Appendix BSummary of Field Data: Freeway and Arterial Speeds
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-1
Appendix BSummary of Field Data:Freeway and Arterial Speeds
This appendix presents a summary of findings from the travel time and speed surveysconducted on freeway and arterial segments as part of the evaluation of the rampmetering system in the Twin Cities region.
In the figures, the arterial routes are identified as follows:
• CR-61 = County Route 61;
• Vick = Vicksburg Avenue;
• TH-77 = TH-77;
• Univ = University Avenue;
• Marsh = Marshall Avenue;
• Rice = Rice Avenue; and
• Edge = Edgerton Avenue.
The colors in the graphics indicate the day of the week in which the travel time surveyswere performed, as follows:
• Red = Travel time surveys performed on a Monday;
• Blue = Travel time surveys performed on Tuesday through Thursday; and
• Yellow = Travel time surveys performed on a Friday.
The two evaluation study periods are represented as follows:
• “With” = With ramp metering; and
• “Without” = Without ramp metering.
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-2 Cambridge Systematics, Inc.
I-494 NB P.M. Peak (With)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Glea
son L
k
Carls
on on
ramp
CR-6
TH-55
Rock
ford
49th
Bass
Lk
Fish L
k
Fish L
k Int
erchg
Wea
ver L
k
95th
Ave
Location
Sp
eed
(mp
h)
I-494 SB A.M. Peak (With)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Wea
ver L
k
Fish L
k Int
erchg
Fish L
k
Bass
Lk 49th
Rock
ford
TH-55
CR-6
Carls
on on
ramp
Glea
son L
k
Carls
on To
wers
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-3
I-494 NB P.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Glea
son L
k
Carls
on on
ram
pCR
-6
TH-55
Rock
ford
49th
Bass
Lk
Fish L
k
Fish L
k Int
erchg
Wea
ver L
k
95th
Ave
Location
Sp
eed
(mp
h)
I-494 SB A.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Wea
ver L
k
Fish L
k Int
erch
g
Fish L
k
Bass
Lk 49th
Rock
ford
TH-55
CR-6
Carls
on on
ram
p
Glea
son L
k
Carls
on To
wers
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-4 Cambridge Systematics, Inc.
I-35W NB A.M. Peak (With)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Crys
tal Lk
So. C
ross
CR-42
CR-38
Burn
svill
e
Hwy 1
3Cl
iff
Blac
k Dog
106th 98
th
Location
Sp
eed
(mp
h)
I-35W NB A.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
Crys
tal Lk
So. C
ross
CR-42
CR-38
Burn
svill
e
Hwy 1
3Cl
iff
Blac
k Dog
106th 98
th
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-5
I-94 EB P.M. Peak (With)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Union
Pac R
R
Dunw
oody
I-94 I
nter
chg
Grov
eland
I-35W 11
thCe
dar
25th
W. R
iver
27th
Hwy 2
80
Pelha
m
Vand
alia
Fairv
iew
Snell
ing
Ham
line
Lexin
gton
Victo
riaDa
le
Wes
tern
John
Irela
nd
Jacks
on
Lafay
ette
Mou
nds
Location
Sp
eed
(mp
h)
I-94 WB A.M. Peak (With)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Lafay
ette
Jacks
on
John I
relan
d
Wes
tern
Dale
Victo
ria
Lexin
gton
Ham
line
Snell
ing
Fairv
iew
Vand
alia
Pelha
m
Hwy 2
8027
th
W. R
iver
25th
Ceda
r11
thI-3
5W
Grov
eland
I-94 I
nterc
hg
Dunw
oody
Union
Pac R
RPe
nn
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-6 Cambridge Systematics, Inc.
I-94 WB P.M. Peak (With)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Lafay
ette
Jacks
on
John I
relan
d
Wes
tern
Dale
Victo
ria
Lexin
gton
Ham
line
Snell
ing
Fairv
iew
Vand
alia
Pelha
m
Hwy 2
8027
th
W. R
iver
25th
Ceda
r11
thI-3
5W
Grov
eland
I-94 I
nterc
hg
Dunw
oody
Union
Pac R
RPe
nn
Location
Sp
eed
(mp
h)
I-94 EB P.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Union
Pac R
R
Dunw
oody
I-94 I
nter
chg
Grov
eland
I-35W 11
thCe
dar
25th
W. R
iver
27th
Hwy 2
80
Pelh
am
Vand
alia
Fairv
iew
Snell
ing
Ham
line
Lexin
gton
Victo
riaDa
le
Wes
tern
John I
relan
d
Jacks
on
Lafay
ette
Mou
nds
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-7
I-94 WB A.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Lafay
ette
Jacks
on
John
Irela
nd
Wes
tern
Dale
Victo
ria
Lexin
gton
Ham
line
Snell
ing
Fairv
iew
Vand
alia
Pelh
am
Hwy 2
8027
th
W. R
iver
25th
Ceda
r11
thI-3
5W
Grov
eland
I-94 I
nter
chg
Dunw
oody
Union
Pac R
RPe
nn
Location
Sp
eed
(mp
h)
I-94 WB P.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Lafay
ette
Jacks
on
John I
relan
d
Wes
tern
Dale
Victo
ria
Lexin
gton
Ham
line
Snell
ing
Fairv
iew
Vand
alia
Pelha
m
Hwy 2
8027
th
W. R
iver
25th
Ceda
r11
thI-3
5W
Grov
eland
I-94 I
nterc
hg
Dunw
oody
Union
Pac R
RPe
nn
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-8 Cambridge Systematics, Inc.
I-35E NB P.M. Peak (With)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Unive
rsity
Penn
sylva
nia
BNSF
Sout
h
Mar
yland
Arlin
gton
Larp
enteu
r
Rose
lawn
CR-B
Hwy 3
6
Littl
e Can
ada
Owas
so
I-35E
/I-69
4 Merg
e
Edge
rton
I-35E
/I-69
4 Spl
itCR
-E
BNSF
Nor
thCR
-FCR
-96
Location
Sp
eed
(mp
h)
I-35E SB A.M. Peak (With)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
CR-F
BNSF
Nor
thCR
-E
I-35E
/I-69
4 Merg
e
Edge
rton
I-35E
/I-69
4 Spl
it
Owas
so
Littl
e Can
ada
Hwy 3
6CR
-B
Rose
lawn
Larp
enteu
r
Arlin
gton
Mar
yland
BNSF
Sout
h
Penn
sylva
nia
Unive
rsity
Wac
outa
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-9
I-35E NB P.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Unive
rsity
Penn
sylva
nia
BNSF
Sout
h
Mar
yland
Arlin
gton
Larp
enteu
r
Rose
lawn
CR-B
Hwy 3
6
Littl
e Can
ada
Owas
so
I-35E
/I-69
4 Mer
ge
Edge
rton
I-35E
/I-69
4 Spl
itCR
-E
BNSF
Nor
thCR
-FCR
-96
Location
Sp
eed
(mp
h)
I-35E SB A.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
CR-F
BNSF
Nor
thCR
-E
I-35E
/I-69
4 Merg
e
Edge
rton
I-35E
/I-69
4 Spl
it
Owas
so
Littl
e Can
ada
Hwy 3
6CR
-B
Rose
lawn
Larp
enteu
r
Arlin
gton
Mar
yland
BNSF
Sout
h
Penn
sylva
nia
Unive
rsity
Wac
outa
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-10 Cambridge Systematics, Inc.
I-494 CR-61 NB P.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
Carls
onCR
-6
TH-55
Rock
ford
Schm
idt L
kCR
-47
Bass
LkI-4
94
Bass/
Wed
gwd
Fish\
Wed
gwd
Wea
ver/
Wed
gwd
Vick
sbur
g
Dunk
irk
Targ
et
Location
Sp
eed
(mp
h)
I-494 CR-61 SB A.M. Peak (With)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
Dunk
irk
Vick
sbur
g
Wea
ver/
Wed
gwd
Fish\
Wed
gwd
Bass/
Wed
gwd
I-494
Bass
LkCR
-47
Schm
idt L
k
Rock
ford
TH-55
CR-6
Carls
on
Carls
on/I
-494
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-11
I-494 CR-61 NB P.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
Carls
onCR
-6
TH-55
Rock
ford
Schm
idt L
kCR
-47
Bass
LkI-4
94
Bass/
Wed
gwd
Fish\
Wed
gwd
Wea
ver/
Wed
gwd
Vick
sbur
g
Dunk
irk
Targ
et
Location
Sp
eed
(m
ph
)
I-494 CR-61 SB A.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
Dunk
irk
Vick
sbur
g
Wea
ver/
Wed
gwd
Fish\
Wed
gwd
Bass/
Wed
gwd
I-494
Bass
LkCR
-47
Schm
idt L
k
Rock
ford
TH-55
CR-6
Carls
on
Carls
on/I
-494
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-12 Cambridge Systematics, Inc.
I-494 Vick NB P.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
Glea
son
CR-6
Hwy 5
5
Rock
ford
Schm
idt L
kCR
-47
Bass
Lk
Wea
ver
Wea
ver L
k95
th
Location
Sp
eed
(mp
h)
I-494 Vick SB A.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
Wea
ver L
k
Wea
ver
Bass
LkCR
-47
Schm
idt L
k
Rock
ford
Hwy 5
5CR
-6
Glea
son
Carls
on To
wers
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-13
I-494 Vick NB P.M. Peak (Without)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
Glea
son
CR-6
Hwy 5
5
Rock
ford
Schm
idt L
kCR
-47
Bass
Lk
Wea
ver
Wea
ver L
k95
th
Location
Sp
eed
(mp
h)
I-494 Vick SB A.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
Wea
ver L
k
Wea
ver
Bass
LkCR
-47
Schm
idt L
k
Rock
ford
Hwy 5
5CR
-6
Glea
son
Carls
on To
wers
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-14 Cambridge Systematics, Inc.
I-35W TH-77 NB A.M. Peak (With)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
McA
ndre
ws12
7thI-3
5E Cliff
Diffl
ey
Hwy 1
3
Blac
k Dog
Old S
hako
pee
Location
Sp
eed
(mp
h)
I-35W TH-77 NB A.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
McA
ndrew
s12
7thI-3
5E Cliff
Diffl
ey
Hwy 1
3
Blac
k Dog
Old S
hako
pee
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-15
I-94 Univ WB A.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
7th
Lafay
ette
Jacks
on Rice
Wes
tern
Dale
Victo
ria
Lexin
gton
Haml
ine
Snell
ing
Fairv
iew
Vand
alia
Hwy 2
8027
th
Huro
n
Chur
ch
Was
hingto
n
Location
Sp
eed
(mp
h)
I-94 Univ WB P.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
7th
Lafay
ette
Jacks
on Rice
Wes
tern
Dale
Victo
ria
Lexin
gton
Haml
ine
Snell
ing
Fairv
iew
Vand
alia
Hwy 2
8027
th
Huro
n
Chur
ch
Was
hingto
n
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-16 Cambridge Systematics, Inc.
I-94 Univ EB P.M. Peak (Without)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
Chur
ch
Huro
n27
th
Hwy 2
80
Vand
alia
Fairv
iew
Snell
ing
Haml
ine
Lexin
gton
Victo
riaDa
le
Wes
tern
Rice
Jacks
on
Lafay
ette
7th
Mou
nds
Location
Sp
eed
(mp
h)
I-94 Univ WB A.M. Peak (Without)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
7th
Lafay
ette
Jacks
on Rice
Wes
tern
Dale
Victo
ria
Lexin
gton
Ham
line
Snell
ing
Fairv
iew
Vand
alia
Hwy 2
8027
th
Huro
n
Chur
ch
Was
hingt
on
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-17
I-94 Univ WB P.M. Peak (Without)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
7th
Lafay
ette
Jacks
on Rice
Wes
tern
Dale
Victo
ria
Lexin
gton
Ham
line
Snell
ing
Fairv
iew
Vand
alia
Hwy 2
8027
th
Huro
n
Chur
ch
Was
hingto
n
Location
Sp
eed
(mp
h)
I-94 Marsh EB P.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
Ceda
r/Rv
rside
Ceda
r/M
innhh
Fran
k/M
innh
h26
th33
rd27
thLa
ke
Creti
n
Fairv
iew
Snell
ing
Ham
line
Lexin
gton
Victo
ria Dale
Wes
tern
Sum
mit
John
Irela
nd
Rice
/Uni
v
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-18 Cambridge Systematics, Inc.
I-94 Marsh WB A.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
Rice
/Univ
John
Irela
nd
Sum
mit
Wes
tern
Dale
Victo
ria
Lexin
gton
Ham
line
Snell
ing
Fairv
iewCr
etin
Lake 27
th33
rd26
th
Fran
k/M
innhh
Ceda
r/M
innh
h
Ceda
r/Rv
rside
Location
Sp
eed
(m
ph
)
I-94 Marsh WB P.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
Rice
/Uni
v
John
Irela
nd
Sum
mit
Wes
tern
Dale
Victo
ria
Lexin
gton
Ham
line
Snell
ing
Fairv
iewCr
etin
Lake 27
th33
rd26
th
Fran
k/M
innh
h
Ceda
r/M
innhh
Ceda
r/Rv
rside
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-19
I-94 Marsh EB P.M. Peak (Without)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
Ceda
r/Rv
rside
Ceda
r/M
innh
h
Fran
k/M
innh
h26
th33
rd27
thLa
ke
Creti
n
Fairv
iew
Snell
ing
Ham
line
Lexin
gton
Victo
riaDa
le
Wes
tern
Sum
mit
John
Irela
nd
Rice
/Univ
Location
Sp
eed
(mp
h)
I-94 Marsh WB A.M. Peak (Without)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
Rice
/Uni
v
John
Irela
nd
Sum
mit
Wes
tern
Dale
Victo
ria
Lexin
gton
Ham
line
Snell
ing
Fairv
iewCr
etin
Lake 27
th33
rd26
th
Fran
k/M
innh
h
Ceda
r/M
innhh
Ceda
r/Rv
rside
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-20 Cambridge Systematics, Inc.
I-94 Marsh WB P.M. Peak (Without)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
Rice
/Univ
John
Irela
nd
Sum
mit
Wes
tern
Dale
Victo
ria
Lexin
gton
Ham
line
Snell
ing
Fairv
iewCr
etin
Lake 27
th33
rd26
th
Fran
k/M
innhh
Ceda
r/M
innh
h
Ceda
r/Rv
rside
Location
Sp
eed
(m
ph
)
I-35E Rice NB P.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
Penn
sylva
nia
Hatch
Mar
yland
Arlin
gton
Larp
enteu
r
Rose
lawn
CR-B
Hwy 3
6CR
-C
Owas
soI-6
94CR
-F
Hwy 9
6
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-21
I-35E Rice SB A.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
CR-F
I-694
Owas
soCR
-C
Hwy 3
6CR
-B
Rose
lawn
Larp
enteu
r
Arlin
gton
Mar
yland
Hatch
Penn
sylva
nia
Unive
rsity
Location
Sp
eed
(mp
h)
I-35E Rice NB P.M. Peak (Without)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
Penn
sylva
nia
Hatch
Mar
yland
Arlin
gton
Larp
enteu
r
Rose
lawn
CR-B
Hwy 3
6CR
-C
Owas
soI-6
94CR
-F
Hwy 9
6
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-22 Cambridge Systematics, Inc.
I-35E Rice SB A.M. Peak (Without)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
CR-F
I-694
Owas
soCR
-C
Hwy 3
6CR
-B
Rose
lawn
Larp
enteu
r
Arlin
gton
Mar
yland
Hatch
Penn
sylva
nia
Unive
rsity
Location
Sp
eed
(mp
h)
I-35E Edge NB P.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
Min
neha
haCa
se
Mar
yland
Arlin
gton
Larp
enteu
r
Rose
lawn
CR-B
Hwy 3
6
Littl
e Can
ada
Labo
re
I-35E
/I-69
4
Vadn
aisCR
-ECR
-F
Hwy 9
6
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
Cambridge Systematics, Inc. B-23
I-35E Edge SB A.M. Peak (With)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
CR-F
CR-E
Vadn
ais
I-35E
/I-69
4
Labo
re
Littl
e Can
ada
Hwy 3
6CR
-B
Rose
lawn
Larp
enteu
r
Arlin
gton
Mar
yland
Case
Minn
ehah
a
Payn
e
Location
Sp
eed
(mp
h)
I-35E Edge NB P.M. Peak (Without)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
Minn
ehah
aCa
se
Mar
yland
Arlin
gton
Larp
enteu
r
Rose
lawn
CR-B
Hwy 3
6
Littl
e Can
ada
Labo
re
I-35E
/I-69
4
Vadn
aisCR
-ECR
-F
Hwy 9
6
Location
Sp
eed
(mp
h)
Twin Cities Ramp Meter Evaluation – Appendix to the Final Report
B-24 Cambridge Systematics, Inc.
I-35E Edge SB A.M. Peak (Without)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
CR-F
CR-E
Vadn
ais
I-35E
/I-69
4
Labo
re
Littl
e Can
ada
Hwy 3
6CR
-B
Rose
lawn
Larp
enteu
r
Arlin
gton
Mar
yland
Case
Min
neha
haPa
yne
Location
Sp
eed
(mp
h)
AppA.pdfAppendix A�Dates and Locations of License Plate Number Data Collection
AppB.pdfAppendix B�Summary of Field Data: Freeway and Arterial Speeds
AppE.pdfAppendix€E�Socioeconomic Distribution of Market Research Samples
AppF.pdfAppendix€F�Geocoding of Respondents’ �Origin-DestinationTripsData PreparationGeocoding Methodology
AppG.pdfTOC.pdf1.0Project Background1-12.0Evaluation Team2-13.0Evaluation Objectives3-14.0Performance Measures and Evaluation Methodologies4-14.1Evaluation Measures4-14.2Overview of Evaluation Methodologies4-4
5.0Test Plan for Field Data Collection5-15.1Corridor Selection Process5-15.1.1Identify the Corridor Selection Criteria5-25.1.2Identify Candidate Corridors5-25.1.3Apply Corridor Selection Criteria and Select Corridors �To Be Studied5-3
5.2Field Data Collection Plan5-35.2.1Field Data Collection Schedule5-115.2.2Evaluation Objectives5-12
5.3Field Data Analysis Plan5-285.4Field Data Management Plan5-295.4.1Field Data Collection, Transfer, and Storage5-295.4.2Field Data Security5-295.4.3Configuration Control5-295.4.4Documentation of External Influences5-305.4.5Quality Control and Quality Assurance5-30
6.0Test Plan for Focus Groups and Surveys6-16.1Qualitative Research€– Focus Groups6-16.2Quantitative Research€– Traveler Surveys6-3
7.0Test Plan for Benefit/Cost Analysis7-18.0Test Plan for Secondary Research8-19.0Schedule, Meetings, and Deliverables9-19.1Project Schedule9-19.2Meetings9-29.3Reports and Presentations9-3
LOT&LOF.pdf3.1Evaluation Goals and Objectives3-24.1Evaluation Measures4-25.1Candidate Corridors for Ramp Meter Evaluation5-45.2Candidate Corridors for Ramp Meter Evaluation Versus Criteria5-75.3Field Data Collection Schedule5-115.4.Ramps Selected for Manual Field Data Collection5-215.5Summary of Performance Measures and Data Sources5-282.1Evaluation Team2-35.1Candidate Corridors for Ramp Meter Evaluation5-65.2Twin Cities Corridors Selected for Detailed Evaluation5-105.3I˚494 Corridor5-155.4I˚35W Corridor5-165.5I˚94 Corridor5-185.6I˚35E Corridor5-199.1Project Schedule9-2
Text.pdf1.0Project Background22.0Evaluation Team3.0Evaluation Objectives44.0Performance Measures and Evaluation Methodologies(4.1Evaluation Measures(4.2Overview of Evaluation Methodologies
55.0Test Plan for Field Data Collection(5.1Corridor Selection Process5.1.1Identify the Corridor Selection Criteria5.1.2Identify Candidate Corridors5.1.3Apply Corridor Selection Criteria and Select Corridors To Be Studied
(5.2Field Data Collection Plan5.2.1Field Data Collection Schedule5.2.2Evaluation Objectives5.2.2.1Objective€1: Assess Traffic Flow Impacts5.2.2.2Objective€2: Assess Travel Time Impacts5.2.2.3Objective€3: Assess Ramp Impacts5.2.2.4Objective€4: Assess Safety Impacts5.2.2.5Objective€5: Assess Transit Impacts5.2.2.6Summary of Performance Measures and Data Sources
(5.3Field Data Analysis Plan
(5.4Field Data Management Plan5.4.1Field Data Collection, Transfer, and Storage5.4.2Field Data Security5.4.3Configuration Control5.4.4Documentation of External Influences5.4.5Quality Control and Quality Assurance
66.0Test Plan for Focus Groups and Surveys(6.1Qualitative Research€– Focus Groups(6.2Quantitative Research€– Traveler Surveys
77.0 Test Plan for Benefit/Cost Analysis8.0Test Plan for Secondary Research99.0Schedule, Meetings, and Deliverables(9.1Project Schedule(9.2Meetings(9.3Reports and Presentations
LOT&LOF.pdf3.1Evaluation Goals and Objectives3-24.1Evaluation Measures4-25.1Candidate Corridors for Ramp Meter Evaluation5-45.2Candidate Corridors for Ramp Meter Evaluation Versus Criteria5-75.3Field Data Collection Schedule5-115.4.Ramps Selected for Manual Field Data Collection5-215.5Summary of Performance Measures and Data Sources5-282.1Evaluation Team2-35.1Candidate Corridors for Ramp Meter Evaluation5-65.2Twin Cities Corridors Selected for Detailed Evaluation5-105.3I˚494 Corridor5-155.4I˚35W Corridor5-165.5I˚94 Corridor5-185.6I˚35E Corridor5-199.1Project Schedule9-2
TOC.pdf1.0Project Background1-12.0Evaluation Team2-13.0Evaluation Objectives3-14.0Performance Measures and Evaluation Methodologies4-14.1Evaluation Measures4-14.2Overview of Evaluation Methodologies4-4
5.0Test Plan for Field Data Collection5-15.1Corridor Selection Process5-15.1.1Identify the Corridor Selection Criteria5-25.1.2Identify Candidate Corridors5-25.1.3Apply Corridor Selection Criteria and Select Corridors �To Be Studied5-3
5.2Field Data Collection Plan5-35.2.1Field Data Collection Schedule5-115.2.2Evaluation Objectives5-12
5.3Field Data Analysis Plan5-285.4Field Data Management Plan5-295.4.1Field Data Collection, Transfer, and Storage5-295.4.2Field Data Security5-295.4.3Configuration Control5-295.4.4Documentation of External Influences5-305.4.5Quality Control and Quality Assurance5-30
6.0Test Plan for Focus Groups and Surveys6-16.1Qualitative Research€– Focus Groups6-16.2Quantitative Research€– Traveler Surveys6-3
7.0Test Plan for Benefit/Cost Analysis7-18.0Test Plan for Secondary Research8-19.0Schedule, Meetings, and Deliverables9-19.1Project Schedule9-19.2Meetings9-29.3Reports and Presentations9-3
AppI.pdfText.pdfQualitative Research with TravelersOverviewChapter 1: “With Meters”Key FindingsGeneral Ramp Meter PerceptionsAwareness of Ramp Meter BenefitsRamp Meter Performance MeasuresAttitudes toward Ramp Meter ShutdownsInformation Needs for Ramp Meter Shutdowns
Implications
Chapter 2: “Without Meters”Key FindingsGeneral Reactions toward Ramp Meter ShutdownsImpact of Ramp Meter Shutdowns on Travel BehaviorsMedia Coverage of Ramp Meter ShutdownsEvaluation of Ramp Meter Shutdown ExperimentPreferences for Alternative Ramp Meter Solutions
Implications
BeforeGroupSession.pdfRAMP METER STUDY – QUALITATIVE RESEARCH
AfterGroupSession.pdfRAMP METER STUDY – QUALITATIVE RESEARCH
FocusGroupScreener.pdfINTRODUCTIONGROUP ASSIGNMENT GRID
AppK.pdfAppendix K�Technical Memorandum€– Secondary Research(1.0Basics of Ramp Metering
(2.0Extent, Type, and Usage of Ramp MeteringExtentSystem WarrantLocations for Ramp MeteringControllersHours of Operation
(3.0Ramp Metering Goals and Strategies
(4.0Ramp ConfigurationGeometric ConfigurationExperiences in Several CitiesQueue Detectors
((5.0Measures of Effectiveness(6.0Public Relations Efforts and Public Feedback(7.0Enforcement Issues(8.0Future Plans for Ramp Metering Systems by Implementing Agencies(9.0Keys to a Successful Ramp Metering Program(10.0Keys to a Good Ramp Metering Study/Evaluation(11.0Suggested Interviewees(12.0Peer City InterviewsSeattle, WashingtonPhoenix, Arizona
(13.0References