4" RGS CONDUITS ABOVE ACCESSIBLE CEILING FOR AT&T BACKBONE CABLING. MAINTAIN 48" LARGE RADIUS SWEEPS
FOR ALL BENDS. PROVIDE 2500 LB MULE TAPE IN BOTH CONDUITS. CONDUITS SHALL ONLY BE USED FOR AT&T CABLE.5. ROUTE (2) 2-1/2" CONDUITS ABOVE CEILING FOR GPS ANTENNA CABLING. COMMUNICATIONS CONTRACTOR TO INSTALL
CONDUITS WITH 2500 LB. MULE TAPE IN BOTH CONDUITS, (2)NEMA 3R PULL BOXES AT ANTENNA RACK AND NEMA 1 ENCLOSURE INELECTRONICS SHOP. SEE SHEETS 1/I400 AND 4/I402 FOR ADDITIONAL INFORMATION. COORDINATE EXACT LOCATION BEFOREINSTALL.
6. PROVIDE (2) 4" CONDUITS FROM CABLE TRAY ABOVE ACCESSIBLE CEILING TO CABLE TRAY BELOW CEILING IN IT ROOM. PROVIDE48" LARGE RADIUS SWEEPS.
7. PROVIDE 48" LARGE RADIUS SWEEPS FOR BACKBONE CONDUITS THROUGH CEILING TO CABLE TRAY IN IT ROOM.8. PROVIDE (2) 1-1/4" CONDUITS FROM FLOORBOX TO ABOVE ACCESSIBLE CEILING FOR TELECOM AND AV CABLING. PROVIDE
PULLSTRING IN CONDUITS.9. ROUTE (1) 1" CONDUIT IN FURNITURE SYSTEM. MAINTAIN 12" BEND RADIUS MINIMUM, TYP.10. ROUTE CONDUIT IN CHASE TO ABOVE ACCESSIBLE CEILING.11. INSTALL (1) 1-1/2" CONDUIT FROM GATE CARD READER ON GROUND FLOOR TO ABOVE ACCESSIBLE CEILING.12. INSTALL (1) 1-1/2" CONDUIT FROM CAMERA ON GROUND FLOOR TO ABOVE ACCESSIBLE CEILING.13. ROUTE (2) 4" RGS CONDUITS FROM PULLBOX #PB1 ABOVE CEILING ON 1ST FLOOR TO UNDERGROUND PULLBOX #UGPB1. TRANSITIONTO SCHEDULE 40 BEFORE MAINTAIN LARGE RADIUS SWEEPS. SEE SHEET T110 AND T101 FOR ADDITIONAL INFORMATION. PROVIDE 250 LB
MULETAPE ALONG ENTIRE ROUTE IN BOTH 4" CONDUITS.
2
3
4
5
6
7
88
9 10
8
11
12
PB1
1V
1V
14
13
14
1V
14
1V14
2D
+60"AFF
+80"AFF+80"AFF
1515
2D2D
+80"AFF
+80"AFF
1616
16
AV2D
2
1V
COORDINATE EXACT LOCATIONWITH ELEVATOR CONTRACTOR
COORDINATE EXACT LOCATIONWITH ELEVATOR CONTRACTOR
WAP2D
WAP2D
WAP2D
AV2D
1717
14. PROVIDE ANALOG VOICE CABLE TO EACH OUTLET.15. PROVIDE JUNCTION BOX FOR FUTURE CAMERA NEEDS. PROVIDE 1" CONDUIT FROM BOX TO ABOVE CEILING.16. PROVIDE FLUSH CEILING JUNCTION BOX FOR CEILING MOUNTED MICROPHONES.17. SEE ELECTRICAL PLANS FOR ADDITIONAL INFORMATION.18. PROVIDE AND INSTALL (2) 1-1/4" CONDUITS, QUANTITY AS SHOWN. PROVIDE PULLSTRING IN EMPTY CONDUITS.19. SEE SHEET T110 FOR CONTINUATION.
1818
8 8
1818
19
1
1
1/8" = 1'-0"T201T111
1 TECHNOLOGY PLAN 1ST FLOOR
CHECKED:DRAWN:
NUMBER:DATE:
DA
TE
/ D
ES
CR
IPT
ION
:R
EV
:
1091
TO
MM
Y M
UN
RO
DR
IVE
, BIL
OX
I, M
S 3
9532
228.
594.
2323
P...
..228
.594
.222
3 F
A R C H I T E C T S
eleyguildhardy.com
A R C H I T E C T S
FIN
AL
CO
NST
RU
CTI
ON
DO
CU
MEN
TS-IF
B R
EBID
MAHATV
09/19/201615-036
MA
RIN
E R
ES
EA
RC
H F
AC
ILIT
Y
TEC
HN
OLO
GY
PLA
N 1
ST
FLO
OR
T111 15-0
36M
ARIN
E R
ESEA
RC
H F
ACIL
ITY
NO
RTH
SCALE: 1/8"=1'-0"
0' 16'8'8'
11/10/16 .
1A
DD
ED
AR
EA
OF
REFU
GE P
HO
NE
C