L B J
and if time = money
over $109 million is blown a year
most heavily traveled corridor in North TexasAnd the 3rd most congested in Texas
With thousands of businesses lining the busy corridor,the segment Between U.S. 75 and Interstate 35E is the
The 635 construction project is aimed to be completed in 2015.During this time, the lanes will be redrawn regularly posing as a visibility risk.
TO REDUCE YOUR COLLISION RISK, STAY INFORMED ABOUT CHANGING LANDSCAPEOR FIND AN ALTERNATIVE ROUTE TO YOUR DESTINATION.
Have you been injured in a car accident? Call:
(214) 222-4000(817) 870-0007
Brought to you by:
Sources: newlbj, dallas news
http://www.thedurhamfirm.com