Briefing

• What have we achieved so far?

• Who is the Preferred Supplier?

• What the next steps are?

Page 4: HR User Group 12 th  November 2008 Tim Wells

Achievements in the last quarter

• Evaluation– ITT scoring– Demonstrations– Technical clarification– Reference site visits– Conference calls

• Preferred supplier appointed

Page 5: HR User Group 12 th  November 2008 Tim Wells
Page 6: HR User Group 12 th  November 2008 Tim Wells
Page 7: HR User Group 12 th  November 2008 Tim Wells
Page 8: HR User Group 12 th  November 2008 Tim Wells
Page 9: HR User Group 12 th  November 2008 Tim Wells
Page 10: HR User Group 12 th  November 2008 Tim Wells

Preferred supplier

Page 11: HR User Group 12 th  November 2008 Tim Wells

Project plan• Project website: http://www.ucl.ac.uk/hr/rome

Description Estimated completion date

Preferred Supplier appointed Nov 08

Live system Mar / Apr 09

Rolled out to departments July 09

Page 12: HR User Group 12 th  November 2008 Tim Wells

Next steps

• Finalise contract

• Finalise specification design

• Begin system build

• Plan for User Acceptance Testing (UAT)

• Planning for pilot and rollout

Page 13: HR User Group 12 th  November 2008 Tim Wells
Page 14: HR User Group 12 th  November 2008 Tim Wells

Thank you

• HR– Clara Ferrer-Lopez– Helen Brown– Mark Rice

• Departments– Denise Beales – Richard Sharp– Mark Tiwarri

• Finance– Pam Reel

• Procurement– Bob Swan

• Everyone who came to the demonstrations

Page 15: HR User Group 12 th  November 2008 Tim Wells

Any questions?


Recommended