HYDROPOWER HYDROPOWER DEVELOPMENT IN INDIA DEVELOPMENT IN INDIA 1 NHPC Limited November, 2011

HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

  • Upload
    vukien

  • View
    216

  • Download
    2

Embed Size (px)

Citation preview

Page 1: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

HYDROPOWER HYDROPOWER DEVELOPMENT IN INDIADEVELOPMENT IN INDIA

1

NHPC Limited

November, 2011

Page 2: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

A) POTENTIAL ASSESSED BY CEA : 1,48,701 MW

B) INSTALLED CAPACITY DEVELOPED : 38,706 MW

C) UNDER DEVELOPMENT : 15, 707 MW

HYDRO POWER POTENTIAL IN INDIA

2

SOURCE: CEA

Page 3: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

INSTALLED CAPACITY- SECTOR WISE

(HYDRO)

INSTALLED CAPACITY- SECTOR WISE

(HYDRO)

PRIVATE

2,525 MW (6.5 %)CENTRAL

8,885 MW (23 %)

As on 30th sept 2011

3

SOURCE: CEA

Total Installed Hydro Capacity – 38,706 MW

STATE27,296 MW (70.5 %)

Page 4: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

Present Optimal

HYDRO THERMAL MIX IN INDIAHYDRO THERMAL MIX IN INDIA

Hydro

Hydro40 %

4

Thermal& Others

79%

Hydro

21%

Thermal & Others

60%

Page 5: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

MAJOR CENTRAL SECTOR UTILITIES

- HYDRO INSTALLED CAPACITIES

MAJOR CENTRAL SECTOR UTILITIES

- HYDRO INSTALLED CAPACITIES

UTILITY NAME GENERATING

CAPACITY

CAPACITY UNDER DEVELOPMENT

11TH PLAN 12TH PLAN

NHPC 5295 MW* 1080 MW 4467MW**

BBMB 2866 MW NIL NIL

SJVNL 1500 MW 412 MW 348 MW

5

* Includes 1520 MW through its subsidiary NHDC

** Includes 3092 MW slipped from 11th plan projects

SJVNL 1500 MW 412 MW 348 MW

THDC 1000 MW 400 MW 1444 MW

NEEPCO 755 MW 600 MW 180 MW

DVC 144 MW NIL NIL

NTPC NIL 1920 MW 551 MW

Page 6: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

6

NHPC in

Indian Hydro Sector

NHPC in

Indian Hydro Sector

Page 7: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

PHYSICAL PROFILEPHYSICAL PROFILE� POWER STATIONS UNDER OPERATION : 14 Nos. (5295 MW)

� XI PLAN (2007-12) PROJECTS : 8 Nos. (2230 MW*)

• Projects commissioned : 3 nos. (1150 MW)

• Projects under construction : 5 nos. (1080 MW)

� XII PLAN (2012-17) PROJECTS : 8 Nos. (4467 MW)

• Projects under construction : 5 no. (3422 MW)

• Projects under clearance / Sanction : 3 nos. (1045 MW)

� BEYOND XII PLAN PROJECTS : 19 Nos. (13831 MW)

7

� BEYOND XII PLAN PROJECTS : 19 Nos. (13831 MW)

• Projects under clearance / Sanction (Hydro) : 9 nos. (8606 MW)

• NHPC own : 4 Projects (4920 MW)

• In JVC : 8 Projects (3986MW) **

• Projects under FR / DPR preparation : 7 nos. (2485 MW)

• Thermal Projects in JV (NHDC) : 2 nos. (2640 MW)

• Wind Project in JV (NHDC) : 1 no. (100 MW)

* Original Target – 5322 MW

** Incl. 3 Projects (JV) with OHPC (320 MW) at SINDOL – I, II & III

Page 8: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

POWER STATIONS UNDER OPERATIONPOWER STATIONS UNDER OPERATION

S.No. Power StationsInstalled

Capacity (MW)

Year of

Comm.Completion Cost (Crs.)

Tariff

(P/Kwh)

1 BAIRASIUL (HP) 180 (3X60) 1981 155 77.85

2 LOKTAK (Manipur) 105 (3X35) 1983 143 128. 18

3 SALAL - I / II (J&K) 690 (6X115) 1987 / 1995 929 65.78

4 TANAKPUR (Uttarakhand) 120 (3X40) 1992 407 119.77

5 CHAMERA – I (HP) 540 (3X180) 1994 2400 138.65

6 URI (J&K) 480 (4X120) 1997 3300 121.93

7 RANGIT (Sikkim) 60 (3X20) 1999 492 158.98

8

7 RANGIT (Sikkim) 60 (3X20) 1999 492 158.98

8 CHAMERA-II (HP) 300 (3X100) 2003 2047 267.46

9 DHAULIGANGA-I (Uttarakhand) 280 (4X70) 2005 1788 181.01

10 DULHASTI (J&K) 390 (3X130) 2007 5228 512.53

11 TEESTA-V (Sikkim) 510 (3X170) 2008 2935 150.20

12 SEWA-II (J&K) 120 (3X40) 2010 1061 416.76

TOTAL 3775

JOINT VENTURE

13 INDIRA SAGAR (MP) 1000 (8X125) 2004 3989 224.00

14 OMKARESHWAR (MP) 520 (8X65) 2007 2434 230.00

GRAND TOTAL 5295

Page 9: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

WORLD CLASS

EXPERTISE IN PLANNING,

DESIGN & ENGINEERING

OF HYDROELECTRIC

PROJECTS AND

PREPARATION OF DPRs

EQUIPPED WITH STATE-OF-

THE-ART EQUIPMENTS

AND TECHNOLOGIES FOR

INVESTIGATION OF

PROJECTS.

CONTRACT

MANAGEMENT

CORE COMPETENCYCORE COMPETENCY

9

CONSTRUCTION

MANAGEMENT, OPERATION

& MAINTENANCE,

RENOVATION AND

MODERNISATION OF HYDRO

PROJECTS / POWER

STATIONS

CONSTRUCTION OF

UNDERGROUND WORKS

AND DAMS/BARRAGES

CORE COMPETENCYCORE COMPETENCY

Page 10: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

ACHIEVEMENTS OF NHPCACHIEVEMENTS OF NHPC

• CONSTRUCTED 10 NO CONCRETE GRAVITY DAMS, 4 NO ROCKFILL DAMS, 3 NO BARRAGES

AND 1 NO EARTHFILL DAMS

• 10 NO DAMS/BARRAGES OF VARIOUS TYPES PRESENTLY UNDER CONSTRUCTION

• COMPLETED TUNNELLING OF MORE THAN 150 KMS IN HIMALAYAN REGION

• CONSTRUCTED CONCRETE FACED ROCKFILL DAM (CFRD) FOR THE FIRST TIME IN INDIA AT

DHAULIGANGA HE PROJECT (280 MW) OF NHPC IN UTTARAKHAND

• CUTOFF WALL FOR THE LENGTH OF 182 M AND MAXIMUM DEPTH OF 70.6 M USING PLASTIC

CONCRETE CONSTRUCTED FOR THE FIRST TIME IN INDIA AT DHAULIGANGA HE PROJECT (280

10

CONCRETE CONSTRUCTED FOR THE FIRST TIME IN INDIA AT DHAULIGANGA HE PROJECT (280

MW), UTTARAKHAND

• INTRODUCED JET GROUTING FOR THE FIRST TIME IN INDIA AT TEESTA-V HE PROJECT (510

MW), SIKKIM

• COMPLETED ONE OF WORLD’S LONGEST INCLINED PRESSURE SHAFTS (1546 M) USING

DOUBLE SHIELD TBM AT PARBATI-II HE PROJECT (800 MW), H.P

• COMPLETED CHAMERA HE PROJECT STAGE-II (300 MW) IN HIMACHAL PRADESH AHEAD OF

SCHEDULE IN RECORD TIME OF 4-1/2 YEARS- A TREND SETTER IN HYDRO DEVELOPMENT IN

INDIA

Page 11: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

NHPC’S PRESENCE IN AFRICANHPC’S PRESENCE IN AFRICA

• NIGERIA

CLIENT : M/s DANGOTE INDUSTRIES LIMITED , LAGOS

PROJECT : SHIRORO HYDRO POWER STATION ( 600 MW)

11

PROJECT : SHIRORO HYDRO POWER STATION ( 600 MW)

NHPC IS PROVIDING TECHNICAL CONSULTANCY SERVICES TO

M/S DANGOTE INDUSTRIES ON CONCESSIONING OF 600MW

SIHRORO HYDRO POWER STATION .

Page 12: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

NHPC IN CONSULTANCY SERVICESNHPC IN CONSULTANCY SERVICES

• PROVIDING CONSULTANCY SERVICES TO ORGANISATION BOTH IN PUBLIC AND

PRIVATE SECTOR INCLUDING STATE GOVERNMENTS

• REGISTERED AS CONSULTANT IN THE AREA OF HYDROPOWER WITH WORLD BANK,

ASIAN DEVELOPMENT BANK AND AFRICAN DEVELOPMENT BANK

• TOTAL VALUE OF COMPLETED AND ONGOING ASSIGNMENTS IS OF THE ORDER OF

`̀̀̀165 CRORE

• MAJOR ON-GOING ASSIGNMENTS INCLUDE

12

• MAJOR ON-GOING ASSIGNMENTS INCLUDE

� PREPARATION OF DPR OF CHAMKARCHHU-I (670 MW) & KURI-GONGRI (1800 MW)

HE PROJECTS IN BHUTAN

� ADDITIONAL INVESTIGATIONS AND PREPARATION OF UPDATED DPRs FOR

TAMANTHI (1200 MW) & SHWEZAYE (660 MW) HE PROJECTS IN MYANMAR

� RAISING HEIGHT OF EXISTING DHANIKARI CONCRETE DAM BY 5 MTS AT PORT

BLAIR, A&N ISLANDS

� SUPPLY, ERECTION, TESTING & COMMISSIONING OF 400 KV ADDITIONAL GIS BAY

OF URI-I & CHAMERA-II HE PROJECTS

Page 13: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

POWER STATIONS UNDER OPERATIONPOWER STATIONS UNDER OPERATION

13

1000MW I�DIRA SAGAR PS540 MW CHAMERA-I PS

690 MW SALAL PS

480 MW URI-I PS

Page 14: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

BUSINESS DEVELOPMENTBUSINESS DEVELOPMENT-- JVJV� SIGNED AGREEMENTS WITH GOVT. OF ARUNACHAL PRADESH FOR IMPLEMENTATION OF

3000 MW DIBANG, 750 MW TAWANG-I (NOW 600 MW) AND 750 MW TAWANG-II (NOW 800 MW)

PROJECTS IN JUNE 2007.

� A JOINT VENTURE COMPANY “CHENAB VALLEY POWER PROJECTS (P) LTD.” HAS BEEN

FORMED WITH JKSPDC AND PTC INDIA LTD. TO DEVELOP PAKAL DUL, KIRU & KWAR

PROJECTS IN J&K WITH AN AGGREGATE CAPACITY OF 2120 MW .

� A JOINT VENTURE COMPANY “NATIONAL POWER EXCHANGE LTD.” HAS BEEN FORMED WITH

NTPC, PFC AND TCS TO SET UP AND OPERATE POWER EXCHANGE AT NATIONAL LEVEL

� A JOINT VENTURE COMPANY “NATIONAL HIGH POWER TEST LABORATORY PVT. LTD.” HAS

14

� A JOINT VENTURE COMPANY “NATIONAL HIGH POWER TEST LABORATORY PVT. LTD.” HAS

BEEN FORMED WITH NTPC, POWER GRID & DVC FOR ONLINE HIGH POWER SHORT CIRCUIT

TEST FACILITY IN THE COUNTRY .

� A JOINT VENTURE COMPANY “LOKTAK DOWNSTREAM HYDROELECTRIC CORPORATION

LIMITED” HAS BEEN FORMED WITH GOVT. OF MANIPUR (26% EQUITY) FOR EXECUTION OF 66

MW LOKTAK DOWNSTREAM PROJECT.

� SIGNED Promoters Agreement for IMPLEMENTATION OF 1500 MW TIPAIMUKH PROJECT

THROUGH A JOINT VENTURE COMPANY WITH SJVNL(26%) AND GOVT OF MANIPUR(5%).

� SIGNED MOU FOR IMPLEMENTATION OF THREE HE PROJECTS FOR 320 MW AT SINDOL

STAGE-I,II & III IN ORISSA THROUGH A JOINT VENTURE COMPANY WITH OHPC & GoO.

Page 15: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

BUSINESS DEVELOPMENTBUSINESS DEVELOPMENT

EXPANDING INTERNATIONAL OPERATIONS, NHPC IS ENGAGED IN FOLLOWING COUNTRIES

� BHUTAN –

� DPR OF 720 MW MANGDECHHU HE PROJECT SUBMITTED TO RGoB IN SEPT ’08 AND THE SAME

ACCEPTED BY RGoB.

� ON 23.03.2010 SIGNED AGREEMENT FOR PROVIDING ENGINEERING & CONSULTANCY SERVICES

PERTAINING TO PRE-CONSTRUCTION ACTIVITIES OF MANGDECHHU HE PROJECT,

� ENGINEERING & DESIGN CONSULTANCY SERVICES - AN AGREEMENT HAS BEEN SIGNED WITH

MANDECHHU PROJECT AUTHORITY LTD (MHPA) ON 09.03.2011 FOR MANGNECHU HEP.

� AGREEMENTS SIGNED ON 22.12.2009 FOR PREPARATION OF DPRs OF 2 PROJECTS :

(I) 670 MW CHAMKARCHHU-I – TO BE SUBMITTED BY DEC 2011

15

(II) 1800 MW KURI-GONGRI – TO BE SUBMITTED BY 2012

NHPC SITE OFFICES ESTABLISHED

� MYANMAR - STUDY OF MASTER PLAN OF CHINDWIN RIVER BASIN AND REVIEW OF DETAILED

FEASIBILITY REPORTS OF TAMANTHI (1200 MW) AND SHWEZAYE (660 MW) HYDRO POWER

PROJECTS. REVIEW REPORTS SUBMITTED BY NHPC IN DEC’ 2008 i.e. WITHIN THE AGREED

SCHEDULE OF 3 MONTHS. AGREEMENT SIGNED WITH MEA ON 08.01.2010

�INTERIM REPORT IN RESPECT OF TAMANTHI SUBMITTED IN OCT-10

�AND THAT OF SHWEZAYE SUBMITTED IN APR-11.

�UPDATED DPR OF TAMANTHI SUBMITTED IN OCTOBER, 2011 ie 3 MONTHS AHEAD OF SCHEDULE.

� TAJIKISTAN - TRIPARTITE AGREEMENT BETWEEN MEA, BHEL & NHPC SIGNED IN AUG 2008 FOR

UNDERTAKING RM&U WORKS OF VARZOB HYDRO POWER PLANT-I (2 X 3.67 MW). NHPC TEAM

POSITIONED AT SITE AND WORKS ARE IN PROGRESS.

Page 16: HYDROPOWER DEVELOPMENT IN INDIAindiainbusiness.nic.in/trade/presentation_loc/NHPC.pdf · ntpc, pfcand tcs to set upand operate power exchange at national level a joint venture company

BENEFITS OF HYDROPOWERBENEFITS OF HYDROPOWER

• ABUNDANT HYDRO POTENTIAL

• MEETS PEAKING POWER

• IMPROVES GRID STABILITY & RELIABILITY

• RENEWABLE SOURCE OF ENERGY

16

• FOSTERS ENERGY SECURITY

• AFFORDABLE & COST EFFECTIVE

• ENVIRONMENTALLY BENIGN SOURCE

• ADDITIONAL BENEFITS FOR STORAGE SCHEMES - FLOOD

MODERATION, IRRIGATION, TOURISM ETC