7/23/2019 MS.alum & Glazing
1/5
BINA GOODYEAR BERHAD(18645-H)
METHOD STATEMENT SUBMITTAL
Scope of work: Architectural Submittal No:
Projec !"e#
THE E$E%UTION AND %OMPLETION O& SUPERSTRU%TURE 'ORS &OR THE
PROPOSED DESA PUTRA DEELOPMENT ON LOT P*T 185+ ,185. /ALAN 106E.
AMPUNG PANDAN TENGAH (DESA PANDAN). MUIM AMPANG. UALA LUMPUR*
Description of item for which approval is sought:
ALUMINIUM , GLA2ING 'ORS
SPECIFICAI!N "EFE"ENCE
"ADE SPECIFICAI!N FINIS#ES
"ADE C!DE A"C#IEC$"A%
Enclose& please fin& the following for review:
DO%UMENT 0 SAMPLE
IteDescription 'uantit( "evision
)*+ ,etho& Statement for Aluminium - .la/ing 0orks
Submitte& b( :0illiam eh
"eceive& b( :
Signature : Signature :
Date : Date :
D!3r!!o
Puncak 1encana S23 %S3 Arkitek S23 #P %ee Dan rakan4rakan
5entrikon Perun&ing S23 F Associates !thers
7/23/2019 MS.alum & Glazing
2/5
BINA GOODYEAR BERHAD(18645-H)
METHOD STATEMENT SUBMITTAL
Scope of work: Architectural Submittal No:
Projec T!"e#
THE E$E%UTION AND %OMPLETION O& SUPERSTRU%TURE 'ORS &OR THE
PROPOSED DESA PUTRA DEELOPMENT ON PART O& LOT +8+7. SE%TION G8.
'ANGSA MA/U. UALA LUMPUR
A%$,INI$, - .%A6IN. 0!"1S
,AIN C!N"AC!": BINA GOODYEAR BHD
NA,E: Chiang 7ok ,ing
SI.NA$"E:
DAE:
C!NS$%AN
8AAC#,EN 9A;GARIS AR%HITE%TS
SDN BHD
NA,E:
SI.NA$"E:
DAE:
A - "eviewe&*
3 - "eviewe& with comments* "evise an& resubmit
C 4 "e
7/23/2019 MS.alum & Glazing
3/5
BINA GOODYEAR BERHAD(18645-H)
ATTA%HMENT 9A:
%OMMENTS BY %ONSULTANTS %ONSULTANT #
DESC"IPI!N !F IE,S:
- Method Statement for Aluminium & Glazing Works
S$3,IA% N!* : 3.32DP2A"C#2,S2+))
ITEM %OMMENTS
C!,,EN 37 : ==============
SI.NA$"E : ==================
DAE : ===================
7/23/2019 MS.alum & Glazing
4/5
BGB 'or; Me!33!oScope of work:
Arc
7/23/2019 MS.alum & Glazing
5/5
S$3,IED 37: Chiang 7ok ,ing "ECEIED 37: =========
SI.NA$"E: ==========*** SI.NA$"E: =========**
DAE: ==========*** DAE: ==========
DIS"I3$I!N: C%IEN P"!5EC ,ANA.E" C!NS$%AN