Three generations of passion and experience in construction at the service of Private and Public clients. A leader in
the sectors of: infrastructure and mobility, real estate development, producing aggregates for construction and
special demolition, environmental protection.
Innovation Campus
1) Operating in full respect of the most evolved
environmental rules means saving the planet and
guaranteeing a future for generations to come.
2) Those building great structures on very large areas
must carefully consider environmental sustainability
aspects.
3) The energy efficiency of projects and
constructions must be quantifiable and certifiable
according to precise international standards.
4) Environmental performance, the integration of
constructions and the valorisation of the landscape
must be continually monitored from the planning of
works through to their realisation and management.
ENVIRONMENTAL SUSTAINABILITY
ABOVE ALL ELSE
INNOVATION CAMPUS KEYWORDS
STRATEGIC LOCATION
ACCESSIBILITY
INNOVATION
WORK AND LIFE
FUNCTIONALITY AND
EFFICIENCY
FLEXIBLE SPACES
GREEN AND ENVIRONMENTALLY
COMPATIBLE
ENERGY SAVINGDESIGN
ARCHITECTURE
LANDSCAPE INTEGRATION
QUALITY AND DURABILITY OF CONSTRUCTION
STRATEGIC LOCATION, ACCESSIBILITY
Linate Airport Accessibility
Paris 1h e 20 min.
Barcelona 1h e 40 min.
London 1h e 45 min.
INNOVATION CAMPUS
Located in municipality of Peschiera
Borromeo is just 7 km from the
centre of Milan and 2 minutes from
Milano Linate Airport.
The transport network facilitates
accessibility and the development of
trade relations.
EST BY-PASS TEM SP103-SP 14-
Via San Bovio
SP 13EST BY-PASS
SP103-SP 14-
Via San Bovio
INNOVATION CAMPUS
S.P. 121 First tract
T.E.M.
Second tract
T.E.M.
BRE.BE.MI.
ATM Overground line 73
S.P. 13
Uscita Forlanini/
Linate/SP 15b
EST BY PASS
HEADQUARTER
BASILISCO
Vimercate
SP 15 b – SP 14
– Via San Bovio
DISTANCE AND TIME TAKEN…………25 Km - 30/60 minutes
EST BY-PASS
Vimercate Carugate Exit Pioltello
SP 121
2011
DISTANCE AND TIME TAKEN …………25 Km - 38/60 minutes
MelzoAgrate ExitVimercate
DISTANCE AND TIME TAKEN …………27 Km - 38/60 minutes
SP103-SP 14-
Via San Bovio
2012
DISTANCE AND TIME TAKEN …………27 Km - 25/45 minutes
Vimercate Agrate Esit Melzo
EST BY-PASS SP 13 SP103-SP 14-
Via San Bovio
2013 FIRST T.E.M. TRACT
Vimercate Agrate Exit
Uscita
Caponago
A4
DISTANCE AND TIME TAKEN …………31 Km - 20/30 minutes
SP 103-SP14
2015 T.E.M. COMPLETION
Vimercate
A4 TEM SP103-SP 14-
Via San BovioEST BY-PASS
Agrate Exit
Caponago
Exit SP 103-SP14
DISTANCE AND TIME TAKEN …………31 Km - 20/30 minutes
Travel TimesInfrastructure and road system
TRAVEL TIME …………………………..…………. 15 minutes
Line M1
Line S5
Travel Times
Sesto FS
INNOVATION CAMPUS
RHO Fiera Milano
San Donato M.se
Sesto FS
Bisceglie
Cologno Nord
Gessate
Abbiategrasso
Assago Milanofiori
Maciachini
San Cristoforo FS
Linate Airport
Pioltello
Monza Bettola
- Planned-
Bignami
- Under costruction -
Paullo
- Planned -
Peschiera Borromeo
Segrate
2015 LINE MM4 LINATE AIRPORT
Mi Porta Garib. Segrate
Mi Porta Venezia SegrateSesto FS
Cologno Nord
San Siro - Lotto
10 min. 15 min.
15 min. 12 min.
Line S9
Line M1 Line S5
Every 10 min. Every 15 min.
Every 5 min. Every 10 min.
Mi Porta Garib. Segrate
SegrateMi Porta Venezia
Line M2
Every 5 min.
Every 5 min.
Line S5
Every 15 min.
12 min.
15 min.
Line S5
Every 15 min.
15 min.
12 min.
Lotto Fiera Milano City
TRAVEL TIME……………………………………. 25 minutes
TRAVEL TIME ……………………………….……. 27 minutes
TRAVEL TIME ……………………………………. 30 minutes
TRAVEL TIME ……………………………………. 24 minutes
MI P.ta Garibaldi
Mi P.ta Venezia
Bisceglie Mi Porta Venezia Segrate
TRAVEL TIME ……………………………………. 30 minutes
18 min. 12 min.
Every 5 min.
Line M1
Every 15 min.
Line S5
Mi Rogoredo
Mi P.ta Vittoria
Mi Porta Vittoria Segrate6 min. 9 min.
Lines S
Every 10 min.
Line S5
Every 15 min.
Mi Rogoredo
Railway Infrastructure System
INNOVATION WORK AND LIFE
Distinguished and strong
company imagea green area of over 10.000.000 sq.m
with sport and leisure facilities
possible partnershipwith multinational leaders
proximity to
Media, Partner, Clients
IBM H.Q.
3M H.Q.
MONDADORI H.Q. IDROSCALO Park
MIRAZZANO Castle
Peschiera Golf Club
Innovation Technology
A NEW SILICON VALLEY
Building A Building B
Building C
Asilo
Indoor parking spacesHub
Service Access
Outdoor ParkService Road
Service Road
Park of “fontanili”
RestaurantFitness
30.000 sq.m of indoor parking spaces 70.000 sq.m Giardini ricreativi
Agricultural Park
Basket-ball, soccer, tennis and volley pitches
Main Entrance
Exit
4 Indipendent access ways10.000.000 sq.m of green area
50.000 sq.m of open space office
Building D
LOCATION STRATEGICA ACCESSIBILITA’FUNCTIONALITY AND EFFICIENCY
From an Agricultural rural court…
…to a Tecnological court
Choice of layout
S/V Indicates the ratio between the dispersing surface and the volume. Among possible shapes, the court layout is
the one which guarantees the least thermal loss
DP The court layout has the smallest distance between furthest points. This makes for higher working
efficiency and lower building management costs.
3 m
4 m
4,5
m
Plant engineering flexibility 4 m of net internal height allow for a wide choice in plant engineering solutions
Efficient natural airing single opening façade modules favour natural air circulation to all work stations
Structural typology – Section of typical floor
Efficient lighting the 3 m net height of glass façade walls guarantee a correct natural illumination
Employment efficiency the 20 m breadth of floors afford maximum employment efficiency in terms of
square metres/person
Technical spaces and hygienic services are
localised in the corners so as to avoid a waste
of working spaces
Ensures the possibility of disposing of both open
plan offices and director offices, meeting rooms,
lounges and relaxation areas, mainframe and
storage areas...
Spatial efficiency
Structural flexibility
Optimal natural illumination
Effective access systemsThese connect the buildings with each other and
their external position saves room for work
The architectural court plan and glass façades
allow for a perfect distribution of light on the
work floor20 m
Efficiency of the Floor Plan
The Security exits and floor services have
been designed big enough to guarantee a
330-person employment capacity per floor,
equal to a workstation every 10 m2.
Employment capacity
LOCATION STRATEGICA ACCESSIBILITA’FLEXIBLE SPACES
LOCATION STRATEGICA ACCESSIBILITA’
GREEN AND ENVIRONMENTALLY
COMPATIBLE
GREEN BUILDING CERTIFICATION
L.E.E.D.Leadership in Energy and
Enviromental Design
Sustainability of site
Water management
Energy and atmosphere
Resources and materials
Internal air quality
+70% dedicated to green spaces
+40% saving in drinkingwater consumption
+30% saving on costof necessary energy
+30% of product used arefrom recycled materials
+30% than standardventilation air change
Sustainability of the site
Sustainable construction site management –
We take measures to avoid raising dust, dispersing earth outside the work site
and we use sound barriers so as not to disturb nearby inhabited and green
areas, safeguarding the health of neighbours and preserving natural
habitats in green areas.
Green area – the carefully planning of spaces, the restoration of
the Gambarone fountain, the closeness to the two parks: Parco Agricolo
Sud Milan and the Parco dell’Idroscalo make of this site an area of great
environmental value.
Alternative means of transport – More than 5% of
our parking places have been set aside for low emission cars and those with
alternative fuel. A cycle path, bicycle racks and dedicated changing rooms and
showers encourage the use of bicycles to reach the complex from nearby
areas.
Public transport access – Within 400 m from the entrance
to the complex are 2 bus lines + 1 bus on demand, which connect the site to
the Railway networkand to Linate Airport.
Water managment
Rain water collection – Rain water is filtered and
collected in tanks and is used for flushing toilets and watering the green
areas.
Careful planning of green areas – the planning
of the green areas has taken account of the water requirements of the
various plant species, so indigenous species with least need for water
were chosen.
Certified taps – the installation of Leed certified timed taps
and toilets with dual flush buttons has allowed for a noteworthy saving of
water use in the building.
Energy and atmosphere
Efficient envelope – the façades of all the buildings are state of
the art technology in the reduction of thermal energy loss.
Integrated sun-breakers avoid took much thermal energy accumulating in the
indoor areas of the buildings and thus avoiding the excessive use of air
conditioning during summer.
Solar and photovoltaic panels – Solar and
photovoltaic panels are installed on the roofs of the buildings supplying hot
water ad clean electricity, avoiding the use of fossil fuels which are
expensive and damaging to the environment.
Remote heating – A centralised remote heating plant allows for
greater energy efficiency, lower environmental impact and a smaller
carbon footprint CO2 compared to localised boilers and heaters
Using the water table for cooling – our wells fetch
underground water channelling it into the chillers for cooling in summer
Resources and materials
Recycled material – the choice of construction materials fell on
all products with the highest amount of recycled materials. Choosing this
type of material avoids the continuous impoverishment of raw materials present
in the natural environment.
Regional materials – more than 70% of products installed in
construction are from recycled raw materials, or those extracted and processed
within 800 Km of the site. This favours the local economy and reduces
pollution due to long product transportation.
.
Certified wood – most of the wood used in building is FSC
certified and comes from sustainably managed forests.
Ricycling of construction waste – Thanks to
separate waste collection and the careful management of the site, more than
81% of the waste generated during construction was recycled.
Internal air quality
Improved ventilation – the amount of ventilation was brought
to 30% beyond the standards required for perfect air replenishment
improving the health and comfort of dwellers.
Greater thermal comfort – Thanks to independent
temperature settings for areas and halls the best thermal comfort is guaranteed
for all users of the complex and for all areas in the buildings.
Internal air quality managment – During
construction, measures were taken to provide the best possible indoor air
quality, protecting and sealing off all conducts to mechanical areas, avoiding
fumes in closed areas and protecting them from dust, sawdust and possible
pollutants.
Low VOC materials – During the works only low VOC
chemicals were used. Paint, silicone and glue in traditional construction are
responsible for releasing organic compounds into the atmosphere which are
damaging to human health, causing allergies and breathing problems as well
as being damaging to the environment. Thanks to the use of low VOC
materials the highest health standards are guaranteed for indoor areas.
LOCATION STRATEGICA ACCESSIBILITA’ENERGY SAVING
Brise-soleil
Continuous façade with high energy efficiency
Pergola
Study of solar radiation: 21 june/21 December
LOCATION STRATEGICA ACCESSIBILITA’
DESIGN
ARCHITECTURE
LOCATION STRATEGICA ACCESSIBILITA’LANDSCAPE INTEGRATION
LOCATION STRATEGICA ACCESSIBILITA’QUALITY AND DURABILITY
OF CONSTRUCTION