Transcript
Page 1: INDIVIDUAL SCHEME A47 ELM HIGH ROAD - Fenland District · INDIVIDUAL SCHEME A47 ELM HIGH ROAD WISBECH ACCESS STRATEGY Option EH1 – Minor Improvement to the existing Elm High Road/A47

INDIVIDUAL SCHEME A47 ELM HIGH ROAD

WISBECH ACCESS STRATEGY

Option EH1 – Minor Improvement to the existing Elm High Road/A47 Roundabout

Option EH3B – Relocating the Elm High Road/A47 Roundabout further east

WHY THIS SCHEME IS PART OF THE WISBECH ACCESS STRATEGY? BENEFITS OF THE SCHEME

n Elm High Road is a key transport corridor into and out of Wisbech especially from the East and the South

n The A1101 between the A47 and Ramnoth Road/Weasenham Lane is a key congestion point on the Wisbech road network

EH1 - Roundabout improvement in current location

n Improves each arm of the existing roundabout to assist trafficfromeachdirection

n Reduces congestion in the short term

n Reduces queues in the short term

EH3B - Relocation of Roundabout further east

n A larger roundabout reduces delays and congestion on A47 and A1101

n The site is not constrained by existing development and site location

n Limited construction impact

EH3B - Relocation of Roundabout further east

©Crown copyright and database rights 100023205

EH1 - Roundabout improvement in current location

©Crown copyright and database rights 100023205

14176FDC~PresentationBoard_8.indd 1 17/10/2017 11:42

Recommended