HAMILTON’S PRIME INDUSTRIAL PARK
READY 2 NOVEMBER!! A Standalone office/warehouse buildings for lease
600 Arthur Porter Drive, Te Rapa Te Rapa Gateway Industrial Development, Hamilton, New Zealand
Table of Contents
1. Location2. Site Plan3. Development Brief4. Pricing5. Plans6. Outline Specification
1. LocationTe Rapa Gateway is the Gateway to Hamilton. Strategically located and just minutes from the Waikato Expressway, main northern rail line, Te Rapa Road, Avalon Road and the largest shopping centre in New Zealand, The Base, Te Rapa Gateway is the ideal place to locate your business operations in an area long associated with Hamilton industry.
Proposed bus and rail links in close proximity to the industrial park will be an important feature for businesses and staff alike. The Rotokauri future urban area on the opposite side of the expressway will provide future opportunity for businesses moving to Te Rapa Gateway, as will the expressway from Hamilton to Auckland, which is due for completion by 2019.
75 10 85 MINS MINS MINS
AUCKLAND HAMILTON CBD TAURANGA
2. Site Plan
Location of the Office/Warehouse standalone building – 600 Arthur Porter Drive
3. Development Brief
Chalmers Properties have developed the office and warehouse standalone buildings which are designed and constructed to the highestquality buildings which will suit its surroundings in the Te Rapa Gateway Industrial Park. The building comprises of Office/Showroom andWarehouse at ratios demanded by the market and available to lease now!
Building: 600 Arthur Porter Drive, Te Rapa Office – 249m2 Warehouse – 1,060m2 Canopy – 249m2
Zoning: Rotokauri Industrial, Hamilton City Council
Features: 9 metre clear span Warehouse
2 level offices overlooking high profile Arthur Porter Drive
Drive through truck access
Easy Access to by major arterial routes
Close to key amenities
On-site car parking
Minimum 100% NBS
Duel supply 11KVA electrical reticulation
Ultra-fast Broadband
Completion: Ready for 2 November 2019 occupation.
Contact Us Michael Clark Sales and Development Manager [email protected] 09 212 8712 021 279 0622 David Chafer General Manager [email protected] 03 472 9894 29 9 6205
4. Pricing
560 Arthur Porter Drive Area (sqm) Rental ($/sqm) Rental p.a.
Office 249.00 $ 225.00 $ 56,025.00 Warehouse 1,060.00 $ 125.00 $ 132,500.00
Canopy 249.00 $ 65.00 $ 16,185.00 TOTAL $ 204,710.00
*All prices are net rent and plus GST (if any).
*Agreement to Lease documents can be supplied upon request.
5. Plans and Perspectives
A000
AS SHOWN @ A1
dwg No
Index & Locality Plan
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON JVINDUSTRIAL PARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 8/11/2018
C
rev date details
C H A L ME R S R O
A D
AR
TH
UR
PO
RT
ER
DR
I VE
PROPOSEDDEVELOPMENT
LOT 18
CL
EM
NE
WB
Y R
OA
D
ID
A000A100A101A102A200A201A202A300A301A302A303A400A401A402A403A404A500A501A600A601A700A701A702A703A704A705A706A707A708A709
SHEET
Index & Locality PlanProposed Site Plan & Accessibility PlanSite PlanSite works DetailFloor Plan: WarehouseFloor PLan OfficeRoof PlanElevationsSections: WarehouseSections: OfficeSections: OfficeStairsStairsInternal Elevations: Ground Floor OfficeLunch Room: Floor Plan & ElevationsLunch Room: Sections & DetailsReflected Ceiling PlanFloor Finishes PlanWindow ScheduleDoor ScheduleConstruction Details: WarehouseConstruction Details: WarehouseConstruction Details: WarehouseConstruction Details: WarehouseConstruction Details: OfficeConstruction Details: OfficeConstruction Details: OfficeConstruction Details: OfficeConstruction Details: OfficeConstruction Details: Office
N
Ground Floorscale 1:2500
TE RAPA GATEWAY DEVELOPMENTWAREHOUSE & OFFICE BUILDINGS:LOT 18HAMILTON JV INDUSTRIAL PARK
14 S
ept 2
018
Dev
elop
ed D
esig
n
AAAAAAAAAAAAAAAAAAAAA
25 O
ctob
er 2
018
Det
aile
d D
esig
n
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
06 N
ovem
ber 2
018
For C
onse
nt
CCCCCCCCCCCCCCCCCCCCCCCCCCCCCC
D
07 N
ovem
ber 2
018
For C
onse
nt_F
ire D
oors
D
D
D
D
A100
AS SHOWN @ A1
dwg No
Proposed Site Plan &Accessibility Plan
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 2019/4/2
C
rev date details
Total Site Area: 2,516 m2
Total Site Area: 2,562 m2
148 m2
149 m2Total site area: 3,395 m2
118 m2
59 m2
Total Site Area: 2,369 m2
1,051 m2
1,094 m2
100 m2
Total Site Area: 2,369 m2
1,094 m2
1,051 m2
27 m2
To exterior edge of canopy: 248 m2
103 m2
9,000
Total site area: 3,834 m2
OFFICE
OFFICE
(14)EXISTING LOT 20
WAREHOUSE TO REMAIN
EXISTING LOT 19WAREHOUSE TO REMAIN
261m2
258m2
LOT 18WAREHOUSE
(8)
(6)
LOT 21 & 22
LOT 23WAREHOUSE(51m x 26.3m)
Warehouse Gross Area: 1,321m2
12345678910111213
1 2
123
56
78
910
1112
1 2 3 4
1
13
20 m2
OFFICE359m2
OFFICE359m2
C H A L M E R S R O A D
AR
TH
UR
P
OR
TE
R
DR
IV
E
R.O
.W
CL
EM
N
EW
BY
R
OA
D
(19)
R.O
.W
5m buildingsetback 9,000
E01A300
23 m2
OFFICE200m2
100/100
6,000
1,00
02,
500
Loading Bay
5 x Bicycle Parks
56
78
910
1112
1 2 3 4
13
E01A300
1xAccessible CarParking space with
yellow road markings &accessibility symbol
Kerb ramp to pavedarea; max slope 1 in 8
Accessible thresholdand signage on entry
door at 1550mmabove FFL
Toilet sign fixed tooutside of doors D12
& D13 at 1550mmabove FFL
Accessible WC c/wUnisex signage fixed
to outside of doorsD14 at 1550mm
above FFL
SITE PLAN 1:500scale 1:500
ACCESSIBILITY PLANscale 1:200
KERB RAMPnot to scale
NOTE: Refer A200, A201 & A601 for Accessible Doorwidths and details
D
LOT 18TOTAL SCHEDULE OF AREAS
Ref
eren
ceN
orth
SITE COVERAGE
Site Area: 2,369m2
Permeable Area: 103m2 4.3%(20% of entire site= 473m2)
PARKING REQUIREMENTS
CPD Parking Requirements:Warehouse 1 per 150m²Office 1 per 40m²Accessible 1 for up to 20 carparksCycle Racks 1 per 10 staff
Warehouse 1,060m² ( 7 Required)Office 200m² ( 5 Required)
Total Carparks Required 13Total Carparks Achieved 13
Chalmers RoadNorthgateHamilton 3200
Lots 18DP 519482600 Arthur Porter Drive, Hamilton
Site Area 2,369m2
Warehouse Gross 1,060m2LunchRoom Gross 23m2Stairs Gross 26m2Total Warehouse Gross 1109m2
Office Gross 200m2
Canopy 248m2
Total Built Area Gross 1,309m2
Total Site Coverage Gross 55.3%
SITE LEGAL DESCRIPTION
W
S E
N
W i n t e r S u n r i s e
Summe r S u n r i s e
W i n t e r S u n s e tS u m m e r S u n s e t
https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65793939https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043354https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65793941https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65793941
2/05/2019
FOR CONSENT/ CONSTRUCTIONTE RAPA GATEWAY WAREHOUSE & OFFICEDEVELOPMENT LOT 18 (SPEC BUILDING)HAMILTON JV INDUSTRIAL PARK
rev date details24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
design
drawn
job no.
cad file
checked
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
job title dwg title
A101
dwg Nostatus rev
CSite Plan
date
#Pln
AS SHOWN @ A1scale
22,4
00
49,506
2,20
05,
000
2,340 6,037
5,38
05,
220
10,6
002,
200
13,0
00
9,50
0
2,50
02,
500
2,50
02,
500
2,50
02,
500
2,50
02,
500
1,20
02,
500
Set-out 13,890
2,500 1,100 2,500 2,500 2,500
1,45
03,
940
3,94
01,
290
1,45
03,
940
3,94
01,
290
500
500
7,50
050
050
0
5,015
RL + 32.53RL + 32.40
RL + 32.40RL + 32.40
RL + 32.32
RL + 32.32
RL + 32.05 RL + 32.05
RL + 31.05
G01 G02
5m RD 5m RD
Amin 1:100 fall
min 1:100 fall
HT HT
HT
CANOPY
Staff Courtyard
LOT 18WAREHOUSE
Gross Area: 1060m 2(49.5x22.4)
FFL+ 32.55
FFL+ 32.55
LOADING BAY
56
78
910
1112
1 2 3 4
13
OFFICEGross Area: 200m2
(2 story)100/100
11,100
7,700
Set-o
ut 1
0,61
0
Set-out
E01A300
B
B
B
B
B
B
B
B
K
SITE PLAN 1:100scale 1:100
NOTES
3.
Refer Civil Engineers drawings for Site, paving levels andboundary retaining walls
Refer Civil Engineers drawings for all Site drainage andSanitary Sewer layout details
Refer Electrical Engineers drawings for incoming Electricalsupply, lighting and all Electrical services
1.
2.
4.
All car parks to be marked using 100mm wide ReseneSidewalk paving paint
Main contractor to provide all temporary power & watersupplies during construction
6.
Refer Electrical Engineers drawings for all site and exteriorbuilding lighting details
5.
7. Provide temporary power at pillar box
Property boundary
LEGEND
Grassed Area; topsoil and grass seedingYard pavement: 175mm concrete on hardfillrefer to Civil Engineer's drawings forspecification
Carpark pavement: 35mm MIX asphaltconcrete on hardfill; refer to Civil Engineer'sdrawings for specification
Footpath/Hardstand pavement: 20mm MIX14 asphalt concrete on hardfill; refer to CivilEngineer's drawings for specification
Existing neighbours fence to remain
Sliding Yard gate/door; refer A103 for detailG01
A
Kerb ramp to comply with NZBC D1; referCivil drawings for detail
K
ACO threshold drain with Galv SteelLongitudinal Grate (located at entry)
B
x3 Hose tapHT
x8 Bollards; Refer to A102 for details
D
Ref
eren
ceN
orth
W
S E
N
W i n t e r S u n r i s eSumme r S u n r i s e
W i n t e r S u n s e t
S u m m e r S u n s e t
https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436614https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340
A102
AS SHOWN @ A1
dwg No
Site works Detail
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON JVINDUSTRIAL PARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 20/12/2018
C
rev date details
300 150 300
300 150 300
A
align
LC
align
LC
1200mm high 165Ø x 5mmgalvanised ms pipe bollard,filled with concrete, capped,yellow powdercoat finish(including baseplate)
Bollard base plate; as permanufacturer's detail
Bollard base plate; as permanufacturer's detail
1200mm high 165Ø x 5mmgalvanised ms pipe bollard,filled with concrete, capped,yellow powdercoat finish(including baseplate)
Rollerdoor jamb; referP04/A701 for detail
LC
LC
align
align
JAMB
JAMB
TYP. BOLLARD SPACING @ ROLLER SHUTTER DOOR @ GRIDLINE Ascale 1:10
chec
k on
site
100
1400
30
Downpipe; referRoof Plan for sizing
MS dynabolts at300crs max
dp
MS dynabolts at300crs
Galv. steel protector;paint finish
Galv. steelprotector; paintfinish
--
Office precast conc.panel wall
75 clear space allaround down pipes
TYP. DOWNPIPE SHROUD PLANscale 1:10
TYP. DOWNPIPE SHROUD ELEVATIONscale 1:10
Note:DP Shroud to allBulkstore DP
1,200 9,800 C.O.S 1,200
50
10,650 C.O.S
2,60
0
War
ehou
se L
ot 1
9 bu
ildin
g lin
e
G01 & G02 GATE ELEVATIONscale 1:50
100NB round cornerposts & caps; postcentres to manufacturer'srecommendation. Blackpowder coat finish.
Manual Swing Gates
Galvanised steel spear top Manual Swing Gatedesign:RHS frame size to manufacturersrecommendation/design with 15mm dia x 1.2mm roundvertical bars @100mm crs. Black powder coat finish.Gates lockable via security system
Pedestrian fire egress access: Hinged gate o allowoccupants on the inside to unlatch and exit (mindimension 910mm width)
1,20
0
165
165Ø x 5mm galvanised mspipe bollard, filled withconcrete, capped, yellowpowdercoat finish (includingbaseplate)
Concrete paving - refer CivilEngineer's drawings
Bollard bolted to concreteslab as recommended bymanufacturer
TYP. BOLLARD ELEVATION @ WAREHOUSEscale 1:10
NOTE:- All bollards to be painted- Refer Plans for locations
Contrasting colour &texture surface finish
KERB CROSSING DETAILscale 1:50
1,10
0
1,000
2,100 min
1 in 8 max. slope
D
https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452096
A200
AS SHOWN @ A1
dwg No
Floor Plan:Warehouse
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON JVINDUSTRIAL PARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 2/8/2019
C
rev date details
D01
D05
D02
D05a D05b
D14 D16D15
D13
D07
D03
D04
D11
D09
W04
W03
W02
D10
D06
DW
FP02
A700P01A700
P05A700
P03A700
7,790 7,790
74.01
31.03
84.01 45.0245.01 84.0131.0374.02 74.0274.01 45.01
5m RD 5m RD
WAREHOUSEFFL + 32.55
(49.2m x 22.4m)1,060m2
CANOPY(49.6m x 5m)
Gross Area: 200m2(2 story)100/100
D08
W06
W05
A A
E E
B B
D D
7
7
2
2
1
1
C C
6
6
5
5
4
4
3
3
D12
P04A700
57,202
7,700 9,900 9,900 9,900 9,900 9,900
22,4
00
13,0
007,
200
165
22,0
7016
5
165 49,190 165
2,19
19,
000
4,00
07,
200
AA301
AA301
BA301
BA301
DA301
CA301
FA302
FA302
EA302
EA302
HA303
IA303
GA303
E01A300
E02A300
E03A300
E04A300
74.01 31.03
31.03
31.04
31.05
51.14
31.03
31.03
74.01
31.05
GROUND FLOOR OFFICEFFL + 32.55
ACCWC
WC 1WC 2
CLEANERSROOM
3 STRUCTURE31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel
(Natural Finish)165mm thick 240 min Fire rated precast concrete wall panel;Natual finish; Refer Engineer's drawings for details.
31.04 150mm Precast Concrete Wall Panel (Exposed aggregateFinish)150mm thick precast concrete wall panel; Exposed aggregatefinish; Refer Engineer's drawings for details.
31.05 150mm Precast Concrete Wall Panel (Concretebandsawn panels)150mm thick precast concrete wall panel; Shutter finish (use150mm wide x 25mm thick oregon pine boards) to exteriorface; Refer Engineer's drawings for details.
4 ENCLOSURE45.01 Roller Door
New Metabuilt Warehouse roller door; 5m high, 0.75mmpowdercoat frame and door finish; Motorised (3 phase) rollershutter doors, Automatic operation, spring balanced, standard
guide to jambs & birdproofing to door head, complete withwind lock guides; Colour to match Colorsteel Ironsand
45.02 Exterior DoorsSolid panel security door, powdercoated aluminium facedtimber; Refer Door Hardware Schedule for details; Colour tomatch Colorsteel Ironsand
5 INTERIOR51.12 16mm Plywood lining
16mm Plywood Lining; Polyurethane finish51.14 16mm Plywood lining on GBTL 60 fire rated system
(60/60/60)16mm Plywood wall lining on 13mm GIB fyreline to each sideof the timber framing; clear polyurathane finish
7 SERVICES74.01 Warehouse DPs: 150 uPVC Downpipes
150 dia. uPVC downpipes with DP protectors; paint finish;
Refer A103 for typical DP & protector layouts74.02 Warehouse Canopy DPs: 100 uPVC Downpipes
100 dia. uPVC downpipes with DP protectors; paint finish;Refer A103 for typical DP & protector layouts
8 EXTERNAL84.01 Bollards
150mm NB dia. x 1200mm high concrete filled galv steelbollards painted yellow. Fixed to concrete slab at exposedcorners of building, roller doors (int & ext) and at services.
GROUND FLOOR PLANscale 1:100
NOTE:
1. LINING NOTE: Refer to A201 for office building lining details & A402for lining details of bathroom area
2. TIMBER FRAMING NOTE
H1.2 SG8 radiata Pine unless stated/ detailed otherwise.
2a) Office building ground floor internal timber walls:- Full height to the underside of the first floor concrete slab
system.- 90x75 timber framing @ 600 crs max
2b) Office building first floor internal timber walls:- Wall height to ceiling level- Refer to 'Tracklock seismic bracing design for wall bracing
details'- 90x45 timber framing @ 600 crs max
2c) Internal stairs area timber walls:- Refer to A400 & A401 for wall heights- Specific Engineering design; Refer to Structural engineering
drawings for details
3. OFFICE INSULATION NOTE
3a) Office Thermal Insulation:- Roof: R2.9 Retrofit ceiling insulation (above ceiling tiles)- All precast walls: 45mm thick R1.4 Expol polystyrene
insulation- All timber walls: Batt R 3.2 wall insulation 140mm thick- HWC insulation wrap to all HWCs
3b) Office Acoustic Insulation:- To all office building ground floor interior timber framed walls:
Pink Batts Silencer full height of framing
4. CONCRETE NIB:- 150mm high concrete nib on office ground floor. Refer
Engineers drawings for details.
5. SWITCHES:Mechanical and Switch Positions: All thermostats to be locatedadjacent to light switches. All final switch locations to be confirmed onsite with Architect.
E
Ref
eren
ceN
orth
W
S E
N
W i n t e r S u n r i s e
Summe r S u n r i s e
W i n t e r S u n s e tS u m m e r S u n s e t
https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444151https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444037https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65793939https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043341https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043333https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345
A201
AS SHOWN @ A1
dwg No
Floor Plan Office
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON JVINDUSTRIAL PARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 2/8/2019
C
rev date details
21
FA302
EA302
HA303
BA301
IA303
E02A300
A
E
B
D
C
D14 D16D15
D13
D07
D03
D04
D11
D09
W04
W03
W02
D10
D06
DW
F
P06A704
P08A704
P07A704
P09A704
195 7,505 165
7,700
165 1,928 140
90 4,125 195
Gross Area: 200m2(2 story)100/100
W06
W05
D12
2,20
0
1,360 4,445
195 6,905 553
5,442 195
51.02
45.03
31.04
31.05
31.03
45.03 74.14
74.03
31.05
45.03
51.0251.08
45.03
51.0251.08
31.04
31.04
51.0251.08
51.0251.08
51.0951.14
51.0251.08
51.0951.14
51.0951.14
31.03
51.1a51.09
GROUND FLOOR OFFICEFFL + 32.55
ACCWC
WC 1WC 2
CLEANERSROOM
FA302
EA302
GA303
1,34
51,
200
1,20
01,
200
1,20
01,
200
1,20
01,
200
1,20
02,
055
15,2
007,
200
2,20
09,
000
4,00
07,
200
195
12,6
1019
5
3 STRUCTURE31.02 150mm Precast Concrete Wall
Panel (Natural Finish)150mm thick precast concrete wallpanel; Natual finish; ReferEngineer's drawings for details.
31.03 165mm Precast Concrete240/240/240 FRR Wall Panel(Natural Finish)165mm thick 240 min Fire ratedprecast concrete wall panel; Natualfinish; Refer Engineer's drawings fordetails.
31.04 150mm Precast Concrete WallPanel (Exposed aggregate Finish)150mm thick precast concrete wallpanel; Exposed aggregate finish;Refer Engineer's drawings fordetails.
31.05 150mm Precast Concrete WallPanel (Concrete bandsawnpanels)150mm thick precast concrete wallpanel; Shutter finish (use 150mmwide x 25mm thick oregon pineboards) to exterior face; ReferEngineer's drawings for details.
4 ENCLOSURE42.06 Office Wall: Profiled Metal
Cladding0.55mm BMT Colorsteel EnduraDimond Heritage Tray cladding overbuilding paper over cavibat battens@ 600 crs max over building paperover timber framing; Colour:Ironsand
45.03 Shopfront glazingPowdercoated 125mm Front GlazedFirvie Suite aluminium tinted doubleglazed joinery; Colour to matchcolorsteel Ironsand
5 INTERIOR51.01 13mm GIB Standard on timber
framing13mm GIB Standard on timberframing; Level 4 stopped & selaed,paint finish
51.1a GIB Ezybrace system - GS1-N ontimber framing
GIB bracing system [GS1-N]: 13mmGIB Standard on timber framing;Level 4 stopped & selaed, paintfinish
51.02 13mm GIB Standard on timberstrapping on precast wall13mm GIB Standard on 90x45mmtimber strapping on DPC on precastconcrete wall; Level 4 stopped &selaed, paint finish. 140mm furtherstrapping to bathroom area.
51.06 GBUW 60a Fire Rated System(60/60/60)2 layers of 13mm GIB Fyreline tointerior side of timber framing or ontimber strapping or on PC panel(Lining to be installed full height ofthe wall - first floor walls to theunderside of the roofing) ; Level 4stopped & sealed, paint finish
51.08 R1.4 wall insulation with timberstrapping on PC conc wall45mm thick R1.48 Expol-xpolystyrene insulation with timberstrapping on PC conc wall
51.09 R3.2 wall insulation on timberframing140mm thick batt R3.2 on timberframing
51.12 16mm Plywood lining16mm Plywood Lining; Polyurethanefinish
51.14 16mm Plywood lining on GBTL 60fire rated system (60/60/60)16mm Plywood wall lining on 13mmGIB fyreline to each side of thetimber framing stopped & sealed(fire rated lining to be installed fullheight of the wall); plywood lining tohave clear polyurathane finish
7 SERVICES74.03 Office DPs: 100 uPVC Downpipes
100 dia. uPVC downpipes with DPprotectors; paint finish; Refer A103for typical DP & protector layouts
74.14 Channel DrainACO threshold drain with Galv SteelLongitudinal Grate (located at entry)
GROUND FLOOR PLAN OFFICEscale 1:50
NOTE:
1. Refer to A402 for lining details of bathroom area
2. TIMBER FRAMING NOTE
H1.2 SG8 radiata Pine unless stated/ detailedotherwise.
2a) Office building ground floor internal timber walls:- Full height to the underside of the first floor
concrete slab system.- 90x75 timber framing @ 600 crs max
2b) Office building first floor internal timber walls:- Wall height to ceiling level- Refer to 'Tracklock seismic bracing design for
wall bracing details'- 90x45 timber framing @ 600 crs max
2c) Internal stairs area timber walls:- Refer to A400 & A401 for wall heights- Specific Engineering design; Refer to
Structural engineering drawings for details
3. FIRST FLOOR WALL BRACING
Tracklock wall bracing system to be provided for all firstfloor interior walls; Refer to A711 for details
4. OFFICE INSULATION NOTE
3a) Office Thermal Insulation:- Roof: R2.9 Retrofit ceiling insulation above
ceiling tiles- All precast walls: 45mm thick R1.4 Expol
polystyrene insulation- All timber walls: Batt R 3.2 wall insulation
140mm thick- HWC insulation wrap to all HWCs
3b) Office Acoustic Insulation:- To all office building ground floor interior
timber framed walls: Pink Batts Silencer fullheight of framing
5. INTUMESCENT COATING TO STEEL STRUCTURE
- Refer to structural specifications for details.- All steel structure (columns & beams) supporting
office first floor conc system must haveintumescent coating system with the same firerating as per the fire rating on the first floorsystem; Refer to the fire report. Contractor toensure the compatibility between theintumescent coating and any other steel coatings(primer, topcoat). It must provide joint warranties. D
Ref
eren
ceN
orth
W01
W04
W03
W02
D18
W09W08
W07
1234567891011
12131415161718192021
P10A704
P11A704
42.06 45.03 42.06
51.0251.08
51.0151.09
51.0251.08
51.0251.08
51.0151.09
45.03
45.03
45.03
45.03
31.04
31.04
42.06
42.0642.0642.06 31.05
51.0651.09
51.0651.08
31.02
51.0251.08
42.06
42.06
31.05
51.0951.14
51.0951.14
51.0951.14
45.03
31.03
31.03
FIRST FLOORWAREHOUSE OFFICE
FFL +36.25
21
FA302
EA302
HA303
BA301
IA303
E02A300
A
E
B
D
C
FA302
EA302
GA303
FIRST FLOOR PLAN OFFICEscale 1:50
W
S E
N
W i n t e r S u n r i s e
Summe r S u n r i s e
W i n t e r S u n s e t
S u m m e r S u n s e t
https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444151https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444151https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043341https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043333https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345
A202
AS SHOWN @ A1
dwg No
Roof Plan
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON JVINDUSTRIAL PARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 20/12/2018
C
rev date details
S01A701
S02A701
9,00
04,
000
13,0
0049,500
9,900 9,900 9,900 9,900 9,900
1,810 955 3,820 955 3,820 955 3,820 955 4,775 955 3,820 955 4,775 955 3,820 955 3,820 955 3,820 955 1,810
22,6
805,
000
7,700
12,6
00
1,300
300 1,200
FALL 4°
FALL 5°
FALL 5°
FALL 3°
FALL 3.5°
A A
E E
B B
D D
7
7
2
2
1
1
C C
6
6
5
5
4
4
3
3
AA301
AA301
BA301
BA301
DA301
CA301
FA302
FA302
EA302
EA302
HA303
IA303
GA303
E01A300
E02A300
E03A300
E04A300
450
150
42.01
74.05
74.01
74.05
74.0374.0474.15
74.0374.04
74.01
74.01
74.01
74.02
45.0642.0242.01 42.01 42.02 42.01 42.02 42.01 42.02 42.0242.01
42.0242.01 42.01 42.02 42.0242.01 42.0242.01 42.0242.01
74.02
42.01
74.07
74.07
Fall 1:100 minFall 1:100 minFall 1:100 min Fall 1:100 min
Fall 1:100 min Fall 1:100 min
Fall 1:100 min
Fall
1:10
0 m
inFa
ll 1:
100
min
4 ENCLOSURE42.01 Warehouse Roof: Profiled Metal Roofing
0.55mm BMT Colorsteel Endura DimondRoofing DP955 over roof underlay on wirenetting on DHS purlins; Colour: Ironsand
42.02 Warehouse clearlite: Translucent ProfiledRoofingAlsynite clearlite roof lights: Topglass GC HiLine / Topspan; profile ALS955
45.06 Office Entry CanopyEuroglass Canopy Structure with stainlesssteel gutter and downpipe
7 SERVICES74.01 Warehouse DPs: 150 uPVC Downpipes
150 dia. uPVC downpipes with DP protectors;paint finish; Refer A103 for typical DP &protector layouts
74.02 Warehouse Canopy DPs: 100 uPVCDownpipes100 dia. uPVC downpipes with DP protectors;paint finish; Refer A103 for typical DP &protector layouts
74.03 Office DPs: 100 uPVC Downpipes100 dia. uPVC downpipes with DP protectors;paint finish; Refer A103 for typical DP &protector layouts
74.04 Rainwater Head
0.75mm BMT Colorsteel Endura RWHColorsteel Endura to match wall claddingcolour
74.05 Dimond 300 Box External GutterColorsteel Endura Dimond 300 Box externalgutter with external gutter brackets fixed at600mm CRS max laid to fall; finish to matchgutter
74.07 Membrane GutterNuraply 3PM two layer membrabe systemgutter on 17mm CDH3 ply on 45x45mm SG6H3.2 timber framing @400 crs max laid to fall
74.15 ScupperNuralite 200x75 aluminium scupper with leafguard; Refer to S12/A705 for details
ROOF PLANscale 1:100
NOTE:
-DP Finish: All downpipes to be paint finishedunless otherwise noted.-Elevation: Refer A300s for DP elevations-Mechanical Roof Penatration: Refer Mechanicaldrawings for flashing detail-Provide design & build proprietary cable-based FallArrest system to Warehouse, Canopy and Office
GENERAL
- Drawing to be read in conjunction with plans &elevations for final DP layouts
- Provide Certifix design & build proprietary cable-based Fall Arrest & roof ladder access system to roofto Department of Labour, OSH & NZBC D1/AS1requirements. Design to include anchor points atregular intervals along Warehouse Ridge line. Yellowpaint lines across safe zones / boundary.
- All external Gutters @ 1:200 fall min.
- All internal Gutters @1:100 fall min.
NOTE: Colorsteel Endura protective coating toBOTH top & underside faces of steel - canopy only
WAREHOUSE, CANOPY & OFFICE ROOF DESIGN PROPOSAL
- Warehouse building roofGutter: served by Dimond 300mm Box gutter (33,550mm²) at gridline A and EDP: drained by 4 x 150ØDP
- Warehouse canopy roofGutter: served by Box 300 ( 27,000m2) with DPs at gridline 3 and 5DP: drained by 2 x 100ØDP
- Office building roofGutter: served by membrane gutter 450W x 90H mm (40,500m²) with RWH overflow at gridline B and DDP: drained by 2 x 100ØDP
- Office entry canopy roofGutter: served by custom made gutter 150W x 80H mmDP:drained by 1 x 80ØDP
Warehouse Roof - External Gutter
564 m² / 2 = 287 m²
According to Figure 15 of E1/AS1, for a planarea of roof discharging to section of aexternal gutter of 287 m², the cross-sectionalarea needs to be 25,000mm² at least.
According to the table 5 of E1/AS1, a 150Ødownpipe can serve up to 350m² of a planarea of roof if the pitch is 0-25°
Warehouse Canopy Roof - Internal Gutter
248 m² / 2 = 124 m²
According to Figure 16 of E1/AS1, for a planarea of roof discharging to section of a internalgutter of 124 m², the cross-sectional areaneeds to be 25,000mm² at least.
According to the table 5 of E1/AS1, a 100Ødownpipe can serve up to 155m² of a planarea of roof if the pitch is 0-25°
Office Roof - Office Internal Gutter
109 m² / 2 = 55 m²
According to Figure 16 of E1/AS1, for a planarea of roof discharging to section of a internalgutter of 55 m², the cross-sectional area needsto be 12,000mm² at least.
According to the table 5 of E1/AS1, a 100Ødownpipe can serve up to 155m² of a planarea of roof if the pitch is 0-25°
Office Entry Canopy Roof - Internal Gutter
10 m²
According to Figure 16 of E1/AS1, for a planarea of roof discharging to section of a internalgutter of 10 m², the cross-sectional area needsto be 4,000mm² at least.
According to the table 5 of E1/AS1, a 65Ødownpipe can serve up to 60m² of a planarea of roof if the pitch is 0-25°
D
Ref
eren
ceN
orth
W
S E
N
W i n t e r S u n r i s e
Summe r S u n r i s e
W i n t e r S u n s e tS u m m e r S u n s e t
287m²
124m²
287m²
124m²
54m²
54m²287m²287m²
10m²
https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444151https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436616https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436616
A300
AS SHOWN @ A1
dwg No
Elevations
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 2019/4/2
C
rev date details
1 2 73 4 5 6
7,700 9,900 9,900 9,900 9,900 9,90057,202
7,70
0
6,40
0
3,70
0
2,70
0
3,210 4,490
45.05
42.06
31.09
74.04
74.03
84.02
31.03
42.0142.02
74.01
74.05
45.05
31.05
31.05
FFL + 32.550
FCL + 35.250
FFL + 36.250
CL + 38.950
RL + 40.250Top of parapet
RL+40.160Top of precast wall
7 2 16 5 4 3
9,900 9,900 9,900 9,900 9,900 7,70057,202
7,70
0
2,70
0
3,70
0
6,40
0
45.05
45.03
42.0674.04
74.03
45.06
31.03
31.03
42.01
42.01 42.02
84.02
74.05
31.07
45.01 45.01
45.02
74.01
84.02
31.03
31.03
FFL + 32.550
FCL + 35.250
FFL + 36.250
CL + 38.950
RL + 40.250Top of parapet
RL+40.160Top of precast wall
A B D EC
22,4007,200 4,000 9,000 2,200
6,40
03,
700
2,70
0
7,70
0 9,00
0
42.06
45.05
31.03
31.04
45.03
45.0331.03
74.05
45.03
FFL + 32.550
FCL + 35.250
FFL + 36.250
FCL + 38.950
RL + 40.250Top of parapet
RL + 41.550u/s portal knee
42.03
42.0342.09
42.09
74.01
E D B AC
22,4002,200 9,000 4,000 7,200
6,00
0
9,00
0
31.03
74.05
42.01
42.01
FFL + 32.550
RL + 38.550
RL + 41.550
u/s canopy beam
u/s portal knee
84.02
74.01
84.02
74.01
3 STRUCTURE31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel (Natural
Finish)165mm thick 240 min Fire rated precast concrete wall panel; Natualfinish; Refer Engineer's drawings for details.
31.04 150mm Precast Concrete Wall Panel (Exposed aggregateFinish)150mm thick precast concrete wall panel; Exposed aggregate finish;Refer Engineer's drawings for details.
31.05 150mm Precast Concrete Wall Panel (Concrete bandsawnpanels)150mm thick precast concrete wall panel; Shutter finish (use 150mmwide x 25mm thick oregon pine boards) to exterior face; ReferEngineer's drawings for details.
31.07 150mm Precast Concrete 60/60/60 FRR Wall Panel (Concretebandsawn panels)150mm thick 60 min Fire rated precast concrete wall panel; Shutterfinish (use 150mm wide x 25mm thick oregon pine boards) toexterior face; Refer Engineer's drawings for details.
31.09 150mm Precast Concrete 90/90/90 FRR Wall Panel (Exposedaggregate Finish)150mm thick 90 min Fire rated precast concrete wall panel; Exposedaggregate finish; Refer Engineer's drawings for details.
4 ENCLOSURE42.01 Warehouse Roof: Profiled Metal Roofing
0.55mm BMT Colorsteel Endura Dimond Roofing DP955 over roofunderlay on wire netting on DHS purlins; Colour: Ironsand
42.02 Warehouse clearlite: Translucent Profiled RoofingAlsynite clearlite roof lights: Topglass GC Hi Line / Topspan; profileALS955
42.03 Warehouse Wall: Profiled Metal Cladding on timber strappingon Precast Conc Wall0.40mm BMT Colorsteel Endura Dimond Cladding LT7 fastenedthrough 20mm cavibat onto H3.1 75x45 LOSP horizontal timberbattens @1500crs with type 17 14 gauge x 10TPI x 90mm fasteners(30mm penetration minimum). Structural timber battens to beanchored through DPC to precast walls with M8 Chemset studs andEpcon C65 @ 1000mm spacing along the battens (fixings- specific
engineering design); Colour: Ironsand42.06 Office Wall: Profiled Metal Cladding
0.55mm BMT Colorsteel Endura Dimond Heritage Tray claddingover building paper over cavibat battens @ 600 crs max overbuilding paper over timber framing; Colour: Ironsand
42.09 Warehouse Accent Wall: Profiled Metal Cladding Accent Colour0.55mm BMT Colorsteel Endura Dimond LT7 Cladding (standard933 with strip) fastened through 20mm cavibat onto H3.1 75x45LOSP horizontal timber battens @1500 crs with type17 14gauge x10TPI x 75mm fasteners. Structural timber battens to be anchoredthrough DPC to precast walls with M8 Chemset studs and Epcon C6@ 1000mm spacing along the battens (fixings - specific engineeringdesign); Colour: TBA
45.01 Roller DoorNew Metabuilt Warehouse roller door; 5m high, 0.75mmpowdercoat frame and door finish; Motorised (3 phase) roller shutterdoors, Automatic operation, spring balanced, standard guide tojambs & birdproofing to door head, complete with wind lock guides;Colour to match Colorsteel Ironsand
45.02 Exterior DoorsSolid panel security door, powdercoated aluminium faced timber;Refer Door Hardware Schedule for details; Colour to matchColorsteel Ironsand
45.03 Shopfront glazingPowdercoated 125mm Front Glazed Firvie Suite aluminium tinteddouble glazed joinery; Colour to match colorsteel Ironsand
45.05 1st Floor Office Window Head, Jamb & Sill Flashing withAccent Colours2mm thick powdercoated aluminium jamb flashing; Colour: TBA
45.06 Office Entry CanopyEuroglass Canopy Structure with stainless steel gutter anddownpipe
7 SERVICES74.01 Warehouse DPs: 150 uPVC Downpipes
150 dia. uPVC downpipes with DP protectors; paint finish; ReferA103 for typical DP & protector layouts
74.03 Office DPs: 100 uPVC Downpipes
100 dia. uPVC downpipes with DP protectors; paint finish; ReferA103 for typical DP & protector layouts
74.04 Rainwater Head0.75mm BMT Colorsteel Endura RWH Colorsteel Endura to matchwall cladding colour
74.05 Dimond 300 Box External GutterColorsteel Endura Dimond 300 Box external gutter with externalgutter brackets fixed at 600mm CRS max laid to fall; finish to matchgutter
8 EXTERNAL84.02 Shrouds
1m high galv steel shroud downpipe protectors to all downpipes inyard and warehouse area
SOUTH ELEVATIONscale 1:100
NORTH ELEVATIONscale 1:100
WEST ELEVATIONscale 1:100
EAST ELEVATIONscale 1:100
E
A301
AS SHOWN @ A1
dwg No
Sections: Warehouse
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 2/05/2019
C
rev date details
ABDE C
S03A701
S04#LayID
S05A702
S06A703
S07A703
S08A703
2,40
06,
000
9,00
0 10,8
20
2,200 9,000 4,000 7,200
42.01
74.01
74.05
74.02
84.0131.0145.02
45.01
42.0142.01
31.03
51.14
31.03 31.03
FFL + 32.550
RL + 34.950
RL + 38.550
RL + 41.550
Top of precast
u/s canopy beam
u/s portal knee
RL + 43.370Apex
1 2 3 4 5
S10A703 S11
A703
9,00
0
2,70
03,
700
6,40
0 7,70
0
9,9007,700 9,900 9,900 9,900 9,900
42.03
74.0742.05
42.06
45.03
45.01
84.01
51.14
31.03
45.01
84.0131.01
31.0345.03
31.0331.03 31.03 31.03 31.03
42.01
45.02FFL + 32.550
RL + 41.550
u/s portal knee
FFL + 32.550
FCL + 35.250
FFL + 36.250
FCL + 38.950
RL + 40.250Top of parapet
A
6,00
0
9,00
0 10,8
20
2,40
0
42.0174.05
74.01
74.02
84.01
45.01
42.01
31.03
31.03
FFL + 32.550
RL + 34.950
RL + 38.550
RL + 41.550
Top of precast
u/s canopy beam
u/s portal knee
RL + 43.370Apex
A
S09A703
6,00
0
9,00
0 10,8
20
2,40
0
42.0174.05
74.01
74.02
84.01
45.01
42.01
31.03
31.03
FFL + 32.550
RL + 34.950
RL + 38.550
RL + 41.550
Top of precast
u/s canopy beam
u/s portal knee
RL + 43.370Apex
3 STRUCTURE31.01 Concrete Slab
Concrete floor slab on DPC on sand blinding on metal; ReferEngineer's draw ings for details.
31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel(Natural Finish)165mm thick 240 min Fire rated precast concrete wall panel;Natual finish; Refer Engineer's drawings for details.
4 ENCLOSURE42.01 Warehouse Roof: Profiled Metal Roofing
0.55mm BMT Colorsteel Endura Dimond Roofing DP955 overroof underlay on wire netting on DHS purlins; Colour:Ironsand
42.03a Warehouse Wall: Profiled Metal Cladding0.40mm BMT Colorsteel Endura Dimond Cladding LT7 onsteel girts; Colour: Ironsand
42.05 Office Roof: Profiled Metal Roofing
0.55mm BMT Colorsteel Endura Dimond Roofing DP955 overbuilding paper over white sizalation and wire netting; Colour:Ironsand
42.06 Office Wall: Profiled Metal Cladding0.55mm BMT Colorsteel Endura Dimond Heritage Traycladding over building paper over cavibat battens @ 600 crsmax over building paper over timber framing; Colour:Ironsand
45.01 Roller DoorNew Metabuilt Warehouse roller door; 5m high, 0.75mmpowdercoat frame and door finish; Motorised (3 phase) rollershutter doors, Automatic operation, spring balanced, standardguide to jambs & birdproofing to door head, complete withwind lock guides; Colour to match Colorsteel Ironsand
45.02 Exterior DoorsSolid panel security door, powdercoated aluminium facedtimber; Refer Door Hardware Schedule for details; Colour tomatch Colorsteel Ironsand
45.03 Shopfront glazing
Powdercoated 125mm Front Glazed Firvie Suite aluminiumtinted double glazed joinery; Colour to match colorsteelIronsand
5 INTERIOR51.12 16mm Plywood lining
16mm Plywood Lining; Polyurethane finish51.14 16mm Plywood lining on GBTL 60 fire rated system
(60/60/60)16mm Plywood wall lining on 13mm GIB fyreline to each sideof the timber framing; clear polyurathane finish
7 SERVICES74.01 Warehouse DPs: 150 uPVC Downpipes
150 dia. uPVC downpipes with DP protectors; paint finish;Refer A103 for typical DP & protector layouts
74.02 Warehouse Canopy DPs: 100 uPVC Downpipes
100 dia. uPVC downpipes with DP protectors; paint finish;Refer A103 for typical DP & protector layouts
74.05 Dimond 300 Box External GutterColorsteel Endura Dimond 300 Box external gutter withexternal gutter brackets fixed at 600mm CRS max laid to fall;finish to match gutter
74.07 Membrane GutterNuraply 3PM two layer membrabe system gutter on 17mmCDH3 ply on 45x45mm SG6 H3.2 timber framing @400 crsmax laid to fall
8 EXTERNAL84.01 Bollards
150mm NB dia. x 1200mm high concrete filled galv steelbollards painted yellow. Fixed to concrete slab at exposedcorners of building, roller doors (int & ext) and at services.
SECTION A-Ascale 1:100
SECTION B-Bscale 1:100
SECTION C-Cscale 1:100
SECTION D-Dscale 1:100
D
https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452096https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436619
A302
AS SHOWN @ A1
dwg No
Sections: Office
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 2019/4/2
C
rev date details
S12A705
S13A706
6,40
07,
700
3,70
0
2,70
0
FFL + 32.550
FCL + 35.250
FFL + 36.250
FCL + 38.950
RL + 40.250Top of parapet
51.0151.11
51.0351.11
51.01 45.0351.0251.02 45.03
53.01
45.0345.03 45.03
51.01
51.0151.01
42.05
51.1053.01
42.06
53.0153.03
51.06
45.0351.02
31.05
31.05
WC 1
GROUND FLOOROFFICE
FIRST FLOORWAREHOUSE
OFFICE
S14A706
S15A706
S16A707
2,70
01,
000
2,70
0
7,70
0
7,200 4,000 9,000 2,200
170
135
220
190 42.01 74.05
74.01
84.01
45.06
42.05
FFL + 32.550
FCL + 35.250
FFL + 36.250
RL + 40.250Top of parapet
FCL + 38.950
RL+35.420
RL+36.115
RL+39.170
RL+40.060
31.03
42.06
45.03
51.1053.01
53.01
51.02
51.02
42.06
45.03
31.05
51.0151.11
42.03
42.01
53.01 53.03
51.03
GROUND FLOOROFFICE
FIRST FLOORWAREHOUSE OFFICE
WC 2
BDE C
2,200 9,000 4,000
A B D EC
3 STRUCTURE31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel
(Natural Finish)165mm thick 240 min Fire rated precast concrete wall panel;Natual finish; Refer Engineer's drawings for details.
31.05 150mm Precast Concrete Wall Panel (Concretebandsawn panels)150mm thick precast concrete wall panel; Shutter finish (use150mm wide x 25mm thick oregon pine boards) to exteriorface; Refer Engineer's drawings for details.
4 ENCLOSURE42.01 Warehouse Roof: Profiled Metal Roofing
0.55mm BMT Colorsteel Endura Dimond Roofing DP955 overroof underlay on wire netting on DHS purlins; Colour:Ironsand
42.03a Warehouse Wall: Profiled Metal Cladding0.40mm BMT Colorsteel Endura Dimond Cladding LT7 onsteel girts; Colour: Ironsand
42.05 Office Roof: Profiled Metal Roofing0.55mm BMT Colorsteel Endura Dimond Roofing DP955 overbuilding paper over white sizalation and wire netting; Colour:Ironsand
42.06 Office Wall: Profiled Metal Cladding0.55mm BMT Colorsteel Endura Dimond Heritage Traycladding over building paper over cavibat battens @ 600 crsmax over building paper over timber framing; Colour:Ironsand
45.03 Shopfront glazingPowdercoated 125mm Front Glazed Firvie Suite aluminiumtinted double glazed joinery; Colour to match colorsteelIronsand
45.06 Office Entry CanopyEuroglass Canopy Structure with stainless steel gutter anddownpipe
5 INTERIOR51.01 13mm GIB Standard on timber framing
13mm GIB Standard on timber framing; Level 4 stopped &selaed, paint finish
51.02 13mm GIB Standard on timber strapping on precast wall13mm GIB Standard on 90x45mm timber strapping on DPCon precast concrete wall; Level 4 stopped & selaed, paintfinish. 140mm further strapping to bathroom area.
51.03 13mm GIB Aqualine on timber framing13mm GIB Aqualine on timber framing; Level 4 stopped &selaed, paint finish
51.06 GBUW 60a Fire Rated Syatem (60/60/60)2 layers of 13mm GIB Fyreline to interior side of timberframing or on timber strapping or on PC panel; Level 4stopped & sealed, paint finish
51.10 R2.9 roof insulation150mm R2.9 Retrofit ceiling insulation with 20mm thermaxcavity
51.11 Pink Batts SilencerPink Batts Silencer wall acoustic insulation
53.01 Suspended Ceiling TilesRH99 Mineral fibre fissured square edge 1200 x 600mmceiling tiles on exposed seismic grade suspended gridsystem.
53.03 Suspended GIB Aqualine CeilingSuspended 13mm GIB Aqualine ceiling on seismicsuspended grid system; level 4 stopped, sealed & paint finish.
7 SERVICES74.01 Warehouse DPs: 150 uPVC Downpipes
150 dia. uPVC downpipes with DP protectors; paint finish;Refer A103 for typical DP & protector layouts
74.05 Dimond 300 Box External GutterColorsteel Endura Dimond 300 Box external gutter withexternal gutter brackets fixed at 600mm CRS max laid to fall;finish to match gutter
8 EXTERNAL84.01 Bollards
150mm NB dia. x 1200mm high concrete filled galv steelbollards painted yellow. Fixed to concrete slab at exposedcorners of building, roller doors (int & ext) and at services.
SECTION E-Escale 1:50
SECTION F-Fscale 1:50
https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436616https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452098https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452098https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452098https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043351
A303
AS SHOWN @ A1
dwg No
Sections: Office
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 2019/4/2
C
rev date details
S18A707
6,40
0
7,70
0
3,70
0
2,70
0
51.1053.01
42.05
53.01
45.03
51.01
42.06
45.03
51.01
45.0351.01
45.0351.01
FFL + 32.550
FCL + 35.250
FFL + 36.250
RL + 40.250Top of parapet
FCL + 38.950
RL+35.420
RL+36.115
RL+39.170
RL+40.060
GROUND FLOOROFFICE
FIRST FLOORWAREHOUSE
OFFICE
S19A708
6,40
0
7,70
0
4,000 7,200
6,00
0
2,70
0
51.01
51.1053.01
42.05
53.01
45.0351.01 45.03
45.03 45.0351.01 51.01
42.06
45.03
FFL + 32.550
FCL + 35.250
FFL + 36.250
RL + 40.250Top of parapet
FCL + 38.950
RL+35.420
RL+36.115
RL+39.170
RL+40.060
GROUND FLOOROFFICE
FIRST FLOORWAREHOUSE
OFFICE
S20A708
S21A708
S22A709
S23A709
S17A707
51.0351.11
51.01 51.0351.11
31.04
51.0251.08
51.0251.08
51.01
51.1053.01
42.05
42.06
53.01
51.01
45.03
45.03
51.0251.08
51.0351.11
53.03 53.03 53.03
FFL + 32.550
FCL + 35.250
FFL + 36.250
RL + 40.250Top of parapet
FCL + 38.950
RL+35.420
RL+36.115
RL+39.170
RL+40.060
GROUND FLOOROFFICE
FIRST FLOORWAREHOUSE
OFFICE
WC 2WC 1 ACC. WC WAREHOUSELUNCHROOM
E D BC A
1 2
3 STRUCTURE31.04 150mm Precast Concrete Wall Panel
(Exposed aggregate Finish)150mm thick precast concrete wall panel;Exposed aggregate finish; Refer Engineer'sdrawings for details.
4 ENCLOSURE42.05 Office Roof: Profiled Metal Roofing
0.55mm BMT Colorsteel Endura DimondRoofing DP955 over building paper overwhite sizalation and wire netting; Colour:Ironsand
42.06 Office Wall: Profiled Metal Cladding0.55mm BMT Colorsteel Endura DimondHeritage Tray cladding over building paperover cavibat battens @ 600 crs max overbuilding paper over timber framing; Colour:Ironsand
45.03 Shopfront glazingPowdercoated 125mm Front Glazed FirvieSuite aluminium tinted double glazed joinery;Colour to match colorsteel Ironsand
5 INTERIOR51.01 13mm GIB Standard on timber framing
13mm GIB Standard on timber framing;Level 4 stopped & selaed, paint finish
51.02 13mm GIB Standard on timber strappingon precast wall13mm GIB Standard on 90x45mm timberstrapping on DPC on precast concrete wall;Level 4 stopped & selaed, paint finish.140mm further strapping to bathroom area.
51.03 13mm GIB Aqualine on timber framing13mm GIB Aqualine on timber framing;Level 4 stopped & selaed, paint finish
51.08 R1.4 wall insulation with timberstrapping on PC conc wall45mm thick R1.48 Expol-x polystyreneinsulation with timber strapping on PC concwall
51.10 R2.9 roof insulation150mm R2.9 Retrofit ceiling insulation with20mm thermax cavity
51.11 Pink Batts SilencerPink Batts Silencer wall acoustic insulation
53.01 Suspended Ceiling TilesRH99 Mineral fibre fissured square edge1200 x 600mm ceiling tiles on exposedseismic grade suspended grid system.
53.03 Suspended GIB Aqualine CeilingSuspended 13mm GIB Aqualine ceiling onseismic suspended grid system; level 4stopped, sealed & paint finish.
SECTION G-Gscale 1:50
SECTION H-Hscale 1:50
SECTION I-I
https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436618https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436618https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436618https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043356https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043356https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043351https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043351
A400
AS SHOWN @ A1
dwg No
Stairs
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 2019/4/2
C
rev date details
176.
2
285 25310
Timber stringer (sides)
20mm high density particle board treads and risers
Stair nosing; Tredsafe AA123 or equal approvedPitch line
Undercut timber stringer (middle)
Tread: 310mmRiser: 176.2mmNosing: 25mm
Direct stuck commercial grade carpet tiles; refer toA500 for details
GBUW 60a 2x13mm GIB Fyreline lining(60/60/60) on 70x35 timber battens fixedto underside of stairs; paint finish
200
50 65 13 600
13mm GIB Standardlining
13mm GIB Standardlining to on 90x45mmtimber wall; studs @400crs; Level 4stopped & sealed,paint finish TBA
50mm stainless steelhandrail on Drake &Wrigley handrailbracket; 1032 flatcurved fixed totimber frame; chromeplate finish
Precast panel; paint finish
D07
D11
D09
D10
165 1,928 140
150 477 140 1,326 140
195
9,75
52,
320
1,45
42,
540
900
2,82
561
01,
285
140
5,63
914
01,
285
1,10
1
S02A401
S02A401
Top of stairs: edge of nosing
Bottom of stairs1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
19
20
21
D12
140
2,41
014
09,
245
140
63 50 1,100 5063
140
E01#LayID
51.02
74.03
51.0951.14
51.0751.09
51.0251.08
51.0751.09
51.01
51.01
51.07
51.0951.14
51.01
51.0151.0951.14
51.07
51.02
51.01
31.3a
51.0951.14
31.03
CLEANERSROOM
D18
S02A401
S02A401
140
11,7
8914
0
140
1,10
090
195 1,943 14045 150 477 140 1,326 140
140 63 50 1,100 50 63 140
2,54
090
02,
824
610
9,75
52,
320
Top of stairs: edge of nosing
Bottom of stairs
E01#LayID
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
51.0251.08
51.0251.08
51.0251.08
31.05
51.0951.14
51.0751.09
51.02
51.0751.09
51.01
51.01
51.01
51.0151.0751.0951.14
51.0751.09
31.3a
51.0951.14
51.0951.14
B
C
B
C
2
Timber stringer (sides)
20mm high density particle board treads and risers
140x45mm H1.2 SG8 timber wall framing
70x35mm H1.2 timber battens
GBUW 60a 2x13mm GIB Fyreline lining (60/60/60) on70x35 timber battens fixed to underside of stairs; paint
finish
GBTL 60 fire rated system (60/60/60): 13mm GIBFyreline lining to each side of the frame on 140x45mmtimber wall; Level 4 stopped & sealed, paint finish TBA
Direct stuck commercial grade carpet tiles; refer toA500 for details
16mm Plywood lining; Polyurathane finish
2
3 STRUCTURE31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel
(Natural Finish)165mm thick 240 min Fire rated precast concrete wall panel;Natual finish; Refer Engineer's drawings for details.
31.3a 165mm Precast Concrete 240/240/240 FRR Wall Panel(Paint Finish)165mm thick 240 min Fire rated precast concrete wall panel;Paint finish; Refer Engineer's drawings for details.
31.05 150mm Precast Concrete Wall Panel (Concretebandsawn panels)150mm thick precast concrete wall panel; Shutter finish (use150mm wide x 25mm thick oregon pine boards) to exteriorface; Refer Engineer's drawings for details.
5 INTERIOR51.01 13mm GIB Standard on timber framing
13mm GIB Standard on timber framing; Level 4 stopped &selaed, paint finish
51.02 13mm GIB Standard on timber strapping on precast wall13mm GIB Standard on 90x45mm timber strapping on DPCon precast concrete wall; Level 4 stopped & selaed, paint
finish. 140mm further strapping to bathroom area.51.07 GBTL 60 fire rated system (60/60/60)
13mm GIB Fyreline to each side of the frame on timberframing; Level 4 stopped & selaed, paint finish
51.08 R1.4 wall insulation with timber strapping on PC concwall45mm thick R1.48 Expol-x polystyrene insulation with timberstrapping on PC conc wall
51.09 R3.2 wall insulation on timber framing140mm thick batt R3.2 on timber framing
51.14 16mm Plywood lining on GBTL 60 fire rated system(60/60/60)16mm Plywood wall lining on 13mm GIB fyreline to each sideof the timber framing; clear polyurathane finish
7 SERVICES74.03 Office DPs: 100 uPVC Downpipes
100 dia. uPVC downpipes with DP protectors; paint finish;Refer A103 for typical DP & protector layouts
01A401
STAIR DETAILscale 1:5
03A401
STAIR DETAILscale 1:5
02A401
STAIR DETAILscale 1:5
GROUND FLOOR STAIR PLANScale 1:25
FIRST FLOOR STAIR PLANScale 1:25
Ref
eren
ceN
orth
W
S E
N
W i n t e r S u n r i s e
Summe r S u n r i s e
W i n t e r S u n s e tS u m m e r S u n s e t
https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452099https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452099
3/9/2018
DETAILED DESIGNTE RAPA GATEWAY WAREHOUSE & OFFICEDEVELOPMENT LOT 18 (SPEC BUILDING)HAMILTON JV INDUSTRIAL PARK
C
rev date details24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
design
drawn
job no.
cad file
checked
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
job title dwg title
A401
dwg Nostatus rev
Stairsdate
#Pln
AS SHOWN @ A1scale
900
200
1,10
0
2,70
0
210
210
2,70
0
25310
176
300
90x45mm H1.2 SG8 timber joists@ 1200crs
Stair way ceiling: GBTL 60 firerated system (60/60/60): 13mm
GIB Fyreline lining to each side ofthe timber joists; Level 4 stopped
& sealed, paint finish TBA
FFL + 32.550
FFL + 36.250
LandingRL + 34.490
CL + 38.950
GBTL 60 fire rated system(60/60/60): 13mm GIBFyreline lining (60/60/60) toeach side of the frame on90x45mm timber framing;Level stopped & selaed,paint finish
1
2
3
4
5
67
89
10
1112
13
14
15
16
17
18
19
20
21
03A401
01403
1,10
090
020
0
2,70
0
51.01
31.03
31.3a
31.3a
51.01
51.01
31.03
31.03
51.0751.09
31.03
51.01 51.01
51.0951.14
51.0951.14
51.0951.14
51.0751.09
20mm HD particle board onfloor joists to form landing;GBUW 60 2x13mm GIBFyreline lining (60/60/60) on70x35mm timber battens tounderside of landing and stair;Paint finish TBA Undercut timber
stringer (middle)
GBUW 60a fire rated system(60/60/60): 2x13mm GIBFyreline lining (60/60/60) on70x35 timber battens fixed tounderside of stairs; paintfinish
20mm high density particleboard treads and risers;direct stuck commercialgrade carpet tiles
50mm stainless steelhandrail on Drake &Wrigley handrail bracket;1032 flat curved fixed totimber frame; chrome platefinish
CLEANER'S ROOM
Specific Engineered timberframing; Refer to Structuralengineer's docs for details
C B
65 50 1,000 50 65
FFL + 32.550
FFL + 36.250
LandingRL + 34.490
Undercut timber stringer (middle)
Timber stringer (sides of stair)
20mm high density particle board treadsand risers; direct stuck commercial gradecarpet tiles
GBUW 60a fire rated system (60/60/60):2x13mm GIB Fyreline lining on 70x35timber battens fixed to underside of stairs;Level 4 stopped & sealed, paint finish TBA
GBTL 60 fire rated system (60/60/60):13mm GIB Fyreline lining to each side ofthe frame on timber wall; Level 4 stopped& sealed, paint finish TBA
Stainless steel handrail on stainless steelbrackets
GBTL 60 fire rated system (60/60/60):13mm GIB Fyreline lining to each side ofthe timber joists; Level 4 stopped & sealed,paint finish TBA
13mm GIB Standard on timber framing;Level 4 stopped & selaed, paint finish.
Specific Engineered timber framing; Referto Structural engineer's docs for details
Precast conc wall; natural finish
02403
03401
2
3 STRUCTURE31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel (Natural
Finish)165mm thick 240 min Fire rated precast concrete wall panel; Natualfinish; Refer Engineer's drawings for details.
31.3a 165mm Precast Concrete 240/240/240 FRR Wall Panel (PaintFinish)165mm thick 240 min Fire rated precast concrete wall panel; Paintfinish; Refer Engineer's drawings for details.
5 INTERIOR51.01 13mm GIB Standard on timber framing
13mm GIB Standard on timber framing; Level 4 stopped & selaed,paint finish
51.07 GBTL 60 fire rated system (60/60/60)13mm GIB Fyreline to each side of the frame on timber framing;Level 4 stopped & selaed, paint finish
51.09 R3.2 wall insulation on timber framing
140mm thick batt R3.2 on timber framing51.14 16mm Plywood lining on GBTL 60 fire rated system (60/60/60)
16mm Plywood wall lining on 13mm GIB fyreline to each side of thetimber framing; clear polyurathane finish
STAIRS SECTION S01scale 1:25
STAIRS SECTION S02scale 1:25
A402
AS SHOWN @ A1
dwg No
Internal Elevations:Ground Floor Office
design
drawn
job no.
dwg title
cad file
scale
status
CPL0642.00 Te Rapa Lot 18_Mainfile.pln
DETAILED DESIGN
TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK
24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141
p. +64 9 303 4759www.eclipsearchitecture.co.nz
rev
checked
job title
CPL0471.00
date 2019/4/2
C
rev date details
750
1,600
2,77
0
3,38
0
2,340
71.07
71.08
51.07
HWC
ELEVATION 09: CLEANER'S ROOMscale 1:25
600
1,900
500
450900
1,00
0
1,660
700
750
750 155
450
1,660 1,900
71.05
55.09
51.0351.11
66.03 66.03
51.0351.11
51.0351.11
66.03
51.0351.11
55.02
71.06
55.09
55.07
71.05
66.03
53.03 53.03 53.03 53.03
ELEVATION 04: WCscale 1:25
ELEVATION 03: WCscale 1:25
ELEVATION 01: WCscale 1:25
ELEVATION 02: WCscale 1:25
800
100
1,00
0
600
500
9501,600 950
2,70
0
66.03
55.07
51.0351.11
71.03
55.02
71.04 71.03
66.03
51.0351.11
51.0351.11
66.03
53.03 53.03 53.03
ELEVATION 06: WCscale 1:25
ELEVATION 05: WCscale 1:25
ELEVATION 07: WCscale 1:25
DW
F
#DrgID#LayID
290
140
2,41
014
0
150
140
1,70
090
1,30
090
140
51.01
51.01
51.1a
51.0351.11
51.0151.11
51.0351.11
51.0351.11
51.0151.11
51.0351.11
71.03
51.0351.11
Top of stairs: edge of nosing
19
20
21
640 90 950 90 950 90 1,950 140 150
51.07
51.0251.08
51.07
51.02
51.01
71.05
55.09
71.06
71.03
71.04 71.04
09
HWC
OFFICE
0402
0301
07
0605
5 INTERIOR51.01 13mm GIB Standard on timber framing
13mm GIB Standard on timber framing; Level 4stopped & selaed, paint finish
51.02 13mm GIB Standard on timber strapping onprecast wall13mm GIB Standard on 90x45mm timberstrapping on DPC on precast concrete wall; Level4 stopped & selaed, paint finish. 140mm furtherstrapping to bathroom area.
51.03 13mm GIB Aqualine on timber framing13mm GIB Aqualine on timber framing; Level 4stopped & selaed, paint finish
51.07 GBTL 60 fire rated system (60/60/60)13mm GIB Fyreline to each side of the frame on
timber framing; Level 4 stopped & selaed, paintfinish
51.08 R1.4 wall insulation with timber strapping onPC conc wall45mm thick R1.48 Expol-x polystyrene insulationwith timber strapping on PC conc wall
51.11 Pink Batts SilencerPink Batts Silencer wall acoustic insulation
53.03 Suspended GIB Aqualine CeilingSuspended 13mm GIB Aqualine ceiling onseismic suspended grid system; level 4 stopped,sealed & paint finish.
55.02 ACC Mirror: 1000x500mm mirrorACC Mirror: 1000x500mm mirror
55.07 Toilet roll holder: by tenant, contractor toinstallToilet roll holder: by tenant, contractor to install
55.09 Acc. RailsStainless steel grab rails 750x750x32mm dia tocomply with NZS4121:2001
6 FINISH66.03 Selected Commercial Grade Vinyl Flooring
Polyflor XL PU with welded seams & 150mmaluminium capped coving
67.02 Stainless Steel BenchtopStainless steel benchtop 40mm with anti-spillsquare edge and 150mm upstand to all verticalsurfaces
67.03 Laminex MeltecaLaminex Melteca laminate on 16mm MDFsubstrate; 2mm rigid PVC clashing to all exposededges. Colour TBA by Architect
67.04 Enko Group HandleEnko Group handles; TBA by architect
7 SERVICES71.01 Kitchen Sink + Mixer
Mercer EH102 Horizon 850 kitchen sink with righthand drainer. 860W x 510D with Model 65continuous feed heavy duty Insinkerator insert +Marketti blade sink mixer
71.03 WC PanCaroma Profile 4 Trident Connector Toilet Suite
71.04 WC WHB + MixerCaroma Compact Wall Basins with Marketti Bladefixed Basin Mixers; Angle cistern taps
71.05 ACC WC PANCaroma Disabled Suite or Dux ViennaCommercial Care Toilet Suite
71.06 ACC WHB + MixerCaroma 450 wall basins withwith Marketti Bladefixed Basin Mixers; Angle cistern taps
71.07 HWCRheem 135Ltr hot water cylinder mounted to wall.HWC on drip tray on floor/shelf 20mm particleboard on 140x45mm timber joists at 400crs
71.08 Cleaners Sink + Mixer
Burns & Ferrall Cleaners sinks with Markettiproject exposed sink faucet; Angle cisetern taps
GROUND FLOOR REFERENCE PLANscale 1:25
Ref
eren
ceN
orth
W
S E
N
W i n t e r S u n r i s e
Summe r S u n r i s e
W i n t e r S u n s e tS u m m e r S u n s e t
https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/55380984https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/55380984
6. Outline Specifications
Lot 18, Te Rapa Gateway Development, Te Rapa, Hamilton
OUTLINE SPECIFICATION
Version 1.0: 9th
August 2018
1.0 GENERAL
1.1 Document Control. This outline specification is to be read in conjunction with
the following drawings: eclipse architecture B&L Plan dated 8/8/18.
1.2 Location is Lot 18, Clem Newby Drive, Te Rapa Gateway, Hamilton. Approx. 2,369m2 land area.
2.0 MATERIALS AND WORKMANSHIP
2.1 All materials and workmanship shall comply with the New Zealand Building Act, all relevant New Zealand Standard Specifications and with Local Authority and Statutory Body Requirements. In particular:
The NZ Building Act Local Authority Bylaws NZ Building Code: Acceptable Solutions Health and Safety and the Employment Act Appropriate NZ Standards Statutory laws and regulations
3.0 PROJECT OUTLINE
3.1 The site is approximately 2,369 which consist of the following:
Lot 18:
Site Area - circa 2,369m2 Warehouse - 992m2 Office – 221m2 Canopy 150m2 Parking – 14 spaces (subject to final design approval)
3.2 Warehouse:
a. Lot 18 – Circa 2,369m2 – 992m2 Warehouse.
b. Interior height approximately 9.0m under purlin at knee.
c. Floor slab to be designed in accordance with loadings as per drawings or thickness specified.
3.3 Offices and amenities approximately 2.7m stud height below ceilings. 3.4 Office area approximately – 221m2
3.5 Site Works – pavement to be designed for heavy duty use.
4.0 SITE
4.1 Cleared site with services capped and located at boundaries. 5.0 EXCAVATION
5.1 Excavate to required levels and remove surplus material from site.
5.2 Excavate to form column foundations.
5.3 Excavate to form perimeter foundations.
6.0 GROUND REMEDIATION
6.1 Backfill excavated site with engineered fill in accordance with the engineer’s instructions.
7.0 CONCRETE WORK AND PRE-CAST PANELS
7.1 Reinforced Mass concrete foundations to suit building structure.
7.2 30MPa reinforced concrete in pads, floor slab and thickening of floor slab
(Canopy slab 175mm thick, warehouse slab 175mm thick, office slab 125mm thick). Subject to developers engineers final design.
7.3 Saw cuts around all columns and at 5 metre interval in both directions for the
floor slab.
7.4 We have allowed to construct the office first floor out of Comflor Tray Deck, including for the supply, installation of all Tray Deck, concrete topping, reinforcing, all associated trims, formwork, castings and propping.
7.5 Precast concrete walls to all ground perimeter walls (150mm unless
otherwise specified by the fire engineer):
Warehouse - Supply and install 150mm thick precast panels to all external walls (Heights as required by Fire Report).
Office walls – Exterior walls shall be precast concrete, integrated
with aluminium framed windows and selected cladding system plus allowance for some architectural finish to office precast walls).
7.6 Ground floor slabs to be laid on 1 layer of 0.25 micron Polythene. 7.7 Concrete slabs to be saw cut to comply with NZBC. No sealed joints. 7.8 Minimum 150mm compacted hard fill under all ground floor slabs. 7.9 Sealant to both sides of pre-cast walls.
8.0 STRUCTURAL STEEL
8.1 Structural steel generally comprises UC/UB columns and rafters. Allow for
bolted connections (to minimise on-site welding).
8.2 All structural steel blasted to SA2.5 and primed with inorganic zinc primer DFT75. Topcoat all visible steel work.
8.3 Cold rolled steel purlins and girts. All purlins and girts Z275 zinc coated.
(Z450 to loading canopy purlins, if any).
9.0 METAL ROOFING AND CLADDING
9.1 Warehouse and Office:
a. 0.55mm coloursteel roofing or equivalent fixed over building paper over white sizalation and wire netting with flashings to match.
b. Alsynite clearlite roof lights to approximately 10% of the Warehouse
roof area.
c. 0.55mm Colorcote flashing’s to provide a weathertight building.
d. Colorcote 125 industrial eaves gutters.
e. Colorcote rainwater heads to painted PVC downpipes fixed to warehouse wall taken to ground level.
f. Allow for flashings to ventilators if required. Timber trimmers with roof
underlay to run over the top of the trimmer and 0.55 coloursteel back flashings.
g. 0.40mm coloursteel vertical laid cladding fixed to girts to Warehouse
external walls as per drawings. Bottom of cladding fixed to galvanised folded plate fixed to concrete panel (through each trough). Allow for cavity closer.
h. Calder Stewart Euro-tray or equivalent wall cladding to front facade of offices as per drawings. Laid over solid ply sarking complete with associated fixings and flashings.
9.2 Ladder access and walkway to roof access not applicable.
10.0 ALUMINIUM JOINERY
10.1 Powder coated commercial aluminium joinery to front façade of offices.
10.2 1 No. aluminium automatic entry double doors for office as per drawings with
glazed exterior canopy over.
10.3 Clear Double glazing to all external glazed areas.
11.0 CARPENTRY AND JOINERY
11.1 Aluminium (or similar) clad solid core external egress doors in matching
frames with powdercoat finish. (Egress doors 1980 x 910mm wide)
11.2 Internal doors:
a. All interior doors 1980 x 810mm wide.
b. Hollow core interior doors with paint finish in timber reveals to Office to Warehouse (complete with latch/locksets and door closers where required). Prepared for electronic locking systems.
c. Hollow core timber cavity slider to accessible toilet (complete with
accessible privacy set).
d. Timber hollow core doors with paint finish to all internal areas.
11.3 All hardware commercial grade SCP finishes. Door closers to all exterior doors.
11.4 Internal partition walls:
a. Toilets – 90 x 45 timber framing at 600 centres with fibreglass batts to walls (for acoustic purposes) lined with 10mm Gib board with paint finish (Aqualine to accessible toilet and shower).
b. Generally
Steel partitions or timber framing to all internal office walls, with 13mm Gib board linings and paint finish to form the areas shown on the office plans (fire rated gib board linings if required by Fire Engineers Report).
Allow for fibreglass batts (for acoustic purposes) to all internal walls.
12.0 WALL FINISHES
12.1 Warehouse - Warehouse walls shall generally be unlined and unpainted. Steelwork shall be factory prime paint finish.
12.2 Office / Amenities Area - Area shall be gib lined, to a level 4 paint finish.
13.0 INTERNAL DECORATION
Office
Concrete – Strapped and lined with gib. Board. Gib Board – Three coat acrylic paint finish. Timber Doors - Three coat enamel paint finish. Timber Trim - Three coat enamel paint finish.
14.0 EXTERNAL DECORATION
Outline external decoration
Steelwork – One coat primer, one undercoat and one finish coat gloss enamel.
Warehouse – Natural (unpainted) precast concrete panel walls with selected Colourcote metal cladding over DHS girts.
Office Cladding – Selected Colorcote Eurotray on timber frame precast panels (as per architectural plans/elevations).
Colour scheme for building to be finalised later.
15.0 CEILINGS
15.1 Mineral fibre tile in 600 x 1200 exposed seismic grade suspended grid to open plan office.
15.2 13mm Gib board lining on suspended steel grid to toilets and stairs
(Aqualine to accessible toilet and showers) at 2.70m. 16.0 METALWORK
16.1 Fixed concrete filled steel bollards to inside and outside of all Warehouse
roller/sliding doors (4 No. per door), size 175mm dia. x 1200mm high.
16.2 All bollards to be finished in safety yellow paint finish or equivalent.
16.3 Downpipe protectors to all external gutters in high trafficable areas.
16.4 Aluminium Balustrading to stair case. 16.5 Security gates will be double chain-link black powder coated manual gates
as per drawings.
17.0 ELECTRICAL AND DATA
17.1 Mains Supply - A 3 phase 100-amp underground supply from Power Authority main shall be provided to The Main Distribution Board (MOB) and 1st floor office Sub Distribution board.
17.2 Distribution Boards - Distribution Boards shall be provided to allow for sufficient capacity to supply to a normal office requirement. They shall have sheet metal cabinets complete with MCB's with metering facilities to local supply authority standards.
17.3 Lighting - Office lighting shall be recessed Thorn flat panel LED 1200 x
600mm 5540 lumens. Warehouse to be fitted with