Unincorporated Greenburgh Comprehensive Plan
9-28-16
Chapter 13.0 Implementation and Monitoring 13.1 Relationship to our Guiding Principles
Each policy of the Plan is consistent with the guiding principles. Successful implementation of these policies suggests that a wide range of benefits are expected for existing residents and businesses and for those who will choose unincorporated Greenburgh as a place to reside, to visit and/or to start a new business. Instituting the policies of the Plan will place unincorporated Greenburgh on a path to achieving the stated goals and objectives. The success of the Plan is dependent on efficient and “full implementation.” This chapter outlines how the Plan will be implemented, identifies the various stakeholders that will have a role in implementation, and provides timeframes for implementation. How, when, and who monitors progress of the Plan’s implementation is also a significant focus of this chapter.
13.2 Implementation of Interconnected Policies
Each chapter of the Plan contains overlapping policies. In Table 1.2 of Introduction to the Comprehensive Plan (Chapter 1.0) each guiding principle is stated and followed by list of the numerous chapters that contain related policies. “Full implementation,” noted in Section 13.1 (Relationship to our Guiding Principles), refers to the fact that implementing the policies of one chapter are only likely to provide Town-wide benefits and support our guiding principles when implemented in connection with the polices of each chapter of the Plan.
13.3 Implementing the Plan (How)
The adoption of the Plan is the first step in the implementation process. Continuing action to implement the Plan will be needed for it to have lasting impact. This section identifies how the goals, objectives and policies for the immediate and long-range protection, enhancement, growth and development of unincorporated Greenburgh are translated into concrete actions. The Plan will be implemented in several ways. These methods are noted below in generalized categories and are assigned to each policy in Table 13.4, as appropriate.
Continuation of Municipal Support (Symbol: CMS) – Implementation that
involves ongoing/future support of existing policies or protocol by land use
boards, committees and the staff of unincorporated Greenburgh.
Creation of a Directory List (Symbol: CDL) – Implementation that requires the
creation of a new directory or the supplementation of existing lists.
Formal Policy (Symbol: FP) – Implementation that does not expressly require a
zoning text amendment but should be referenced by land use boards,
committees, staff, residents, businesses and any agencies conducting actions in
unincorporated Greenburgh.
Directory lists are catalogues of Town information such as
total park listings and acreages, or a
catalogue of existing businesses in the
Town.
Chapter 13.0 Implementation and Monitoring
13-2 9-28-16
Inter-municipal/Regional Coordination (Symbol: IM/RC) – Implementation
that requires coordination with municipalities outside unincorporated
Greenburgh and various regional governmental and non-governmental
agencies.
Leverage Funding Sources (Symbol: LFS) – Implementation that requires and
will be enhanced by acquisition of grants and/or regional governmental
funding sources.
Private Sector Coordination (Symbol: PSC) – Implementation that entails
coordination with private sector industries and companies to understand the
information and resources needed for business retention and expansion.
Town Department Coordination (Symbol: TDC) – Implementation that involves
coordination within various Town of Greenburgh departments.
Zoning Map Amendment (Symbol: ZMA) – Implementation that requires an
amendment to the Zoning Map of the Town of Greenburgh.
Zoning Text Amendment (Symbol: ZTA) – Implementation that requires an
amendment to the text of the Code of the Town of Greenburgh.
13.4 Plan Implementation Responsibilities (Who)
The Department of Community Development and Conservation, in coordination with a range of implementation partners, will be the lead facilitator to implement the Plan and coordinate consistency reviews among municipal departments. This section identifies the various representatives from Town staff, existing boards and committees, and other key stakeholders that will be charged with ensuring that the Plan is used and followed. These entities will be responsible not only for coordinating overall implementation of the Plan but also working to ensure that public outreach and education is achieved. Table 13.1 lists the departments of the Town of Greenburgh that will contribute to the Plan’s implementation.
13-3
Unincorporated Greenburgh Comprehensive Plan
9-28-16
Table 13.1: Town of Greenburgh Departments
Department Symbol Location Address
Assessor’s Office AO Town Hall 177 Hillside Avenue, Greenburgh
Building Department BD Town Hall 177 Hillside Avenue, Greenburgh
Bureau of Engineering * BoE Town Hall 177 Hillside Avenue, Greenburgh
Bureau of Highways * BoH Sanitation/Highway
Garage 100 Sprain Road, P.O. Ardsley
Bureau of Sanitation * BoS Sanitation/Highway
Garage 100 Sprain Road, P.O. Ardsley
Community Development & Conservation
CD&C Town Hall 177 Hillside Avenue, Greenburgh
Community Resources (TDYCC) CR Theodore D. Young Community Center
32 Manhattan Avenue, P.O. White Plains
Comptroller’s Office CO Town Hall 177 Hillside Avenue, Greenburgh
Consolidated Water Dist. No.1 * WD Water Shop 181 Knollwood Road,
P.O. White Plains
Department of Public Works * DPW Town Hall 177 Hillside Avenue, Greenburgh
Greenburgh Nature Center GNC Nature Center 99 Dromore Road, P.O. Scarsdale
Greenburgh Public Library GPL Library 300 Tarrytown Road, P.O. Elmsford
Greenburgh Public Access TV PATV Town Hall 177 Hillside Avenue, Greenburgh
Greenburgh Town Court GTC Town Court Complex 188 Tarrytown Road,
P.O. White Plains
Mechanical Information Systems MIS Town Hall 177 Hillside Avenue, Greenburgh
Office of Town Attorney TA Town Hall 177 Hillside Avenue, Greenburgh
Parks and Recreation P&R Parks and Recreation
Administration Building 11 Olympic Lane, P.O. Ardsley
Philanthropy PLY Town Hall 177 Hillside Avenue, Greenburgh
Police Department PD Police Department
Headquarters 188 Tarrytown Road,
P.O. White Plains
Purchasing Department PURCH Town Hall 177 Hillside Avenue, Greenburgh
Tax Department TD Town Hall 177 Hillside Avenue, Greenburgh
Town Clerk’s Office TC Town Hall 177 Hillside Avenue, Greenburgh
Town Historian TH Town Hall 177 Hillside Avenue, Greenburgh
Town Supervisor/Town Board TB Town Hall 177 Hillside Avenue, Greenburgh
* The Bureaus of Engineering, Highway and Sanitation are within the Department of Public Works
Chapter 13.0 Implementation and Monitoring
13-4 9-28-16
Table 13.2: Town of Greenburgh Boards, Committees and Miscellaneous
Board or Committee Symbol Members
Affordable Housing Committee AHC -
Antenna Review Board ARB 5
Arts and Culture Committee A&CC 7
Board of Ethics BE 7*
Community Resources Advisory Board CRAB 15
Conservation Advisory Council CAC 6
Friends of the Library Board FLB 16
Greenburgh Nature Center Board of Directors
GNCBoD 17
Greenburgh Public Library Board of Directors GPLBoD 8
Hartsdale Contextual Review Committee HCRC 5
Historic and Landmarks Preservation Board H&LPB 6
Parks and Recreation Advisory Board P&RAB 16
Planning Board PB 8*
Police Department Advisory Board PDAB 15
Town Board TB 5
Zoning Board of Appeals ZBA 8*
Miscellaneous
Hartsdale Public Parking District HPPD 3
* Includes alternate
Table 13.2 lists the boards and committees of unincorporated Greenburgh, as well as the Hartsdale Public Parking District. For implementation responsibilities, these entities are assigned to each appropriate policy in Table 13.4.
13-5
Unincorporated Greenburgh Comprehensive Plan
9-28-16
Table 13.3 lists inter-municipal and regional planning partners. For implementation responsibilities, these entities are assigned to each appropriate policy in Table 13.4. Inter-municipal agencies typically refer to the municipalities that are adjacent to unincorporated Greenburgh (Village of Ardsley, Village of Dobbs Ferry, Village of Elmsford, Village of Hastings on Hudson, Village of Irvington, Town of Mount Pleasant, Town of North Castle, Village of Scarsdale, Village of Tarrytown, City of White Plains and the City of Yonkers), although inter-municipal coordination is expected with non-adjacent municipalities. Each of these municipalities are highlighted as coordinated planning areas in various portions of the Plan. Two groups are not listed in Table 13.3; however, these groups are the most important planning partners with regard to the Plan’s implementation. The residents and businesses of unincorporated Greenburgh, through continued public outreach and education, will contribute heavily to the success of the Plan’s implementation.
Table 13.3: Intermunicipal and Regional Planning Partners
Planning Partner Symbol
Applicable School District ASD
Consolidated Edison ConEd
Hudson River Valley Greenway HRVG
Hudson Valley Regional Council HVRC
Intermunicipal Agencies * IM
Metro Transit Authority MTA
Mid-Hudson Regional Economic Development Council MHREDC
New York Municipal Transportation Council NYMTC
New York State Department of Environmental Conservation NYSDEC
New York State Department of Environmental Protection NYSDEP
New York State Department of Transportation NYSDOT
New York State Energy Research and Development Authority NYSERDA
New York State Emergency Management Office NYSEMO
New York State Historic Preservation Office NYSHPO
New York State Thruway Authority NYSTA
United Water UW
US Army Corp of Engineers USACE
Westchester Community College & Regional Universities WCC/RU
Westchester County WC
* Typically consists of municipalities adjacent to unincorporated Greenburgh
Chapter 13.0 Implementation and Monitoring
13-6 9-28-16
13.5 Plan Implementation Timeframes (When)
Plan implementation will begin following adoption of the Plan. The timeframe for implementing each policy is listed in Table 13.4. It is anticipated that policies designated “short term” will be implemented within one to two years. Implementation of policies designated “long term” will take longer than two years. Policies designated with an “ongoing” timeframe are not tasks or actions that can be completed but rather policies and protocols, either existing or newly adopted with the Plan, that require ongoing adherence. Although the Plan will be used to guide decision-making and actions affecting the enhancement, growth and physical development of unincorporated Greenburgh over the next 20 years, it is expected that subsequent plan review and updates will occur every five years. In addition, continual monitoring of the Plan’s progress will take place.
The monitoring process is described in Section 13.7.
13.6 Plan Implementation Procedure Matrix
Table 13.4 lists each policy number found in the Plan. This matrix notes the methods to be used to carry out the respective policy, the entities responsible for implementation, and a timeframe associated with each policy.
13-7
Unincorporated Greenburgh Comprehensive Plan
9-28-16
Table 13.4: Implementation Procedures
Implementation Type Primary Implementation
Groups Implementation
Timeframe
Chapter 1.0 N/A N/A N/A
Chapter 2.0 N/A N/A N/A
Chapter 3.0 Sustainable Development
Policy 3.1.1.1 TDC CD&C Long Term
Policy 3.1.1.2 CDL CD&C Short Term
Policy 3.1.1.3 CDL CD&C Ongoing
Policy 3.1.1.4 CDL CD&C Ongoing
Policy 3.1.1.5 CDL CD&C Short Term
Policy 3.1.1.6 FP, ZTA, PSC CD&C Short Term
Policy 3.1.1.7 FP, PSC CD&C, TB, PB, BD Ongoing
Policy 3.2.1.1 FP, IM/RC CD&C, MHREDC Long Term
Policy 3.2.1.2 FP, IM/RC CD&C, HVRC Long Term
Policy 3.2.1.3 FP, IM/RC CD&C, WC Long Term
Policy 3.2.1.4 LFS CD&C, PLY Ongoing
Policy 3.2.1.5 FP, IM/RC CD&C, BD, TB Long term
Policy 3.3.1.1 FP, PSC CD&C Long Term
Policy 3.3.1.2 FP, PSC CD&C Long Term
Policy 3.4.1.1 TDC CD&C, OA Short Term
Policy 3.4.1.2 TDC, LFS CD&C Ongoing
Policy 3.4.1.3 FP BD, BoE, DPW, CD&C Ongoing
Policy 3.4.2.1 CMS, LFS BD, DPW, TB, CD&C Ongoing
Policy 3.4.2.2 CMS BD, DPW, TB, CD&C Ongoing
Policy 3.5.1.1 FP, ZMA, ZTA BD, CD&C, CR, P&R Ongoing
Policy 3.5.1.2 FP, ZMA, ZTA ACC, CD&C, H&LPB Ongoing
Policy 3.5.1.3 FP, ZMA, ZTA BoE, BoH, CD&C, DPW Ongoing
Policy 3.5.1.4 FP, ZMA, ZTA CD&C, P&R Ongoing
Policy 3.5.1.5 FP, ZMA, ZTA BoE, BoH, CD&C, DPW Ongoing
Policy 3.5.1.6 FP, ZMA, ZTA BoE, BoH, CD&C, DPW, WC,
NYSDOT, NYMTC Ongoing
Policy 3.5.1.7 FP, ZMA, ZTA CD&C, IM, WC Ongoing
Policy 3.5.1.8 FP, ZMA, ZTA CD&C, IM, MHREDC, WC Ongoing
Policy 3.5.1.9 FP, ZMA, ZTA CD&C, IM, WC Ongoing
Chapter 13.0 Implementation and Monitoring
13-8 9-28-16
Table 13.4: Implementation Procedures (continued)
Implementation Type Primary Implementation
Groups Implementation
Timeframe
Policy 3.6.1.1 CMS, FP, PSC, TDC BD, BoE, CD&C, DPW,
NYSDEC, NYSEPA, NYSEMO Ongoing
Policy 3.6.1.2 CMS, FP, PSC, TDC BD, BoE, CD&C, DPW,
NYSDEC, NYSEPA, NYSEMO Ongoing
Policy 3.6.1.3 CMS, FP, PSC, TDC BD, BoE, CD&C, DPW,
NYSDEC, NYSEPA, NYSEMO Ongoing
Chapter 4.0 Community Well-Being
Policy 4.1.1.1 FP CD&C, CR, P&R Ongoing
Policy 4.1.1.2 FP ACC, CR, CD&C Ongoing
Policy 4.1.1.3 FP P&R Ongoing
Policy 4.1.1.4 FP, IM/RC CD&C, IM Ongoing
Policy 4.1.1.5 FP CD&C, DPW, P&R, PB, TB Ongoing
Policy 4.1.1.6 TDC CD&C Short Term
Chapter 5.0 Art, Culture and Historic Resources
Policy 5.1.1.1 CMS, FP, PSC ACC, CD&C Ongoing
Policy 5.1.1.2 TDC, FP ACC, CD&C Ongoing
Policy 5.1.1.3 TDC, IM/RC CD&C, H&LPB Ongoing
Policy 5.1.1.4 PSC ACC, CD&C Ongoing
Policy 5.1.1.5 CDL, CMS ACC, CD&C, H&LPB, TC Ongoing
Policy 5.1.1.6 TDC, FP, PSC ACC, CD&C Ongoing
Policy 5.1.1.7 TDC, FP, PSC ACC, CD&C Long Term
Policy 5.1.1.8 FP, ZTA ACC, CD&C, TA Short Term
Policy 5.1.1.9 CMS H&LPB, CD&C Ongoing
Policy 5.1.1.10 CMS H&LPB, CD&C, TB, PB Ongoing
Policy 5.1.1.11 TDC, LFS TH, H&LPB, CD&C Ongoing
Policy 5.1.1.12 TDC, CMS, PSC CD&C, TB, PB Ongoing
Policy 5.1.1.13 TDC TA, TB, CD&C, H&LPB Short Term
Policy 5.2.1.1 CMS CD&C Ongoing
Policy 5.2.1.2 CMS, FP H&LPB, CD&C Ongoing
Policy 5.2.1.3 CMS H&LPB, PB, TB Ongoing
Policy 5.2.1.4 CMS H&LPB, CD&C Ongoing
13-9
Unincorporated Greenburgh Comprehensive Plan
9-28-16
Table 13.4: Implementation Procedures (continued)
Implementation Type Primary Implementation
Groups Implementation Timeframe
Policy 5.2.1.5 TDC, FP H&LPB, CD&C Long Term
Policy 5.2.1.6 FP, ZTA CD&C, ACC Long Term
Policy 5.2.1.7 TDC, FP TB, ACC, TB, H&LPB Short Term
Policy 5.2.1.8 ZTA TB, ACC, CD&C Short Term
Chapter 6.0 Environmental Resources and Related Systems
Policy 6.1.1.1 ZTA BoE, CD&C, TA Short Term
Policy 6.1.1.2 ZTA BoE, CD&C, TA, BD Short Term
Policy 6.1.1.3 ZTA BoE, CD&C, TA, BD Short Term
Policy 6.2.1.1 CMS, FP CAC, PB, TB, ZBA Ongoing
Policy 6.2.1.2 CMS, FP, ZTA CAC, CD&C, TB, TA, BD Ongoing
Policy 6.2.1.3 CMS, FP, ZTA CAC, CD&C, TB, TA, BD Ongoing
Policy 6.2.1.4 ZTA CAC, CD&C, TB, TA Short Term
Policy 6.2.1.5 FP, ZTA CAC, CD&C Short Term
Policy 6.2.1.6 TDC, CMS, FP CAC, CD&C Ongoing
Policy 6.2.1.7 TDC, CMS, FP CAC, PB, TB, ZBA Ongoing
Policy 6.2.1.8 TDC, CMS, FP CAC, PB, TB, ZBA Ongoing
Policy 6.2.1.9 CMS, FP CAC, PB, TB, ZBA Ongoing
Policy 6.3.1.1 FP CAC, PB, TB, ZBA Ongoing
Policy 6.3.1.2 ZTA BoE, CD&C, TA Short Term
Policy 6.4.1.1 TDC, FP, IM/RC CAC, CD&C, NYSDOT, PB,
TB, ZBA Ongoing
Policy 6.4.1.2 ZTA BD, BoE, CD&C Short Term
Policy 6.4.1.3 ZTA BD, CD&C, TB, CAC, TA Short Term
Policy 6.4.1.4 ZTA BD, CD&C, TB, CAC, TA Short Term
Policy 6.4.1.5 CMS, FP CAC, PB, TB, ZBA Ongoing
Policy 6.4.1.6 ZTA BD, CD&C, TB, CAC, TA Short Term
Policy 6.5.1.1 TDC, FP, PSC PB, TB, ZBA Ongoing
Policy 6.5.1.2 FP, ZTA CD&C, PB, TA, TB, ZBA Ongoing
Policy 6.6.1.1 DC, IM/RC CD&C, NYSDOT, PB, TB,
WC Ongoing
Policy 6.6.1.2 CMS, IM/RC BoE, CD&C, ConEd, DPW Ongoing
Policy 6.6.1.3 CMS, FP CAC, PB, TB, ZBA Ongoing
Policy 6.7.1.1 FP, ZTA BD, CD&C, PB, TB, ZBA Ongoing
Policy 6.7.1.2 IM/RC BoE, BoH, CD&C, DPW,
NYSDOT Ongoing
Policy 6.8.1.1 IM/RC BoE, BoH, CD&C, DPW,
NYSDOT Ongoing
Chapter 13.0 Implementation and Monitoring
13-10 9-28-16
Table 13.4: Implementation Procedures (continued)
Implementation Type Primary Implementation
Groups Implementation
Timeframe
Policy 6.8.1.2 CMS, FP CAC, PB, TB, ZBA Ongoing
Policy 6.8.1.3 TDC BoE, CD&C, DPW Ongoing
Policy 6.9.1.1 FP, ZTA CAC, CD&C, PB, TA, TB Short Term
Policy 6.9.1.2 FP, ZTA CD&C, PB, TA, TB, Short Term
Policy 6.9.1.3 FP, ZTA CD&C, PB, TA, TB, Short Term
Policy 6.9.1.4 FP, ZTA CD&C, PB, TA, TB Short Term
Chapter 7.0 Parks, Trails, Open Space and Recreation Facilities
Policy 7.1.1.1 CDL, TDC P&R Ongoing
Policy 7.1.1.2 TDC P&R Long Term
Policy 7.1.1.3 CMS, TDC BoE, P&R Ongoing
Policy 7.1.1.4 CMS, TDC BoE, P&R Ongoing
Policy 7.1.2.1 TDC BoE, P&R, TB Long Term
Policy 7.1.2.2 TDC P&R, TB Ongoing
Policy 7.1.2.3 TDC, LFS P&R, TB Long Term
Policy 7.2.1.1 TDC, CDL P&R, TB, CD&C Ongoing
Policy 7.2.1.2 TDC, TA, CD&C, HPPD, P&R Short Term
Policy 7.2.1.3 TDC, FP, ZTA P&R, TB, CD&C Short Term
Policy 7.2.1.4 TDC, FP, ZTA P&R, TB, CD&C Short Term
Policy 7.2.2.1 CDL P&R, TC Ongoing
Policy 7.2.2.2 FP P&R, TA, CD&C Short Term
Policy 7.2.2.3 FP P&R, TB Ongoing
Policy 7.2.2.4 FP P&R, TB Ongoing
Policy 7.2.2.5 CDL, TDC P&R, TB Ongoing
Policy 7.2.3.1 IM/RC CD&C, P&R, TA Ongoing
Policy 7.2.3.2 TDC CR, P&R, TA Ongoing
Policy 7.2.3.3 TDC CD&C, HRVG Ongoing
Policy 7.2.3.4 TDC, IM/RC, FP CD&C, IM, WC Ongoing
Policy 7.2.3.5 FP, ZTA PB, TB Ongoing
Policy 7.2.3.6 TDC, FP P&R, TA, TB Short Term
Policy 7.2.3.7 TDC, ZTA CD&C, TB Short Term
Policy 7.2.4.1 TDC, FP H&LPB, NYSHPO, WC Long Term
Policy 7.2.4.2 TDC, FP P&R, TA, TB Ongoing
13-11
Unincorporated Greenburgh Comprehensive Plan
9-28-16
Table 13.4: Implementation Procedures (continued)
Implementation Type Primary Implementation
Groups Implementation
Timeframe
Policy 7.2.5.1 TDC, FP, IM/RC BoH, HRVG, IM, NYSDOT,
PB, P&R, TB, WC Ongoing
Policy 7.2.5.2 TDC HRVG, NYDOT, PB, TB, WC Ongoing
Policy 7.2.5.3 TDC, IM/RC HRVG, IM, P&R, TB, WC Ongoing
Policy 7.2.5.4 CDL CD&C, P&R Long Term
Policy 7.2.5.5 FP, ZTA P&R, PB, TA, TB Short Term
Policy 7.2.5.6 TDC P&R, TA, TB, CD&C Long Term
Policy 7.2.5.7 TDC P&R, TA Long Term
Policy 7.3.1.1 TDC P&R Long Term
Policy 7.3.1.2 ZMA, ZTA CD&C, P&R, TA Short Term
Policy 7.3.1.3 ZTA CD&C, TA Short Term
Policy 7.3.1.4 ZTA CD&C, TA Long Term
Policy 7.3.1.5 TDC, FP TDC, FP Ongoing
Policy 7.3.1.6 ZTA CD&C, TA Short Term
Policy 7.3.1.7 IM/RC ConEd, TDC, IM Ongoing
Policy 7.3.1.8 TDC, IM/RC, LFS P&R, TB, CD&C Long Term
Policy 7.4.1.1 FP DPW, PB, P&R, TB Ongoing
Policy 7.4.1.2 TDC CD&C Long Term
Policy 7.4.1.3 FP DPW, P&R Ongoing
Policy 7.4.2.1 FP DPW, PB, P&R, TB Ongoing
Policy 7.4.2.2 TDC, FP BoH, DPW, P&R Ongoing
Chapter 8.0 Public Infrastructure and Essential Services
Policy 8.1.1.1 FP BoE, DPW Ongoing
Policy 8.1.1.2 CMS/FP PB, TB, ZBA, CD&C, TA Ongoing
Policy 8.1.1.3 FP, TDC, PSC TB, TA, CD&C, BofE, DPW Ongoing
Policy 8.1.1.4 FP, TDC, PSC TB, TA, CD&C, BofE, DPW Long Term
Policy 8.1.2.1 FP BoE, DPW Ongoing
Policy 8.1.2.2 CDL BoE, DPW Long Term
Policy 8.1.2.3 CDL BoE, DPW Long Term
Policy 8.1.2.4 FP BoE, DPW Ongoing
Chapter 13.0 Implementation and Monitoring
13-12 9-28-16
Table 13.4: Implementation Procedures (continued)
Implementation Type Primary Implementation
Groups Implementation
Timeframe
Policy 8.1.2.5 TDC, FP BoE, CD&C, DPW Ongoing
Policy 8.1.3.1 TDC BoE, DPW Long Term
Policy 8.1.3.2 TDC BoE, DPW Ongoing
Policy 8.1.3.3 TDC BoE, CD&C, ConEd, DPW,
UW Ongoing
Policy 8.1.3.4 TDC, IM/RC, PSC CD&C, DPW Ongoing
Policy 8.1.3.5 FP BoE, DPW, PB, TB Ongoing
Policy 8.1.3.6 IM/RC, PSC, TDC BoE, CD&C, ConEd, DPW Long Term
Policy 8.2.1.1 CMS, TDC DPW, UW Ongoing
Policy 8.2.1.2 TDC DPW Ongoing
Policy 8.2.1.3 CMS, TDC DPW Ongoing
Policy 8.2.1.4 CMS DPW Ongoing
Policy 8.2.1.5 TDC, IM/RC BD, DPW, UW Ongoing
Policy 8.2.2.1 CMS CD&C, DPW Ongoing
Policy 8.2.2.2 CMS CD&C, PB, TB Ongoing
Policy 8.2.2.3 FP CD&C, DPW Ongoing
Policy 8.2.2.4 FP CD&C, PB, TB Ongoing
Policy 8.2.2.5 FP DPW, NYCDEP, WC Ongoing
Policy 8.2.1.6 IM/RC, LFS, TDC BoE, WD, TB, TA Long Term
Policy 8.2.1.7 LFS, IM/RC, TDC BoE, CD&C, WD, TB, TA Short Term
Policy 8.2.3.1 FP DPW Ongoing
Policy 8.2.3.2 CMS DPW Ongoing
Policy 8.2.3.3 FP DPW Ongoing
Policy 8.3.1.1 TDC, FP CD&C, DPW, TA Long Term
Policy 8.3.1.2 CMS, TDC, FP ConEd, DPW Ongoing
Policy 8.3.1.3 CDL BoE, CD&C Short Term
Policy 8.3.2.1 CDL BoE, DPW Long Term
Policy 8.3.2.2 CMS DPW Ongoing
Policy 8.3.3.1 FP BoE, DPW, TB Long Term
Policy 8.3.3.2 CMS, TDC, LFS BoE, DPW, TB, CD&C Ongoing
Policy 8.3.3.3 FP, PSC, TDC BoE, CD&C, DPW, PB, TB Ongoing
Policy 8.3.4.1 FP DPW Ongoing
Policy 8.3.4.2 TDC DPW Short Term
Policy 8.4.1.1 TDC, PSC DPW Long Term
13-13
Unincorporated Greenburgh Comprehensive Plan
9-28-16
Table 13.4: Implementation Procedures (continued)
Implementation Type Primary Implementation
Groups Implementation
Timeframe
Policy 8.4.1.2 ZTA TB, TA, BoE, CD&C, BD Long Term
Policy 8.4.2.1 TDC, PSC BoE, CD&C, DPW, PB, TB Long Term
Policy 8.4.2.2 TDC, FP BoE, DPW, PB, TB Ongoing
Policy 8.4.2.3 TDC, FP BoE, PB, TB Ongoing
Policy 8.4.2.4 TDC, PSC BoE, CD&C, DPW, PB, TB Ongoing
Policy 8.4.2.5 TDC, PSC CD&C, DPW, PB, TA, TB Ongoing
Policy 8.4.2.6 TDC, IM/RC CD&C, DPW, IM, TA, WC Ongoing
Policy 8.4.2.7 TDC BoE, DPW Ongoing
Policy 8.5.1.1 FP BoE, CD&C, DPW, PB, TB Ongoing
Policy 8.5.1.2 FP DPW, TA Ongoing
Policy 8.5.1.3 CMS DPW Ongoing
Policy 8.5.1.4 CMS DPW Ongoing
Policy 8.5.1.5 CMS, IM/RC DPW, TB Ongoing
Policy 8.5.1.6 TDC, IM/RC DPW, TB, TA, WC Ongoing
Policy 8.6.1.1 FP CD&C Ongoing
Policy 8.6.1.2 FP CD&C Ongoing
Chapter 9.0 Transportation, Mobility and Access
Policy 9.1.1.1 FP, PSC CD&C, DPW, PB, TB Ongoing
Policy 9.1.1.2 TDC, FP CD&C, NYSDOT, WC Ongoing
Policy 9.1.1.3 TDC, ZMA, ZTA IM, PB, TB, WC Long Term
Policy 9.1.1.4 TDC, FP, IM/RC, LFS CD&C Ongoing
Policy 9.1.1.5 DC, FP, CMS CD&C, PB, TB, ZBA Ongoing
Policy 9.1.1.6 TDC, FP, LFS, PSC TB, TA, DPW, CD&C,
NYSDOT Ongoing
Policy 9.1.1.7 TDC, FP, LFS, PSC TB, TA, DPW, CD&C Ongoing
Policy 9.2.1.1 ZTA PB, TB Ongoing
Policy 9.2.1.2 FP, IM/RC, LFS CD&C, WC, HRVG Ongoing
Policy 9.2.1.3 TDC, IM/RC, PSC CD&C, HRVG, WC, PB, TB Ongoing
Policy 9.2.1.4 FP, TDC, IM/RC TB, CD&C Ongoing
Policy 9.2.1.5 FP, TDC, IM/RC TB, CD&C Ongoing
Policy 9.2.1.6 TDC, IN/RC CD&C, WC, HRVG Long Term
Policy 9.3.1.1 TDC, PSC CD&C, IM, NYSDOT, NYSTA,
NYMTC, PB, TB, WC Ongoing
Policy 9.3.1.2 TDC, PSC CD&C, PB, TA, TB Long Term
Chapter 13.0 Implementation and Monitoring
13-14 9-28-16
Table 13.4: Implementation Procedures (continued)
Implementation Type Primary Implementation
Groups Implementation
Timeframe
Policy 9.3.1.3 TDC, FP, PSC PB, TB Ongoing
Policy 9.3.1.4 FP PB, TB Ongoing
Policy 9.3.1.5 IM/RC CD&C, WC Ongoing
Policy 9.4.1.1 TDC, ZTA CD&C, NYSDOT, PD Long Term
Policy 9.4.2.1 FP PB, TB Ongoing
Policy 9.5.1.1 FP PB, TB Ongoing
Policy 9.5.1.2 TDC, IM/RC CD&C, DPW, TA Ongoing
Policy 9.5.1.3 FP CD&C, PB, TB Ongoing
Policy 9.6.1.1 IM/RC CD&C, NYMTC, PD Ongoing
Policy 9.6.1.2 FP, IM/RC CD&C, PB, TB Ongoing
Policy 9.6.1.3 TDC PD Long Term
Policy 9.6.1.4 IM/RC CD&C, DPW, NYSDOT Short Term
Policy 9.7.1.1 TDC, CS PD Ongoing
Policy 9.7.1.2 FP CD&C, DPW, PB, TB Ongoing
Policy 9.7.1.3 CMS, TDC, IM/RC TB, PD, CD&C, WC Ongoing
Policy 9.8.1.1 TDC, FP CD&C, PD Ongoing
Policy 9.9.1.1 IM, RC CD&C, IM, NYMTC,
NYSDOT, WC Ongoing
Policy 9.9.1.2 CMS, FP, ZTA TB, PB, ZBA, CD&C, DPW Ongoing
Policy 9.9.1.3 CDL, TDC TB, CD&C Long Term
Policy 9.10.1.1 CMS, TDC, PSC TB, PB, DPW, CD&C Long Term
Policy 9.10.1.2 CMS, TDC TB, DPW, CD&C Ongoing
Policy 9.10.1.3 TDC, ZTA CD&C Long Term
Policy 9.10.1.4 FP, PSC, CMS TB, PB, ZBA, CD&C Ongoing
Policy 9.11.1.1 ZTA CD&C, TB, TA Short Term
Policy 9.11.1.2 ZTA CD&C, TB, TA Short Term
Policy 9.11.1.3 FP, CMS, PSC CD&C, TB, PB Ongoing
Policy 9.11.1.4 FP, ZTA, CMS, PSC CD&C, TB, TA, PB Ongoing
Policy 9.11.1.5 FP, ZTA, CMS, PSC CD&C, TB, TA, PB Short Term
Policy 9.11.1.6 FP, ZTA, CMS, TDC CD&C, TB, TA, PB, ZBA Short Term
Policy 9.12.1.1 FP, ZMA, ZTA PB, TB, CD&C, NYSDOT, WC Ongoing
Policy 9.12.1.2 FP, ZMA, ZTA CD&C, PB, TB, NYSDOT, WC Long Term
13-15
Unincorporated Greenburgh Comprehensive Plan
9-28-16
Table 13.4: Implementation Procedures (continued)
Implementation Type Primary Implementation
Groups Implementation
Timeframe
Policy 9.12.1.3 ZTA TB, TA, CD&C Long Term
Policy 9.12.1.4 IM/RC, TDC CD&C, HCRC Long Term
Chapter 10.0 Demographics and Housing
Policy 10.1.1.1 ZMA CD&C, TA Short Term
Policy 10.1.1.2 TDC, ZMA, ZTA CD&C Ongoing
Policy 10.1.1.3 CMS, TDC BD, TB Ongoing
Policy 10.1.1.4 ZTA BD, CD&C, TA Short Term
Policy 10.1.1.5 ZTA CD&C, TA, TB Short Term
Policy 10.2.1.1 ZTA, TDC, PSC CD&C, TB, TA Short Term
Policy 10.2.1.2 TDC, PSC CD&C, TB, TA Long Term
Policy 10.2.1.3 ZTA CD&C, TA, TB Short Term
Policy 10.2.1.4 ZTA CD&C, TA, TB Short Term
Policy 10.2.2.1 TDC, ZTA CD&C, TB, TA Short Term
Policy 10.2.2.2 TDC, ZTA CD&C, TA, TB Short Term
Policy 10.2.3.1 TDC, ZTA BD, CD&C, TA Long Term
Policy 10.2.3.2 TDC, ZTA CD&C, TA, TB Short Term
Policy 10.2.4.1 FP, TDC CD&C, TB, AHC Short Term
Policy 10.3.1.1 FP CD&C, TB Ongoing
Chapter 11.0 Economic Development
Policy 11.1.1.1 IM/RC CD&C, IM, WC Ongoing
Policy 11.1.1.2 IM/RC CD&C, WC Ongoing
Policy 11.1.1.3 IM/RC CD&C, MHREDC, WC Ongoing
Policy 11.1.1.4 IM/RC CD&C, MHREDC, WC Ongoing
Policy 11.1.1.5 IM/RC CD&C, HVRC Ongoing
Policy 11.2.1.1 PSC CD&C Ongoing
Policy 11.2.1.2 PSC CD&C Short Term
Policy 11.2.1.3 TDC CD&C, IM Long Term
Policy 11.2.1.4 TDC, PSC CD&C Ongoing
Policy 11.2.1.5 TDC, IM/RC CD&C, TB, WCC/RU Ongoing
Policy 11.2.1.6 TDC, PSC CD&C Ongoing
Policy 11.3.1.1 TDC CD&C, DPW Long Term
Policy 11.3.1.2 PSC CD&C Ongoing
Policy 11.4.1.1 TDC, IM/RC, PSC CD&C, NYMTC, NYSDOT,
PB, TB, WC Ongoing
Policy 11.4.1.2 TDC, IM/RC, PSC CD&C, NYMTC, NYSDOT,
TA, TB Ongoing
Policy 11.4.1.3 IM/RC CD&C, IM, NYMTC,
NYSDOT, TA, TB Ongoing
Chapter 13.0 Implementation and Monitoring
13-16 9-28-16
Table 13.4: Implementation Procedures (continued)
Implementation Type Primary Implementation
Groups Implementation
Timeframe
Policy 11.4.1.4 TDC, PSC PB, TB Ongoing
Policy 11.4.1.5 IM/RC, ZMA, ZTA CD&C, WC Long Term
Policy 11.5.1.1 ZMA, ZTA CD&C, PB, TB Ongoing
Policy 11.5.1.2 ZTA CD&C, PB, TB Ongoing
Policy 11.5.1.3 CMS, ZMA, ZTA CD&C, PB, TB Ongoing
Policy 11.5.1.4 FP, TDC, ZTA CD&C, PB, TB Ongoing
Policy 11.5.1.5 FP, TDC, ZTA CD&C, PB, TB Ongoing
Policy 11.5.1.6 FP CD&C, PB, TB Ongoing
Policy 11.5.1.7 FP, TDC, ZTA CD&C, PB, TB Ongoing
Policy 11.6.1.1 FP, ZTA CD&C, PB, TB Ongoing
Policy 11.6.1.2 FP, ZTA CD&C, PB, TB Ongoing
Policy 11.6.1.3 FP, ZTA CD&C, PB, TB Ongoing
Policy 11.7.1.1 FP, TDC, LFS CD&C, PD Long Term
Policy 11.7.1.2 FP, TDC CD&C, HPPD Long Term
Policy 11.8.1.1 TDC CD&C Long Term
Policy 11.8.1.2 TDC, LFS CD&C, MHREDC Long Term
Policy 11.9.1.1 CMS, FP, PSC TB, PB, CD&C Ongoing
Policy 11.9.1.2 CMS, FP, PSC TB, PB, CD&C Ongoing
Policy 11.9.1.3 CMS, FP, PSC TB, PB, CD&C Ongoing
Policy 11.9.1.4 FP, IM/RC TA, CD&C, PD Ongoing
Chapter 12.0 Land Use and Zoning
Policy 12.1.1.1 ZMA CD&C, PB, TB Short Term
Policy 12.2.1.1 ZMA, ZTA CD&C, TA Short Term
Policy 12.2.1.2 ZMA, ZTA CD&C, TA Short Term
Policy 12.2.1.3 DC, TDC, ZMA, ZTA CD&C, TA Long Term
Policy 12.2.1.4 TDC, FP, ZTA CD&C, TA, TB Short Term
Policy 12.2.1.5 TDC, FP, ZTA CD&C, TA, TB Short Term
Policy 12.2.1.6 TDC, FP, ZTA CD&C, TA, TB Short Term
Policy 12.2.1.7 ZTA CD&C, TA, TB Short Term
Policy 12.2.1.8 ZTA CD&C, TA, TB Short Term
Policy 12.2.2.1 ZTA TB, CD&C, TA Long Term
Policy 12.3.1.1 IM/RC, PSC, CMS CD&C, IM, NYSDOT, NYMTC, NYSTA, WC
Long Term
Policy 12.3.2.1 IM/RC, PSC, CMS CD&C, IM, NYSDOT, NYMTC, NYSTA, WC
Long Term
Policy 12.3.3.1 IM/RC, PSC, CMS CD&C, IM, NYSDOT, NYMTC, NYSTA, WC
Long Term
Policy 12.3.4.1 IM/RC, PSC, CMS CD&C, HPPD, WC, PD Short Term
13-17
Unincorporated Greenburgh Comprehensive Plan
9-28-16
13.7 Plan Monitoring Responsibilities and Timeframes
The Department of Community Development and Conservation, consistent with facilitating implementation duties, will also take the lead role in monitoring progress of the plan. Following adoption of the Plan, an annual progress report will be issued indicating goals and objectives that have been achieved.
Table 13.4: Implementation Procedures (continued)
Implementation Type Primary Implementation
Groups Implementation
Timeframe
Chapter 12.0 Land Use and Zoning
Policy 12.3.5.1 IM/RC, PSC, CMS CD&C, IM, NYSDOT, NYMTC, NYSTA, WC
Long Term
Policy 12.3.6.1 IM/RC, PSC, CMS CD&C, NYSDOT, NYMTC,
HPPD Long Term
Policy 12.3.6.2 DC, TDC, PSC CD&C, NYSDOT, HPPD Short Term
Policy 12.3.7.1 DC, TDC, PSC, LFS CD&C, HPPD Short Term
Policy 12.3.8.1 IM/RC, PSC, CMS CD&C, IM, NYSDOT, NYMTC, NYSTA, WC
Long Term
Policy 12.4.1.1 CMS, IM/RC, TDC, PSC CD&C, IM, NYSDOT, NYMTC, NYSTA, WC
Ongoing
Policy 12.4.1.2 CMS, IM/RC, TDC, PSC CD&C, IM, NYSDOT, NYMTC, NYSTA, WC
Ongoing
Policy 12.5.1.1 ZMA, TMA, TDC, PSC CD&C, IM, WC Short Term
Policy 12.5.1.2 ZMA, ZTA, IM/RC CD&C, TA, TB Short Term
Policy 12.6.1.1 TDC, PSC, LFS CD&C, PD, GTC Long Term
Policy 12.6.1.2 TDC, PSC CD&C, HPPD Long Term