17
13-1 Unincorporated Greenburgh Comprehensive Plan 9-28-16 Chapter 13.0 Implementaon and Monitoring 13.1 Relaonship to our Guiding Principles Each policy of the Plan is consistent with the guiding principles. Successful implementaon of these policies suggests that a wide range of benefits are expected for exisng residents and businesses and for those who will choose unincorporated Greenburgh as a place to reside, to visit and/or to start a new business. Instung the policies of the Plan will place unincorporated Greenburgh on a path to achieving the stated goals and objecves. The success of the Plan is dependent on efficient and “full implementaon.” This chapter outlines how the Plan will be implemented, idenfies the various stakeholders that will have a role in implementaon, and provides meframes for implementaon. How, when, and who monitors progress of the Plan’s implementaon is also a significant focus of this chapter. 13.2 Implementaon of Interconnected Policies Each chapter of the Plan contains overlapping policies. In Table 1.2 of Introducon to the Comprehensive Plan (Chapter 1.0) each guiding principle is stated and followed by list of the numerous chapters that contain related policies. “Full implementaon,” noted in Secon 13.1 (Relaonship to our Guiding Principles), refers to the fact that implemenng the policies of one chapter are only likely to provide Town-wide benefits and support our guiding principles when implemented in connecon with the polices of each chapter of the Plan. 13.3 Implemenng the Plan (How) The adopon of the Plan is the first step in the implementaon process. Connuing acon to implement the Plan will be needed for it to have lasng impact. This secon idenfies how the goals, objecves and policies for the immediate and long-range protecon, enhancement, growth and development of unincorporated Greenburgh are translated into concrete acons. The Plan will be implemented in several ways. These methods are noted below in generalized categories and are assigned to each policy in Table 13.4, as appropriate. Connuaon of Municipal Support (Symbol: CMS) – Implementaon that involves ongoing/future support of exisng policies or protocol by land use boards, commiees and the staff of unincorporated Greenburgh. Creaon of a Directory List (Symbol: CDL) – Implementaon that requires the creaon of a new directory or the supplementaon of exisng lists. Formal Policy (Symbol: FP) – Implementaon that does not expressly require a zoning text amendment but should be referenced by land use boards, commiees, staff, residents, businesses and any agencies conducng acons in unincorporated Greenburgh. Directory lists are catalogues of Town informaon such as total park lisngs and acreages, or a catalogue of exisng businesses in the Town.

hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

  • Upload
    lytuyen

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Page 1: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

13-1

Unincorporated Greenburgh Comprehensive Plan

9-28-16

Chapter 13.0 Implementation and Monitoring 13.1 Relationship to our Guiding Principles

Each policy of the Plan is consistent with the guiding principles. Successful implementation of these policies suggests that a wide range of benefits are expected for existing residents and businesses and for those who will choose unincorporated Greenburgh as a place to reside, to visit and/or to start a new business. Instituting the policies of the Plan will place unincorporated Greenburgh on a path to achieving the stated goals and objectives. The success of the Plan is dependent on efficient and “full implementation.” This chapter outlines how the Plan will be implemented, identifies the various stakeholders that will have a role in implementation, and provides timeframes for implementation. How, when, and who monitors progress of the Plan’s implementation is also a significant focus of this chapter.

13.2 Implementation of Interconnected Policies

Each chapter of the Plan contains overlapping policies. In Table 1.2 of Introduction to the Comprehensive Plan (Chapter 1.0) each guiding principle is stated and followed by list of the numerous chapters that contain related policies. “Full implementation,” noted in Section 13.1 (Relationship to our Guiding Principles), refers to the fact that implementing the policies of one chapter are only likely to provide Town-wide benefits and support our guiding principles when implemented in connection with the polices of each chapter of the Plan.

13.3 Implementing the Plan (How)

The adoption of the Plan is the first step in the implementation process. Continuing action to implement the Plan will be needed for it to have lasting impact. This section identifies how the goals, objectives and policies for the immediate and long-range protection, enhancement, growth and development of unincorporated Greenburgh are translated into concrete actions. The Plan will be implemented in several ways. These methods are noted below in generalized categories and are assigned to each policy in Table 13.4, as appropriate.

Continuation of Municipal Support (Symbol: CMS) – Implementation that

involves ongoing/future support of existing policies or protocol by land use

boards, committees and the staff of unincorporated Greenburgh.

Creation of a Directory List (Symbol: CDL) – Implementation that requires the

creation of a new directory or the supplementation of existing lists.

Formal Policy (Symbol: FP) – Implementation that does not expressly require a

zoning text amendment but should be referenced by land use boards,

committees, staff, residents, businesses and any agencies conducting actions in

unincorporated Greenburgh.

Directory lists are catalogues of Town information such as

total park listings and acreages, or a

catalogue of existing businesses in the

Town.

Page 2: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

Chapter 13.0 Implementation and Monitoring

13-2 9-28-16

Inter-municipal/Regional Coordination (Symbol: IM/RC) – Implementation

that requires coordination with municipalities outside unincorporated

Greenburgh and various regional governmental and non-governmental

agencies.

Leverage Funding Sources (Symbol: LFS) – Implementation that requires and

will be enhanced by acquisition of grants and/or regional governmental

funding sources.

Private Sector Coordination (Symbol: PSC) – Implementation that entails

coordination with private sector industries and companies to understand the

information and resources needed for business retention and expansion.

Town Department Coordination (Symbol: TDC) – Implementation that involves

coordination within various Town of Greenburgh departments.

Zoning Map Amendment (Symbol: ZMA) – Implementation that requires an

amendment to the Zoning Map of the Town of Greenburgh.

Zoning Text Amendment (Symbol: ZTA) – Implementation that requires an

amendment to the text of the Code of the Town of Greenburgh.

13.4 Plan Implementation Responsibilities (Who)

The Department of Community Development and Conservation, in coordination with a range of implementation partners, will be the lead facilitator to implement the Plan and coordinate consistency reviews among municipal departments. This section identifies the various representatives from Town staff, existing boards and committees, and other key stakeholders that will be charged with ensuring that the Plan is used and followed. These entities will be responsible not only for coordinating overall implementation of the Plan but also working to ensure that public outreach and education is achieved. Table 13.1 lists the departments of the Town of Greenburgh that will contribute to the Plan’s implementation.

Page 3: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

13-3

Unincorporated Greenburgh Comprehensive Plan

9-28-16

Table 13.1: Town of Greenburgh Departments

Department Symbol Location Address

Assessor’s Office AO Town Hall 177 Hillside Avenue, Greenburgh

Building Department BD Town Hall 177 Hillside Avenue, Greenburgh

Bureau of Engineering * BoE Town Hall 177 Hillside Avenue, Greenburgh

Bureau of Highways * BoH Sanitation/Highway

Garage 100 Sprain Road, P.O. Ardsley

Bureau of Sanitation * BoS Sanitation/Highway

Garage 100 Sprain Road, P.O. Ardsley

Community Development & Conservation

CD&C Town Hall 177 Hillside Avenue, Greenburgh

Community Resources (TDYCC) CR Theodore D. Young Community Center

32 Manhattan Avenue, P.O. White Plains

Comptroller’s Office CO Town Hall 177 Hillside Avenue, Greenburgh

Consolidated Water Dist. No.1 * WD Water Shop 181 Knollwood Road,

P.O. White Plains

Department of Public Works * DPW Town Hall 177 Hillside Avenue, Greenburgh

Greenburgh Nature Center GNC Nature Center 99 Dromore Road, P.O. Scarsdale

Greenburgh Public Library GPL Library 300 Tarrytown Road, P.O. Elmsford

Greenburgh Public Access TV PATV Town Hall 177 Hillside Avenue, Greenburgh

Greenburgh Town Court GTC Town Court Complex 188 Tarrytown Road,

P.O. White Plains

Mechanical Information Systems MIS Town Hall 177 Hillside Avenue, Greenburgh

Office of Town Attorney TA Town Hall 177 Hillside Avenue, Greenburgh

Parks and Recreation P&R Parks and Recreation

Administration Building 11 Olympic Lane, P.O. Ardsley

Philanthropy PLY Town Hall 177 Hillside Avenue, Greenburgh

Police Department PD Police Department

Headquarters 188 Tarrytown Road,

P.O. White Plains

Purchasing Department PURCH Town Hall 177 Hillside Avenue, Greenburgh

Tax Department TD Town Hall 177 Hillside Avenue, Greenburgh

Town Clerk’s Office TC Town Hall 177 Hillside Avenue, Greenburgh

Town Historian TH Town Hall 177 Hillside Avenue, Greenburgh

Town Supervisor/Town Board TB Town Hall 177 Hillside Avenue, Greenburgh

* The Bureaus of Engineering, Highway and Sanitation are within the Department of Public Works

Page 4: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

Chapter 13.0 Implementation and Monitoring

13-4 9-28-16

Table 13.2: Town of Greenburgh Boards, Committees and Miscellaneous

Board or Committee Symbol Members

Affordable Housing Committee AHC -

Antenna Review Board ARB 5

Arts and Culture Committee A&CC 7

Board of Ethics BE 7*

Community Resources Advisory Board CRAB 15

Conservation Advisory Council CAC 6

Friends of the Library Board FLB 16

Greenburgh Nature Center Board of Directors

GNCBoD 17

Greenburgh Public Library Board of Directors GPLBoD 8

Hartsdale Contextual Review Committee HCRC 5

Historic and Landmarks Preservation Board H&LPB 6

Parks and Recreation Advisory Board P&RAB 16

Planning Board PB 8*

Police Department Advisory Board PDAB 15

Town Board TB 5

Zoning Board of Appeals ZBA 8*

Miscellaneous

Hartsdale Public Parking District HPPD 3

* Includes alternate

Table 13.2 lists the boards and committees of unincorporated Greenburgh, as well as the Hartsdale Public Parking District. For implementation responsibilities, these entities are assigned to each appropriate policy in Table 13.4.

Page 5: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

13-5

Unincorporated Greenburgh Comprehensive Plan

9-28-16

Table 13.3 lists inter-municipal and regional planning partners. For implementation responsibilities, these entities are assigned to each appropriate policy in Table 13.4. Inter-municipal agencies typically refer to the municipalities that are adjacent to unincorporated Greenburgh (Village of Ardsley, Village of Dobbs Ferry, Village of Elmsford, Village of Hastings on Hudson, Village of Irvington, Town of Mount Pleasant, Town of North Castle, Village of Scarsdale, Village of Tarrytown, City of White Plains and the City of Yonkers), although inter-municipal coordination is expected with non-adjacent municipalities. Each of these municipalities are highlighted as coordinated planning areas in various portions of the Plan. Two groups are not listed in Table 13.3; however, these groups are the most important planning partners with regard to the Plan’s implementation. The residents and businesses of unincorporated Greenburgh, through continued public outreach and education, will contribute heavily to the success of the Plan’s implementation.

Table 13.3: Intermunicipal and Regional Planning Partners

Planning Partner Symbol

Applicable School District ASD

Consolidated Edison ConEd

Hudson River Valley Greenway HRVG

Hudson Valley Regional Council HVRC

Intermunicipal Agencies * IM

Metro Transit Authority MTA

Mid-Hudson Regional Economic Development Council MHREDC

New York Municipal Transportation Council NYMTC

New York State Department of Environmental Conservation NYSDEC

New York State Department of Environmental Protection NYSDEP

New York State Department of Transportation NYSDOT

New York State Energy Research and Development Authority NYSERDA

New York State Emergency Management Office NYSEMO

New York State Historic Preservation Office NYSHPO

New York State Thruway Authority NYSTA

United Water UW

US Army Corp of Engineers USACE

Westchester Community College & Regional Universities WCC/RU

Westchester County WC

* Typically consists of municipalities adjacent to unincorporated Greenburgh

Page 6: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

Chapter 13.0 Implementation and Monitoring

13-6 9-28-16

13.5 Plan Implementation Timeframes (When)

Plan implementation will begin following adoption of the Plan. The timeframe for implementing each policy is listed in Table 13.4. It is anticipated that policies designated “short term” will be implemented within one to two years. Implementation of policies designated “long term” will take longer than two years. Policies designated with an “ongoing” timeframe are not tasks or actions that can be completed but rather policies and protocols, either existing or newly adopted with the Plan, that require ongoing adherence. Although the Plan will be used to guide decision-making and actions affecting the enhancement, growth and physical development of unincorporated Greenburgh over the next 20 years, it is expected that subsequent plan review and updates will occur every five years. In addition, continual monitoring of the Plan’s progress will take place.

The monitoring process is described in Section 13.7.

13.6 Plan Implementation Procedure Matrix

Table 13.4 lists each policy number found in the Plan. This matrix notes the methods to be used to carry out the respective policy, the entities responsible for implementation, and a timeframe associated with each policy.

Page 7: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

13-7

Unincorporated Greenburgh Comprehensive Plan

9-28-16

Table 13.4: Implementation Procedures

Implementation Type Primary Implementation

Groups Implementation

Timeframe

Chapter 1.0 N/A N/A N/A

Chapter 2.0 N/A N/A N/A

Chapter 3.0 Sustainable Development

Policy 3.1.1.1 TDC CD&C Long Term

Policy 3.1.1.2 CDL CD&C Short Term

Policy 3.1.1.3 CDL CD&C Ongoing

Policy 3.1.1.4 CDL CD&C Ongoing

Policy 3.1.1.5 CDL CD&C Short Term

Policy 3.1.1.6 FP, ZTA, PSC CD&C Short Term

Policy 3.1.1.7 FP, PSC CD&C, TB, PB, BD Ongoing

Policy 3.2.1.1 FP, IM/RC CD&C, MHREDC Long Term

Policy 3.2.1.2 FP, IM/RC CD&C, HVRC Long Term

Policy 3.2.1.3 FP, IM/RC CD&C, WC Long Term

Policy 3.2.1.4 LFS CD&C, PLY Ongoing

Policy 3.2.1.5 FP, IM/RC CD&C, BD, TB Long term

Policy 3.3.1.1 FP, PSC CD&C Long Term

Policy 3.3.1.2 FP, PSC CD&C Long Term

Policy 3.4.1.1 TDC CD&C, OA Short Term

Policy 3.4.1.2 TDC, LFS CD&C Ongoing

Policy 3.4.1.3 FP BD, BoE, DPW, CD&C Ongoing

Policy 3.4.2.1 CMS, LFS BD, DPW, TB, CD&C Ongoing

Policy 3.4.2.2 CMS BD, DPW, TB, CD&C Ongoing

Policy 3.5.1.1 FP, ZMA, ZTA BD, CD&C, CR, P&R Ongoing

Policy 3.5.1.2 FP, ZMA, ZTA ACC, CD&C, H&LPB Ongoing

Policy 3.5.1.3 FP, ZMA, ZTA BoE, BoH, CD&C, DPW Ongoing

Policy 3.5.1.4 FP, ZMA, ZTA CD&C, P&R Ongoing

Policy 3.5.1.5 FP, ZMA, ZTA BoE, BoH, CD&C, DPW Ongoing

Policy 3.5.1.6 FP, ZMA, ZTA BoE, BoH, CD&C, DPW, WC,

NYSDOT, NYMTC Ongoing

Policy 3.5.1.7 FP, ZMA, ZTA CD&C, IM, WC Ongoing

Policy 3.5.1.8 FP, ZMA, ZTA CD&C, IM, MHREDC, WC Ongoing

Policy 3.5.1.9 FP, ZMA, ZTA CD&C, IM, WC Ongoing

Page 8: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

Chapter 13.0 Implementation and Monitoring

13-8 9-28-16

Table 13.4: Implementation Procedures (continued)

Implementation Type Primary Implementation

Groups Implementation

Timeframe

Policy 3.6.1.1 CMS, FP, PSC, TDC BD, BoE, CD&C, DPW,

NYSDEC, NYSEPA, NYSEMO Ongoing

Policy 3.6.1.2 CMS, FP, PSC, TDC BD, BoE, CD&C, DPW,

NYSDEC, NYSEPA, NYSEMO Ongoing

Policy 3.6.1.3 CMS, FP, PSC, TDC BD, BoE, CD&C, DPW,

NYSDEC, NYSEPA, NYSEMO Ongoing

Chapter 4.0 Community Well-Being

Policy 4.1.1.1 FP CD&C, CR, P&R Ongoing

Policy 4.1.1.2 FP ACC, CR, CD&C Ongoing

Policy 4.1.1.3 FP P&R Ongoing

Policy 4.1.1.4 FP, IM/RC CD&C, IM Ongoing

Policy 4.1.1.5 FP CD&C, DPW, P&R, PB, TB Ongoing

Policy 4.1.1.6 TDC CD&C Short Term

Chapter 5.0 Art, Culture and Historic Resources

Policy 5.1.1.1 CMS, FP, PSC ACC, CD&C Ongoing

Policy 5.1.1.2 TDC, FP ACC, CD&C Ongoing

Policy 5.1.1.3 TDC, IM/RC CD&C, H&LPB Ongoing

Policy 5.1.1.4 PSC ACC, CD&C Ongoing

Policy 5.1.1.5 CDL, CMS ACC, CD&C, H&LPB, TC Ongoing

Policy 5.1.1.6 TDC, FP, PSC ACC, CD&C Ongoing

Policy 5.1.1.7 TDC, FP, PSC ACC, CD&C Long Term

Policy 5.1.1.8 FP, ZTA ACC, CD&C, TA Short Term

Policy 5.1.1.9 CMS H&LPB, CD&C Ongoing

Policy 5.1.1.10 CMS H&LPB, CD&C, TB, PB Ongoing

Policy 5.1.1.11 TDC, LFS TH, H&LPB, CD&C Ongoing

Policy 5.1.1.12 TDC, CMS, PSC CD&C, TB, PB Ongoing

Policy 5.1.1.13 TDC TA, TB, CD&C, H&LPB Short Term

Policy 5.2.1.1 CMS CD&C Ongoing

Policy 5.2.1.2 CMS, FP H&LPB, CD&C Ongoing

Policy 5.2.1.3 CMS H&LPB, PB, TB Ongoing

Policy 5.2.1.4 CMS H&LPB, CD&C Ongoing

Page 9: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

13-9

Unincorporated Greenburgh Comprehensive Plan

9-28-16

Table 13.4: Implementation Procedures (continued)

Implementation Type Primary Implementation

Groups Implementation Timeframe

Policy 5.2.1.5 TDC, FP H&LPB, CD&C Long Term

Policy 5.2.1.6 FP, ZTA CD&C, ACC Long Term

Policy 5.2.1.7 TDC, FP TB, ACC, TB, H&LPB Short Term

Policy 5.2.1.8 ZTA TB, ACC, CD&C Short Term

Chapter 6.0 Environmental Resources and Related Systems

Policy 6.1.1.1 ZTA BoE, CD&C, TA Short Term

Policy 6.1.1.2 ZTA BoE, CD&C, TA, BD Short Term

Policy 6.1.1.3 ZTA BoE, CD&C, TA, BD Short Term

Policy 6.2.1.1 CMS, FP CAC, PB, TB, ZBA Ongoing

Policy 6.2.1.2 CMS, FP, ZTA CAC, CD&C, TB, TA, BD Ongoing

Policy 6.2.1.3 CMS, FP, ZTA CAC, CD&C, TB, TA, BD Ongoing

Policy 6.2.1.4 ZTA CAC, CD&C, TB, TA Short Term

Policy 6.2.1.5 FP, ZTA CAC, CD&C Short Term

Policy 6.2.1.6 TDC, CMS, FP CAC, CD&C Ongoing

Policy 6.2.1.7 TDC, CMS, FP CAC, PB, TB, ZBA Ongoing

Policy 6.2.1.8 TDC, CMS, FP CAC, PB, TB, ZBA Ongoing

Policy 6.2.1.9 CMS, FP CAC, PB, TB, ZBA Ongoing

Policy 6.3.1.1 FP CAC, PB, TB, ZBA Ongoing

Policy 6.3.1.2 ZTA BoE, CD&C, TA Short Term

Policy 6.4.1.1 TDC, FP, IM/RC CAC, CD&C, NYSDOT, PB,

TB, ZBA Ongoing

Policy 6.4.1.2 ZTA BD, BoE, CD&C Short Term

Policy 6.4.1.3 ZTA BD, CD&C, TB, CAC, TA Short Term

Policy 6.4.1.4 ZTA BD, CD&C, TB, CAC, TA Short Term

Policy 6.4.1.5 CMS, FP CAC, PB, TB, ZBA Ongoing

Policy 6.4.1.6 ZTA BD, CD&C, TB, CAC, TA Short Term

Policy 6.5.1.1 TDC, FP, PSC PB, TB, ZBA Ongoing

Policy 6.5.1.2 FP, ZTA CD&C, PB, TA, TB, ZBA Ongoing

Policy 6.6.1.1 DC, IM/RC CD&C, NYSDOT, PB, TB,

WC Ongoing

Policy 6.6.1.2 CMS, IM/RC BoE, CD&C, ConEd, DPW Ongoing

Policy 6.6.1.3 CMS, FP CAC, PB, TB, ZBA Ongoing

Policy 6.7.1.1 FP, ZTA BD, CD&C, PB, TB, ZBA Ongoing

Policy 6.7.1.2 IM/RC BoE, BoH, CD&C, DPW,

NYSDOT Ongoing

Policy 6.8.1.1 IM/RC BoE, BoH, CD&C, DPW,

NYSDOT Ongoing

Page 10: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

Chapter 13.0 Implementation and Monitoring

13-10 9-28-16

Table 13.4: Implementation Procedures (continued)

Implementation Type Primary Implementation

Groups Implementation

Timeframe

Policy 6.8.1.2 CMS, FP CAC, PB, TB, ZBA Ongoing

Policy 6.8.1.3 TDC BoE, CD&C, DPW Ongoing

Policy 6.9.1.1 FP, ZTA CAC, CD&C, PB, TA, TB Short Term

Policy 6.9.1.2 FP, ZTA CD&C, PB, TA, TB, Short Term

Policy 6.9.1.3 FP, ZTA CD&C, PB, TA, TB, Short Term

Policy 6.9.1.4 FP, ZTA CD&C, PB, TA, TB Short Term

Chapter 7.0 Parks, Trails, Open Space and Recreation Facilities

Policy 7.1.1.1 CDL, TDC P&R Ongoing

Policy 7.1.1.2 TDC P&R Long Term

Policy 7.1.1.3 CMS, TDC BoE, P&R Ongoing

Policy 7.1.1.4 CMS, TDC BoE, P&R Ongoing

Policy 7.1.2.1 TDC BoE, P&R, TB Long Term

Policy 7.1.2.2 TDC P&R, TB Ongoing

Policy 7.1.2.3 TDC, LFS P&R, TB Long Term

Policy 7.2.1.1 TDC, CDL P&R, TB, CD&C Ongoing

Policy 7.2.1.2 TDC, TA, CD&C, HPPD, P&R Short Term

Policy 7.2.1.3 TDC, FP, ZTA P&R, TB, CD&C Short Term

Policy 7.2.1.4 TDC, FP, ZTA P&R, TB, CD&C Short Term

Policy 7.2.2.1 CDL P&R, TC Ongoing

Policy 7.2.2.2 FP P&R, TA, CD&C Short Term

Policy 7.2.2.3 FP P&R, TB Ongoing

Policy 7.2.2.4 FP P&R, TB Ongoing

Policy 7.2.2.5 CDL, TDC P&R, TB Ongoing

Policy 7.2.3.1 IM/RC CD&C, P&R, TA Ongoing

Policy 7.2.3.2 TDC CR, P&R, TA Ongoing

Policy 7.2.3.3 TDC CD&C, HRVG Ongoing

Policy 7.2.3.4 TDC, IM/RC, FP CD&C, IM, WC Ongoing

Policy 7.2.3.5 FP, ZTA PB, TB Ongoing

Policy 7.2.3.6 TDC, FP P&R, TA, TB Short Term

Policy 7.2.3.7 TDC, ZTA CD&C, TB Short Term

Policy 7.2.4.1 TDC, FP H&LPB, NYSHPO, WC Long Term

Policy 7.2.4.2 TDC, FP P&R, TA, TB Ongoing

Page 11: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

13-11

Unincorporated Greenburgh Comprehensive Plan

9-28-16

Table 13.4: Implementation Procedures (continued)

Implementation Type Primary Implementation

Groups Implementation

Timeframe

Policy 7.2.5.1 TDC, FP, IM/RC BoH, HRVG, IM, NYSDOT,

PB, P&R, TB, WC Ongoing

Policy 7.2.5.2 TDC HRVG, NYDOT, PB, TB, WC Ongoing

Policy 7.2.5.3 TDC, IM/RC HRVG, IM, P&R, TB, WC Ongoing

Policy 7.2.5.4 CDL CD&C, P&R Long Term

Policy 7.2.5.5 FP, ZTA P&R, PB, TA, TB Short Term

Policy 7.2.5.6 TDC P&R, TA, TB, CD&C Long Term

Policy 7.2.5.7 TDC P&R, TA Long Term

Policy 7.3.1.1 TDC P&R Long Term

Policy 7.3.1.2 ZMA, ZTA CD&C, P&R, TA Short Term

Policy 7.3.1.3 ZTA CD&C, TA Short Term

Policy 7.3.1.4 ZTA CD&C, TA Long Term

Policy 7.3.1.5 TDC, FP TDC, FP Ongoing

Policy 7.3.1.6 ZTA CD&C, TA Short Term

Policy 7.3.1.7 IM/RC ConEd, TDC, IM Ongoing

Policy 7.3.1.8 TDC, IM/RC, LFS P&R, TB, CD&C Long Term

Policy 7.4.1.1 FP DPW, PB, P&R, TB Ongoing

Policy 7.4.1.2 TDC CD&C Long Term

Policy 7.4.1.3 FP DPW, P&R Ongoing

Policy 7.4.2.1 FP DPW, PB, P&R, TB Ongoing

Policy 7.4.2.2 TDC, FP BoH, DPW, P&R Ongoing

Chapter 8.0 Public Infrastructure and Essential Services

Policy 8.1.1.1 FP BoE, DPW Ongoing

Policy 8.1.1.2 CMS/FP PB, TB, ZBA, CD&C, TA Ongoing

Policy 8.1.1.3 FP, TDC, PSC TB, TA, CD&C, BofE, DPW Ongoing

Policy 8.1.1.4 FP, TDC, PSC TB, TA, CD&C, BofE, DPW Long Term

Policy 8.1.2.1 FP BoE, DPW Ongoing

Policy 8.1.2.2 CDL BoE, DPW Long Term

Policy 8.1.2.3 CDL BoE, DPW Long Term

Policy 8.1.2.4 FP BoE, DPW Ongoing

Page 12: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

Chapter 13.0 Implementation and Monitoring

13-12 9-28-16

Table 13.4: Implementation Procedures (continued)

Implementation Type Primary Implementation

Groups Implementation

Timeframe

Policy 8.1.2.5 TDC, FP BoE, CD&C, DPW Ongoing

Policy 8.1.3.1 TDC BoE, DPW Long Term

Policy 8.1.3.2 TDC BoE, DPW Ongoing

Policy 8.1.3.3 TDC BoE, CD&C, ConEd, DPW,

UW Ongoing

Policy 8.1.3.4 TDC, IM/RC, PSC CD&C, DPW Ongoing

Policy 8.1.3.5 FP BoE, DPW, PB, TB Ongoing

Policy 8.1.3.6 IM/RC, PSC, TDC BoE, CD&C, ConEd, DPW Long Term

Policy 8.2.1.1 CMS, TDC DPW, UW Ongoing

Policy 8.2.1.2 TDC DPW Ongoing

Policy 8.2.1.3 CMS, TDC DPW Ongoing

Policy 8.2.1.4 CMS DPW Ongoing

Policy 8.2.1.5 TDC, IM/RC BD, DPW, UW Ongoing

Policy 8.2.2.1 CMS CD&C, DPW Ongoing

Policy 8.2.2.2 CMS CD&C, PB, TB Ongoing

Policy 8.2.2.3 FP CD&C, DPW Ongoing

Policy 8.2.2.4 FP CD&C, PB, TB Ongoing

Policy 8.2.2.5 FP DPW, NYCDEP, WC Ongoing

Policy 8.2.1.6 IM/RC, LFS, TDC BoE, WD, TB, TA Long Term

Policy 8.2.1.7 LFS, IM/RC, TDC BoE, CD&C, WD, TB, TA Short Term

Policy 8.2.3.1 FP DPW Ongoing

Policy 8.2.3.2 CMS DPW Ongoing

Policy 8.2.3.3 FP DPW Ongoing

Policy 8.3.1.1 TDC, FP CD&C, DPW, TA Long Term

Policy 8.3.1.2 CMS, TDC, FP ConEd, DPW Ongoing

Policy 8.3.1.3 CDL BoE, CD&C Short Term

Policy 8.3.2.1 CDL BoE, DPW Long Term

Policy 8.3.2.2 CMS DPW Ongoing

Policy 8.3.3.1 FP BoE, DPW, TB Long Term

Policy 8.3.3.2 CMS, TDC, LFS BoE, DPW, TB, CD&C Ongoing

Policy 8.3.3.3 FP, PSC, TDC BoE, CD&C, DPW, PB, TB Ongoing

Policy 8.3.4.1 FP DPW Ongoing

Policy 8.3.4.2 TDC DPW Short Term

Policy 8.4.1.1 TDC, PSC DPW Long Term

Page 13: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

13-13

Unincorporated Greenburgh Comprehensive Plan

9-28-16

Table 13.4: Implementation Procedures (continued)

Implementation Type Primary Implementation

Groups Implementation

Timeframe

Policy 8.4.1.2 ZTA TB, TA, BoE, CD&C, BD Long Term

Policy 8.4.2.1 TDC, PSC BoE, CD&C, DPW, PB, TB Long Term

Policy 8.4.2.2 TDC, FP BoE, DPW, PB, TB Ongoing

Policy 8.4.2.3 TDC, FP BoE, PB, TB Ongoing

Policy 8.4.2.4 TDC, PSC BoE, CD&C, DPW, PB, TB Ongoing

Policy 8.4.2.5 TDC, PSC CD&C, DPW, PB, TA, TB Ongoing

Policy 8.4.2.6 TDC, IM/RC CD&C, DPW, IM, TA, WC Ongoing

Policy 8.4.2.7 TDC BoE, DPW Ongoing

Policy 8.5.1.1 FP BoE, CD&C, DPW, PB, TB Ongoing

Policy 8.5.1.2 FP DPW, TA Ongoing

Policy 8.5.1.3 CMS DPW Ongoing

Policy 8.5.1.4 CMS DPW Ongoing

Policy 8.5.1.5 CMS, IM/RC DPW, TB Ongoing

Policy 8.5.1.6 TDC, IM/RC DPW, TB, TA, WC Ongoing

Policy 8.6.1.1 FP CD&C Ongoing

Policy 8.6.1.2 FP CD&C Ongoing

Chapter 9.0 Transportation, Mobility and Access

Policy 9.1.1.1 FP, PSC CD&C, DPW, PB, TB Ongoing

Policy 9.1.1.2 TDC, FP CD&C, NYSDOT, WC Ongoing

Policy 9.1.1.3 TDC, ZMA, ZTA IM, PB, TB, WC Long Term

Policy 9.1.1.4 TDC, FP, IM/RC, LFS CD&C Ongoing

Policy 9.1.1.5 DC, FP, CMS CD&C, PB, TB, ZBA Ongoing

Policy 9.1.1.6 TDC, FP, LFS, PSC TB, TA, DPW, CD&C,

NYSDOT Ongoing

Policy 9.1.1.7 TDC, FP, LFS, PSC TB, TA, DPW, CD&C Ongoing

Policy 9.2.1.1 ZTA PB, TB Ongoing

Policy 9.2.1.2 FP, IM/RC, LFS CD&C, WC, HRVG Ongoing

Policy 9.2.1.3 TDC, IM/RC, PSC CD&C, HRVG, WC, PB, TB Ongoing

Policy 9.2.1.4 FP, TDC, IM/RC TB, CD&C Ongoing

Policy 9.2.1.5 FP, TDC, IM/RC TB, CD&C Ongoing

Policy 9.2.1.6 TDC, IN/RC CD&C, WC, HRVG Long Term

Policy 9.3.1.1 TDC, PSC CD&C, IM, NYSDOT, NYSTA,

NYMTC, PB, TB, WC Ongoing

Policy 9.3.1.2 TDC, PSC CD&C, PB, TA, TB Long Term

Page 14: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

Chapter 13.0 Implementation and Monitoring

13-14 9-28-16

Table 13.4: Implementation Procedures (continued)

Implementation Type Primary Implementation

Groups Implementation

Timeframe

Policy 9.3.1.3 TDC, FP, PSC PB, TB Ongoing

Policy 9.3.1.4 FP PB, TB Ongoing

Policy 9.3.1.5 IM/RC CD&C, WC Ongoing

Policy 9.4.1.1 TDC, ZTA CD&C, NYSDOT, PD Long Term

Policy 9.4.2.1 FP PB, TB Ongoing

Policy 9.5.1.1 FP PB, TB Ongoing

Policy 9.5.1.2 TDC, IM/RC CD&C, DPW, TA Ongoing

Policy 9.5.1.3 FP CD&C, PB, TB Ongoing

Policy 9.6.1.1 IM/RC CD&C, NYMTC, PD Ongoing

Policy 9.6.1.2 FP, IM/RC CD&C, PB, TB Ongoing

Policy 9.6.1.3 TDC PD Long Term

Policy 9.6.1.4 IM/RC CD&C, DPW, NYSDOT Short Term

Policy 9.7.1.1 TDC, CS PD Ongoing

Policy 9.7.1.2 FP CD&C, DPW, PB, TB Ongoing

Policy 9.7.1.3 CMS, TDC, IM/RC TB, PD, CD&C, WC Ongoing

Policy 9.8.1.1 TDC, FP CD&C, PD Ongoing

Policy 9.9.1.1 IM, RC CD&C, IM, NYMTC,

NYSDOT, WC Ongoing

Policy 9.9.1.2 CMS, FP, ZTA TB, PB, ZBA, CD&C, DPW Ongoing

Policy 9.9.1.3 CDL, TDC TB, CD&C Long Term

Policy 9.10.1.1 CMS, TDC, PSC TB, PB, DPW, CD&C Long Term

Policy 9.10.1.2 CMS, TDC TB, DPW, CD&C Ongoing

Policy 9.10.1.3 TDC, ZTA CD&C Long Term

Policy 9.10.1.4 FP, PSC, CMS TB, PB, ZBA, CD&C Ongoing

Policy 9.11.1.1 ZTA CD&C, TB, TA Short Term

Policy 9.11.1.2 ZTA CD&C, TB, TA Short Term

Policy 9.11.1.3 FP, CMS, PSC CD&C, TB, PB Ongoing

Policy 9.11.1.4 FP, ZTA, CMS, PSC CD&C, TB, TA, PB Ongoing

Policy 9.11.1.5 FP, ZTA, CMS, PSC CD&C, TB, TA, PB Short Term

Policy 9.11.1.6 FP, ZTA, CMS, TDC CD&C, TB, TA, PB, ZBA Short Term

Policy 9.12.1.1 FP, ZMA, ZTA PB, TB, CD&C, NYSDOT, WC Ongoing

Policy 9.12.1.2 FP, ZMA, ZTA CD&C, PB, TB, NYSDOT, WC Long Term

Page 15: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

13-15

Unincorporated Greenburgh Comprehensive Plan

9-28-16

Table 13.4: Implementation Procedures (continued)

Implementation Type Primary Implementation

Groups Implementation

Timeframe

Policy 9.12.1.3 ZTA TB, TA, CD&C Long Term

Policy 9.12.1.4 IM/RC, TDC CD&C, HCRC Long Term

Chapter 10.0 Demographics and Housing

Policy 10.1.1.1 ZMA CD&C, TA Short Term

Policy 10.1.1.2 TDC, ZMA, ZTA CD&C Ongoing

Policy 10.1.1.3 CMS, TDC BD, TB Ongoing

Policy 10.1.1.4 ZTA BD, CD&C, TA Short Term

Policy 10.1.1.5 ZTA CD&C, TA, TB Short Term

Policy 10.2.1.1 ZTA, TDC, PSC CD&C, TB, TA Short Term

Policy 10.2.1.2 TDC, PSC CD&C, TB, TA Long Term

Policy 10.2.1.3 ZTA CD&C, TA, TB Short Term

Policy 10.2.1.4 ZTA CD&C, TA, TB Short Term

Policy 10.2.2.1 TDC, ZTA CD&C, TB, TA Short Term

Policy 10.2.2.2 TDC, ZTA CD&C, TA, TB Short Term

Policy 10.2.3.1 TDC, ZTA BD, CD&C, TA Long Term

Policy 10.2.3.2 TDC, ZTA CD&C, TA, TB Short Term

Policy 10.2.4.1 FP, TDC CD&C, TB, AHC Short Term

Policy 10.3.1.1 FP CD&C, TB Ongoing

Chapter 11.0 Economic Development

Policy 11.1.1.1 IM/RC CD&C, IM, WC Ongoing

Policy 11.1.1.2 IM/RC CD&C, WC Ongoing

Policy 11.1.1.3 IM/RC CD&C, MHREDC, WC Ongoing

Policy 11.1.1.4 IM/RC CD&C, MHREDC, WC Ongoing

Policy 11.1.1.5 IM/RC CD&C, HVRC Ongoing

Policy 11.2.1.1 PSC CD&C Ongoing

Policy 11.2.1.2 PSC CD&C Short Term

Policy 11.2.1.3 TDC CD&C, IM Long Term

Policy 11.2.1.4 TDC, PSC CD&C Ongoing

Policy 11.2.1.5 TDC, IM/RC CD&C, TB, WCC/RU Ongoing

Policy 11.2.1.6 TDC, PSC CD&C Ongoing

Policy 11.3.1.1 TDC CD&C, DPW Long Term

Policy 11.3.1.2 PSC CD&C Ongoing

Policy 11.4.1.1 TDC, IM/RC, PSC CD&C, NYMTC, NYSDOT,

PB, TB, WC Ongoing

Policy 11.4.1.2 TDC, IM/RC, PSC CD&C, NYMTC, NYSDOT,

TA, TB Ongoing

Policy 11.4.1.3 IM/RC CD&C, IM, NYMTC,

NYSDOT, TA, TB Ongoing

Page 16: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

Chapter 13.0 Implementation and Monitoring

13-16 9-28-16

Table 13.4: Implementation Procedures (continued)

Implementation Type Primary Implementation

Groups Implementation

Timeframe

Policy 11.4.1.4 TDC, PSC PB, TB Ongoing

Policy 11.4.1.5 IM/RC, ZMA, ZTA CD&C, WC Long Term

Policy 11.5.1.1 ZMA, ZTA CD&C, PB, TB Ongoing

Policy 11.5.1.2 ZTA CD&C, PB, TB Ongoing

Policy 11.5.1.3 CMS, ZMA, ZTA CD&C, PB, TB Ongoing

Policy 11.5.1.4 FP, TDC, ZTA CD&C, PB, TB Ongoing

Policy 11.5.1.5 FP, TDC, ZTA CD&C, PB, TB Ongoing

Policy 11.5.1.6 FP CD&C, PB, TB Ongoing

Policy 11.5.1.7 FP, TDC, ZTA CD&C, PB, TB Ongoing

Policy 11.6.1.1 FP, ZTA CD&C, PB, TB Ongoing

Policy 11.6.1.2 FP, ZTA CD&C, PB, TB Ongoing

Policy 11.6.1.3 FP, ZTA CD&C, PB, TB Ongoing

Policy 11.7.1.1 FP, TDC, LFS CD&C, PD Long Term

Policy 11.7.1.2 FP, TDC CD&C, HPPD Long Term

Policy 11.8.1.1 TDC CD&C Long Term

Policy 11.8.1.2 TDC, LFS CD&C, MHREDC Long Term

Policy 11.9.1.1 CMS, FP, PSC TB, PB, CD&C Ongoing

Policy 11.9.1.2 CMS, FP, PSC TB, PB, CD&C Ongoing

Policy 11.9.1.3 CMS, FP, PSC TB, PB, CD&C Ongoing

Policy 11.9.1.4 FP, IM/RC TA, CD&C, PD Ongoing

Chapter 12.0 Land Use and Zoning

Policy 12.1.1.1 ZMA CD&C, PB, TB Short Term

Policy 12.2.1.1 ZMA, ZTA CD&C, TA Short Term

Policy 12.2.1.2 ZMA, ZTA CD&C, TA Short Term

Policy 12.2.1.3 DC, TDC, ZMA, ZTA CD&C, TA Long Term

Policy 12.2.1.4 TDC, FP, ZTA CD&C, TA, TB Short Term

Policy 12.2.1.5 TDC, FP, ZTA CD&C, TA, TB Short Term

Policy 12.2.1.6 TDC, FP, ZTA CD&C, TA, TB Short Term

Policy 12.2.1.7 ZTA CD&C, TA, TB Short Term

Policy 12.2.1.8 ZTA CD&C, TA, TB Short Term

Policy 12.2.2.1 ZTA TB, CD&C, TA Long Term

Policy 12.3.1.1 IM/RC, PSC, CMS CD&C, IM, NYSDOT, NYMTC, NYSTA, WC

Long Term

Policy 12.3.2.1 IM/RC, PSC, CMS CD&C, IM, NYSDOT, NYMTC, NYSTA, WC

Long Term

Policy 12.3.3.1 IM/RC, PSC, CMS CD&C, IM, NYSDOT, NYMTC, NYSTA, WC

Long Term

Policy 12.3.4.1 IM/RC, PSC, CMS CD&C, HPPD, WC, PD Short Term

Page 17: hapter 13.0 Implementation and Monitoring - … · implementation is also a significant focus of this chapter. 13.2 ... continual monitoring of the Plan’s progress ... hapter 13.0

13-17

Unincorporated Greenburgh Comprehensive Plan

9-28-16

13.7 Plan Monitoring Responsibilities and Timeframes

The Department of Community Development and Conservation, consistent with facilitating implementation duties, will also take the lead role in monitoring progress of the plan. Following adoption of the Plan, an annual progress report will be issued indicating goals and objectives that have been achieved.

Table 13.4: Implementation Procedures (continued)

Implementation Type Primary Implementation

Groups Implementation

Timeframe

Chapter 12.0 Land Use and Zoning

Policy 12.3.5.1 IM/RC, PSC, CMS CD&C, IM, NYSDOT, NYMTC, NYSTA, WC

Long Term

Policy 12.3.6.1 IM/RC, PSC, CMS CD&C, NYSDOT, NYMTC,

HPPD Long Term

Policy 12.3.6.2 DC, TDC, PSC CD&C, NYSDOT, HPPD Short Term

Policy 12.3.7.1 DC, TDC, PSC, LFS CD&C, HPPD Short Term

Policy 12.3.8.1 IM/RC, PSC, CMS CD&C, IM, NYSDOT, NYMTC, NYSTA, WC

Long Term

Policy 12.4.1.1 CMS, IM/RC, TDC, PSC CD&C, IM, NYSDOT, NYMTC, NYSTA, WC

Ongoing

Policy 12.4.1.2 CMS, IM/RC, TDC, PSC CD&C, IM, NYSDOT, NYMTC, NYSTA, WC

Ongoing

Policy 12.5.1.1 ZMA, TMA, TDC, PSC CD&C, IM, WC Short Term

Policy 12.5.1.2 ZMA, ZTA, IM/RC CD&C, TA, TB Short Term

Policy 12.6.1.1 TDC, PSC, LFS CD&C, PD, GTC Long Term

Policy 12.6.1.2 TDC, PSC CD&C, HPPD Long Term