Wednesday, March 13, 2013; 4 p.m. to 5 p.m.
AgendaRegional Connector Transit Corridor ProjectCommunity Leadership Council
1st Street/Central Avenue CommitteeJACCC, 244 S San Pedro St
1. Introductions
a. Sign-in Sheet
2. Utility Relocation Activities Update
a. Nisei Week
3. Linkages Program Update
4. Station Area and Station Design Update
5. Review Action Items
6. Schedule Next Meeting
RCCLC: 1st Street/Central Avenue March 13, 2013
1
Wednesday, March 13, 13
Agenda
> Introduction> Utility Relocation Update
• Upcoming• Nisei Week
> Linkages Program Update> Station Area Design> Action Items
2
Wednesday, March 13, 13
Construction Update
3
Wednesday, March 13, 13
2
AT&T– 3rd Party U.lity Reloca.on AT&T– 3rd Party U.lity Reloca.onAc.vity Trenching, vault installa4on and conduit placement
Loca.on 1st St from Central Av to Rose StAlameda St from Temple Av to 2nd St
An.cipated Start Date 1st Quarter of 2013
An.cipated Hours
Monday – Friday: 9am – 3:30pmSaturday: 8am – 8pmSunday: 11am – 6pmNo night 4me work
An.cipated Dura.on 5 months
What to Expect
Maintain through traffic Maintain access to drivewaysLane reduc4ons an4cipatedSpecific traffic impacts TBD
4
Wednesday, March 13, 13
1st St/Central Av Station – 3rd Party Utility Relocations
Hill St
1st St
Alam
eda
St5
Wednesday, March 13, 13
2nd St/Broadway – 3rd Party Utility Relocations
> Removal of roadway and trenching operations along 2nd St.
6
Wednesday, March 13, 13
2nd St/Broadway – 3rd Party Utility Relocations
> Telecommunication lines relocation work will continue along 2nd St near Hill St
> Relocation work will continue through May 2013
> Relocation work by So Cal Gas will follow
7
Wednesday, March 13, 13
Flower St - 3rd Party Utility Relocation
> Utility relocation started Saturday, March 9, 2013 with saw cutting of roadway.
8
Wednesday, March 13, 13
Flower St - 3rd Party Utility Relocation (Contd.)
> Grinding of street surface and metal plate installation
9
Wednesday, March 13, 13
Flower St - 3rd Party Utility Relocation (Contd.)
> Relocation work will occur in phases between 4th St and 5th St through April 2013
> Relocation activities by So Cal Gas will follow
10
Wednesday, March 13, 13
Nisei Week
> August 10, 11, 17 and 18, 2013
> Closure of First St from San Pedro St to Alameda St for Festival
> Rolling closures for Parade
> Metro will coordinate with community and Planning Committee to ensure it’s a successful event
11
Wednesday, March 13, 13
Linkages Update
> Separate effort from Regional Connector activities
> Study will begin Fall 2013
> Outcome of the study will include concrete activities for implementation
> Funding available for implementation through Metro Gold Line Eastside Extension - Access Program
12
Wednesday, March 13, 13
Contact Information
Construction Relations> Olga Arroyo> [email protected]> 213.922.7277
13
Project Wide> [email protected]> www.metro.net/regionalconnector> Facebook: MetroRegionalConnector> Twitter: @metroconnector
Wednesday, March 13, 13
Station Area Design
14
Wednesday, March 13, 13
Topics for Discussion
> Review of Basic Station Entrance Plaza Site Plan
> Incorporation of Metro’s “Kit of Parts” Design for all Station Pavilion Elements
> Architectural Design Images
15
Wednesday, March 13, 13
Station Vicinity
16
Wednesday, March 13, 13
Station Entrance Plaza Site Plan
17
Wednesday, March 13, 13
Station Entrance Plaza and Pavilion
18
Wednesday, March 13, 13
Station Entrance Pavilion Looking Southwest
19
Wednesday, March 13, 13
Station Entrance Looking Southeast from 1st Street
20
Wednesday, March 13, 13
Station Entrance Looking Northwest from Alameda St
21
Wednesday, March 13, 13
Station Entrance Looking Northeast from Central Ave
22
Wednesday, March 13, 13
Station Entrance Pavilion with Canopy Removed
23
Wednesday, March 13, 13
Action Items
24
Wednesday, March 13, 13
Contact Information
Community Relations> Ann Kerman> [email protected]> 213.922.7671
Construction Relations> Olga Arroyo> [email protected]> 213.922.7277
25
Project Wide> [email protected]> www.metro.net/regionalconnector> Facebook: MetroRegionalConnector> Twitter: @metroconnector
Wednesday, March 13, 13