Water Station 1 Project Update - 1
Presentation Title Subtitle (optional)
Date Vancouver City Council Workshop/Public Hearing Staff, Title Staff, Title
Water Station 1 Project Update
December 8, 2014
Vancouver City Council Workshop
Tyler Clary,
Water Engineering Program Manager
Michelle Henry,
Civil Engineer
Water Station 1 Project Update - 2
• Water System Overview
• Water Station 1 Overview
• Water Station 1 History
• 2005 Site Master Plan
• Current Phase
• Future Phases
• Ongoing Communication
Presentation Overview
Water Station 1 Project Update - 3
• 4th largest utility in Washington State
• 72-square-mile service area
• 240,000 customers
• 1,000 miles of distribution pipe
• 40 wells at nine water stations
• 9.4 billion gallons pumped in 2013
Water System Overview
Use this blank background to display large graphics that do not easily fit on
the slide layout with the CoV wave at the bottom.
Use this blank background to display large graphics that do not easily fit on
the slide layout with the CoV wave at the bottom.
Water Station 1
Existing Site
Water Station 1 Project Update - 7
• Documented water source since 1880
• 1909 - 1 MG reservoir constructed
• 1937 - City took over ownership
• 1938 - 4 MG reservoir and elevated tank
• 1980 - Site fence removed
• 1985 - Amphitheater constructed
• 1998 - Swift Skate Park constructed
(MG = Million Gallons)
Water Station 1 History
Use this blank background to display large graphics that do not easily fit on
the slide layout with the CoV wave at the bottom.
Water Station 1 Project Update - 9
• Old facilities
• Recognized importance
• Recognized vulnerability
• Improve reliability through replacement of aging
facilities
2005 Water Station 1 Master Plan
2005 Master Plan
Water Station 1 Project Update
• 2013 evaluation of existing storage
• Remove 1 MG reservoir
• Replace elevated tank
• Complete seismic improvements to 4 MG reservoir
Seismic Evaluation
Water Station 1 Project Update
• 2013 consultant Request For Qualifications (RFQ)
• August 2013 Council approved a contract with CH2M HILL
• Preliminary design report (30% plans)
• Preliminary design complete
• Needed electrical upgrades are significant
• Needed control system upgrades are significant
• Treatment system upgrade
Current Project Status
Water Station 1
Phase 1 Project
Water Station 1
Future Phases
Water Station 1 Project Update - 15
• Final Phase 1 consultant contract with CH2M HILL consent December 15 ($6 million)
• Pump Station and Operations building
• Site electrical and emergency power
• Treatment system building
• Security improvements
• Control system at WS 1 and Ops Center (SCADA)
Phase 1 Consultant Contract
Water Station 1 Project Update - 16
• Replace 1970s era equipment
• Back-up server to Ops Center
• Upgrades to Ops Center
• New software
• New fiber network
• New control panels
• Large portion of contract
Control System
Water Station 1 Project Update - 17
• Software purchase for control system (RFP)
• Control panel purchase
• Construction contract to upgrade Ops Center controls
• Treatment system purchase (RFP)
• Right of Way vacation old East Reserve
Council Approval Requests 2015
Water Station 1 Project Update - 18
• Phase 1 design January 2015
• Smaller contracts throughout 2015
• Phase 1 construction contract 2016 - 2017 ($18
million)
• Phase 2 consultant contract 2016
• Phase 2 construction 2018 ($13 million)
• Phase 3 replace 3 wells 2022 ($3 million)
Next Steps/Timeline
Water Station 1 Project Update - 19
• Central Park Neighborhood
Association involvement in 2005
Master Plan effort
• News articles
• Current and future outreach with
Central Park and other NAs
• Web and Water Report updates –
www.cityofvancouver.us/Water
Ongoing Communications
Water Station 1 Project Update - 20
• Tyler Clary, Water Engineering Program Manager
(360)487-7169
• Michelle Henry, Civil Engineer
(360)487-7155
Questions and Discussion
To request other formats, please contact: City Manager’s Office (360) 487-8600 | WA Relay: 711 [email protected]