Mohammad AlauddinDeputy Secretary
Power Division
Ministry of Power, Energy & Mineral Resources
Govt. of the People’s Republic of [email protected]
December 19, 2013
December 19, 2013
Total area of about 147,570 sq. km
Between 20°34΄ & 26°38΄ North
Latitude 88°01΄ & 92°41΄ East
Longitude
Population of 153.6 million with a
growth rate of 1.37% [2011]
GDP per capita US$ 838 (FY 2012-13 )
GDP Growth Rate 6.03
Source : Bangladesh Economic Review 2013.
Power Sector: At a Glance
3
Installed Capacity (MW) 10213
Electricity Growth 9% (FY-2013);12 % (FY-2012)
Max. Generation (MW) 6,675[12 July 13]
Total Consumers (Million) 14.2
Transmission Lines (ckt km) 9, 300
Distribution Lines (km) 2,90,000
Per Capita Generation (kWh) 321
Access to Electricity 62%[including 7% RE]
Source : Bangladesh Power Development Board[BPDB]
Present Generation Capacity (November’13)
4
S
L
Source Installed Generation Capacity (MW) Sector
1. BPDB 4186 Public
58%
2. APSCL 777
3. EGCB 622
4. NWPGCL 300
5. RPCL 77
Subtotal 5,962
1. IPPs 1655 Private
42%2. 15 YR. Rental 167
3. 3/5 YR. Rental 1929
4. Power Import 500
Subtotal 4,251
Total 10,213
Source : BPDB
December 19, 2013
88
3
68
1
1,0
31
1,2
02
1,2
56
1,3
87
1,5
38
1,8
17
2,0
16
2,2
36
2,5
29
2,8
85
3,2
61
3,7
68
4,3
02
4,5
60
5,3
08
6,2
14
6,7
59
7,3
45
7,8
57
8,4
50
8,7
46
9,2
95
10
,26
6
10
,90
1
11
,24
3
12
,19
4
13
,63
8
14
,73
9
16
,25
5
17
,44
5
18
,45
8
20
,30
2
21
,40
8
22
,97
8
23
,26
8
24
,94
6
26
,53
3
29
,24
7
31
,35
5
35
,11
8
38
,22
9
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,0001
97
0-7
1
19
72
-7
3
19
74
-7
5
19
76
-7
7
19
78
-7
9
19
80
-8
1
19
82
-8
3
19
84
-8
5
19
86
-8
7
19
88
-8
9
19
90
-9
1
19
92
-9
3
19
94
-9
5
19
96
-9
7
19
98
-9
9
20
00
-0
1
20
02
-0
3
20
04
-0
5
20
06
-0
7
20
08
-0
9
20
10
-1
1
20
12
-1
3
Net Energy Generation in GWh
Net Generation in Bangladesh
Source : BPDB
c
10,000MW
20,000MW
30,000MW
2010
Gas82%
Oil 9%
Coal 5%
Installed Capacity 7300 MW
2021
Gas55%
Installed Capacity 24000 MW
Coal 20%
Others 15%
Oil 10%
Source: Power Sector Master Plan[PSMP] 2010
2030
Installed Capacity38,700 MW
Coal50%
Oil 10%
Others 15%
“Others” including
Renewable Energy
Gas25%
Sl. No. Sources
Capacity(MW)
Probable Location (s)
1Domestic Coal Imported Coal
11,250 8,400
North West Region at Mine MouthChittagong and Khulna
2Domestic Gas/LNG
8,850Gas -Near Load Centers
LNG- Near Coastal Area
3 Nuclear 4,000 Rooppur
4 Regional Grid 3,500
Bahrampur - Bheramara, Silchar -Fenchuganj, Purnia-Bogra-Bongaigaon, Myanmar - Chittagong
5Others (Oil, Hydro & Renewable)
2,700Near Load Centers
Total 38,700
Primary Fuel Sources by 2030
Source: PSMP 2010
Fuel Diversity & Sustainable Supply of Fuel
Private Sector Participation
Harnessing Renewable Energy Resources
Demand Side Management (DSM) & Energy
Efficiency Improvement Program
Regional Co-operation on Cross Border Power Trade
December 19, 2013
FENCHUGANJ
SILCHARFENCHUGANJ
BHERAMARA
BAHARAMPUR
BAHARAMPURBHERAMARA
PURNEABARAPUKURIA
Possible Regional Grid Interconnection
MYANMARCHITTAGONG
BONGAIGAONBARAPUKURIA
500MW [2013-]
500MW [2018-]
MoU on 11.01.2010 for co-operation in power sector.
Grid Connectivity
Exchange of Power
Joint Technical Team proposed an interconnection
between Bheramara & Baharampur. Establishment of
400 KV, 100 km double circuit line & back-to-back
HVDC station at Bheramara.
10
Bangladesh-India Grid Interconnection
Main Components (BD part)
i) 27.35 km 400 kV double circuit transmission line
ii) 400 kV Back-to-Back HVDC station at Bheramara
iii) 4.5 km LILO of double circuit Ishurdi-Khulna
230kV line at Bheramara.
Main Components (Indian part)
i) 73.5 km 400 kV double circuit transmission line
ii) 400 kV switching station at Baharampur.
December 19, 2013
Project Cost (BD part)
i) F. E = Tk 910.71 Crore[111.06 Million USD] (ADB)
ii) L. C = Tk 669.12 Crore (GoB+PGCB)
Total =Tk 1,579.83 Crore
Project Cost (Indian part)
Total = Rs 160.32 Crore
December 19, 2013
400 kV Transmission Line (BD Part)
Contract Signed : 30-Dec-2010
Contractor : Cobra, Spain
Consultant : PGCIL, India
Target of Completion : May, 2013
Actual Completion : 30th June, 2013
Line Energization : 30th August, 2013
December 19, 2013
Back-to-Back HVDC Station
Contract Signed : March 29, 2011
Target of Completion : July, 2013
Test Power Flow : September 27, 2013
Inauguration : October 5, 2013
COD for 175 MW : October 5, 2013
COD for 500 MW: December 4, 2013
December 19, 2013
PPA 1 : 250 MW (25 yrs. with delivery starting 2013)
NVVN (NTPC trading arm) signed a PPA with BPDB
in February 28, 2012.
Round the clock power supply.
Power allocation by GoI from discretionary share of
NTPC projects.
Tariff at regulated rate + trading margin + wheeling
costs
16
PPA
PPA 2 : 250 MW (3 yrs. with delivery starting in 2013)
PTC India Ltd. signed a PPA with BPDB in
November 14, 2013.
Round the clock power supply.
Tariff= Non-escalable capacity charge + Non-
escalable energy charge
17
PPA
Expand energy development beyond boundaries.
Link potential sources to markets.
Facilitate investment to serve a regional market
Lower operational costs & improve the supply mix.
Address demand supply imbalance & improve
reliability of supply
Eventually contributes towards development of an
Asian “energy highway.”