See a
a Problem,
JAn
JWOnnua
C 201l Rep
10 port
Solve a Prroblem…
See a Problem, Solve a Problem…
2 | P a g e
Contents Scholarships ........................................................................................................................................... 3
Aims for 2010 from our 2009 Annual Report .................................................................... 3
Aims for 2011 .......................................................................................................................................... 4
Internship ................................................................................................................................................. 5
Aims for 2010 from the 2009 Annual Report ..................................................................... 5
Aims for 2011 .......................................................................................................................................... 6
Clean Water ............................................................................................................................................. 7
Aims for 2010 from the 2009 Annual Report ..................................................................... 7
Aims for 2011 .......................................................................................................................................... 9
Microfinance ........................................................................................................................................ 10
Aims for 2010 from the 2009 Annual Report .................................................................. 10
Aims for 2011 ....................................................................................................................................... 11
Free Classes ............................................................................................................................................. 12
Aims for 2010 from the 2009 Annual Report .................................................................. 12
Aims for 2011 ....................................................................................................................................... 14
Emergency Relief ................................................................................................................................ 15
Aims for 2010 from the 2009 Annual Report .................................................................. 15
Fire Relief (2007 & 2008) ................................................................................................................. 16
Scholarship Student Emergencies ...................................................................................... 16
Operation Smile (March 2010) ................................................................................................. 16
Aims for 2011 ....................................................................................................................................... 16
Volunteers .............................................................................................................................................. 17
Laos .............................................................................................................................................................. 18
Aims for 2010 from the 2009 Annual Report .................................................................. 18
Aims for 2011 ....................................................................................................................................... 19
Myanmar ................................................................................................................................................... 19
Aims for 2010 from the 2009 Annual Report .................................................................. 19
Aims for 2011 ....................................................................................................................................... 19
Publicity ................................................................................................................................................... 20
Aims for 2010 from the 2009 Annual Report .................................................................. 20
Aims for 2011: ...................................................................................................................................... 21
Acknowledgments ............................................................................................................................. 22
See a
Aim
Our � to h
•
� to t
•� to c
•
� to cseeki
•
voluninterabilit
In 2fairacaorgstu
a Problem,
ms for 2010
aims for 201have all final
• All 20 stugraduatio
take on at lea
• JWOC tocontinue to r
• JWOC habeneficialprocess wfrom JWO
continue to iing skills, car
• Further tesessions o
nteering on ervals which soty to carry ou
2010 JWOC r, hosting 26 ademic instituganizations asdents.
0 from ou
10 were: l year studen
udents in Camon ceremony ast 20 new st
ook on 26 stureview and e
as had made l for all invol
which was alsOC and to geimplement anreer worksho
eacher traininon job-seekin
each of JWOought to heigut the tasks n
ran its first elocal busines
utions, bankss well as 300
SDM(y INNT
ur 2009 An
nts complete
mbodia werewhich was htudents in th
udents in Camevaluate the
many imporlved. In partiso held beforet settled befnd carry out ops and perso
ng and first ang skills, whi
OC’s projects.ghten the stuneeded for ea
ever careers sses, s and university
ScholarDonations reMoney Spent(Remaining fyears and sem
In brief Number of gNumber of nTotal numbe
nnual Rep
e their studie
e able to gradheld in Novemhe fall.
mbodia in Oe programme
rtant changesicular, this hare first year sfore they starfurther train
onal finance.
aid training wich culminate
2010 haprogramstrengthJWOC hCambodcontinustudentswas conCambodinductiouniversistart at J The schpronunseeking first Carlearnt n
. Training waudents’ underach of the pro
rshipseceived: $ 49,t: $26,542.63funds were dmesters yet to
graduates in Cnew students er of students
port
es successfull
duate successmber.
ctober. , the applicat
s to the progras involved students startrted their claning for the
was implemened in JWOC’
as been a wonmme. We havhened the prohad its largesdia. The syste
ued and has ws, projects, d
ntinued, addedia received fon process, wity enrollmenJWOC befor
holarship studciation and tskills course
reer Day in Anumerous skilas held for earstanding of oject steps. I
,202.75 3 onated in advo be paid).
Cambodia: 20given schola
s holding a sc
ly (20 studen
fully and wer
tion process
ramme throutrengthening
ted universitysses. students incl
nted for all ss first Career
nderfully sucve welcomedogramme in mst intake of sem of having
worked well, donors and sted to, and reffirst aid train
which this yeant so all first re starting un
dent trainingteaching was e was also addAugust. Throlls and gainedach project, bthe core aim
In addition to
vance for the
0 arships in Cacholarship at
ts).
re able to att
and guidelin
ughout the yeg the applicaty giving them
luding furthe
tudents as wr Day.
ccessful year d many new smany ways. Icholarship stg one intake proving benetaff. The longfined this yeaning in additioar was held inyear students
niversity for t
g introduced continued anded which cu
oughout the yd experienceby the projec
ms of the projo internal trai
Solve a Pr
e students’ fu
ambodia: 26t the close of
end their off
nes.
ear to make ition and indu
m more time
er training on
well as a five,
on the scholstudents and In October 2tudents so faof students aeficial for theger inductionar. All new ston to the usun advance ofs could have the first time
in 2009 in nd a five-sessulminated in year the stude through thect manager, aects but alsoining, the JW
roblem…
uture
f 2010: 60
ficial
it more uction to learn
n job-
two hour
arship have
2010, ar – 26 in a year has e n process tudents in ual f time to .
sion job-JWOC’s
dents also eir at regular o their WOC
See a Problem, Solve a Problem…
4 | P a g e
students were able to benefit from various workshops held by visiting JWOC volunteers, which included marketing, life coaching, massage, self-defense and photography. JWOC continues to seek as many ways as possible to support our students and in addition to laptop computers for loan for assignments, JWOC has now added cameras and a range of books and DVDs for the students to borrow. In 2010 20 JWOC students completed their studies. Given that universities in Cambodia currently only hold their official ceremonies every few years the 2010 graduates were very lucky to be able to join JWOC 2009 graduates plus some of our students completing their associate degrees, before moving onto their bachelors degrees, to all attend their official ceremony in November – more than 30 JWOC students graduated and received their certificates! Aims for 2011
Our aims for 2011 are;
• to have all final year students complete their studies successfully (16 students);
• to take on at least 19 new students;
• to continue to review and evaluate the programme, the application process and guidelines;
• to continue to implement and carry out further training for the students including a focus on personal finance and personal health.
More than 30 JWOC scholarship students attended their official graduation ceremony at BBU in November
20 scholarship students completed their university degrees with JWOC in 2010.
See a
Aim
Our
•
•
•
•
The Jstreninvaland Scontistaff ManstudeothersimilVantwhicinterSeptemanato bein th The gradugreat
a Problem,
ms for 2010
aims for 201
• to contin
A
d
si
• to explor
T
gr
• to evalua
U
im
• to write athe progr
F
b
JWOC Interngth in 2010. luable traininSomit. Their inued and th
f Boret (Microager) for muents. The intr organizatiolar aims. For tha were alsoch spanned rirnship came tember when ager positione able to ben
heir roles as p
internship pruate interns. t experience
0 from th
10 were:
nue the train
A whole range
evelopment
imilar project
re moving th
The programm
raduate inter
ate, adapt an
University inte
mpact of the
a final reportramme.
Final report w
elow).
rnship PrograThe graduat
ng and experiEnglish, dev
hey were joineofinance Pro
uch of this traerns were als
ons in Cambothe second t
o able to attenight across JWto a very sucboth Somit
ns, which theefit from the
project manag
rogramme wThe first unifor the intern
DM INNN
he 2009 An
ning and oth
e of training
theory. In ad
ts in Pursat a
he program
me grew and
rnships.
nd improve
ernships and
programme
t on the bene
written which
amme has gote internship ience for ourvelopment aned by JWOC
oject Manageaining as wellso able to takodia workingtrip to Phnomnd and visit tWOC’s projecessful end oand Sokhorn
ey both accepeir newly acqgers.
was also able tiversity internns and the st
InternsDonations RMoney Spen
In brief Number of gNumber of uNumber of h
nnual Rep
her aspects
has been con
ddition, two s
and Phnom P
mme into othe adapted to i
the programd graduate hig
and adapt to
efits, lessons
h included the
one from strecontinued to
r two graduatnd other train
C’s other twor) and Vanthl as by other ke two field tg on similar pm Penh, Borthe four orgaects. The gradof its first yean were offerepted. JWOC iquired skills a
to expand in nship was hetaff and was v
ship Received: $5,5nt: $7,894.31
graduate inteuniversity inthigh school g
port
of the progranducted, cov
study trips to
Penh were m
er areas and iincorporated
mme based ongh school int
o circumstanc
learnt and re
e benefits, le
ength to o provide tes – Sokhorning full-time
ha (Office university
trips to visit projects with ret and anizations duate ar in ed project is delighted nd experienc
2010 to incleld for three very instructi
500.00
rns: 2 terns: 5 graduate inte
amme as set vering English
o a range of d
made in May a
including othd university in
n our experieternships wer
ces encounte
ecommendat
ssons and re
n
ce
lude both unimonths for five for JWO
The Grtrip to Pother dlearn ab
rns: 9
out in the orh language, t
different orga
and July.
her beneficianternships an
ence and impre introduced
ered during th
tions for futu
commendati
iversity interfour universiC to learn ho
raduate InterPhnom Penh
development bout their wo
Solve a Pr
riginal propoteaching, and
anizations ru
aries. nd high schoo
pact. d to further t
he year.
ure continuat
ions (as detai
ns and high ity interns. Itow to shape
rns and staff h in July to vorganization
ork.
roblem…
osal. d
unning
ol
the
tion of
iled
school t was a this
took a visit ns and
See a Problem, Solve a Problem…
6 | P a g e
element of the programme in the future. Each intern was partnered with a manager on rotation, which meant they had experience working on each of JWOC’s projects both in the field and in the office. The managers themselves gained experience in training and management and were able to take pride in how much they themselves had learnt over the last nine months. The internship worked very well and JWOC was excited to have been able to offer four young students such a great opportunity as well as being able to see the benefits in skills and confidence the three months brought. For the future of the university internship JWOC decided to further enhance the position by offering it to two interns for a six month period each. This, it is hoped, will allow the intern to gain more experience to ready them for future employment, as well as to provide more continuity and support to the project managers. Our first of the two interns started in October and has already been doing very well in his first two rotations on Clean Water and Microfinance.
The high school graduate internship was the second new internship to be introduced in 2010. This internship was offered for nine interns during the month of August. The aim of the internship was to give recent high school graduates, who wanted to learn more about the work and aims of charitable organizations, their first work experience in this area. The nine interns selected were able to work alongside the annual Oxford and Cambridge University TravelAid volunteers. Thus, they were able to gain experience of planning and running fun, educational activities for children as well as learning all about the different areas of JWOC’s work. Working with volunteers from overseas also allowed them to learn more about other cultures and gave them lots of creative ideas for working with children as well as improving their English. This internship was a great success for all involved and was a very interesting and creative way to expand the internship programme to support those just starting out in their careers.
Aims for 2011
Our aims for 2011 are:
• to ensure the two university interns continue to receive the training and experience from working at JWOC on all of the projects.
• to explore moving the programme into other areas and including other beneficiaries and consider implementing an adapted version of the high school graduate internship again in August 2011.
• to continue to use the internship programme as a means for JWOC’s staff and interns to learn as much as possible about the aims and practical actions of good charitable organizations and to reach out and connect with other organizations working on the same issues.
• to evaluate, adapt and improve the programme based on our experience and impact.
Nine High School Graduate Interns spent the month of August working with visiting volunteers from the UK to run holiday activities for local children.
See a
Aim
Our
•
•
•
•
The Centto thtrainfilter
a Problem,
ms for 2010
2010 aims w
• 5 villagesand comp
F
• to conso
Aupin
• to increa(especially
Cth
• to evaluatrial and l
Tva
first full yeartered approache original moning sessions r care and hyg
CDoMoAd InNuToToToToAp
0 from th
were:
s this year unpleting each o
Five villages c
lidate the apAll steps, matpdating, buyi
n their work,
ase capacityy the first – n
Capacity of Clhe work, incl
ate, adapt anlater villages
The approacharious enhan
r of the Cleanch saw manyodel, includinin well main
ygiene for all
lean Waonations receoney spent: $dditional fun
n brief umber of villotal number ootal number ootal number ootal number opproximate N
he 2009 An
nder the villaone within th
completed by
pproach durinerials and traing a sufficieand develop
for both oldneeds assessmlean Water ouding a parti
nd improve at the six-mo
h has gone thncements thro
n Water Villay enhancemeng specialize
ntenance, watvillage elders
ater eived:$66,357$59,861.42 ds are donati
lages helped:of new wells of old wells fof filters distof hygiene paNumber of p
nnual Rep
age centered he anticipatey November
ng these fiveaining consolent amount opment of new
d and new JWment/scoutinofficers consiicular focus o
the approachonth mark.
hrough a contoughout 201
201cenbeeguiJWthechaandenh
Wavill
thelayecon
age nts d ter s
7.29
ions already
5 completeddrilled: 77 (7
fixed: 182 tributed folloacks distribu
people affecte
port
approach (thd time-frame2010. One v
e villages (inclidated throu
of good qualiw materials.
WOC scholarng/mapping)iderably increon needs asse
h depending
tinuous proc0 (see below
10 has been tntered approen extremelyided by a fo
WOC works we course of tallenges faced evaluatiohancements h
• a moreater officers lage;
• the intre Village Chieer of suppncluded;
received for
d, 1 in progre73 family wel
owing traininguted followinged: 3,600
his is dependee). village in proc
cluding, stepsugh meticulouty equipmen
rship student). eased througessment, map
on our expe
cess of monitw for details).
the first full yach to Clean
y encouragingocus on the with, has methe year and ed. Through on, a nuhave been m
e thorough mcan better id
roduction ofef and Grouport for the
villages to be
ess lls & four co
g: 684 g training: 2,
ent on fundin
cess beginnin
s, materials anus record keet to support
ts in all the st
gh regular traipping, and sc
erience and o
toring and ev
year implemen Water and tg. This approlong term imet with conshas adapted a process of
umber of made to the pr
mapping prodentify areas
f specialized p Leaders to e villagers
Solve a Pr
e completed
ommunity we
918
ng, finding v
ng in late No
nd training).eping, continClean Water
teps of the ap
ining in all arcouting for n
our return vis
valuation lead
enting JWOCthe results sooach – motivmpact on thsiderable suc
well to the f constant m
modificatioroject includ
ocess whereof most nee
training sesprovide an aafter the p
roblem…
in 2011.
ells)
villages
ovember.
nuous r officers
pproach
reas of new wells.
sits to our
ding to
C’s village o far have vated and
he villages ccess over variety of
monitoring ons and ding:
eby Clean ed in each
ssions for additional project is
See a Problem, Solve a Problem…
8 | P a g e
• the introduction of specially prepared flyers for every household in each village giving further details and support about the resources JWOC has provided. These flyers include details of nearby suppliers for replacement parts as well as the costs of replacing these parts if they become broken or worn out;
• further enhancements to the ceramic filter training sessions. The enhancements pre-empt issues we have discovered in the first few villages with regard to maintenance and upkeep of the filters;
• a specially designed follow up filter training to support families and areas of the villages where problems have surfaced with ceramic filters;
• further refinement of the surveys JWOC conducts in each village to measure the impact of the projects.
Results
As the project has moved past its very early stages, JWOC has been able to benefit from its first glimpses at the follow up survey data that is collected in each village from an average of twenty percent of the households helped. Two follow up surveys are conducted following the conclusion of the initial two month collaboration. The first surveys, a month after the end of the project, focus on the knowledge and every day practices of the villagers with regard to wells, water storage and hygiene. The results so far have shown very significant changes in these regards. Treatment of water before drinking, for example, changed dramatically across the board, showing that more than ninety percent of those surveyed were treating water after the project compared to an average of around thirty percent beforehand. Similarly, results from the hygiene seminars showed a very significant increase in knowledge about hand washing and teeth cleaning after the project. Frequency and technique in these areas were shown to change positively in almost every person surveyed. Less data is currently available on the Impact Assessments, conducted six months after the end of the project, but early results are encouraging. As the project goes into its second year and more results come in for this part of the survey process, JWOC will have a much better indication of the way the project is affecting the health of the villages JWOC has worked with.
Some of the stages JWOC goes through in each partner village in Siem Reap Province including: ceramic filter training; well drilling; hygiene training; and water testing.
See a Problem, Solve a Problem…
9 | P a g e
Aims for 2011
Our 2011 aims are:
• 5 villages this year under the village centered approach;
• to maintain a high level of capacity amongst the Scholarship student Clean Water officers in all the steps of the approach;
• to continually evaluate, adapt and improve the approach depending on our experience, and return visits to our partner villages;
• to develop further relationships with Commune officials to work in collaboration with local authorities to find areas where the need is greatest;
• to enhance training seminars through development of further visual resources including flip-charts;
• to expand fundraising efforts to include larger donor bodies such as foundations to support the project.
Women in Lbaeuk Village, Pouk District, return to their homes with their ceramic water filters after attending compulsory filter training delivered by JWOC’s Scholarship Student Clean Water Officers.
See a
Aim
Our
•
•
•
•
•
•
•
a Problem,
ms for 2010
aims for 201
• to continmicrofinastudents a
F R
pr F
em
• to succestime and
Suth
• to train anmanage of the pro
Bb
• to add thwhich boloan fromthrough teducation
Htrbu
• to integrmicrofina
Ainin
• to ensureorganizedhandove
A
• to evaluaexperienc
0 from th
10 were:
ue capacity ance, social imand further f
Further traininRegular trainin
roject managFurther traininmergency pla
sfully complrepeat borrouccessful dishe last cycle.
nd enable ththe majority ogramme.
Boret successeen doing we
e next stage orrowers will m JWOC to ftaking positivn and their fu
Hygiene trainiraining for seusiness and r
rate other prance program
A range of furnvolved in thntegrated from
e policies, prod, labeled ander in the futurAll document
ate, adapt ance, repaymen
MDML NRcR9N
he 2009 An
building incmpact and prfinancial and ng and suppong for the stuger. ng introduceanning and b
ete the new powers. persal of fou
e assistant mof the ongoi
fully becameell handling a
of the develobe provided
further enhanve steps in reuture plannining introduceecond time brecord-keepin
rogrammes mme (includinrther educati
he programmm the Clean
ocedures, andd filed to allore. s written up
nd improve nt rate and im
MicrofDonations reMoney SpenLoan Funds
Number of lRepayment rcompleted): Repayment r92.5% Number of l
nnual Rep
cluding furthroject managbusiness adv
ort for the asudents in rela
ed for secondbusiness.
plan of four
ur loan cycles
manager to being , weekly
e project manall elements o
opment plan with suppornce their liveelation to theng. ed for first tiorrowers; anng support g
and elementng educationonal element
me and hygienWater Proje
d documentsow for easy m
and clearly f
the programmpact.
financeeceived: $271
nt: $4287.71 Dispersed: $
loans distriburate for early 93% rate for Augu
loan cycles di
port
her training ogement for thvice for borrssistant and tation to each
d and third tim
loan cycles
s with an equ
e able to indeand regular l
nager in Septof the progra
– Microfinart and expects and those o
eir houses, th
me borrowernd further pergiven to furth
ts of JWOC’sn and hygienets introduced
ne and water-ct.
s are clearly wmanagemen
filed.
mme dependin
18
$18,956 (inclu
uted: 163 January and
ust and Dece
istributed: 4
on a whole rahe assistant mowers. then project mh step of the
me borrower
per year, ea
ual balance of
ependently loan cycle pa
ember and hamme.
ance + - in ted to use theof their famileir health, th
rs; water-filtersonalized her borrower
s work into the). d for all those-filter training
written, nt and
ng on our
uding recycle
May loan cy
ember loan cy
ange of topicmanager and
manager carrprogramme
rs in relation
ach with a go
f new and pr
rts
has
eir ly
heir
er
rs.
he
e g
In 201borrooptionsubsiafter acompsessioMF+ progr
Solve a Pr
ed loan funds
ycles (now
ycles (still on
s related to the scholarsh
ried out. conducted b
to finance,
ood number o
revious borro
10 second tiowers had thn of buyingdized waterattending a
pulsory trainon as part ofpart of the
ramme
roblem…
s)
ngoing):
hip
by the
of first
owers in
ime he g a r filter
ning f the
See a Problem, Solve a Problem…
11 | P a g e
The programme continues to be evaluated from all angles and adapted accordingly – the introduction of a ‘gift policy’, whereby borrowers receive 10% of the principle borrowed when they repay on time would be one example which has helped borrowers in planning their funds and helped JWOC with the repayment rate, allowing JWOC to help more borrowers.
The Microfinance Programme in 2010 was able to build on the development in 2009, to provide a firm basis for continuing to move the project forward in 2011. All policies, procedures and tracking records were consolidated, updated and adapted to improve clarity in JWOC’s lending policy and procedures for every step of the loan cycle. This included the commencement of the ‘gift policy’ (as detailed above) which has been a very successful addition to the programme. The project manager and scholarship students received support and training relating to finance and the implementation of each step of the project cycle. In addition, the project manager was able to join training for the graduate internship, building his knowledge and introducing him to methods used by other Microfinance organisations.
During the year, JWOC was able to disperse $18,956 to borrowers through the four scheduled loan cycles. The repayment remained high despite periods of flooding and the continued difficult financial climate but was definitely boosted by the introduction of the ‘gift policy’. The three different levels of the Microfinance Plus plan were introduced gradually over the year ensuring that all JWOC repeat borrowers were able take part in each step. First time borrowers received hygiene training from JWOC’s clean water officers and five hygiene packs to take home to their family. Second time borrowers received ceramic-water filter training in how the filter works, how to set it up, how to clean it and the benefits of filtered drinking water, again from the clean water officers. All second time borrowers were
then given the option to buy a filter from JWOC at a subsidized rate. Both trainings and resources received a very positive response from borrowers with the majority of second-time borrowers choosing to purchase a water filter. Towards the end of the year, JWOC was also able to have its first third time borrowers (since the inception of Microfinance Plus) and was
therefore able to work with those seeking a further loan from JWOC to more deeply understand their motivation, business and business plans. This third phase of the plan asked borrowers to keep track of various elements to their business and work with JWOC staff to identify key issues to address through their next loan and make a detailed budget. This support will continue through the loan cycle and thus into 2011. Aims for 2011
Our aims for 2011 are;
• to successfully complete the new plan of three loan cycles in 2011 (based on the current six-month cycle), each with a good number of first time and repeat borrowers.
• to provide loans to approximately 100 borrowers during 2011.
• to continue to develop the Microfinance Plus elements of the programme, in particular helping third and fourth time borrowers to grow and develop their businesses in the long-term independently from JWOC.
• to continue capacity building including further training on a whole range of topics related to microfinance, social impact and project management for the project manager and the scholarship student Microfinance officers.
• to continue to ensure policies, procedures, and documents are clearly written, organized, labeled and filed to allow for easy handover in the future.
• to evaluate, adapt and improve the programme depending on JWOC’s experience, repayment rate and impact.
August 2010 was our busiest registration night ever with more than 120 potential borrowers coming to find out about the loans.
See a
Aim
Our
•
•
•
•
•
•
a Problem,
ms for 2010
aims for 201
• to continfurther tr
Mth
Emre
• to increasfunding, tstudents
MintecoSiinthby
• to continto offer th
AE
• to find fu tw
se
• to continprocess fointerest an
Ath
• to consomanagem
0 from th
10 were;
ue to increasraining and reMonthly teachhe year;
Extra resourcmeetings heldesources into
se the numbteacher and s
s who have acMore classes ancluding a re-eenage Englisomputer clasiem Reap. W
n November he number oy fifty percen
ue to add to hrough utiliz
A greater rangEnglish classe
urther ways towo new classecured throu
ue to build ofor scholarshind facilities.
A formal schohe commenc
lidate our clment.
he 2009 An
se the qualityesources for her training w
es introducedd to assist teao their classes
ber of classesspace constraccess to furthand more lea-designed setsh classes ansses at the co
With the new iand the openf students at nt to around
the range ozing new locage of classes es, English fo
o gain sponssroom sponsough fundraisin
on the libraryip students a
olarship studement of a n
lasses at one
FreeDonatMoneyDuringsponsospread In brieNumbEstimaNumb
nnual Rep
y of all of ouour teachers
workshops h
d for teachinchers in incos.
s we offer (inaints) and soher educationarning levels it of Kinderga
nd a new launommunity cenintake of schning of the nJWOC look750.
f regular claal and foreignintroduced in
or sewing and
orship for vaorships securng appeals du
y we have staand potentiall
ent library innew commun
central locat
e Classetions Receivey Spent: $93,g 2010 JWOCorships in Cad over two ye
ef ber of free claated number
ber of official
port
ur classes thros. eld througho
ng and monthorporating th
n line with o the numbernal opportunintroduced, arten courses
nch of JWOCnter locationholarship studnew computeks set to incre
asses we are n volunteer sncluding teend internet lite
arious classesred in 2010 auring the yea
arted at JWOly the wider c
ntroduced witnity library wh
tion, if possib
es ed: $94,091.9608.56 C was able toambodia – thears.
asses at the eof students
l teacher train
ough
out
hly hese
r of nities.
s, C’s n in dents er lab, ease
able skills. nage eracy classes
s to increase
and extra resoar.
OC and to stacommunity d
th structuredhich is to be
ble, to furthe
In stuclaparann
2
o secure two hese funds ($
end of 2010: 3who studied ning hours h
in the comp
e donations
ources for cl
art a more strdepending on
d lending polideveloped in
er increase qu
February, cudying in JWasses had thrticipate in nual Giant P
Solve a Pr
classroom 5,000) each w
38 in 2010: 850
held: 25
uter lab.
to this projelassrooms in
ructured borrn books rece
icies. Funds n 2011.
uality through
children WOC’s Engle chance to Siem Reap’Puppet Para
roblem…
will be
0
ect. Laos
rowing eived,
raised for
h better
lish s ade.
See a Problem, Solve a Problem…
13 | P a g e
JWOC’s Wat Chork classes were closed in September with all teachers and resources moving to the central location of the JWOC Community Center, which has new facilities in the form of a new two storey building to accommodate all the extra classes.
• to evaluate, adapt and improve the programme based on our experience and impact. The programme has gone through a continuous process of monitoring and evaluation leading to
various enhancements throughout 2010 (see below for details). 2010 has been an amazing year for JWOC’s Free Classes. The first part of the year was a great time to consolidate some of the increases in numbers and quality that were brought about in 2009. All our classes continued well with teachers making the most of a set curriculum, schedules, new resources and teacher training workshops. We were also able to adapt courses and schedules as needed and, in particular, on the sewing course were able to create a new longer course for all students and add an official English for sewing component. The results of the policies and additions we put in place became even more visible in 2010 as students continued to attend classes, pass classes and we continued to have students coming to register at JWOC for their chance to learn with us. JWOC’s aim to also focus on extra-curricular activities for children was continued through the weekly art class and JWOC’s first year of participation in the annual Giant Puppet Project. JWOC has also maintained a focus on education through both the Clean Water and Microfinance projects and the aim for 2011 is to further integrate the projects so that all learning and training is shared and that as many of JWOC’s beneficiaries are able to learn and be supported by all the elements of all the different JWOC projects.
The second half of the year saw the very exciting development of our new storey building at JWOC. The provision of two new classrooms meant we were able to accommodate all the teachers from Wat Chork and so consolidate JWOC Free Classes into one center to enhance quality and learning. These two new classrooms also mean that we have been able to hold more classes at the most popular times which is particularly significant for our young learners and JWOC has been able to hire a new full-time teacher as well as placing more students on the Free Classes project, to ensure all the new space is used to the maximum. Children in Cambodia either study in the morning or the afternoon and then rotate. As the rotation schedule is not fixed, it is difficult for JWOC to build its schedule meaningfully around the children’s free time. The best times for children’s classes to be held are therefore at 11 am after the morning shift and before the afternoon shift and 5pm when both shifts have finished. JWOC now has the space to
potentially offer 8 children’s classes with the addition of these two classrooms and therefore have up to 200 children studying at any one time. The addition of these two new classrooms also gives the classes more flexibility in general to work with the other projects and their need for space, in particular Microfinance. Borrower registration night, loan applications and loan dispersals can now happen every three months without the need to disrupt any classes. Similarly, teacher and scholarship student training and meetings can always be held without disruption, thanks to these new spaces and the internal changes to the office which have created one much larger meeting room. Over and above the two new classrooms, the new building has made possible a computer lab and community library. The new computer lab has not only ensured we can offer all the classes we were offering at Wat Chork at the Community Center, but has also allowed us to increase the number of computers we can have and therefore the number of students who can attend these classes. As the year ended we had 20 new computers for the lab enabling 20 students to study simultaneously in the lab throughout the week. We were also able to hire a full-time lab supervisor and computer teacher to compliment our three IT students. Not only is he able to teach
JWOC’s regular English classes went from strength to strength in 2010 with better resources, more teacher training and improved facilities.
See a Problem, Solve a Problem…
14 | P a g e
a wide-range of basic computer literacy courses but he is also able to ensure that at all times the lab and its resources are well looked after. This new lab will provide both classes for those who would not otherwise have the opportunity and a place where students can come and practice and complete their homework and assignments. We are also in the process of gaining matching software for our English textbooks so students in 2011 will also be able to benefit from multi-media learning in their English classes through regular scheduled visits to the lab. Finally, the JWOC library has also been a great addition to the educational opportunities JWOC can offer. In 2011, we hope to hire a librarian and set in motion a whole-range of educational activities throughout the day for students, young and old, to be able to benefit from this new space and its resources. In 2010 the library has already been in use by our new kindergarten class, art class and for various trainings and meetings.
Aims for 2011
• to continue to increase the quality of all of our classes through further training and resources for our teachers.
• to fully develop the community library and maximize its benefits to JWOC beneficiaries.
• to maintain the number of classes we offer (in line with funding, teacher and space constraints) and the number of students attending.
• to find further ways to gain sponsorship for various classes to increase donations to this project.
• to fully utilize the new building by making sure all classes are full and as many classes as possible are offered throughout the week.
• to optimize use of all the multi-media resources available to assist learning.
• to introduce further extra-curricular components to all our Free Classes to build on the hand-washing and teeth cleaning lessons which are already included in schedules.
• to evaluate, adapt and improve the programme based on our experience and impact.
A wonderful new computer lab with twenty computers and a full time supervisor and teacher were made possible in 2010.
The vocational sewing classes had a great year with over forty students able to benefit from learning this new skill and further elements of the course introduced such as English for Sewing.
See a
Aim
Our Fire
•
•
Typh
•
Ope
•
In G
•
•
•
a Problem,
ms for 2010
2010 aims wRelief
• to co
coup
• to contin In
JWreM
hoon Ketsan
• to utilise protect t
Wsucoawar
eration Smile
• to run an
JWSm
General
• to write a E
A
• to provid Se
co
• to evalua
Wfrth
0 from th
were:
ntinue to co
ollections havps for borrow
nue to suppo
n an effort toWOC’s Micrepayments. A
Microfince prna
the remaininhemselves e
While there isurrounding Jommunities awareness of hre now perme
nother succe
WOC was abmile doctors
and get approEmergency RAugust meetin
de further em
eminars and ourse.
ate, adapt an
With the creatrom previoushe case of an
E
he 2009 An
ollect from bve continuedwers who mi
ort Makara io maximize thofinance Pro
A better systeroject manage
ng funds fromeveryday fro still a way toWOC), signias part of ouhealth issues
manently store
essful trip inble to facilitat in March. F
oval for an emelief action png.
mergency tra
workshops h
nd improve tion of the Es experience,
n emergency f
Emergen
nnual Rep
borrowers and and procediss payments
in his effortshe consisten
oject Manageem of paymeer took over
m the typhooom the effecto go with thiificant efforts
ur Free Classe and facilitatied at JWOC
n March 2010te a trip for tour of these
mergency relplan and spen
aining, plannheld for staff
the programEmergency R, JWOC is nofaced by the
ncy Reli
port
nd ensure thedures put in ps.
s to collect cy and the am
er initially colnt tracking wthe Fire Reli
on to help locts of heavy ras goal in 201s have been mes and Microing the increin a new stor
0. ten children twere able to
lief immediatnding limit ap
ning and impf and scholar
mme based onRelief guidelinow better prelocal commu
ief
e maximum iplace for mor
mount of timllaborated wiwas introduceief collection
cal villagers tain 1 (given the made to reac
ofinance projased use of wreroom, buil
to Phnom Peo have a life c
te action pla
pproved by J
plementation rship student
n our experienes which incepared to actunity.
s returned re structured
me made avaiith Makara toed and in Nons on a perma
to have the m
sheer populach out to the ects, promotwater filters. lt in early 201
enh to consuchanging ope
an and spen
JWOC’s Boa
for staff andts including a
ence and impcorporate all t decisively an
Solve a Pr
d and regular
ilable to this o support himovember, theanent basis.
materials they
ation size in surrounding
ting increasedEmergency m
10.
ult the Operaeration.
nding limit ard of Directo
d scholarshipa six hour firs
pact. the lessons lnd with conf
roblem…
follow
project, m with
y need to
the area g d materials
ation
ors at the
p students st aid
earnt fidence in
See a Fire
$717 Follothe lof thfromrate, Effoprocthan Repaarea mixecollecomm Sch
Num WhilstudeattacstudeJWOcombnow numyear. Ope
Buildable Penhsurgethe transguardwerespecifour girl wOper
Aim
Fire
•Floo
•
a Problem,
e Relief (2
79.34 outstan
owing the twloans given oheir homes, Jm these borro
with some borts have thess by assigna scholarship
ayments contor family cri
ed but we arecting back amunities.
holarship
mber of schol
le the comments have me
cked near his ent with sev
OC was able bined with flook forwarber of stude
eration Sm
ding on our to support t
h to consult ery. Operatioreturn jour
sportation codian. Given
e only able ialist laser eqchildren we
who had beenration Smile
ms for 201
Relief
• to continod relief
• to furthercommuni
2007 & 200
nding
wo village fireout in responWOC has coowers. The cborrowers paherefore beening them top student off
tinue to be hises. It is harre continuingas much mo
p Student
larship stude
munities JWOet with difficuhouse with
vere cuts acroto fund a
follow up trerd to being abents and staf
mile (Mar
collaborationten Siem Reathe internati
on Smile covrney, while osts, food athe complexto operate
quipment to ere all able tn unable to hin Decembe
1
nue to collec
r efforts to hities surroun
8)
es that occurnse, to assistontinued to ccollections aaying back men made to o a permanenficer.
hampered by rd to predict g to renew ooney as poss
t & Staff E
nts who hav
OC works wult health issa machete, poss both hancrucial operatment paid ble to use hi
ff with treatm
rch 2010)
n with Operaap children tional doctor
vered all hospJWOC cov
and accommxity of some on four of operate on
o have life chave the surgr 2009
ct from borro
help local villading the JWO
red in 2007 at people in tcollect on a mare continuin
more regularlyimprove th
nt member o
changes thathe outcom
our efforts tsible that ca
Emergenc
ve received fin
with have avues. One cas
prompted JWnds, severingation on bofor by JWOs hands norm
ment for a v
ation Smile ito make the s and explorpital costs anvered the
modation forof the defor
f the ten chthe others. N
changing surgery on a pre
owers and en
agers prepareOC Commun
and 2008 andthe rebuildinmonthly basing at a mixedy than othershe collectionof staff rathe
at are out of Jme of these re
o draw this an be made
cies
nancial assist
voided majose in particul
WOC to use itg some of thoth hands toOC, successfumally again inariety of illn
n 2009, JWOjourney to P
re the possibnd some monremainder
r each child rmities, the d
hildren, lackiNeverthelessrgery, includievious JWOC
nsure the ma
e for the evennity Center in
d g is d s. n er
JWOC’s conepayments inproject to aavailable for
tance: 3
or disaster inar of a scholts emergency
he tendons ao mend the ully restored n the future.
nesses affectin
OC was Phnom bility of ney for of the and a
doctors ing the s, these ing one
C trip to
aximum is ret
nt of floodinn Siem Reap
SOwshfeh
ntrol such as n 2011 and rea successful cr future eme
n 2010, somarship studeny funds to heand limiting haffected tenmobility in hJWOC was
ng them dur
turned
ng during thep;
Socheata was Operation Smwith JWOC the had been
few months pher health.
Solve a Pr
borrowers leesults will ceconclusion, uergencies fac
me of our scnt, who was elp. The attachis use of hi
ndons. The ohis fingers analso able to
ring the cour
e rainy season
able to returmile in Phnomo have the suunable to ha
previously du
roblem…
eaving the ertainly be ultimately cing local
cholarship randomly ck left the is fingers. operation, nd he can support a rse of the
n in the
rn to m Penh urgery ave a ue to
See a Scho
•
• In G
•
•
Camweekclassalso unive JWOsuppJenkiworkhelp On rJWOand CFebrsigniinvesSrey,villagHSLjoineschomarkwith $11,0to wrProje
a Problem,
olarship stud
• to continin their liv
• to raise fu
General
• to continimplemen
• to evalua
mbridge Univek long summes as well as been able to ersities.
OC has also bport of some inson joined ked with manthem with th
returning to AOC, doing somClean Water ruary and wasificant projecstigating wate, where we wge through o
L and their voed us in May larship stude
keting workshthe Japanese
000 for the Srite a report ect Manager
dent and sta
ue to suppoves through
unds for thes
ue to providntation for st
ate, adapt an
ersities in themer camp for
getting involbe involved
been lucky enwonderful loJWOC for 3
ny of our schheir teachingAustralia, Nome amazing programmess able to help
cts – the Gianer access in t
were able, lateur clean wate
olunteers. Janfor a month
ents in the fohop for Janee class for PaScholarship pon a Commuand JWOC s
aff “every da
rt JWOC’s sfinancial assi
se “every day
e as many optaff and scho
nd improve
e UK – Travlocal childrenlved in manyin a range of
nough this yeonger-term v3 weeks earlieholarship studg and classroooel has workefundraising fs. Holly Hetzp JWOC withnt Puppet Prthe remote dier in the yearer programmne Price and
h and workedorm of life coe and massageatricia. Jane wprogramme! Wunity Well JWseamstress so
ay emergen
staff and schistance and p
y emergencie
pportunities aolarship stude
the program
Volun 2010 was avolunteers the differenbrought. Wclasses, thrconversatioLaos, who themselvesalso had nuPoint AcadWater and training in
elAid – was an focusing oy other areas f cultural exc
ear to have thvolunteers! Ner in the yeardent teachersom managemed tirelessly ffor our Scholzel joined us h two very roject Paradeistrict of Ban
r, to work witme with the h
Patricia Reqd with many ooaching and ae classes and
went home anWe were alsoWOC built ino set the whe
ncies”
holarship stpastoral care.
es.”
as possible foents;
mme based on
nteers
another greathave include
nt projects thWe have had rough Journeyon class in Chave brough
s learnt moreumerous studdemy in the UMicrofinancCambodia anable to run, an art, music, of JWOC’s w
change progr
he Noel r and s to
ment. for larship in
e and nteay th the
help of qua of the a
d helping nd ran a 50ko very lucky tn 2009 in Yeaeels in motio
Vit
udents in ov
or emergenc
n our experie
t year for JWed a wide varhey have wormade many
ys Within Tourambodia and
ht their Englie about our sdent groups tUS, was able ce Projects asnd Laos. Analongside ourdance and s
work. This yrammes from
ulthrathon fto have a visiang Village, an for our wo
Volunteers finvolved in atheir month
vercoming em
cy training,
ence and imp
WOC volunteeriety of ages, rked on and volunteers v
r Company, ind our readingish skills to otudents and Jthis year. Onto be involv
s well as runnother group r high schooports and heear, JWOC a
m various sch
for JWOC, rait from Martiand work witonderful new
from TravelAa conversatiolong stay at J
Solve a Pr
mergencies th
planning and
pact.
ers! Once agatime spent askills they ha
visiting the frcluding our
g and drawingour students JWOC. We
ne group fromved in our Clening self-defefrom Oxfordl interns, a th
elping in Engand its studenhools, groups
aising more ti Brown whoth the Microf
w Microfinanc
Aid in the UKon class durinJWOC in Au
roblem…
hey face
d
ain, the at JWOC, ave ree
g class in and have have
m West ean ense d and hree-glish nts have and
than o was able finance ce bags,
K get ng ugust.
See a for wsharethankJWOgift o
Aim
Our
•
•
•
•
JWbuPriin
a Problem,
which she theed their time k them all! W
OC every weeof time they g
ms for 2010
aims for 201
• to gradua Sc
• to gradua 8
• to continbicycles
SuN
• to potent(depende
Ato
WOC was ablilding of a laimary School2010.
en donated aand skills wi
We also wouldekend and whgive to JWO
LaoAt thNumScholNum
0 from th
10 were:
ally increase
cholarship st
ally increase
Free classes
ue our origin
upplied PhikNga, the local
tially assist Phnt on fundin
Assisted Phik o enable all th
e to facilitatearge extensionl in Phik Noy
all the costs. Tith JWOC and like to thanhile we hopeC and their f
os he end of 201
mber of gradularship Stude
mber of Free C
he 2009 An
the numbe
tudent numb
the numbe
at the end o
nal support f
k Noy with all primary sch
hik Noy Pring, village par
Noy with thhe classes an
2SwhscntFt
fpS
f
e the n to the y Village
There have bnd passed onnk our Camb they learn frfellow Camb
10 uates: 1 ents: 7 Classes: 8
nnual Rep
r of scholars
bers increased
r of free clas
of 2010
for Phik No
ll uniforms fohool where JW
imary Schoortnership and
he funding fond the pre-sch
2010 has beeScholarship we have beenhas been furtstudents evercosts. Traininnow being rutraining. TheFree Classestime has consurrounding further classrprimary schoSchool Wishschool at Phifunding of th
been many otn news about bodian volunrom the expeodians.
port
ship studen
d to 7
sses (depend
oy Primary S
for the new scWOC’s Free
ol with the bd thus sustainor a new buildhool to have
en a year of cprogramme
n able to makther financialry month to hng has also inun which alte students ares at Muang Ntinued to a bcommunity.room to be sool teachers’ h List. Our Lik Noy has inheir new scho
ther volunteeJWOC to ot
teer studentserience we ar
nts
dent on scho
School in the
chool year anClasses are h
building of anability). ding for addia classroom
onsolidatione is growing ke in the last l support we help them wncreased this ernate betweee enjoying theNga primary be great bene JWOC has a
sponsored anresources to ocal Villagencreased thisool building.
ers and fundrthers for whis who chose re also indebt
olarship stude
e form of bo
nd teaching sheld.
a new schoo
itional classroeach.
n and growth and benefitinyear. A greaare now able
with some of tyear and mo
en teacher traeir roles as teschool and rfit for childralso been abl
nd for many o be funded th
e School Sups year throug In this new
Solve a Pr
raisers who hich we wouldto come andted to them f
ent numbers)
oks, uniform
supplies at M
ol building
ooms and ba
for JWOC Lng from the t new develoe to give all ttheir essentiaonthly worksaining and caeachers in JWreading and den of all agesle to raise funof the much hrough our Bpport of the gh JWOC’s m
venture JWO
roblem…
have d like to d help for the
)
ms and
Muang
athrooms
Laos. The changes
opment the al living hops are areer
WOC’s drawing s in the nds for a needed
Back to primary
majority OC
See a workcomm Aim
•••
•
Aim
Our
•
•
•
Durischocontivolunable this g Aim
••••
a Problem,
ked very closmitment to t
ms for 201
• to gradua
• to gradua
• to continsolutions
• to continsolutions
ms for 2010
aims for 201
• to contin C
yo
• to contin A
co
• to check iinto and p
Tor
ing the courslarship progrinued to visitnteer time thfor the first tgoes, hopes t
ms for 201
• to contin
• to contin
• to contin
• to potent
ely with the the school an
1
ally increase
ally increase
ue support fto the issues
ue to supporto the issues
0 from th
10 were:
ue with our sContinued to ounger childr
ue to suppo
Andrea and Bontact.
in with whatplan for futu
The JWOC Brphanage eac
se of 2010 thramme and ht the orphana
hrough helpintime to be abto be able to
1
ue with our s
ue to suppor
ue to suppo
tially match n
school and thnd the import
the numbe
the numbe
for Phik Nos facing them
rt Muang Ns facing them
he 2009 An
support for tsupport schoren.
rt Tin in all Brandon were
t is happeningure assistan
oard has nowch year.
e JWOC Boahas agreed foage regularlyng the youngble to match extend this i
support for t
rt the orphan
rt Tin in all
new students
he villagers wtance of edu
r of scholars
r of free clas
oy Primary Sm;
Nga Primary m.
MyaAt theNumbNumb
nnual Rep
the current s
olarship stud
he does on be able to visit
g, that it is innce and poss
w approved t
ard agreed toor four new sy and ensure tger children aspecific sponin 2011.
the current s
nage if a new
he does on b
with specific
who all madecation for th
ship studen
sses (depend
School includ
School inclu
anmar e end of 201ber of Scholaber of Schola
port
scholarship
dents from th
behalf of JWt Tin and the
n line with whsibilities. the support o
o continue tostudents to bthe students at the orphannsors with st
scholarship
need arises;
behalf of JW
c JWOC spo
e their own fiheir children.
nts;
dent on scho
ding finding
uding finding
0 arship Studenarship Studen
students anhe orphanage
OC. e orphanage i
hat we are do
of four new s
o support thee added to thare attending
nage with thetudents in My
students an
OC;
onsors.
inancial and
olarship stude
more sustain
g more sustai
nts: 12 nts who grad
nd the orphane, who in retu
in addition to
oing overall a
scholarship s
e orphanage ihe programmg university a
eir daily needyanmar and,
nd four new s
Solve a Pr
personal
ent numbers)
nable and lon
inable and lo
duated: 2
nage. urn look afte
o regular ema
at JWOC, to
students from
in the form ome annually. Tand completis. JWOC wadepending o
students;
roblem…
);
ng-term
ong-term
r the
ail
look
m the
of the Tin has ing their
as also on how
See a
Aim
Our
•
•
•
•
•
•
•
a Problem,
ms for 2010
aims for 201
• to contin W
w
• to add fu N
Mpr
• to add m th
anh
• to add ph th
mup
• to improfor non-p
• to continclasses an
adanopscScR
• to work in need o
JWRUraanst
0 from th
10 were:
ue to updateWebsite updawithin the web
urther inforNew areas of Microfinance
roject.
more feedbache JWOC blond thoughts ave been inc
hotos, informhe Facebook
more than sixpdated with
ove JWOC’sprofits throug
ways onot co
ue to advertnd new loan cdvertising JWnd scholarshpportunities chools wherecholarship ap
Reap province
with other oof clean waterWOC contin
Reap and in thUS Peace Coraise awarenesnd Phnom Ptudent applic
he 2009 An
e the websitted on at leasbsite.
rmation abofeedback devand Laos Up
ck from donog has been aabout their eluded in new
mation to ourFan page ha times up to new pictures
s visibility ogh Google). of improvingompleted dur
tise JWOC cycles and JW
WOC’s projechip student vi
available. Coe posters canpplication infe as well as p
organizationr.
nues to seek rhe rest of Carps in Kamposs about JWO
Penh yielding cations from
Publi
nnual Rep
te regularly st a weekly b
ut each of ouveloped for apdates, JWOC
nors, beneficiactively updaexperiences awsletters and
r fan page onas gone frommore than 2
s and inform
on the intern
g visibility, paring 2010.
in the local WOC t-shirtscts in the locisits are madeonnections hn be displayedformation wa
promoted at a
ns in Siem R
relationships ambodia. In pong Cham PrOC scholarshencouragingrural areas o
icity
port
basis as well a
ur programmall the projecC Talk mailo
iaries and volated throughoat JWOC. Otspecial repor
n Facebookm strength to 220 and with ation about w
net, for exam
articularly thr
communitys. cal communite in person to
have also beend and announas also postean Education
Reap to find
with other oparticular, JWrovince to athips. Links wg ideas and poutside Siem
as considerab
mes includingcts, includingouts and sche
lunteers in diout the year, ther donor anrts.
k and keep it strength in 2lots of regul
what is happ
mple, through
rough Googl
y through wo
ty has been imo disseminatn made with ncements maed in all high n Fair in Kam
d students in
organizationsWOC was ablttend an educ
were also madossibilities foReap Provin
ble enhancem
g their news, g periodical Feduled report
ifferent partsproviding vo
nd volunteer
up to date. 2010, increasiar visitors. Tening at JWO
h Google Gr
le Grants we
ord of mouth
mproved in 2te informationumerous lo
ade in classesschools in o
mpong Cham
need of scho
s doing similale to work wication fair whde with organor future sounce.
Solve a Pr
ment of differ
processes anFree Classes, ts on the Cle
s of the websolunteer exprs feedback se
ing its fan baThe page is reOC.
rants (free ad
re set in mot
h, advertising
2010. Regulaon about the ocal governms by the teachutlying town
m (see below)
olarships and
ar work bothith a membehere we werenizations in P
urces of schol
roblem…
rent areas
nd reports
an Water
site. eriences ections
ase by egularly
dvertising
tion but
g for new
ar staff
ment hers.
ns in Siem ).
d villages
h in Siem r of the e able to Pursat larship
See a Problem, Solve a Problem…
21 | P a g e
JWOC has been incredibly lucky in 2010 to have a growing number of supporters and fundraisers spreading the word about JWOC and raising funds across all our projects. Through connections with both Journeys Within Tour Company and B&B and Go Philanthropic, JWOC has many new supporters who wish to give back to the places they travel and stay connected to once they return home. JWOC also has a growing number of JWOC Ambassadors who share JWOC with the people they meet and help JWOC to raise funds. The website and Facebook continue to be kept up to date with JWOC’s latest news that is therefore shared with new and continuing supporters. We are also keeping in regular contact with all our donors and supporters through project feedback, updates and the bi-annual newsletters, which helps to build trust in JWOC and our work and ensure everyone continues to feel part of the process and the JWOC family. In particular, in 2010, we were able to run a hugely successful ‘buy a brick’ campaign which allowed us to raise the funds we needed to complete our new building with two classrooms, a library and a computer lab. We would especially like to thank the larger donors who played a significant part in making this building possible – Allen & Janet Johnson, Jeff & Tracey Morrell, The Collette Foundation, CA, the O’Connell Family and Journeys Within Tour Company and B&B. As in 2009, knowledge of JWOC and our work continues to spread in Southeast Asia and JWOC is now increasing its partnerships with more villages and organizations to make sure its work continues to share ideas with others and help those most in need.
Aims for 2011:
• to continue to update the website regularly;
• to add further information about each of our programmes including their news, processes and reports;
• to continue to include feedback from donors, beneficiaries and volunteers in different parts of the website;
• to continue to update our fan page on Facebook with photos and information throughout the year;
• to improve JWOC’s visibility on the internet;
• to continue to advertise JWOC in the local community through word of mouth, advertising for new classes and new loan cycles and JWOC t-shirts;
• to work with other organizations in Siem Reap to find students in need of scholarships and villages in need of clean water.
See a Problem, Solve a Problem…
22 | P a g e
Acknowledgments We also want to make sure to recognize the wider JWOC team that helps to make everything possible. This includes all of you – JWOC’s generous supporters – Brandon and Andrea Ross, the Cambodia team, Nicole and Phaeng in Laos and Tin in Myanmar and of course all the scholarship students and our volunteers! Thanks to all our 2010 donors without whom none of what JWOC does would be possible: Aakre, Kare * Abrahamson, Candace * Adams, Holly * Agins, Carol & Richard * Aiyar, Kavita *
Allen, Brant & Denise * Allen, Callaway & Marsha * Allen, Sutter * Amen, Philip * Anang-Koletty,
Yuhaniz * Andreson, Heidi * Andrighetto, Annie * Arthur, Paul * Bader, Lisa * Bailey, Adrienne *
Baloy, Lauren * Bank of America * Barbara Bella and Associates * Bardi, Karin * Barker, Catherine *
Barstow School * Bateman, Andy * Battin, Joseph * Baughman, Doug * Baughman, Randall *
Baughman, Tim * Becker, Ann and Muschler, David * Belancik, Robert * Bellefeuille, Bernard *
Bender, Kathleen * Beninga, Cheryl * Berliner, June & Robert * Berube, Paul and Marianne * Bhagat,
Nancy * Bhutani, Jay * Bickford, Roscoe and Barbara * Bishop, Debbie * Blackshaw, Julie * Blonz,
Barbara and Steven * Bolster, Betsy * Boyd, Andrew & Laura * Brandt, Stephen * Brane, Terri *
Brinkman, Doris & Jerry * Brock, Rod and Susan * Broman, Lisa * Brown-Allen, Barbara * Brown,
Connie * Brown, Jim & Mary * Brown, Marti * Brown, Rebecca * Browne, Rebecca * Bryant,
Barbara * Bulfinch, Cindy * Burns, Jane * Busby, James * Computer Associates * Caillon, Emily and
Chene, David * Carley, Travis * Carmona, Carla * Cashion, Ronald * Chadwick, Gary and Sharon *
Chakravorti, Ranjit & Sunanda * Champagne, Jill * Cheng, Nerou * Clark, Linda * Cohen, Sheila *
Colburn, Matthew and Olga * Coleman, Mariann * Collette Foundation * Colson, Christopher and
Emily * Cowell, Tony and Sheena * Cox, David & Comptor, Tamara * Curtis, Patricia * Dalgas, Steve
* Dallas, Kimberley * Davanzo, Joan * Davis, Tracey & Daniel * Day, Mariane J. * Demitrios, Celeste
* Denny, Nicholas * Derdowski, Paige and Carroll, Kelley * Detling, Lynda * Diana Henderson
Photography * Didner, Pam * Direnfeld, Lorne * Downie, Heather * Dumars, David & Karen *
Dunham, Deborah * Duthie, Jill * Duthie, Jo * Emanuels, Elizabeth & Timothy * Espiritu, Justine *
Esquer, Victoria * Fakes, Bill & Reese, Robin * Fay, Jackie * Fazel, Kathy * Feeney, Brian * Ferrier,
Shannon & Lee * Fetting, Carmen * Fiedler, Joanne & Duane * Findlay, Doug * Finigan, Stephanie
and Dorothy * Fink, Melissa * Finkel, Jodi * Forsythe, Deborah * Foster, Kathleen * Fox, Richard *
Fox, Robert * Frankel, David and Jaclyn * Frant, Judith * Fuchs, Stuart * Fuster, Marco * Gaerlan,
Francis * Gaerlan, Hannah * Gaerlan, Lynette * Garbutt, Anne * Garcia, Michelle * Gerst, Tony and
Jennifer * Ghosh, Debjani * Global Buddies * Go Philanthropic * Goldin, Richard and Alice * Google
Matching Gifts Program * Grafton, Jenny * Greater Good Foundation * Griffin, Chastity * Hall,
Kendra * Hambly, Janice * Hankins, Jennifer * Hanrahan, Thomas * Hanson, Robert and Alice *
Hardy, Dan * Harris, Brian * Harte, Eileen * Havkins, Sabina * Hayashi, Georgia * Hedani Morishita,
Barbara * Heid, Kermit & Noreen * Hendricks, Eren * Hetzel, Holly * Heuser, Thomas * Hing Fay,
Eleanor * Hoffman, Beth * HSL Constructor Pte Ltd * Humphrey, Janie & John * James, Teena and
Mike * Jamison, Eric and Allison * Jenkins, Diane * Jenkinson, Noel * Johns, Jeff * Johns, Todd &
Sheila * Johnson, Dawn * Johnson, Janet & Allen * Johnson, Judith * Johnson, Kira & Tovar, Chon *
Johnson, Rebecca * Johnson, Stephanie * Jones, Cara * Journeys Within * JWOC Scholarship Students
* Kane, Yukari * Kaplan, Sue * Karakkal, John * Karousos, Dean * Kasilag, Marie * Keith, Sherry &
Girling, Robert * Kelly, Christine * Kelly, Stephen * Khan, Sattar * Khemara Angkor Hotel * Kiefer,
Jennifer * Kieswetter, Susan * Kim, Douglas * King, Laurence * Koodin, Laurence * Koontz, Andrea
* Koppel, Talli * Kornberg, Steve and Edna * Kreger, Glenn * Krochak, Ron and Elizabeth *
Kucharski, Halina * Kunokasky, Etana * Kurmel, Larry and Ruth * Kusel, Jonathan & Hafsrud, Amy *
Labadie, Dean and Janice * Lacer, Maxine * Lakeside Tahoe City * LaMore, Carissa * Laughton,
Clifford * Lautenberg, Luciano * Lawless, Jennifer * Lee, David * Lee, Jennifer * Lembcke, Marilyn
* Leonard, Kevin * Leppert, Catharine * Lewis, Harry and Eileen * Lewis, Lawrence & Sandra *
Lieberman, Richard * Lin, Elizabeth * Liu, Maywin * Lopez, Sandra * Lorch, Rachel * Loudermilk,
See a Problem, Solve a Problem…
23 | P a g e
Inc. * Lucy Loves Ethel * Lynn, Robert * Mah, Lillian * Maimone, Denise * Maloy, Patti * Marson,
Michele * Matturro, Anna * May, Michael * Mayberg, Stephen & Elizabeth Dolezal * McArthur,
Camilla & Andrew * McArthur, Elisabeth & Colin * McGourty, Cara * McGrew, Christine *
McKenna, Mary * McKinnon, Evelyn * McNish, Zachary * McPherson, Summer * Medecki, Jackie *
Merewether, Patrick & Steinbock, Margaret * Mervis, Roger * Meyer, Alvin & Jennifer * Meyers,
Cynthia * Miller, Nancy * Mitchell, Charles and Gay * Miura, Siobhan * Mond, Christy *
Montgomery, Nelly * Moore, Linda * Moreland, Stephanie * Morrell, Jeff and Tracey * Morris, Shane
& Brooke * Mueller, Pamela * Muftouglu, Mehmet Fahri * Myers, Thomas & Marie * Nafziger, Amy
* Nebesar, Alex * Nelson, Ann and David * Nelson, Calvin * Nelson, Rebecca * New Zion Baptist
Church Family * Nguyen, Van (Thanh) * Nicholls, Norman and Alice * Nichols, Jeanann * Nigg,
Philippa & Dudley * Nixon, Julie * Noll, Thomas & Bonnie * Nop-Lee, Thana * Nor Cal Beverage *
Novick, Leonard * Nunley, Deanna * O'Connor, Christine * Olson, Patricia * Paine, Alix * Patterson,
Claire * Payne, Taylor * Pencil Promise * Perry, Sarah * Petty, John (Jed) * Petty, Leah * Piner,
Brian and Jill * Plecash, Barbara * Pool, Pollyanna * Powdermaker, Alan * Powell, Glenn * Price,
Jane * Prisco, Shelley * Proodian, David * Ransom, Cynthia * Raza, Sughra * Redinger, Christine *
Redmond, Charles * Reiley, David * Renton, Leigh and Mary * Requa, Patricia * Requa, Stephanie *
Rhoads, Bryan * Riddiford, Clive and Shirley * Riddiford, Jeri * River City High Sch (RCHS) Interact
Club, * Ross, Andrea * Ross, Andrea & Brandon * Ross, Toby * Rotary Clubs of Davis * Rothhaar,
Dennis * Rubeo, Thomas * Rubin, Amy * Rupp, Richard * Russ, Gregory * S Club (Sierra High
School) * Sampson, Sheila * San Francisco University High School * Sanna, Rosemary * Schmidt,
Katrin * Schneider, Tina * Schneller, Anne & Bratton, Michael * Shah, Unnati and Leong, Ken *
Shaw, Gordon and Ronda * Shellenberg, Shannon * Silverberg, Lewis * Silverman, Scott * Singer,
Andrew * Singer, Martha * Smalley, Carol & Hanna, Stan * Smith, David * Smith, Shirley * Snowe,
Sandra * Sorensen, Sue & John * St. Leonards Parish, Melbourne * Stang, James & Lydia * Stanley,
Rollin * Stein Family * Stockard, Lynn * Stopa, Justin * Strand, Linda Sue and Don * Strasser, Eric *
Strew, Jim * Struett, Eleanor * Sturman, Rett and Peter * Sulva, Michael * Sumler, James * Surney,
Vera * Swain, Theresa * Swanson, Kate * Tallant, Sandra * Tarbox, Karin & Scott * Taylor, Suzanne
* Theng, Tan * Thompson, Seth * Toler, Ann and Bourgeois, Tom * Topp, David * Travel Aid *
Truckee Thursdays * True, Kenneth & Holly * Turner, Allison * Up Country Inc * Van Beers, Lois
and Eskridge, Betsy * Van Gucht, Sarah * Vanderpoel, Thomas * Vigil, Nina * Villemaire, Lois *
Washington, Jane * Wasserman, Liz * Werner, Michael & Edwenna * Whiteford, Kevin and Leslie *
Wigglesworth, David * Williams, Melissa * Wilson, Brian and Cathy * Wordbury, Tee * Wu, Carolyn
* Yalowich, Robert * Young, Robert * Zack, Lt. Col. Tim and Christina * Zimmer, Carole *