A) POTENTIAL ASSESSED BY CEA : 1,48,701 MW
B) INSTALLED CAPACITY DEVELOPED : 38,706 MW
C) UNDER DEVELOPMENT : 15, 707 MW
HYDRO POWER POTENTIAL IN INDIA
2
SOURCE: CEA
INSTALLED CAPACITY- SECTOR WISE
(HYDRO)
INSTALLED CAPACITY- SECTOR WISE
(HYDRO)
PRIVATE
2,525 MW (6.5 %)CENTRAL
8,885 MW (23 %)
As on 30th sept 2011
3
SOURCE: CEA
Total Installed Hydro Capacity – 38,706 MW
STATE27,296 MW (70.5 %)
Present Optimal
HYDRO THERMAL MIX IN INDIAHYDRO THERMAL MIX IN INDIA
Hydro
Hydro40 %
4
Thermal& Others
79%
Hydro
21%
Thermal & Others
60%
MAJOR CENTRAL SECTOR UTILITIES
- HYDRO INSTALLED CAPACITIES
MAJOR CENTRAL SECTOR UTILITIES
- HYDRO INSTALLED CAPACITIES
UTILITY NAME GENERATING
CAPACITY
CAPACITY UNDER DEVELOPMENT
11TH PLAN 12TH PLAN
NHPC 5295 MW* 1080 MW 4467MW**
BBMB 2866 MW NIL NIL
SJVNL 1500 MW 412 MW 348 MW
5
* Includes 1520 MW through its subsidiary NHDC
** Includes 3092 MW slipped from 11th plan projects
SJVNL 1500 MW 412 MW 348 MW
THDC 1000 MW 400 MW 1444 MW
NEEPCO 755 MW 600 MW 180 MW
DVC 144 MW NIL NIL
NTPC NIL 1920 MW 551 MW
6
NHPC in
Indian Hydro Sector
NHPC in
Indian Hydro Sector
PHYSICAL PROFILEPHYSICAL PROFILE� POWER STATIONS UNDER OPERATION : 14 Nos. (5295 MW)
� XI PLAN (2007-12) PROJECTS : 8 Nos. (2230 MW*)
• Projects commissioned : 3 nos. (1150 MW)
• Projects under construction : 5 nos. (1080 MW)
� XII PLAN (2012-17) PROJECTS : 8 Nos. (4467 MW)
• Projects under construction : 5 no. (3422 MW)
• Projects under clearance / Sanction : 3 nos. (1045 MW)
� BEYOND XII PLAN PROJECTS : 19 Nos. (13831 MW)
7
� BEYOND XII PLAN PROJECTS : 19 Nos. (13831 MW)
• Projects under clearance / Sanction (Hydro) : 9 nos. (8606 MW)
• NHPC own : 4 Projects (4920 MW)
• In JVC : 8 Projects (3986MW) **
• Projects under FR / DPR preparation : 7 nos. (2485 MW)
• Thermal Projects in JV (NHDC) : 2 nos. (2640 MW)
• Wind Project in JV (NHDC) : 1 no. (100 MW)
* Original Target – 5322 MW
** Incl. 3 Projects (JV) with OHPC (320 MW) at SINDOL – I, II & III
POWER STATIONS UNDER OPERATIONPOWER STATIONS UNDER OPERATION
S.No. Power StationsInstalled
Capacity (MW)
Year of
Comm.Completion Cost (Crs.)
Tariff
(P/Kwh)
1 BAIRASIUL (HP) 180 (3X60) 1981 155 77.85
2 LOKTAK (Manipur) 105 (3X35) 1983 143 128. 18
3 SALAL - I / II (J&K) 690 (6X115) 1987 / 1995 929 65.78
4 TANAKPUR (Uttarakhand) 120 (3X40) 1992 407 119.77
5 CHAMERA – I (HP) 540 (3X180) 1994 2400 138.65
6 URI (J&K) 480 (4X120) 1997 3300 121.93
7 RANGIT (Sikkim) 60 (3X20) 1999 492 158.98
8
7 RANGIT (Sikkim) 60 (3X20) 1999 492 158.98
8 CHAMERA-II (HP) 300 (3X100) 2003 2047 267.46
9 DHAULIGANGA-I (Uttarakhand) 280 (4X70) 2005 1788 181.01
10 DULHASTI (J&K) 390 (3X130) 2007 5228 512.53
11 TEESTA-V (Sikkim) 510 (3X170) 2008 2935 150.20
12 SEWA-II (J&K) 120 (3X40) 2010 1061 416.76
TOTAL 3775
JOINT VENTURE
13 INDIRA SAGAR (MP) 1000 (8X125) 2004 3989 224.00
14 OMKARESHWAR (MP) 520 (8X65) 2007 2434 230.00
GRAND TOTAL 5295
WORLD CLASS
EXPERTISE IN PLANNING,
DESIGN & ENGINEERING
OF HYDROELECTRIC
PROJECTS AND
PREPARATION OF DPRs
EQUIPPED WITH STATE-OF-
THE-ART EQUIPMENTS
AND TECHNOLOGIES FOR
INVESTIGATION OF
PROJECTS.
CONTRACT
MANAGEMENT
CORE COMPETENCYCORE COMPETENCY
9
CONSTRUCTION
MANAGEMENT, OPERATION
& MAINTENANCE,
RENOVATION AND
MODERNISATION OF HYDRO
PROJECTS / POWER
STATIONS
CONSTRUCTION OF
UNDERGROUND WORKS
AND DAMS/BARRAGES
CORE COMPETENCYCORE COMPETENCY
ACHIEVEMENTS OF NHPCACHIEVEMENTS OF NHPC
• CONSTRUCTED 10 NO CONCRETE GRAVITY DAMS, 4 NO ROCKFILL DAMS, 3 NO BARRAGES
AND 1 NO EARTHFILL DAMS
• 10 NO DAMS/BARRAGES OF VARIOUS TYPES PRESENTLY UNDER CONSTRUCTION
• COMPLETED TUNNELLING OF MORE THAN 150 KMS IN HIMALAYAN REGION
• CONSTRUCTED CONCRETE FACED ROCKFILL DAM (CFRD) FOR THE FIRST TIME IN INDIA AT
DHAULIGANGA HE PROJECT (280 MW) OF NHPC IN UTTARAKHAND
• CUTOFF WALL FOR THE LENGTH OF 182 M AND MAXIMUM DEPTH OF 70.6 M USING PLASTIC
CONCRETE CONSTRUCTED FOR THE FIRST TIME IN INDIA AT DHAULIGANGA HE PROJECT (280
10
CONCRETE CONSTRUCTED FOR THE FIRST TIME IN INDIA AT DHAULIGANGA HE PROJECT (280
MW), UTTARAKHAND
• INTRODUCED JET GROUTING FOR THE FIRST TIME IN INDIA AT TEESTA-V HE PROJECT (510
MW), SIKKIM
• COMPLETED ONE OF WORLD’S LONGEST INCLINED PRESSURE SHAFTS (1546 M) USING
DOUBLE SHIELD TBM AT PARBATI-II HE PROJECT (800 MW), H.P
• COMPLETED CHAMERA HE PROJECT STAGE-II (300 MW) IN HIMACHAL PRADESH AHEAD OF
SCHEDULE IN RECORD TIME OF 4-1/2 YEARS- A TREND SETTER IN HYDRO DEVELOPMENT IN
INDIA
NHPC’S PRESENCE IN AFRICANHPC’S PRESENCE IN AFRICA
• NIGERIA
CLIENT : M/s DANGOTE INDUSTRIES LIMITED , LAGOS
PROJECT : SHIRORO HYDRO POWER STATION ( 600 MW)
11
PROJECT : SHIRORO HYDRO POWER STATION ( 600 MW)
NHPC IS PROVIDING TECHNICAL CONSULTANCY SERVICES TO
M/S DANGOTE INDUSTRIES ON CONCESSIONING OF 600MW
SIHRORO HYDRO POWER STATION .
NHPC IN CONSULTANCY SERVICESNHPC IN CONSULTANCY SERVICES
• PROVIDING CONSULTANCY SERVICES TO ORGANISATION BOTH IN PUBLIC AND
PRIVATE SECTOR INCLUDING STATE GOVERNMENTS
• REGISTERED AS CONSULTANT IN THE AREA OF HYDROPOWER WITH WORLD BANK,
ASIAN DEVELOPMENT BANK AND AFRICAN DEVELOPMENT BANK
• TOTAL VALUE OF COMPLETED AND ONGOING ASSIGNMENTS IS OF THE ORDER OF
`̀̀̀165 CRORE
• MAJOR ON-GOING ASSIGNMENTS INCLUDE
12
• MAJOR ON-GOING ASSIGNMENTS INCLUDE
� PREPARATION OF DPR OF CHAMKARCHHU-I (670 MW) & KURI-GONGRI (1800 MW)
HE PROJECTS IN BHUTAN
� ADDITIONAL INVESTIGATIONS AND PREPARATION OF UPDATED DPRs FOR
TAMANTHI (1200 MW) & SHWEZAYE (660 MW) HE PROJECTS IN MYANMAR
� RAISING HEIGHT OF EXISTING DHANIKARI CONCRETE DAM BY 5 MTS AT PORT
BLAIR, A&N ISLANDS
� SUPPLY, ERECTION, TESTING & COMMISSIONING OF 400 KV ADDITIONAL GIS BAY
OF URI-I & CHAMERA-II HE PROJECTS
POWER STATIONS UNDER OPERATIONPOWER STATIONS UNDER OPERATION
13
1000MW I�DIRA SAGAR PS540 MW CHAMERA-I PS
690 MW SALAL PS
480 MW URI-I PS
BUSINESS DEVELOPMENTBUSINESS DEVELOPMENT-- JVJV� SIGNED AGREEMENTS WITH GOVT. OF ARUNACHAL PRADESH FOR IMPLEMENTATION OF
3000 MW DIBANG, 750 MW TAWANG-I (NOW 600 MW) AND 750 MW TAWANG-II (NOW 800 MW)
PROJECTS IN JUNE 2007.
� A JOINT VENTURE COMPANY “CHENAB VALLEY POWER PROJECTS (P) LTD.” HAS BEEN
FORMED WITH JKSPDC AND PTC INDIA LTD. TO DEVELOP PAKAL DUL, KIRU & KWAR
PROJECTS IN J&K WITH AN AGGREGATE CAPACITY OF 2120 MW .
� A JOINT VENTURE COMPANY “NATIONAL POWER EXCHANGE LTD.” HAS BEEN FORMED WITH
NTPC, PFC AND TCS TO SET UP AND OPERATE POWER EXCHANGE AT NATIONAL LEVEL
� A JOINT VENTURE COMPANY “NATIONAL HIGH POWER TEST LABORATORY PVT. LTD.” HAS
14
� A JOINT VENTURE COMPANY “NATIONAL HIGH POWER TEST LABORATORY PVT. LTD.” HAS
BEEN FORMED WITH NTPC, POWER GRID & DVC FOR ONLINE HIGH POWER SHORT CIRCUIT
TEST FACILITY IN THE COUNTRY .
� A JOINT VENTURE COMPANY “LOKTAK DOWNSTREAM HYDROELECTRIC CORPORATION
LIMITED” HAS BEEN FORMED WITH GOVT. OF MANIPUR (26% EQUITY) FOR EXECUTION OF 66
MW LOKTAK DOWNSTREAM PROJECT.
� SIGNED Promoters Agreement for IMPLEMENTATION OF 1500 MW TIPAIMUKH PROJECT
THROUGH A JOINT VENTURE COMPANY WITH SJVNL(26%) AND GOVT OF MANIPUR(5%).
� SIGNED MOU FOR IMPLEMENTATION OF THREE HE PROJECTS FOR 320 MW AT SINDOL
STAGE-I,II & III IN ORISSA THROUGH A JOINT VENTURE COMPANY WITH OHPC & GoO.
BUSINESS DEVELOPMENTBUSINESS DEVELOPMENT
EXPANDING INTERNATIONAL OPERATIONS, NHPC IS ENGAGED IN FOLLOWING COUNTRIES
� BHUTAN –
� DPR OF 720 MW MANGDECHHU HE PROJECT SUBMITTED TO RGoB IN SEPT ’08 AND THE SAME
ACCEPTED BY RGoB.
� ON 23.03.2010 SIGNED AGREEMENT FOR PROVIDING ENGINEERING & CONSULTANCY SERVICES
PERTAINING TO PRE-CONSTRUCTION ACTIVITIES OF MANGDECHHU HE PROJECT,
� ENGINEERING & DESIGN CONSULTANCY SERVICES - AN AGREEMENT HAS BEEN SIGNED WITH
MANDECHHU PROJECT AUTHORITY LTD (MHPA) ON 09.03.2011 FOR MANGNECHU HEP.
� AGREEMENTS SIGNED ON 22.12.2009 FOR PREPARATION OF DPRs OF 2 PROJECTS :
(I) 670 MW CHAMKARCHHU-I – TO BE SUBMITTED BY DEC 2011
15
(II) 1800 MW KURI-GONGRI – TO BE SUBMITTED BY 2012
NHPC SITE OFFICES ESTABLISHED
� MYANMAR - STUDY OF MASTER PLAN OF CHINDWIN RIVER BASIN AND REVIEW OF DETAILED
FEASIBILITY REPORTS OF TAMANTHI (1200 MW) AND SHWEZAYE (660 MW) HYDRO POWER
PROJECTS. REVIEW REPORTS SUBMITTED BY NHPC IN DEC’ 2008 i.e. WITHIN THE AGREED
SCHEDULE OF 3 MONTHS. AGREEMENT SIGNED WITH MEA ON 08.01.2010
�INTERIM REPORT IN RESPECT OF TAMANTHI SUBMITTED IN OCT-10
�AND THAT OF SHWEZAYE SUBMITTED IN APR-11.
�UPDATED DPR OF TAMANTHI SUBMITTED IN OCTOBER, 2011 ie 3 MONTHS AHEAD OF SCHEDULE.
� TAJIKISTAN - TRIPARTITE AGREEMENT BETWEEN MEA, BHEL & NHPC SIGNED IN AUG 2008 FOR
UNDERTAKING RM&U WORKS OF VARZOB HYDRO POWER PLANT-I (2 X 3.67 MW). NHPC TEAM
POSITIONED AT SITE AND WORKS ARE IN PROGRESS.
BENEFITS OF HYDROPOWERBENEFITS OF HYDROPOWER
• ABUNDANT HYDRO POTENTIAL
• MEETS PEAKING POWER
• IMPROVES GRID STABILITY & RELIABILITY
• RENEWABLE SOURCE OF ENERGY
16
•
• FOSTERS ENERGY SECURITY
• AFFORDABLE & COST EFFECTIVE
• ENVIRONMENTALLY BENIGN SOURCE
• ADDITIONAL BENEFITS FOR STORAGE SCHEMES - FLOOD