LonMark, the open Smart Streetlight Platform
Save energy and enhance maintenance efficiency on your streetlight network
Streetlight Control and Monitoring: Objectives/Needs
SAVE ENERGY Dimming to produce the right light at the right time
Dimming based on sensors/signals Control switch ON/OFF
REDUCE MAINTENANCE COSTS Automatic failure identification and analysis
Enhance maintenance services
REMOTE CONTROL IN REAL TIME To reduce onsite trips and act faster
To gain visibility and control any situation
Transform the streetlight network into the
SMART CITY APPLICATIONS BACKBONE 24/7 power to any device in the street
1
2
4
3
LonMark Smart Streetlight Solution’s Architecture
SEGMENT CONTROLLER •Astronomical Clock •Alarming, Historics, Cabinet control and monitoring •3G/GPRS or WiFi connection with the server
LIGHT CONTROLLER IN EACH STREETLIGHT •Programmed ON – OFF – Dimming control •Failure identification •Powerline communication – Open and Standard •Many available modules
CENTRAL MANAGEMENT SOFTWARE (CMS) • Web Services interfaces to integration with 3rd party • Alarm management • Reporting • Automatic data collect and aggregation
WEB USER INTERFACES PROVIDED BY THE CMS • Real-time monitoring on Maps • Failure Reports and trend Analysis • Energy Consumption Reports • Anticipate end-of-life of Lamps • Program ON/OFF/Dimming schedulers
IN THE STREET
ON THE SERVER
FOR THE END-USER
SEGMENT CONTROLLER IN THE CABINET LONWORKS
Radio Bridge
Central Management Software
About the Segment Controller
Integrated Autonomous Segment Controller Powerline communication with Light Controllers using ISO14908 protocol Embedded astronomical clock for SUNRISE/SUNSET signals Numerous calendars and schedulers Real-time synchronized clock Datalog up to 3 months TCP/IP : HTTP, XML, FTP, TELNET Alarm and Notification Manager Customized programmable modules User-friendly configuration Software allowing simple, rapid and lean installation process
Digital Inputs & Outputs Control Mains Relay Detect electrical segment failures Detect open doors
Energy Metering P, U, I, COS PHI on 3 phases Active, reactive, cumulated Energy
Dynamic Automatic Repeating To enable any Light Controller to communicate with Segment Controller without any configuration nor engineering
Local and Remote Control Smartphone applications Streetlight.Vision Central Server Customized smartphone/tablet apps
Many Light Point Controllers available
COMMUNICATION ON POWERLINE 30 different models from 20 manufacturers
Powerline : Standard ISO 14908
Automatic signal repeating
LIGHT CONTROLLERS: MAIN FEATURES ON, OFF and DIMMING commands
Lamp Feedback Monitoring
Failure Identification (lamp failure,
high/low voltage, high/low power, high temp, …)
Electrical Measures (U, I, COS PHI, E, …)
Energy and RunHours metering
INTEROPERABLE INTERCHANGEABLE LonMark Profile
All OLCs can be controlled on the same
segment, by the same Segment Controller
and the same Central Management Software
Additional vendor specific features
APANET GLC1xxv2-
small
ADIC
Can be installed in the Pole
YES YES YES YES YES
Can be installed in the Luminaire
YES YES YES NO NO
Dimmable ballast Integrated ballast 1-10V Any 1-10V or DALI ballast Any Magnetic ballast Any Magnetic ballast
Lamp Alarm YES YES YES YES YES
Current Alarm YES YES YES YES YES
Voltage Alarm YES YES YES YES YES
Temperature Alarm YES YES YES (option) NO NO
Other alarms High/Low Power Low power factor, high/low power
High/low Power, low power factor, low/high
voltage, low/high current, open luminaire/pole
detection
High/low power, low power factor, low/high
voltage, low/high current, open luminaire/pole
detection
Low power factor, High/Low Power
Metering values U, I, °C, KWH, H P, cos phi, E, H U, I, P, Cos Phi, kWh, h, Temp.
U, I, P, Cos Phi, kWh, h U, I, P, Cos Phi, KWH, H
Max Power 400 W 400 W 500 W 1000 W 250 W
LonMark certified YES YES YES NO YES
APANET Ferro
AMKO inductions
CITYLONE SL42 for magnetic
ballast
Many Light Point Controllers available (1/2)
OSRAM DALI – 1-10V
RONGWEN
Can be installed in the Pole
YES YES YES YES NO NO
Can be installed in the Luminaire
YES YES YES YES YES YES
Dimmable ballast 2 dali ballast & one 1-10V ballast at same
time
Any 1-10V ballast Any ballast, any lamp Any ballast, any lamp I2C controllabe dimmable Ballast
4 x DALI ballasts 2 x RGBW DALI ballast
4 x 1-10V ballasts
Lamp Alarm YES YES YES YES YES YES
Current Alarm YES YES NO YES YES YES
Voltage Alarm YES YES NO YES YES YES
Temperature Alarm YES YES NO YES YES YES
Other alarms High/low Power, low power factor, low/high
voltage, low/high current
Low power factor Low power factor Pole impact, grounding absence
Low power factor, high/low power
High/low power Low power factor
Relay failure Digital input triggered
Metering values U, I, Cos Phi, Temp, H U, I, P, Cos Phi, KWH, H - U, I, P, Cos Phi, KWH, H U, °C, KWH, H U, I, P, Cos Phi, E, t, T
Max Power 300W 500 W 500 W 500 W 400 W 350 W
LonMark certified YES YES NO NO YES NO
CITYLONE 21
Many Light Point Controllers available (2/2) Echelon
e-Controls Flashnet
World-wide adoption More than 470.000 light points in 17 countries
- Europe &
Middle East -
Oslo, Lyon, Paris, Przytyk, Barcelona, Dublin, Rouen,
Brest, Dutch highways,
Utrecht, Eindhoven, Köln,
Ay, Metz, Mulhouse,
Wroclaw, Strasbourg,
Marseille, Nice, Arahova,
Saint-Priest, Joinville,
Sénart, Moissy Cramayel,
Mecca, Portuguese
highways, Arahova,
Leucate, Jelenia Gora, St
Paul, Badalona, Terrassa,
St Jean de Mont, Polish
highways, Tameside, Milton
Keynes, Cork City, Belfast,
Betton, York, Vannes,
Savigny, Stirling,
Edinburgh, Cordemais,
Gaia, Cadiz, San
Sebastian, Riyad, Jedrzejow…
- Asia Pacific -
DongGuan, Jakarta,
Chang’An, Shanghai,
Tianjin, GuangZhou,
YanCheng, Perth, …
Customer Case n°1: Dublin (Ireland)
NUMBER OF STREETLIGHTS UNDER CONTROL > 1200
SOLUTION DELIVERED BY THE i.LON segment controller with
Streetlight.Vision embedded software Streetlight.Vision CMS server
STARTING DATE: 2009
RETURN ON INVESTMENT < 4,5 YEARS Electricity cost = 14 cents of Euros per KWH Average wattage 120 W Average dimming > 35%
NEXT STEPS Deploying additional cabinets Deploy additional applications controller by the
Streetlight.Vision Software
Customer Case n°2: DongGuan (China)
NUMBER OF STREETLIGHTS UNDER CONTROL > 120.000
SOLUTION DELIVERED BY RONGWEN Rongwen electronic dimmable ballast with
LonWorks light point controller Streetlight.Vision segment controller GPRS communication with China mobile Streetlight.Vision CMS software in the control room
STARTING DATE: SEPTEMBER 2010
RETURN ON INVESTMENT < 3 YEARS Electricity cost = 10 cents of Euros per KWH Average wattage = 250 W Average dimming > 42%
NEXT STEPS Deploy ESCO model in most of the province of China Extend to Intelligent City applications
Customer Case n°3: Brasov (Romania)
NUMBER OF STREETLIGHTS UNDER CONTROL = 11084
Cabinet and Light Point Control Solution IntelliLight Controllers inteliLIGHT StreetLight Control NMS Enterprise Edition software Apanet environmental sensors ADIC electronic ballast with integrated control Echelon smart servers and electronic ballast controllers Mobotix video surveillance cameras 2N Telekomunikace panic buttons
STARTING DATE: 2014
RETURN ON INVESTMENT < 4 YEARS Electricity cost: 12 cents of Euro per KWH Average wattage: 150W Average dimming: 30%
SMART CITY APPLICATIONS By the end of 2014, all the 399 streets of Brasov will be remotely controlled by the inteliLIGHT® solution. Complete compatibility and interoperability with controllers from different vendors, sensors and smart applications Setting up the premises for the first Smart City in Romania
Customer Case n°3: Oslo (Norway)
NUMBER OF CABINETS AND STREETLIGHTS UNDER
CONTROL > 750 CABINETS (ALL OF THE CITY) AND 8.900
STREETLIGHTS (30.000 IN 2014)
CABINET AND LIGHT POINT CONTROL SOLUTION Citylone light point controllers Streetlight.Vision Control Box including the
i.LON Smart Server Streetlight.Vision Web Hosted CMS Server
STARTING DATE: JANUARY 2012
SMART CITY APPLICATIONS 40% saving based on dimming Adaptive Lighting : Dimming based on SNOW, TRAFFIC Smart City Apps to be deployed
LonMark Open Platform for Smart Streetlight Unique Benefits
MANY LIGHT CONTROLLERS AVAILABLE You negotiate prices, you do not depend on one manufacturer You can issue OPEN TENDERS More than 30 products on the market One new Light Controller every quarter OPEN: Choice in price and feature
EASY, QUICK, « NO SPECIALIST » INSTALLATION No engineering cost involved Repeating technology, no network study prior to install
PRICING IS COMPETITIVE
ROBUST, PROVEN, WIDELY DEPLOYED Thousands of Segment Controllers deployed world-wide Robust and feature-rich telemanagement Software
FUTURE PROOF Standardized protocol is a warranty for end-customers Solution is profitable and grows fast
LonMark Value Proposition
FOR MUNICIPALITIES and CONTRACTORS Issue open tender specifications to not depend on any manufacturer Ask for open interoperable Light Point Controllers. Ask for ISO14908 standard Contact the LonMark members
FOR MANUFACTURERS OF STREETLIGHT PRODUCTS Join the community of LonMark Members Sell to municipalities who have adopted our open platform Get assistance from LonMark and Echelon to migrate your
product to LonWorks Read the LonMark Outdoor Lighting Profile Contact the LonMark Organisation
FOR MANUFACTURERS OF OTHER SMART CITY PRODUCTS Join the community of LonMark Members
Get access to municipalities who have adopted the LonMark open platform Get assistance from LonMark and Echelon to include LonWorks
in your Smart City product Contact the LonMark organisation
Resources for LONMARK Smart Streetlighting
Sample specification for an open streetlighting system Technical white paper on open streetlighting solutions
(click on each document for a direct link)