12
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM PGRP Project No.: 413.B Addenda No. 2 PGRP Project Title: Marine Research Facility – Building Package 00 91 13 - 1 Architect: Eley Guild Hardy Architects PA Issued – November 17, 2016 SECTION 00 91 13 ADDENDA ADDENDUM NUMBER TWO ISSUED NOVEMBER 17, 2016 DATE: November 17, 2016 PROJECT TITLE: Marine Research Facility Building Package PROJECT NUMBER: 413.B OWNER: Mississippi State Port Authority ARCHITECT OF RECORD: Eley Guild Hardy Architects PA TO: Prospective Bidders This Addendum forms a part of the Contract Documents and modifies the October 26, 2016 Issued for Bid - Rebid documents with amendments and additions noted below. Acknowledge receipt of this Addendum in the space provided in the Bid Form. Failure to do so may disqualify the Bidder. This Addendum consists of three pages and nine pages of attachments as follows: SPECIFICATION CHANGES: 1. Section 01 30 00 Administrative Requirements: a. Under Paragraph 1.2F: Change to read, Submit copy of site drawing and completed Final Construction Elevation Certificate, both signed by Land Surveyor certifying elevations and locations of the Work are in conformance with the Contract Documents. Use 2015 Edition (or most current at time of project completion) of the FEMA NFIP Elevation Certificate. 2. Section 08 14 16 Flush Wood Doors: a. Under Paragraph 2.3.C Cut: Change paragraph to read: “Cut: Plain Sliced (flat sliced).3. Section 10 14 00 Signage: a. Under Paragraph 1.1.A - Summary: Add subparagraph 8 to read: 8. Area of Refuge Signage.

November 17, 2016 - Port Of The Future

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM

PGRP Project No.: 413.B Addenda No. 2 PGRP Project Title: Marine Research Facility – Building Package 00 91 13 - 1 Architect: Eley Guild Hardy Architects PA Issued – November 17, 2016

SECTION 00 91 13

ADDENDA ADDENDUM NUMBER TWO – ISSUED NOVEMBER 17, 2016

DATE: November 17, 2016 PROJECT TITLE: Marine Research Facility – Building Package PROJECT NUMBER: 413.B OWNER: Mississippi State Port Authority ARCHITECT OF RECORD: Eley Guild Hardy Architects PA TO: Prospective Bidders This Addendum forms a part of the Contract Documents and modifies the October 26, 2016 Issued for Bid - Rebid documents with amendments and additions noted below. Acknowledge receipt of this Addendum in the space provided in the Bid Form. Failure to do so may disqualify the Bidder. This Addendum consists of three pages and nine pages of attachments as follows: SPECIFICATION CHANGES:

1. Section 01 30 00 Administrative Requirements:

a. Under Paragraph 1.2F: Change to read, “Submit copy of site drawing and completed Final Construction Elevation Certificate, both signed by Land Surveyor certifying elevations and locations of the Work are in conformance with the Contract Documents. Use 2015 Edition (or most current at time of project completion) of the FEMA NFIP Elevation Certificate”.

2. Section 08 14 16 Flush Wood Doors:

a. Under Paragraph 2.3.C – Cut: Change paragraph to read: “Cut: Plain Sliced (flat

sliced).”

3. Section 10 14 00 – Signage:

a. Under Paragraph 1.1.A - Summary: Add subparagraph 8 to read:

8. Area of Refuge Signage.

MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM

PGRP Project No.: 413.B Addenda No. 2 PGRP Project Title: Marine Research Facility – Building Package 00 91 13 - 2 Architect: Eley Guild Hardy Architects PA Issued – November 17, 2016

b. Under Paragraph 2.4 Manufactured Units: Add subparagraph D to read:

D. Area of Refuge Signage Call Box Signage:

1. Reference Specification Section 27 30 00.

2. System shall consist of a minimum of two “location” and “instruction”

signs (Part #7049 - Raised Letter and Braille Instructional Wall Sign

“Directions for Call Box Use) to clearly indicate location of designated

area.

3. Manufacturer: Rath Signs or equal.

4. Section 12 93 00 Site Furnishings:

a. Under Paragraph 2.2.A.3 - Material: Change sub-paragraph a to read: “Horizontal

steel tubing and horizontal steel slat seating with skateboard guards. Provide two

skateboard guards on each bench, one on each side, centered on the bench.”

5. Section 27 30 00 Area of Refuge/Elevator Landing – Two Way Communication System

Base Station, Call Boxes and Signage (4 pages):

a. Add the attached Section in its entirety. This section describes the requirements for

Area of Refuge base station and call boxes.

DRAWING CHANGES:

1. Sheet A342 – Wall Sections (1 sheet):

a. Delete Detail 2/A342 in its entirety. The new Detail 2/A342 shall be as shown on the

attached A342R. A drafting error has been corrected with the revised detail.

2. Sheet FA001- Fire Alarm Riser/Matrix (1 sheet):

a. Delete the original Sheet FA001 and replace with the attached FA001. b. Note 27 was added to the Fire Alarm General Notes. c. Area of Refuge Failure options were added to Input/Output Schedule. d. Area of Refuge device was added to the Fire Alarm Riser.

3. Sheet FA100 – Fire Alarm Ground Floor (1 sheet):

a. Delete the original Sheet FA100 and replace with the attached FA100. b. Area of Refuge base station was added to the Lobby 100. c. Area of Refuge base station was added to the Fire Alarm Legend.

4. Sheet E111 – Ground Floor Power Plan

MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM

PGRP Project No.: 413.B Addenda No. 2 PGRP Project Title: Marine Research Facility – Building Package 00 91 13 - 3 Architect: Eley Guild Hardy Architects PA Issued – November 17, 2016

a. Provide a dedicated 20 ampere, 120 volt circuit and connection to the Area of

Refuge Base Station in Lobby 100 as located on Sheet FA100 (per Revision #1). Route 2-12,1-12 G in ½” EMT to Panel P1. Label as circuit P1-57. Provide and label a 20A/1P circuit breaker in space P1-57 to protect this circuit.

5. Sheet T001 – Technology Symbols and Abbreviations (1 sheet):

a. Delete the original Sheet T001 and replace with the attached T001. b. Area of Refuge symbols were added to the Telecommunications Symbols Legend.

6. Sheet T111 – Technology Plan 1st Floor (1 sheet):

a. Delete the original Sheet T111 and replace with the attached T111. b. Note Revision 1 at Lobby 200 and Receiving 216. An area of refuge wall mounted

analog voice outlet with area of refuge faceplate has been added at each of these locations (two total).

END OF SPECIFICATION CHANGES FOR ADDENDUM NO. 2

MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM

PGRP Project No.: 413.B Area of Refuge/Elevator Landing – Two Way Communication System PGRP Project Title: Marine Research Facility – Building Package 27 30 00 - 1 Architect: Eley Guild Hardy Architects PA Document Status: Addendum #2 – November 18, 2016

Section 27 30 00

Area of Refuge/Elevator Landing - Two-Way Communication System

Base Station, Call Boxes and Signage – ADDENDUM #2 Part 1 - General 1.0 Summary

1.1 The Base Station is to be located at a central control point on the first floor as shown on

the drawings. Call Boxes are to be located on all floors above the first floor, as shown on

the plans.

1.2 The Base Station must be capable of handling a minimum of 5 Call Boxes. Visual

indicators on the Base Station allow rescue personnel to know which Call Box needs assistance. The Base Station must allow rescue personnel to speak to all Call Boxes or individual Call Boxes.

1.3 The emergency communication hardware shall comply with the Americans with Disabilities

Act (ADA). The Call Box shall have the ability to be programmed with up to 5 emergency phone numbers. Upon activation of the emergency push button, a call will be automatically placed to the Base Station. If no one answers at the Base Station, the Call Box must dial a secondary location outside the building to activate two-way off-site person to person voice communications.

2.0 Submittals

2.1 Submit product data sheets. Include operation manuals.

2.2 Wiring or shop diagrams detailing wiring schematics, cabling.

3.0 Construction 3.1 The Base Station must have a Stainless Steel or powder coated steel housing,

red coil cord emergency handset, be 24vdc or 120vac powered and include a

rechargeable battery to maintain backup power for a minimum of 4 hours of talk time.

120vac must be on a dedicated circuit.

3.2 The Call Boxes must be in full compliance with ADA requirements. Call

Boxes require a hands-free speakerphone with an LED to indicate status of call.

3.3 The Call Boxes must allow the programming in of a specific location message of the Call

Box. This allows rescue personnel to know the location of the activated Call Box.

3.4 The Call Boxes are to be located no higher than 48” front reach, or 54” side reach to

the center of the push button above ground level to ensure conformance with the ADA requirements.

MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM

PGRP Project No.: 413.B Area of Refuge/Elevator Landing – Two Way Communication System PGRP Project Title: Marine Research Facility – Building Package 27 30 00 - 2 Architect: Eley Guild Hardy Architects PA Document Status: Addendum #2 – November 18, 2016

3.5 The Area of Refuge Call Boxes must have a Braille faceplate to ensure conformance with the ADA requirements.

3.6 The Base Station must provide an audible and visual indicator that a Call Box has

been activated.

3.7 The 24vdc Power Supply must be capable of supplying power to a minimum of 10

Call Boxes and the Base Station.

4.0 Mounting

4.1 The Base Station is to be mounted on a wall, flush mounted.

4.2 Call Boxes are to be wall, flush mounted.

5.0 Electrical

5.1 Call Boxes and Base Station are to be powered by 24vdc Power Supply. Base Station

to have option of 120vac power.

5.2 Wiring from the Base Station to the Call Boxes shall be in strict accordance with the

manufacturer’s recommendations or requirements.

5.3 Call Boxes must have built-in battery backup and include a rechargeable battery to

maintain backup power for a minimum of 4 hours of talk time.

5.4 Base Station must have a built-in battery backup and include a rechargeable

battery to maintain backup power for a minimum of 4 hours of talk time.

5.5 System shall be in compliance with all state and local Electrical Codes.

6.0 Communications

6.1 The Call Boxes shall have an ADA compliant and vandal resistant speakerphone.

6.2 The Call Boxes shall be hands-free and be a push-button-once to talk system. Once the

button has been pushed, the Call Box will call the Base Station. If no answer at the Base Station, it will automatically call preprogrammed emergency numbers the first of which must be 911. The Call Box must be capable of being programmed with up to 5 emergency numbers.6.3 Call Box shall have location message capability. Call Box must have a minimum 18 second recordable message capability, programmable to play 1 or 2 times. Call Box shall notify called party of the location of the call upon being received at the emergency dispatch center.

6.4 Call Box shall be capable of allowing the called party to replay the location

message if necessary to ensure an understanding of the caller location.

MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM

PGRP Project No.: 413.B Area of Refuge/Elevator Landing – Two Way Communication System PGRP Project Title: Marine Research Facility – Building Package 27 30 00 - 3 Architect: Eley Guild Hardy Architects PA Document Status: Addendum #2 – November 18, 2016

6.5 If system is not attended 24 hours a day, the Call Box must dial a secondary location outside the building to activate two-way off-site person to person voice communications.

6.6 Once call has been made (button pushed), the call can only be terminated by the called party.

6.7 Call Box must have a red LED that will light up upon push of the button. The light shall be

a solid color when the Call Box is activated, and will flash when call has been answered.

6.8 The Call Box must be capable of being programmed and reprogrammed on-site and

remotely.

6.9 Standard Call Box features:

6.9.1 Five number programming.

6.9.2 Operating temperature of between -40 F to +150 F (-40 to + 65 C). 6.9.3 Programmable passwords. 6.9.4 On-Site or remote programmable. 6.9.5 EEPROM memory to protect programming.

7.0 Signage

7.1 System shall consist of a minimum of two “location” and “instruction” signs (Part

#7049 - Raised Letter and Braille Instructional Wall Sign “Directions for Call Box

Use) to clearly indicate location of designated area.

7.2 Reference Addendum #2. Signage to be furnished under Section 10 14 00 Signage.

8.0 Graphics

8.1 Base Station must include wording identifying the location of each Call Box and light an

LED when a particular Call Box has been activated.

8.2 Call Box wording must include “Emergency Phone”, International Phone Symbol and raised

Braille lettering.

9.0 Cabling

9.1 Cabling for two-way communication system shall meet the applicable requirements for Level 1 pathway survivability.

10.0 Warranty

10.1 The Base Station and Call Boxes shall be warranted for a period of three years.

END OF SECTION

MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM

PGRP Project No.: 413.B Area of Refuge/Elevator Landing – Two Way Communication System PGRP Project Title: Marine Research Facility – Building Package 27 30 00 - 4 Architect: Eley Guild Hardy Architects PA Document Status: Addendum #2 – November 18, 2016

THIS PAGE INTENTIONALLY LEFT BLANK

GROUND LEVEL12'-0"

FIRST FLOOR30'-8"

BFE22'-0"

9

B.O. SOFFIT26'-0"

A5003

A5014

DFE24'-0"

A6061

OVERHEAD COILINGDOOR AS SCHED

A6071

1'-6"

57'-2"A.M.S.L.

40'-8"A.M.S.L.

CONC SLAB -SEE STRUCT

MODIFIED BITUMENROOFING SYSTEM

STL BEAM -SEE STRUCT

MTL DECKING- SEE STRUCT

FRAME & GLAZINGAS SCHED

22'-8"HEAD

A.M.S.L.

A.M.S.L.

A.M.S.L.

A.M.S.L.

A.M.S.L.

HEAD

A.M.S.L.

A6079

PARAPET

5/8" GYP BDTIGHT TO DECK

NOTE: 3/4" MARINEGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR LEVELDOWN. 3/4" EXTGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR UP.

3/4" EXT GRADEPLYWOOD

3/4" MARINEGRADE PLYWOOD

STL GIRT -SEE STRUCT

GROUND LEVEL12'-0"

FIRST FLOOR30'-8"

BFE22'-0"

9

B.O. SOFFIT26'-0"

DFE24'-0"

A5015

DRY JOINT ACMRAIN SCREEN MTLPANEL SYSTEM

LIQUID APPLIEDWATERPROOFINGMEMBRANE ON 3/4"PLYWD SHEATHING

CONT. BATT INSUL

8" MTL STUDS @16" O.C.

1/2" CONT SPRAYFOAM INSUL

C.I.P. CONC WALL- SEE STRUCT

49'-2"PARAPET

A.M.S.L.

A.M.S.L.

A.M.S.L.

A.M.S.L.

A.M.S.L.

A.M.S.L.

NOTE: 3/4" MARINEGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR LEVELDOWN. 3/4" EXTGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR UP.

3/4" MARINEGRADE PLYWOOD

3/4" EXT GRADEPLYWOOD

PT FINISHOVERSMOOTHRUBBEDCONC ASSCHED

5/8" GYP ON3 5/8" MTLSTUDS @CEILING

C.I.P.CONCROOFCAP - SEESTRUCT

A5034

8" GROUND LEVEL12'-0"

A6058

A5001

A.5

A60510

18'-0"

8"

14'-8"

A.M.S.L.

A.M.S.L.

50'-8"

SILL

HEAD

A.M.S.L.

PROJECTINGACM TRIM BYND- SEE ELEV

DRY JOINT ACMRAIN SCREEN MTLPANEL SYSTEM

LIQUID APPLIEDWATERPROOFINGMEMBRANE ON 3/4" EXTGRADE PLYWOOD

2" RIGID INSUL

2" GALV "Z" FURRINGCHANNEL @ 16" O.C. W/CLOSURE CHANNELS @PERIMETER

59'-2"PARAPET

A.M.S.L.

FRAME & GLAZINGAS SCHED

A5032

8"

CONC STAIRLANDING -SEE STRUCT

CONC SLAB -SEE STRUCT

5/8" GYP BD ON1 1/2" FURRINGCHANNELS @16" O.C.

5/8" GYP ON2 1/2" MTL STUDS@ UNDERSIDEOF LANDING

5/8" GYP ON3 5/8" MTL STUDS@ CEILING

5/8" GYP BD ON1 1/2" FURRINGCHANNELS @16" O.C.

8"

8"

GRADE - SEE CIVIL

CONT.VAPORBARRIER,TYP.

BASE ASSCHED

A.M.S.L.

A.M.S.L.

DECK15'-0"

3/4" EXT GRADEPLYWOOD

NOTE: 3/4" MARINEGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR LEVELDOWN. 3/4" EXTGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR UP.

C.I.P. CONCROOF CAP -SEE STRUCT

22'-10"A.M.S.L.

CONT. W.P.SHEETMEMBRANE

PROTECTIONBOARD

NOTE: CONCRETEHATCH DRAFTINGERROR REMOVED.

GROUND LEVEL12'-0"

FIRST FLOOR30'-8"

B

B.O. SOFFIT26'-0"

DFE24'-0"

A5002

2'-0

"6"

6"

27'-6"

A5025

A5026

3'-9 5/8"

DRY JOINT ACMRAIN SCREEN MTLPANEL SYSTEM

LIQUID APPLIEDWATERPROOFINGMEMBRANE ON 3/4"PLYWD SHEATHING

CONT. BATT INSUL

8" MTL STUDS @16" O.C.

6" MTL STUDS@ 16" O.C.

C.I.P. CONC COL - SEESTRUCT

BENT PLATE - NOTCHAROUND COLUMN - SEESTRUCT

2'-0

"

CONC SLAB -SEE STRUCT

CEILINGAS SCHED

MODIFIED BITUMENROOFING SYSTEM

1/2" RECOVERY BD

4" RIGID INSUL

MTL DECKING -SEE STRUCT

STL BEAM -SEE STRUCT

1/2" CONT SPRAYFOAM INSUL

3 5/8" MTL STUDFRAMING @ 16"O.C. - EXTENDTIGHT TO DECK

ROOF DRAINLEADERBYND

2" CONT SPRAYFOAM INSUL

OPP

MTL SOFFIT

DRY JOINT ACMRAIN SCREEN MTLPANEL SYSTEM

LIQUID APPLIEDWATERPROOFINGMEMBRANE ON 3/4"PLYWD SHEATHING

CONC PAVERS - SEESITE PLAN

8"

MTL DECKING- SEE STRUCT

TOP OF COL

A.M.S.L.

A.M.S.L.

A.M.S.L.

A.M.S.L.

SOFFIT

A.M.S.L.

PARAPET

8"

ROOF DRAIN BEYOND

NOTE: 3/4" MARINEGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR LEVELDOWN. 3/4" EXTGRADE PLYWOODSHALL BE USEDFROM THE FIRSTFLOOR UP.

2 1/2" MTL STUDS@ 16" O.C.

A5038

CONC PAVERS -SEE SITE PLAN

2", 16 GA GALVSUPPORT "Z"

40'-8"

49'-2"

A.M.S.L.

A.M.S.L.

A5037

CONC SLAB W/REBAR -SEE CIVIL

CHECKED:DRAWN:

NUMBER:DATE:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R

C H

I T

E C

T S

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

BAM, DSHMEL

Oct 26, 201615-036

MA

RIN

E R

ES

EA

RC

H F

AC

ILIT

YF

INA

L C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S -

IFB

RE

BID

WA

LL

SE

CT

ION

S

A342R 15-0

36M

ARIN

E R

ESEA

RC

H F

ACIL

ITY

FIN

AL C

ON

STR

UC

TIO

N D

OC

UM

ENTS

- IF

BR

EBID

3/4" = 1'-0"A110A342R

4 WALL SECTION @ OHC 3/4" = 1'-0"A403A342R

1 WALL SECTION @ EAST STAIR 3/4" = 1'-0"A402A342R

2 WALL SECTION @ WEST STAIR 3/4" = 1'-0"A110A342R

3 WALL SECTION THRU COL

1 2

016-

11-1

4 H

AT

CH

RE

MO

VE

D

FACP

BATTERIES

SURGESUPPRESSION

120 VACDEDICATED

1ST FLOOR NAC

6" WIRE GUTTER

FCPS

GROUND FLOOR SLC

1ST FLOOR SLC

J

DACT

(AS REQD.)

GROUND FLOORNAC

T FTT

TTRRRT

T F T F

AOR

1

FOR CEILING HEIGHTS LESS THAN 86",THE VISUAL LENS MOUNTING HEIGHT SHALL BE

WITHIN 6" OF THE CEILING.

AUDIBLE/VISUAL& VISUAL ONLY

APPLIANCES

SYNCHRONIZE MORE THANTWO APPLIANCES IN ANY

FIELD OF VIEW.

NOTE:REFER TO THE PROPER DEVICEINSTALLATION INSTRUCTIONS FORBACKBOX MOUNTING HEIGHT.

80" MIN

AUDIBLE ONLY

96" MAX (NFPA)ABOVE FINISHED FLOOR

ALERTALERTALERT

FINISHED FLOOR

MANUAL PULLSTATION

NFPA 72 AUDIBLE APPLIANCE 6"MIN BELOWFINISHED CEILING

90" MINABOVE FINISHED FLOOR(OTHER MOUNTING HEIGHTS SHALL BEPERMITTED BY THE AHJ PROVIDING IT MEETS THESOUND LEVEL OUTPUT REQUIRED.)

TO EXIT DOOR5' (MAX)

DOOR WIDTHLESS 3"

45" TO 48" MAX

A/C SUPPLYOR RETURNDIFFUSER

36" (MIN)

CEILING

NFPA 72 2012 EDITION

4" NOTE: MEASUREMENTSSHOWN ARE TO THECLOSEST EDGE OF THEDETECTOR.

4"

12" (MAX)

NFPA 72 2010 EDITION(SECTION 17.7.3.2.1)

WALL-MOUNTED SMOKE / HEAT DETECTOR

HEAT DETECTORS NEVER HERE

ACCEPTED HERE

CEILING-MOUNTED SMOKE/ HEAT DETECTOR

MAGNETICDOORHOLDER 5"

FINISHED WALL

SIDE WALL

DEVICE MOUNTING HEIGHTS (PER NFPA 72)

FIRE ALARM GENERAL NOTES1. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY EQUIPMENT & FIELD DEVICES. EXACT

ROUTING OF CONDUITS TO BE DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO SUITCONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE RECORD DRAWINGS.

2. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING APPROVAL FOR ALL NECESSARY ADJUSTMENTIN CIRCUITING AS REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT AND/OR DEVICES WHICHARE AFFECTED BY ANY AUTHORIZED CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THERECORD DRAWINGS.

3. A STAMPED SET OF APPROVED FIRE ALARM SHOP DRAWINGS SHALL BE AT THE JOB SITE AND SHALL BEUSED FOR INSTALLATION.

4. THE POWER CIRCUIT TO THE FACP AND TO THE FIRE ALARM POWER SUPPLIES SHALL BE ON A DEDICATED120V, 20A BRANCH CIRCUIT BREAKER, AND SHALL HAVE A RED MARKING, LOCK-ON PROVISION AND SHALL BEIDENTIFIED AS "FIRE ALARM CIRCUIT CONTROL." THE LOCATION OF THE CIRCUIT DISCONNECT MEANS(CIRCUIT BREAKER) SHALL BE PERMANENTLY IDENTIFIED AT THE FIRE ALARM CONTROL UNIT.

5. THE CONTRACTOR WILL MAINTAIN ALL AREAS OF THE BUILDING IN A NEAT AND WORKMAN LIKE MANNER.6. ANY SMOKE DETECTOR HEAD INSTALLED BEFORE THE BUILDING IS CLEANED AND ACCEPTED SHALL BE

COVEREDTO PROTECT FROM DUST. ANY FALSE ALARMS DUE TO DIRT CONTAMINATED HEADS SHALL BE THERESPONSIBILITY OF THE FIRE ALARM INSTALLER.

7. THE FIRE ALARM INSTALLER WILL MAINTAIN THE FIRE RESISTANCE INTEGRITY OF ALL WALL, CEILING, ANDROOF ASSEMBLIES ANY TIME THAT WORK IS NOT ACTIVELY BEING PERFORMED.

8. INSTALLATION OF DEVICES SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. POWERLIMITED AND NON-POWER LIMITED FIELD WIRING MUST BE INSTALLED WITHIN THE FACP ENCLOSURE INACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND NEC.

9. ALL WIRING SHALL BE INSTALLED ACCORDING TO NFPA 70 (NEC).10. FIRE ALARM CIRCUITS SHALL BE IDENTIFIED IN ACCORDANCE WITH APPROPRIATE SECTION OF NEC 760.

MARK ALL FIRE ALARM WIRES IN ACCORDANCE WITH NEC 760 SECTIONS FOR POWER LIMITED AND NON-POWER LIMITED WIRE.

11. FIRE ALARM CABLE INSTALLED IN DUCTS, PLENUM, AND OTHER SPACES USED FOR ENVIRONMENTAL AIRSHALL BE TYPE FPLP.

12. FIRE ALARM CABLE INSTALLED IN THE VERTICAL RUNS AND PENETRATE MORE THAN ONE FLOOR OR CABLESINSTALLED IN VERTICAL RUNS IN SHAFTS SHALL BE TYPE FPLR.

13. FIRE ALARM CABLE INSTALLED IN UNDERGROUND CONDUIT OR OTHER WET LOCATIONS SHALL BE UL LISTEDFOR WET LOCATIONS.

14. FIRE ALARM CIRCUITS EXTENDING BEYOND ONE BUILDING AND RUN OUTDOORS SHALL BE INSTALLED INACCORDANCE WITH NFPA 70 ARTICLES 760, 770, 725 AND 800 WHERE APPLICABLE.

15. ALL WIRING, INCLUDING SHIELDS MUST BE DRY AND FREE OF SHORTS AND GROUNDS.16. ALL SHIELDED WIRE MUST HAVE SHIELD CONTINUITY AT FULL LENGTH OF THE WIRE.17. ONLY SYSTEM WIRING CAN BE RUN IN THE SAME CONDUIT.18. 120VAC IS NOT PERMITTED IN THE SAME CONDUIT WITH LOW VOLTAGE WIRING.19. MAINTAIN 40 PERCENT CONDUIT FILL RATIO AS PER NEC REQUIREMENTS.20. ALL WIRING TO BE IN CONDUIT WITH FACTORY APPLIED RED FINISH.21. PROVIDE DUCT DETECTORS IN SUPPLY AIR SYSTEMS. SEE MECH. PLANS FOR LOCATIONS.22. SHUTDOWN OF HVAC SYSTEMS FOR COMPLIANCE WITH NFPA 90A BY MECH.23. PRE-FINAL & FINAL FIRE ALARM TESTING SHALL BE COORDINATE WITH ARCH/ENGINEER.24. ALL WIRING TO BE SOLID COPPER.25. SMOKE DETECTION REQUIRED ABOVE ALL CONTROL PANELS TO INCLUDE NAC EXTENDER PANELS.26. CONTRACTOR TO PROVIDE ALL MEANS AND METHODS TO COMPLY WITH THE EMERGENCY RADIO SYSTEM

COVERAGE ORDINANCE SECTIONS 10-115 THROUGH 10-132 OF THE CITY OF GULFPORT'S CODE ANDORDINANCE.

27. SUPERVISE POWER SUPPLY FOR AREA OF REFUGE SYSTEM.

1

MANUAL PULL STATIONSPRINKLER WATER FLOWELEVATOR MACHINE ROOM WATER FLOW

ELEVATOR MACHINE ROOM DETECTORFIRST FLOOR ELEVATOR LOBBY SMOKE DETECTOR

GROUND FLOOR ELEVATOR LOBBY SMOKE DETECTORSMOKE DETECTOR

DUCT DETECTORVALVE POSITION MONITOR SWITCH

FACP OR FCPS TROUBLE SIGNAL

DISP

LAY

ADDR

ESS

MES

SAG

E O

N TH

E M

AIN

FACP

AND

ANN

UNCI

ATO

RS

RECO

RD T

HE E

VENT

IN T

HE H

ISTO

RY L

OG

BRO

ADCA

ST F

IRE

ALAR

M O

N AL

L CI

RCUI

TS IN

AFF

ECTE

D BU

ILDI

NGAC

TIVA

TE A

LERT

STR

OBE

S TH

ROUG

HOUT

AFF

ECTE

D BU

ILDI

NG

ACTI

VATE

EXT

ERIO

R W

ATER

FLO

W B

ELL

STO

P AI

R HA

NDLI

NG U

NIT

AT D

ETEC

TOR

IN A

LARM

INIT

IATE

PRI

MAR

Y RE

CALL

TO

FIR

ST F

LOO

R

INIT

IATE

SEC

OND

ARY

RECA

LL T

O T

HE 2

ND F

LOO

RIN

ITIA

TE E

LEVA

TOR

POW

ER S

HUT

TRIP

TRAN

SMIT

WAT

ER F

LOW

ALA

RM

TRAN

SMIT

MAN

UAL

PULL

STA

TIO

N AL

ARM

SIG

NAL

TRAN

SMIT

SM

OKE

DET

ECTO

R AL

ARM

SIG

NAL

TRAN

SMIT

DUC

T DE

TECT

OR

SUPE

RVIS

ORY

SIG

NAL

TRAN

SMIT

TAM

PER

ACTI

VATI

ON

SUPE

RVIS

ORY

SIG

NAL

TRAN

SMIT

FAC

P/FC

PS S

UPER

VISO

RY/T

ROUB

LE S

IGNA

L

TRAN

SMIT

ELE

VATO

R DE

TECT

OR

OR

WAT

ERFL

OW

ALA

RM S

IGNA

L

INPUTOUTPUT

LOCAL OUTPUT SIGNAL OUTPUT BASE

FLOW SWITCH

AREA OF REFUGE POWER FAILURE1

NOT TO SCALEFA001

1 FIRE ALARM RISERNOT TO SCALEFA001

2 FA SCHEMATIC - DEVICE MOUNTING HEIGHTSCHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R C H I T E C T S

FIN

AL

CO

NST

RU

CTI

ON

DO

CU

MEN

TS-IF

B R

EBID

MAHJTW

09/19/201615-036

MA

RIN

E R

ES

EA

RC

H F

AC

ILIT

Y

FIR

E A

LAR

M R

ISE

R/M

ATR

IX

FA001 15-0

36M

ARIN

E R

ESEA

RC

H F

ACIL

ITY

11/10/16 .

1A

DD

ED

AR

EA

OF R

EFU

GE P

HO

NE

2 3 4 5 6 7

A

B

C.2

8

D

9

E

1

C

6.1

A.5

COVEREDSTORAGE

103 RECEIVING

104

FREIGHTELEVATOR

105

STAIR

106

STAIRS

101

R R R T

RR

TR

110cd

110cd

WP

WP

110cd

110cd

WP

WP

110cdWP

110cdWP

LOBBY

100

ELEVATOR

102

1

AO

R

FIRE ALARM LEGEND

HORN STROBE

SMOKE DETECTOR

F

T

R CONTROL RELAY

TAMPER SWITCH

FLOW SWITCH

FAAP

FACP

PULL STATION

FIRE ALARMANNUNCIATORPANEL

FIRE ALARMCONTROL PANEL

STROBE ONLY

DUCT SMOKEDETECTOR

1

AOR AREA OF REFUGEBASE STATION

1/8" = 1'-0"T201FA100

1 FIRE ALARM GROUND FLOOR

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R C H I T E C T S

FIN

AL

CO

NST

RU

CTI

ON

DO

CU

MEN

TS-IF

B R

EBID

MAHJTW

09/19/201615-036

MA

RIN

E R

ES

EA

RC

H F

AC

ILIT

Y

FIR

E A

LAR

M G

RO

UN

D F

LOO

R

FA100 15-0

36M

ARIN

E R

ESEA

RC

H F

ACIL

ITY

NO

RTH

SCALE: 1/8"=1'-0"

0' 16'8'8'

11/10/16 .

1A

DD

ED

AR

EA

OF R

EFU

GE P

HO

NE

BASE STATION REQUIRES 120V

POWER SUPPLY. SEE SHEET

T110 FOR ADD'L INFO.

TELECOMMUNICATIONS SYMBOLS

CABLE TRAY TYPE, SIZE AND MOUNTING HEIGHT ASINDICATED IN CONSTRUCTION DOCUMENTS

REA

R

FR

ON

T

R1 2-POST FLOOR MOUNTED TELECOMMUNICATIONS RACK

VERTICAL WIRE MANAGER

WAP1D WAP = WIRELESS ACCESS POINT, MOUNTED FLUSH IN

FINISHED CEILING. 1D = 1 DATA JACK

TELECOMMUNICATIONS OUTLET1V = 1 VOICE JACK (ANALOG), 3D = 3 DATA JACKS

1V3D

1VANALOG VOICE OUTLET, 1V = 1 VOICE JACK

J-HOOK PATHWAY, TYPE, SIZE AND MOUNTING HEIGHTAS INDICATED IN CONSTRUCTION DOCUMENTS

J

MAIN GROUNDING BUSBAR, TYPE, SIZE AND MOUNTINGHEIGHT AS INDICATED IN CONSTRUCTION DOCUMENTS

TELECOMMUNICATIONS/AV/POWER FLOOR BOX,MOUNTED FLUSH IN FINISHED FLOOR. AV = AUDIO VISUAL,2D = 2 DATA JACK

2D

AV

2D

TELECOMMUNICATIONS/AV/POWER FLUSH WALL BOX.MOUNTING HEIGHT FROM FINISHED FLOOR TO CENTER OFBOX, AS INDICATED ON PLANS. AV = AUDIO VISUAL,2D = 2 DATA JACK

AV

+XX"

2D

TELECOMMUNICATIONS/POWER FLUSH WALL BOX.MOUNTING HEIGHT FROM FINISHED FLOOR TO CENTER OFBOX, AS INDICATED ON PLANS. 2D = 2 DATA JACK

+XX"

S SPEAKERS MOUNTED FLUSH IN FINISHED CEILING.

M MICROPHONES MOUNTED ON FINISHED CEILING.

AREA OF REFUGE WALL MOUNTED ANALOG VOICE OUTLET.PROVIDE AREA OF REFUGE FACEPLATE.

1

AREA OF REFUGE CALL BOX WITH ANALOG VOICE OUTLET -AREA OF REFUGE BASE STATION.B

LINETYPES

EXISTING TO REMAIN

EXISTING TO BE DEMOLISHED

NEW

FUTURE

UNDERGROUND

DENOTES DETAIL OR ENLARGED PLAN

MISCELLANEOUS SYMBOLS

JUNCTION BOX, CEILING MOUNTEDF = FLUSH MOUNTED IN CEILING, C = MOUNTED ABOVE CEILING

JUNCTION BOX, WALL MOUNTED, MOUNTING HEIGHT ASINDICATED ON PLANSF = FLUSH MOUNTED, S = SURFACE MOUNTED

J

JC

ACCESS PANEL. SEE ARCHITECTURAL PLANS FORADDITIONAL INFORMATION

UNDERGROUND CONCRETE MANHOLE. SEE PLANS FOR SIZE.

+XX"

UNDERGROUND PULLBOX. SEE PLANS FOR SIZE.

F

SECURITY SYMBOLS

MD SECURITY ALARM MOTION DETECTOR, WALL MOUNTED. SEESPECIFICATIONS FOR TYPE.

MD SECURITY ALARM MOTION DETECTOR, CEILING MOUNTED. SEESPECIFICATIONS FOR TYPE.

POE

VIDEO SURVEILLANCE CAMERA WITH DOME ENCLOSURE, CEILINGMOUNTED, POE = POWER OVER ETHERNET.

CARD READERCR

ELECTRIC DOOR STRIKEES

ACCESS DOOR POWER SUPPLYDP

VIDEO SURVEILLANCE CAMERA WITH DOME ENCLOSURE, WALLMOUNTED, MOUNTING HEIGHT 9'-0" AFF OR AS NOTED ONDRAWINGS. POE = POWER OVER ETHERNETPOE

ABBREVIATIONS ABBREVIATIONS

OC ON CENTEROD OUTSIDE DIAMETEROSP OUTSIDE PLANT

PB PULLBOXPDU POWER DISTRIBUTION UNITPNL PANELPOE POWER OVER ETHERNETPOTS PLAIN OLD TELEPHONE SERVICEPR PAIRPRI PRIMARYPS POWER SUPPLYPTR PRINTERPVC POLYVINYL CHLORIDEPWR POWER

REC RECEPTACLEREQ REQUIREDRFI RADIO FREQUENCY INTERFERENCERGS RIGID GALVANIZED STEELRM ROOMRX RECEIVER

SB SMARTBOARDSCC SATELLITE COMMUNICATIONS CABINET;SCP SECURITY CONTROL PANELSHT SHEETSM SINGLE MODESPEC SPECIFICATIONSPKR SPEAKERSQ SQUARE

TB TERMINAL BLOCKTBD TO BE DETERMINEDTEL TELEPHONETEMP TEMPERATURETGB TELECOMMUNICATIONS GROUNDING BUSBARTIA TELECOMMUNICATIONS INDUSTRY ASSOCIATIONTMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBARTMH TELECOMMUNICATIONS MANHOLETO TELECOMMUNICATIONS OUTLETTP TAMPER PROOFTTB TELEPHONE TERMINAL BOARDTV TELEVISIONTX TRANSMITTERTYP TYPICAL

UG UNDERGROUNDUGPB UNDERGROUND PULLBOX, WEATHERPROOFUL UNDERWRITERS LABORATORYUON UNLESS OTHERWISE NOTEDUPS UNINTERRUPTIBLE POWER SUPPLYUTP UNSHIELDED TWISTED PAIR

W/ WITHW/O WITHOUTWAN WIDE AREA NETWORKWAP WIRELESS ACCESS POINTWP WEATHER PROOF

AC ABOVE COUNTER HEIGHTAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEANT ANTENNAAUTO AUTOMATICAWG AMERICAN WIRE GAUGE

BFG BELOW FINISHED GRADE

CAT CATEGORYcd CANDELACLG CEILINGCMP COMMUNICATIONS MEDIA PLENUMCOAX COAXIAL CABLECPU CENTRAL PROCESSING UNITCTR CENTERCU COPPER

dB DECIBELDEMARC DEMARCATIONDWG DRAWING

EA EACHEL ELEVATIONELEC ELECTRICALEMT ELECTRICAL METALLIC TUBINGEOL END OF LINE DEVICE(E) EXISTING

FA FIRE ALARMFAAP FIRE ALARM ANNUNCIATOR PANELFACP FIRE ALARM CONTROL PANELFBO FURNISHED BY OTHERSFIXT FIXTURE

GA GAUGEGRS GALVANIZED RIGID STEEL CONDUITGND GROUND

HT HEIGHT

IDF INTERMEDIATE DISTRIBUTION FRAMEIEEE INSTITUTE OF ELECTRICAL & ELECTRONICS ENGINEERS

J-BOX, JB JUNCTION BOX

LAN LOCAL AREA NETWORKLOMM LASER OPTIMIZED MULTI MODE

MAX MAXIMUMMDF MAIN DISTRIBUTION FRAMEMFR MANUFACTURERMIN MINIMUMmm MILLIMETERMTD MOUNTEDMTG MOUNTING

N/A NOT APPLICABLENEC NATIONAL ELECTRICAL CODENEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNFPA NATIONAL FIRE PROTECTION ASSOCIATIONNIC NOT IN CONTRACTNTS NOT TO SCALE

NOT ALL SYMBOLS AND ABBREVIATIONSMAY APPLY TO THIS PROJECT.

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R C H I T E C T S

FIN

AL

CO

NST

RU

CTI

ON

DO

CU

MEN

TS-IF

B R

EBID

MAHATV

09/19/201615-036

MA

RIN

E R

ES

EA

RC

H F

AC

ILIT

Y

TEC

HN

OLO

GY

SY

MB

OLS

AN

D A

BB

RE

VIA

TIO

NS

T001 15-0

36M

ARIN

E R

ESEA

RC

H F

ACIL

ITY

11/10/16 .

1A

DD

ED

AR

EA

OF

REFU

GE P

HO

NE

2 3 4 5 6 7

A

B

C.2

8

D

9

E

1

C

6.1

A.5

LOBBY

200

ELECTRONICSSHOP

231

CONFERENCE

230

ELEC ROOM

222

IT

224

JAN CLOSET /LAUNDRY

223

BOILER

221

MECH COMBINED

219

OUTDOORPLATFORM

220

STORAGE

218

RECEIVING 2

216

MACHINE SHOP

213

LOUNGE

208

CLASSROOM 2

207

CLASSROOM 1

206

PORT/MARINEOFFICE

205

FREIGHTELEVATOR

215

STAIR

217

STAIRS

201

2D2D

2D

2D

MARINE TECHOFFICE 2

228

MARINE TECHOFFICE 1

226

MARINE TECHLAB

225

ELEV MACHINEROOM

229

STOR

227

ELEVATOR

202

WOMENS

209

MENS

211

SHOWER

212

SHOWER

210

2D

AV AV2D 2D

WAP

WAP

2D

2D

AV AV2D

2D

WAP2D

T2016

T2015

+60"AFF

+60"AFF

CORRIDOR

235 CORRIDOR

236

WAP2D

AV2D

+60"AFF

ELEV MACHINEROOM

214

SEATING AREA

203

MENS

238

WOMENS

237

COPY RM

204

WAP2D

AVAV 2D2D

2D

2D

2D

2D

+41"AFF

+41"AFF

+41"AFF

+41"AFF

2V

2V

AV

2D

+41"AFF

2D

+41"AFF

2D+41"AFF

2D+41"AFF

2D +41"AFF

2D +41"AFF

2D

2D

2D2D

2D+41"AFF

2D2D

2D

2D

2D

2D

1

1. PROVIDE 12" X4" WIRE TRAY ABOVE ACCESSIBLE CEILING. COORDINATE PLACEMENT WITH OTHER DISCIPLINES.2. PROVIDE (2) 2-1/2" CONDUITS FROM ELECTRONICS SHOP THROUGH ROOF TO (2) 12'X12"X8" NEMA 3R PULLBOXES AT GPS ANTENNA

RACK. SEE ARCHITECTURAL SHEET 2/A504 FOR ADDITIONAL INFORMATION. COORDINATE EXACT LOCATION BEFORE INSTALL.3. PROVIDE 12"X12"X8" NEMA 1 PULLBOX ABOVE ACCESSIBLE CEILING.4. ROUTE (2) 4" RGS CONDUITS ABOVE ACCESSIBLE CEILING FOR AT&T BACKBONE CABLING. MAINTAIN 48" LARGE RADIUS SWEEPS

FOR ALL BENDS. PROVIDE 2500 LB MULE TAPE IN BOTH CONDUITS. CONDUITS SHALL ONLY BE USED FOR AT&T CABLE.5. ROUTE (2) 2-1/2" CONDUITS ABOVE CEILING FOR GPS ANTENNA CABLING. COMMUNICATIONS CONTRACTOR TO INSTALL

CONDUITS WITH 2500 LB. MULE TAPE IN BOTH CONDUITS, (2)NEMA 3R PULL BOXES AT ANTENNA RACK AND NEMA 1 ENCLOSURE INELECTRONICS SHOP. SEE SHEETS 1/I400 AND 4/I402 FOR ADDITIONAL INFORMATION. COORDINATE EXACT LOCATION BEFOREINSTALL.

6. PROVIDE (2) 4" CONDUITS FROM CABLE TRAY ABOVE ACCESSIBLE CEILING TO CABLE TRAY BELOW CEILING IN IT ROOM. PROVIDE48" LARGE RADIUS SWEEPS.

7. PROVIDE 48" LARGE RADIUS SWEEPS FOR BACKBONE CONDUITS THROUGH CEILING TO CABLE TRAY IN IT ROOM.8. PROVIDE (2) 1-1/4" CONDUITS FROM FLOORBOX TO ABOVE ACCESSIBLE CEILING FOR TELECOM AND AV CABLING. PROVIDE

PULLSTRING IN CONDUITS.9. ROUTE (1) 1" CONDUIT IN FURNITURE SYSTEM. MAINTAIN 12" BEND RADIUS MINIMUM, TYP.10. ROUTE CONDUIT IN CHASE TO ABOVE ACCESSIBLE CEILING.11. INSTALL (1) 1-1/2" CONDUIT FROM GATE CARD READER ON GROUND FLOOR TO ABOVE ACCESSIBLE CEILING.12. INSTALL (1) 1-1/2" CONDUIT FROM CAMERA ON GROUND FLOOR TO ABOVE ACCESSIBLE CEILING.13. ROUTE (2) 4" RGS CONDUITS FROM PULLBOX #PB1 ABOVE CEILING ON 1ST FLOOR TO UNDERGROUND PULLBOX #UGPB1. TRANSITIONTO SCHEDULE 40 BEFORE MAINTAIN LARGE RADIUS SWEEPS. SEE SHEET T110 AND T101 FOR ADDITIONAL INFORMATION. PROVIDE 250 LB

MULETAPE ALONG ENTIRE ROUTE IN BOTH 4" CONDUITS.

2

3

4

5

6

7

88

9 10

8

11

12

PB1

1V

1V

14

13

14

1V

14

1V14

2D

+60"AFF

+80"AFF+80"AFF

1515

2D2D

+80"AFF

+80"AFF

1616

16

AV2D

2

1V

COORDINATE EXACT LOCATIONWITH ELEVATOR CONTRACTOR

COORDINATE EXACT LOCATIONWITH ELEVATOR CONTRACTOR

WAP2D

WAP2D

WAP2D

AV2D

1717

14. PROVIDE ANALOG VOICE CABLE TO EACH OUTLET.15. PROVIDE JUNCTION BOX FOR FUTURE CAMERA NEEDS. PROVIDE 1" CONDUIT FROM BOX TO ABOVE CEILING.16. PROVIDE FLUSH CEILING JUNCTION BOX FOR CEILING MOUNTED MICROPHONES.17. SEE ELECTRICAL PLANS FOR ADDITIONAL INFORMATION.18. PROVIDE AND INSTALL (2) 1-1/4" CONDUITS, QUANTITY AS SHOWN. PROVIDE PULLSTRING IN EMPTY CONDUITS.19. SEE SHEET T110 FOR CONTINUATION.

1818

8 8

1818

19

1

1

1/8" = 1'-0"T201T111

1 TECHNOLOGY PLAN 1ST FLOOR

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R C H I T E C T S

FIN

AL

CO

NST

RU

CTI

ON

DO

CU

MEN

TS-IF

B R

EBID

MAHATV

09/19/201615-036

MA

RIN

E R

ES

EA

RC

H F

AC

ILIT

Y

TEC

HN

OLO

GY

PLA

N 1

ST

FLO

OR

T111 15-0

36M

ARIN

E R

ESEA

RC

H F

ACIL

ITY

NO

RTH

SCALE: 1/8"=1'-0"

0' 16'8'8'

11/10/16 .

1A

DD

ED

AR

EA

OF

REFU

GE P

HO

NE

C