  • HAMILTON’S PRIME INDUSTRIAL PARK

    READY 2 NOVEMBER!! A Standalone office/warehouse buildings for lease

    600 Arthur Porter Drive, Te Rapa Te Rapa Gateway Industrial Development, Hamilton, New Zealand

  • Table of Contents

    1. Location2. Site Plan3. Development Brief4. Pricing5. Plans6. Outline Specification

  • 1. LocationTe Rapa Gateway is the Gateway to Hamilton. Strategically located and just minutes from the Waikato Expressway, main northern rail line, Te Rapa Road, Avalon Road and the largest shopping centre in New Zealand, The Base, Te Rapa Gateway is the ideal place to locate your business operations in an area long associated with Hamilton industry.

    Proposed bus and rail links in close proximity to the industrial park will be an important feature for businesses and staff alike. The Rotokauri future urban area on the opposite side of the expressway will provide future opportunity for businesses moving to Te Rapa Gateway, as will the expressway from Hamilton to Auckland, which is due for completion by 2019.

    75 10 85 MINS MINS MINS

    AUCKLAND HAMILTON CBD TAURANGA

  • 2. Site Plan

    Location of the Office/Warehouse standalone building – 600 Arthur Porter Drive

  • 3. Development Brief

    Chalmers Properties have developed the office and warehouse standalone buildings which are designed and constructed to the highestquality buildings which will suit its surroundings in the Te Rapa Gateway Industrial Park. The building comprises of Office/Showroom andWarehouse at ratios demanded by the market and available to lease now!

    Building: 600 Arthur Porter Drive, Te Rapa Office – 249m2 Warehouse – 1,060m2 Canopy – 249m2

    Zoning: Rotokauri Industrial, Hamilton City Council

    Features: 9 metre clear span Warehouse

    2 level offices overlooking high profile Arthur Porter Drive

    Drive through truck access

    Easy Access to by major arterial routes

    Close to key amenities

    On-site car parking

    Minimum 100% NBS

    Duel supply 11KVA electrical reticulation

    Ultra-fast Broadband

    Completion: Ready for 2 November 2019 occupation.

  • Contact Us Michael Clark Sales and Development Manager [email protected] 09 212 8712 021 279 0622 David Chafer General Manager [email protected] 03 472 9894 29 9 6205

    mailto:[email protected]:[email protected]

  • 4. Pricing

    560 Arthur Porter Drive Area (sqm) Rental ($/sqm) Rental p.a.

    Office 249.00 $ 225.00 $ 56,025.00 Warehouse 1,060.00 $ 125.00 $ 132,500.00

    Canopy 249.00 $ 65.00 $ 16,185.00 TOTAL $ 204,710.00

    *All prices are net rent and plus GST (if any).

    *Agreement to Lease documents can be supplied upon request.

  • 5. Plans and Perspectives

  • A000

    AS SHOWN @ A1

    dwg No

    Index & Locality Plan

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON JVINDUSTRIAL PARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 8/11/2018

    C

    rev date details

    C H A L ME R S R O

    A D

    AR

    TH

    UR

    PO

    RT

    ER

    DR

    I VE

    PROPOSEDDEVELOPMENT

    LOT 18

    CL

    EM

    NE

    WB

    Y R

    OA

    D

    ID

    A000A100A101A102A200A201A202A300A301A302A303A400A401A402A403A404A500A501A600A601A700A701A702A703A704A705A706A707A708A709

    SHEET

    Index & Locality PlanProposed Site Plan & Accessibility PlanSite PlanSite works DetailFloor Plan: WarehouseFloor PLan OfficeRoof PlanElevationsSections: WarehouseSections: OfficeSections: OfficeStairsStairsInternal Elevations: Ground Floor OfficeLunch Room: Floor Plan & ElevationsLunch Room: Sections & DetailsReflected Ceiling PlanFloor Finishes PlanWindow ScheduleDoor ScheduleConstruction Details: WarehouseConstruction Details: WarehouseConstruction Details: WarehouseConstruction Details: WarehouseConstruction Details: OfficeConstruction Details: OfficeConstruction Details: OfficeConstruction Details: OfficeConstruction Details: OfficeConstruction Details: Office

    N

    Ground Floorscale 1:2500

    TE RAPA GATEWAY DEVELOPMENTWAREHOUSE & OFFICE BUILDINGS:LOT 18HAMILTON JV INDUSTRIAL PARK

    14 S

    ept 2

    018

    Dev

    elop

    ed D

    esig

    n

    AAAAAAAAAAAAAAAAAAAAA

    25 O

    ctob

    er 2

    018

    Det

    aile

    d D

    esig

    n

    BBBBBBBBBBBBBBBBBBBBBBBBBBBBBB

    06 N

    ovem

    ber 2

    018

    For C

    onse

    nt

    CCCCCCCCCCCCCCCCCCCCCCCCCCCCCC

    D

    07 N

    ovem

    ber 2

    018

    For C

    onse

    nt_F

    ire D

    oors

    D

    D

    D

    D

  • A100

    AS SHOWN @ A1

    dwg No

    Proposed Site Plan &Accessibility Plan

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 2019/4/2

    C

    rev date details

    Total Site Area: 2,516 m2

    Total Site Area: 2,562 m2

    148 m2

    149 m2Total site area: 3,395 m2

    118 m2

    59 m2

    Total Site Area: 2,369 m2

    1,051 m2

    1,094 m2

    100 m2

    Total Site Area: 2,369 m2

    1,094 m2

    1,051 m2

    27 m2

    To exterior edge of canopy: 248 m2

    103 m2

    9,000

    Total site area: 3,834 m2

    OFFICE

    OFFICE

    (14)EXISTING LOT 20

    WAREHOUSE TO REMAIN

    EXISTING LOT 19WAREHOUSE TO REMAIN

    261m2

    258m2

    LOT 18WAREHOUSE

    (8)

    (6)

    LOT 21 & 22

    LOT 23WAREHOUSE(51m x 26.3m)

    Warehouse Gross Area: 1,321m2

    12345678910111213

    1 2

    123

    56

    78

    910

    1112

    1 2 3 4

    1

    13

    20 m2

    OFFICE359m2

    OFFICE359m2

    C H A L M E R S R O A D

    AR

    TH

    UR

    P

    OR

    TE

    R

    DR

    IV

    E

    R.O

    .W

    CL

    EM

    N

    EW

    BY

    R

    OA

    D

    (19)

    R.O

    .W

    5m buildingsetback 9,000

    E01A300

    23 m2

    OFFICE200m2

    100/100

    6,000

    1,00

    02,

    500

    Loading Bay

    5 x Bicycle Parks

    56

    78

    910

    1112

    1 2 3 4

    13

    E01A300

    1xAccessible CarParking space with

    yellow road markings &accessibility symbol

    Kerb ramp to pavedarea; max slope 1 in 8

    Accessible thresholdand signage on entry

    door at 1550mmabove FFL

    Toilet sign fixed tooutside of doors D12

    & D13 at 1550mmabove FFL

    Accessible WC c/wUnisex signage fixed

    to outside of doorsD14 at 1550mm

    above FFL

    SITE PLAN 1:500scale 1:500

    ACCESSIBILITY PLANscale 1:200

    KERB RAMPnot to scale

    NOTE: Refer A200, A201 & A601 for Accessible Doorwidths and details

    D

    LOT 18TOTAL SCHEDULE OF AREAS

    Ref

    eren

    ceN

    orth

    SITE COVERAGE

    Site Area: 2,369m2

    Permeable Area: 103m2 4.3%(20% of entire site= 473m2)

    PARKING REQUIREMENTS

    CPD Parking Requirements:Warehouse 1 per 150m²Office 1 per 40m²Accessible 1 for up to 20 carparksCycle Racks 1 per 10 staff

    Warehouse 1,060m² ( 7 Required)Office 200m² ( 5 Required)

    Total Carparks Required 13Total Carparks Achieved 13

    Chalmers RoadNorthgateHamilton 3200

    Lots 18DP 519482600 Arthur Porter Drive, Hamilton

    Site Area 2,369m2

    Warehouse Gross 1,060m2LunchRoom Gross 23m2Stairs Gross 26m2Total Warehouse Gross 1109m2

    Office Gross 200m2

    Canopy 248m2

    Total Built Area Gross 1,309m2

    Total Site Coverage Gross 55.3%

    SITE LEGAL DESCRIPTION

    W

    S E

    N

    W i n t e r S u n r i s e

    Summe r S u n r i s e

    W i n t e r S u n s e tS u m m e r S u n s e t

    https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65793939https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043354https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65793941https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65793941

  • 2/05/2019

    FOR CONSENT/ CONSTRUCTIONTE RAPA GATEWAY WAREHOUSE & OFFICEDEVELOPMENT LOT 18 (SPEC BUILDING)HAMILTON JV INDUSTRIAL PARK

    rev date details24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    design

    drawn

    job no.

    cad file

    checked

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    job title dwg title

    A101

    dwg Nostatus rev

    CSite Plan

    date

    #Pln

    AS SHOWN @ A1scale

    22,4

    00

    49,506

    2,20

    05,

    000

    2,340 6,037

    5,38

    05,

    220

    10,6

    002,

    200

    13,0

    00

    9,50

    0

    2,50

    02,

    500

    2,50

    02,

    500

    2,50

    02,

    500

    2,50

    02,

    500

    1,20

    02,

    500

    Set-out 13,890

    2,500 1,100 2,500 2,500 2,500

    1,45

    03,

    940

    3,94

    01,

    290

    1,45

    03,

    940

    3,94

    01,

    290

    500

    500

    7,50

    050

    050

    0

    5,015

    RL + 32.53RL + 32.40

    RL + 32.40RL + 32.40

    RL + 32.32

    RL + 32.32

    RL + 32.05 RL + 32.05

    RL + 31.05

    G01 G02

    5m RD 5m RD

    Amin 1:100 fall

    min 1:100 fall

    HT HT

    HT

    CANOPY

    Staff Courtyard

    LOT 18WAREHOUSE

    Gross Area: 1060m 2(49.5x22.4)

    FFL+ 32.55

    FFL+ 32.55

    LOADING BAY

    56

    78

    910

    1112

    1 2 3 4

    13

    OFFICEGross Area: 200m2

    (2 story)100/100

    11,100

    7,700

    Set-o

    ut 1

    0,61

    0

    Set-out

    E01A300

    B

    B

    B

    B

    B

    B

    B

    B

    K

    SITE PLAN 1:100scale 1:100

    NOTES

    3.

    Refer Civil Engineers drawings for Site, paving levels andboundary retaining walls

    Refer Civil Engineers drawings for all Site drainage andSanitary Sewer layout details

    Refer Electrical Engineers drawings for incoming Electricalsupply, lighting and all Electrical services

    1.

    2.

    4.

    All car parks to be marked using 100mm wide ReseneSidewalk paving paint

    Main contractor to provide all temporary power & watersupplies during construction

    6.

    Refer Electrical Engineers drawings for all site and exteriorbuilding lighting details

    5.

    7. Provide temporary power at pillar box

    Property boundary

    LEGEND

    Grassed Area; topsoil and grass seedingYard pavement: 175mm concrete on hardfillrefer to Civil Engineer's drawings forspecification

    Carpark pavement: 35mm MIX asphaltconcrete on hardfill; refer to Civil Engineer'sdrawings for specification

    Footpath/Hardstand pavement: 20mm MIX14 asphalt concrete on hardfill; refer to CivilEngineer's drawings for specification

    Existing neighbours fence to remain

    Sliding Yard gate/door; refer A103 for detailG01

    A

    Kerb ramp to comply with NZBC D1; referCivil drawings for detail

    K

    ACO threshold drain with Galv SteelLongitudinal Grate (located at entry)

    B

    x3 Hose tapHT

    x8 Bollards; Refer to A102 for details

    D

    Ref

    eren

    ceN

    orth

    W

    S E

    N

    W i n t e r S u n r i s eSumme r S u n r i s e

    W i n t e r S u n s e t

    S u m m e r S u n s e t

    https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436614https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340

  • A102

    AS SHOWN @ A1

    dwg No

    Site works Detail

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON JVINDUSTRIAL PARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 20/12/2018

    C

    rev date details

    300 150 300

    300 150 300

    A

    align

    LC

    align

    LC

    1200mm high 165Ø x 5mmgalvanised ms pipe bollard,filled with concrete, capped,yellow powdercoat finish(including baseplate)

    Bollard base plate; as permanufacturer's detail

    Bollard base plate; as permanufacturer's detail

    1200mm high 165Ø x 5mmgalvanised ms pipe bollard,filled with concrete, capped,yellow powdercoat finish(including baseplate)

    Rollerdoor jamb; referP04/A701 for detail

    LC

    LC

    align

    align

    JAMB

    JAMB

    TYP. BOLLARD SPACING @ ROLLER SHUTTER DOOR @ GRIDLINE Ascale 1:10

    chec

    k on

    site

    100

    1400

    30

    Downpipe; referRoof Plan for sizing

    MS dynabolts at300crs max

    dp

    MS dynabolts at300crs

    Galv. steel protector;paint finish

    Galv. steelprotector; paintfinish

    --

    Office precast conc.panel wall

    75 clear space allaround down pipes

    TYP. DOWNPIPE SHROUD PLANscale 1:10

    TYP. DOWNPIPE SHROUD ELEVATIONscale 1:10

    Note:DP Shroud to allBulkstore DP

    1,200 9,800 C.O.S 1,200

    50

    10,650 C.O.S

    2,60

    0

    War

    ehou

    se L

    ot 1

    9 bu

    ildin

    g lin

    e

    G01 & G02 GATE ELEVATIONscale 1:50

    100NB round cornerposts & caps; postcentres to manufacturer'srecommendation. Blackpowder coat finish.

    Manual Swing Gates

    Galvanised steel spear top Manual Swing Gatedesign:RHS frame size to manufacturersrecommendation/design with 15mm dia x 1.2mm roundvertical bars @100mm crs. Black powder coat finish.Gates lockable via security system

    Pedestrian fire egress access: Hinged gate o allowoccupants on the inside to unlatch and exit (mindimension 910mm width)

    1,20

    0

    165

    165Ø x 5mm galvanised mspipe bollard, filled withconcrete, capped, yellowpowdercoat finish (includingbaseplate)

    Concrete paving - refer CivilEngineer's drawings

    Bollard bolted to concreteslab as recommended bymanufacturer

    TYP. BOLLARD ELEVATION @ WAREHOUSEscale 1:10

    NOTE:- All bollards to be painted- Refer Plans for locations

    Contrasting colour &texture surface finish

    KERB CROSSING DETAILscale 1:50

    1,10

    0

    1,000

    2,100 min

    1 in 8 max. slope

    D

    https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452096

  • A200

    AS SHOWN @ A1

    dwg No

    Floor Plan:Warehouse

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON JVINDUSTRIAL PARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 2/8/2019

    C

    rev date details

    D01

    D05

    D02

    D05a D05b

    D14 D16D15

    D13

    D07

    D03

    D04

    D11

    D09

    W04

    W03

    W02

    D10

    D06

    DW

    FP02

    A700P01A700

    P05A700

    P03A700

    7,790 7,790

    74.01

    31.03

    84.01 45.0245.01 84.0131.0374.02 74.0274.01 45.01

    5m RD 5m RD

    WAREHOUSEFFL + 32.55

    (49.2m x 22.4m)1,060m2

    CANOPY(49.6m x 5m)

    Gross Area: 200m2(2 story)100/100

    D08

    W06

    W05

    A A

    E E

    B B

    D D

    7

    7

    2

    2

    1

    1

    C C

    6

    6

    5

    5

    4

    4

    3

    3

    D12

    P04A700

    57,202

    7,700 9,900 9,900 9,900 9,900 9,900

    22,4

    00

    13,0

    007,

    200

    165

    22,0

    7016

    5

    165 49,190 165

    2,19

    19,

    000

    4,00

    07,

    200

    AA301

    AA301

    BA301

    BA301

    DA301

    CA301

    FA302

    FA302

    EA302

    EA302

    HA303

    IA303

    GA303

    E01A300

    E02A300

    E03A300

    E04A300

    74.01 31.03

    31.03

    31.04

    31.05

    51.14

    31.03

    31.03

    74.01

    31.05

    GROUND FLOOR OFFICEFFL + 32.55

    ACCWC

    WC 1WC 2

    CLEANERSROOM

    3 STRUCTURE31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel

    (Natural Finish)165mm thick 240 min Fire rated precast concrete wall panel;Natual finish; Refer Engineer's drawings for details.

    31.04 150mm Precast Concrete Wall Panel (Exposed aggregateFinish)150mm thick precast concrete wall panel; Exposed aggregatefinish; Refer Engineer's drawings for details.

    31.05 150mm Precast Concrete Wall Panel (Concretebandsawn panels)150mm thick precast concrete wall panel; Shutter finish (use150mm wide x 25mm thick oregon pine boards) to exteriorface; Refer Engineer's drawings for details.

    4 ENCLOSURE45.01 Roller Door

    New Metabuilt Warehouse roller door; 5m high, 0.75mmpowdercoat frame and door finish; Motorised (3 phase) rollershutter doors, Automatic operation, spring balanced, standard

    guide to jambs & birdproofing to door head, complete withwind lock guides; Colour to match Colorsteel Ironsand

    45.02 Exterior DoorsSolid panel security door, powdercoated aluminium facedtimber; Refer Door Hardware Schedule for details; Colour tomatch Colorsteel Ironsand

    5 INTERIOR51.12 16mm Plywood lining

    16mm Plywood Lining; Polyurethane finish51.14 16mm Plywood lining on GBTL 60 fire rated system

    (60/60/60)16mm Plywood wall lining on 13mm GIB fyreline to each sideof the timber framing; clear polyurathane finish

    7 SERVICES74.01 Warehouse DPs: 150 uPVC Downpipes

    150 dia. uPVC downpipes with DP protectors; paint finish;

    Refer A103 for typical DP & protector layouts74.02 Warehouse Canopy DPs: 100 uPVC Downpipes

    100 dia. uPVC downpipes with DP protectors; paint finish;Refer A103 for typical DP & protector layouts

    8 EXTERNAL84.01 Bollards

    150mm NB dia. x 1200mm high concrete filled galv steelbollards painted yellow. Fixed to concrete slab at exposedcorners of building, roller doors (int & ext) and at services.

    GROUND FLOOR PLANscale 1:100

    NOTE:

    1. LINING NOTE: Refer to A201 for office building lining details & A402for lining details of bathroom area

    2. TIMBER FRAMING NOTE

    H1.2 SG8 radiata Pine unless stated/ detailed otherwise.

    2a) Office building ground floor internal timber walls:- Full height to the underside of the first floor concrete slab

    system.- 90x75 timber framing @ 600 crs max

    2b) Office building first floor internal timber walls:- Wall height to ceiling level- Refer to 'Tracklock seismic bracing design for wall bracing

    details'- 90x45 timber framing @ 600 crs max

    2c) Internal stairs area timber walls:- Refer to A400 & A401 for wall heights- Specific Engineering design; Refer to Structural engineering

    drawings for details

    3. OFFICE INSULATION NOTE

    3a) Office Thermal Insulation:- Roof: R2.9 Retrofit ceiling insulation (above ceiling tiles)- All precast walls: 45mm thick R1.4 Expol polystyrene

    insulation- All timber walls: Batt R 3.2 wall insulation 140mm thick- HWC insulation wrap to all HWCs

    3b) Office Acoustic Insulation:- To all office building ground floor interior timber framed walls:

    Pink Batts Silencer full height of framing

    4. CONCRETE NIB:- 150mm high concrete nib on office ground floor. Refer

    Engineers drawings for details.

    5. SWITCHES:Mechanical and Switch Positions: All thermostats to be locatedadjacent to light switches. All final switch locations to be confirmed onsite with Architect.

    E

    Ref

    eren

    ceN

    orth

    W

    S E

    N

    W i n t e r S u n r i s e

    Summe r S u n r i s e

    W i n t e r S u n s e tS u m m e r S u n s e t

    https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444151https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444037https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65793939https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043341https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043333https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345

  • A201

    AS SHOWN @ A1

    dwg No

    Floor Plan Office

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON JVINDUSTRIAL PARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 2/8/2019

    C

    rev date details

    21

    FA302

    EA302

    HA303

    BA301

    IA303

    E02A300

    A

    E

    B

    D

    C

    D14 D16D15

    D13

    D07

    D03

    D04

    D11

    D09

    W04

    W03

    W02

    D10

    D06

    DW

    F

    P06A704

    P08A704

    P07A704

    P09A704

    195 7,505 165

    7,700

    165 1,928 140

    90 4,125 195

    Gross Area: 200m2(2 story)100/100

    W06

    W05

    D12

    2,20

    0

    1,360 4,445

    195 6,905 553

    5,442 195

    51.02

    45.03

    31.04

    31.05

    31.03

    45.03 74.14

    74.03

    31.05

    45.03

    51.0251.08

    45.03

    51.0251.08

    31.04

    31.04

    51.0251.08

    51.0251.08

    51.0951.14

    51.0251.08

    51.0951.14

    51.0951.14

    31.03

    51.1a51.09

    GROUND FLOOR OFFICEFFL + 32.55

    ACCWC

    WC 1WC 2

    CLEANERSROOM

    FA302

    EA302

    GA303

    1,34

    51,

    200

    1,20

    01,

    200

    1,20

    01,

    200

    1,20

    01,

    200

    1,20

    02,

    055

    15,2

    007,

    200

    2,20

    09,

    000

    4,00

    07,

    200

    195

    12,6

    1019

    5

    3 STRUCTURE31.02 150mm Precast Concrete Wall

    Panel (Natural Finish)150mm thick precast concrete wallpanel; Natual finish; ReferEngineer's drawings for details.

    31.03 165mm Precast Concrete240/240/240 FRR Wall Panel(Natural Finish)165mm thick 240 min Fire ratedprecast concrete wall panel; Natualfinish; Refer Engineer's drawings fordetails.

    31.04 150mm Precast Concrete WallPanel (Exposed aggregate Finish)150mm thick precast concrete wallpanel; Exposed aggregate finish;Refer Engineer's drawings fordetails.

    31.05 150mm Precast Concrete WallPanel (Concrete bandsawnpanels)150mm thick precast concrete wallpanel; Shutter finish (use 150mmwide x 25mm thick oregon pineboards) to exterior face; ReferEngineer's drawings for details.

    4 ENCLOSURE42.06 Office Wall: Profiled Metal

    Cladding0.55mm BMT Colorsteel EnduraDimond Heritage Tray cladding overbuilding paper over cavibat battens@ 600 crs max over building paperover timber framing; Colour:Ironsand

    45.03 Shopfront glazingPowdercoated 125mm Front GlazedFirvie Suite aluminium tinted doubleglazed joinery; Colour to matchcolorsteel Ironsand

    5 INTERIOR51.01 13mm GIB Standard on timber

    framing13mm GIB Standard on timberframing; Level 4 stopped & selaed,paint finish

    51.1a GIB Ezybrace system - GS1-N ontimber framing

    GIB bracing system [GS1-N]: 13mmGIB Standard on timber framing;Level 4 stopped & selaed, paintfinish

    51.02 13mm GIB Standard on timberstrapping on precast wall13mm GIB Standard on 90x45mmtimber strapping on DPC on precastconcrete wall; Level 4 stopped &selaed, paint finish. 140mm furtherstrapping to bathroom area.

    51.06 GBUW 60a Fire Rated System(60/60/60)2 layers of 13mm GIB Fyreline tointerior side of timber framing or ontimber strapping or on PC panel(Lining to be installed full height ofthe wall - first floor walls to theunderside of the roofing) ; Level 4stopped & sealed, paint finish

    51.08 R1.4 wall insulation with timberstrapping on PC conc wall45mm thick R1.48 Expol-xpolystyrene insulation with timberstrapping on PC conc wall

    51.09 R3.2 wall insulation on timberframing140mm thick batt R3.2 on timberframing

    51.12 16mm Plywood lining16mm Plywood Lining; Polyurethanefinish

    51.14 16mm Plywood lining on GBTL 60fire rated system (60/60/60)16mm Plywood wall lining on 13mmGIB fyreline to each side of thetimber framing stopped & sealed(fire rated lining to be installed fullheight of the wall); plywood lining tohave clear polyurathane finish

    7 SERVICES74.03 Office DPs: 100 uPVC Downpipes

    100 dia. uPVC downpipes with DPprotectors; paint finish; Refer A103for typical DP & protector layouts

    74.14 Channel DrainACO threshold drain with Galv SteelLongitudinal Grate (located at entry)

    GROUND FLOOR PLAN OFFICEscale 1:50

    NOTE:

    1. Refer to A402 for lining details of bathroom area

    2. TIMBER FRAMING NOTE

    H1.2 SG8 radiata Pine unless stated/ detailedotherwise.

    2a) Office building ground floor internal timber walls:- Full height to the underside of the first floor

    concrete slab system.- 90x75 timber framing @ 600 crs max

    2b) Office building first floor internal timber walls:- Wall height to ceiling level- Refer to 'Tracklock seismic bracing design for

    wall bracing details'- 90x45 timber framing @ 600 crs max

    2c) Internal stairs area timber walls:- Refer to A400 & A401 for wall heights- Specific Engineering design; Refer to

    Structural engineering drawings for details

    3. FIRST FLOOR WALL BRACING

    Tracklock wall bracing system to be provided for all firstfloor interior walls; Refer to A711 for details

    4. OFFICE INSULATION NOTE

    3a) Office Thermal Insulation:- Roof: R2.9 Retrofit ceiling insulation above

    ceiling tiles- All precast walls: 45mm thick R1.4 Expol

    polystyrene insulation- All timber walls: Batt R 3.2 wall insulation

    140mm thick- HWC insulation wrap to all HWCs

    3b) Office Acoustic Insulation:- To all office building ground floor interior

    timber framed walls: Pink Batts Silencer fullheight of framing

    5. INTUMESCENT COATING TO STEEL STRUCTURE

    - Refer to structural specifications for details.- All steel structure (columns & beams) supporting

    office first floor conc system must haveintumescent coating system with the same firerating as per the fire rating on the first floorsystem; Refer to the fire report. Contractor toensure the compatibility between theintumescent coating and any other steel coatings(primer, topcoat). It must provide joint warranties. D

    Ref

    eren

    ceN

    orth

    W01

    W04

    W03

    W02

    D18

    W09W08

    W07

    1234567891011

    12131415161718192021

    P10A704

    P11A704

    42.06 45.03 42.06

    51.0251.08

    51.0151.09

    51.0251.08

    51.0251.08

    51.0151.09

    45.03

    45.03

    45.03

    45.03

    31.04

    31.04

    42.06

    42.0642.0642.06 31.05

    51.0651.09

    51.0651.08

    31.02

    51.0251.08

    42.06

    42.06

    31.05

    51.0951.14

    51.0951.14

    51.0951.14

    45.03

    31.03

    31.03

    FIRST FLOORWAREHOUSE OFFICE

    FFL +36.25

    21

    FA302

    EA302

    HA303

    BA301

    IA303

    E02A300

    A

    E

    B

    D

    C

    FA302

    EA302

    GA303

    FIRST FLOOR PLAN OFFICEscale 1:50

    W

    S E

    N

    W i n t e r S u n r i s e

    Summe r S u n r i s e

    W i n t e r S u n s e t

    S u m m e r S u n s e t

    https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444151https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444151https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043336https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043341https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043333https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345

  • A202

    AS SHOWN @ A1

    dwg No

    Roof Plan

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON JVINDUSTRIAL PARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 20/12/2018

    C

    rev date details

    S01A701

    S02A701

    9,00

    04,

    000

    13,0

    0049,500

    9,900 9,900 9,900 9,900 9,900

    1,810 955 3,820 955 3,820 955 3,820 955 4,775 955 3,820 955 4,775 955 3,820 955 3,820 955 3,820 955 1,810

    22,6

    805,

    000

    7,700

    12,6

    00

    1,300

    300 1,200

    FALL 4°

    FALL 5°

    FALL 5°

    FALL 3°

    FALL 3.5°

    A A

    E E

    B B

    D D

    7

    7

    2

    2

    1

    1

    C C

    6

    6

    5

    5

    4

    4

    3

    3

    AA301

    AA301

    BA301

    BA301

    DA301

    CA301

    FA302

    FA302

    EA302

    EA302

    HA303

    IA303

    GA303

    E01A300

    E02A300

    E03A300

    E04A300

    450

    150

    42.01

    74.05

    74.01

    74.05

    74.0374.0474.15

    74.0374.04

    74.01

    74.01

    74.01

    74.02

    45.0642.0242.01 42.01 42.02 42.01 42.02 42.01 42.02 42.0242.01

    42.0242.01 42.01 42.02 42.0242.01 42.0242.01 42.0242.01

    74.02

    42.01

    74.07

    74.07

    Fall 1:100 minFall 1:100 minFall 1:100 min Fall 1:100 min

    Fall 1:100 min Fall 1:100 min

    Fall 1:100 min

    Fall

    1:10

    0 m

    inFa

    ll 1:

    100

    min

    4 ENCLOSURE42.01 Warehouse Roof: Profiled Metal Roofing

    0.55mm BMT Colorsteel Endura DimondRoofing DP955 over roof underlay on wirenetting on DHS purlins; Colour: Ironsand

    42.02 Warehouse clearlite: Translucent ProfiledRoofingAlsynite clearlite roof lights: Topglass GC HiLine / Topspan; profile ALS955

    45.06 Office Entry CanopyEuroglass Canopy Structure with stainlesssteel gutter and downpipe

    7 SERVICES74.01 Warehouse DPs: 150 uPVC Downpipes

    150 dia. uPVC downpipes with DP protectors;paint finish; Refer A103 for typical DP &protector layouts

    74.02 Warehouse Canopy DPs: 100 uPVCDownpipes100 dia. uPVC downpipes with DP protectors;paint finish; Refer A103 for typical DP &protector layouts

    74.03 Office DPs: 100 uPVC Downpipes100 dia. uPVC downpipes with DP protectors;paint finish; Refer A103 for typical DP &protector layouts

    74.04 Rainwater Head

    0.75mm BMT Colorsteel Endura RWHColorsteel Endura to match wall claddingcolour

    74.05 Dimond 300 Box External GutterColorsteel Endura Dimond 300 Box externalgutter with external gutter brackets fixed at600mm CRS max laid to fall; finish to matchgutter

    74.07 Membrane GutterNuraply 3PM two layer membrabe systemgutter on 17mm CDH3 ply on 45x45mm SG6H3.2 timber framing @400 crs max laid to fall

    74.15 ScupperNuralite 200x75 aluminium scupper with leafguard; Refer to S12/A705 for details

    ROOF PLANscale 1:100

    NOTE:

    -DP Finish: All downpipes to be paint finishedunless otherwise noted.-Elevation: Refer A300s for DP elevations-Mechanical Roof Penatration: Refer Mechanicaldrawings for flashing detail-Provide design & build proprietary cable-based FallArrest system to Warehouse, Canopy and Office

    GENERAL

    - Drawing to be read in conjunction with plans &elevations for final DP layouts

    - Provide Certifix design & build proprietary cable-based Fall Arrest & roof ladder access system to roofto Department of Labour, OSH & NZBC D1/AS1requirements. Design to include anchor points atregular intervals along Warehouse Ridge line. Yellowpaint lines across safe zones / boundary.

    - All external Gutters @ 1:200 fall min.

    - All internal Gutters @1:100 fall min.

    NOTE: Colorsteel Endura protective coating toBOTH top & underside faces of steel - canopy only

    WAREHOUSE, CANOPY & OFFICE ROOF DESIGN PROPOSAL

    - Warehouse building roofGutter: served by Dimond 300mm Box gutter (33,550mm²) at gridline A and EDP: drained by 4 x 150ØDP

    - Warehouse canopy roofGutter: served by Box 300 ( 27,000m2) with DPs at gridline 3 and 5DP: drained by 2 x 100ØDP

    - Office building roofGutter: served by membrane gutter 450W x 90H mm (40,500m²) with RWH overflow at gridline B and DDP: drained by 2 x 100ØDP

    - Office entry canopy roofGutter: served by custom made gutter 150W x 80H mmDP:drained by 1 x 80ØDP

    Warehouse Roof - External Gutter

    564 m² / 2 = 287 m²

    According to Figure 15 of E1/AS1, for a planarea of roof discharging to section of aexternal gutter of 287 m², the cross-sectionalarea needs to be 25,000mm² at least.

    According to the table 5 of E1/AS1, a 150Ødownpipe can serve up to 350m² of a planarea of roof if the pitch is 0-25°

    Warehouse Canopy Roof - Internal Gutter

    248 m² / 2 = 124 m²

    According to Figure 16 of E1/AS1, for a planarea of roof discharging to section of a internalgutter of 124 m², the cross-sectional areaneeds to be 25,000mm² at least.

    According to the table 5 of E1/AS1, a 100Ødownpipe can serve up to 155m² of a planarea of roof if the pitch is 0-25°

    Office Roof - Office Internal Gutter

    109 m² / 2 = 55 m²

    According to Figure 16 of E1/AS1, for a planarea of roof discharging to section of a internalgutter of 55 m², the cross-sectional area needsto be 12,000mm² at least.

    According to the table 5 of E1/AS1, a 100Ødownpipe can serve up to 155m² of a planarea of roof if the pitch is 0-25°

    Office Entry Canopy Roof - Internal Gutter

    10 m²

    According to Figure 16 of E1/AS1, for a planarea of roof discharging to section of a internalgutter of 10 m², the cross-sectional area needsto be 4,000mm² at least.

    According to the table 5 of E1/AS1, a 65Ødownpipe can serve up to 60m² of a planarea of roof if the pitch is 0-25°

    D

    Ref

    eren

    ceN

    orth

    W

    S E

    N

    W i n t e r S u n r i s e

    Summe r S u n r i s e

    W i n t e r S u n s e tS u m m e r S u n s e t

    287m²

    124m²

    287m²

    124m²

    54m²

    54m²287m²287m²

    10m²

    https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444151https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043347https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043332https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043340https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452102https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436616https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436616

  • A300

    AS SHOWN @ A1

    dwg No

    Elevations

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 2019/4/2

    C

    rev date details

    1 2 73 4 5 6

    7,700 9,900 9,900 9,900 9,900 9,90057,202

    7,70

    0

    6,40

    0

    3,70

    0

    2,70

    0

    3,210 4,490

    45.05

    42.06

    31.09

    74.04

    74.03

    84.02

    31.03

    42.0142.02

    74.01

    74.05

    45.05

    31.05

    31.05

    FFL + 32.550

    FCL + 35.250

    FFL + 36.250

    CL + 38.950

    RL + 40.250Top of parapet

    RL+40.160Top of precast wall

    7 2 16 5 4 3

    9,900 9,900 9,900 9,900 9,900 7,70057,202

    7,70

    0

    2,70

    0

    3,70

    0

    6,40

    0

    45.05

    45.03

    42.0674.04

    74.03

    45.06

    31.03

    31.03

    42.01

    42.01 42.02

    84.02

    74.05

    31.07

    45.01 45.01

    45.02

    74.01

    84.02

    31.03

    31.03

    FFL + 32.550

    FCL + 35.250

    FFL + 36.250

    CL + 38.950

    RL + 40.250Top of parapet

    RL+40.160Top of precast wall

    A B D EC

    22,4007,200 4,000 9,000 2,200

    6,40

    03,

    700

    2,70

    0

    7,70

    0 9,00

    0

    42.06

    45.05

    31.03

    31.04

    45.03

    45.0331.03

    74.05

    45.03

    FFL + 32.550

    FCL + 35.250

    FFL + 36.250

    FCL + 38.950

    RL + 40.250Top of parapet

    RL + 41.550u/s portal knee

    42.03

    42.0342.09

    42.09

    74.01

    E D B AC

    22,4002,200 9,000 4,000 7,200

    6,00

    0

    9,00

    0

    31.03

    74.05

    42.01

    42.01

    FFL + 32.550

    RL + 38.550

    RL + 41.550

    u/s canopy beam

    u/s portal knee

    84.02

    74.01

    84.02

    74.01

    3 STRUCTURE31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel (Natural

    Finish)165mm thick 240 min Fire rated precast concrete wall panel; Natualfinish; Refer Engineer's drawings for details.

    31.04 150mm Precast Concrete Wall Panel (Exposed aggregateFinish)150mm thick precast concrete wall panel; Exposed aggregate finish;Refer Engineer's drawings for details.

    31.05 150mm Precast Concrete Wall Panel (Concrete bandsawnpanels)150mm thick precast concrete wall panel; Shutter finish (use 150mmwide x 25mm thick oregon pine boards) to exterior face; ReferEngineer's drawings for details.

    31.07 150mm Precast Concrete 60/60/60 FRR Wall Panel (Concretebandsawn panels)150mm thick 60 min Fire rated precast concrete wall panel; Shutterfinish (use 150mm wide x 25mm thick oregon pine boards) toexterior face; Refer Engineer's drawings for details.

    31.09 150mm Precast Concrete 90/90/90 FRR Wall Panel (Exposedaggregate Finish)150mm thick 90 min Fire rated precast concrete wall panel; Exposedaggregate finish; Refer Engineer's drawings for details.

    4 ENCLOSURE42.01 Warehouse Roof: Profiled Metal Roofing

    0.55mm BMT Colorsteel Endura Dimond Roofing DP955 over roofunderlay on wire netting on DHS purlins; Colour: Ironsand

    42.02 Warehouse clearlite: Translucent Profiled RoofingAlsynite clearlite roof lights: Topglass GC Hi Line / Topspan; profileALS955

    42.03 Warehouse Wall: Profiled Metal Cladding on timber strappingon Precast Conc Wall0.40mm BMT Colorsteel Endura Dimond Cladding LT7 fastenedthrough 20mm cavibat onto H3.1 75x45 LOSP horizontal timberbattens @1500crs with type 17 14 gauge x 10TPI x 90mm fasteners(30mm penetration minimum). Structural timber battens to beanchored through DPC to precast walls with M8 Chemset studs andEpcon C65 @ 1000mm spacing along the battens (fixings- specific

    engineering design); Colour: Ironsand42.06 Office Wall: Profiled Metal Cladding

    0.55mm BMT Colorsteel Endura Dimond Heritage Tray claddingover building paper over cavibat battens @ 600 crs max overbuilding paper over timber framing; Colour: Ironsand

    42.09 Warehouse Accent Wall: Profiled Metal Cladding Accent Colour0.55mm BMT Colorsteel Endura Dimond LT7 Cladding (standard933 with strip) fastened through 20mm cavibat onto H3.1 75x45LOSP horizontal timber battens @1500 crs with type17 14gauge x10TPI x 75mm fasteners. Structural timber battens to be anchoredthrough DPC to precast walls with M8 Chemset studs and Epcon C6@ 1000mm spacing along the battens (fixings - specific engineeringdesign); Colour: TBA

    45.01 Roller DoorNew Metabuilt Warehouse roller door; 5m high, 0.75mmpowdercoat frame and door finish; Motorised (3 phase) roller shutterdoors, Automatic operation, spring balanced, standard guide tojambs & birdproofing to door head, complete with wind lock guides;Colour to match Colorsteel Ironsand

    45.02 Exterior DoorsSolid panel security door, powdercoated aluminium faced timber;Refer Door Hardware Schedule for details; Colour to matchColorsteel Ironsand

    45.03 Shopfront glazingPowdercoated 125mm Front Glazed Firvie Suite aluminium tinteddouble glazed joinery; Colour to match colorsteel Ironsand

    45.05 1st Floor Office Window Head, Jamb & Sill Flashing withAccent Colours2mm thick powdercoated aluminium jamb flashing; Colour: TBA

    45.06 Office Entry CanopyEuroglass Canopy Structure with stainless steel gutter anddownpipe

    7 SERVICES74.01 Warehouse DPs: 150 uPVC Downpipes

    150 dia. uPVC downpipes with DP protectors; paint finish; ReferA103 for typical DP & protector layouts

    74.03 Office DPs: 100 uPVC Downpipes

    100 dia. uPVC downpipes with DP protectors; paint finish; ReferA103 for typical DP & protector layouts

    74.04 Rainwater Head0.75mm BMT Colorsteel Endura RWH Colorsteel Endura to matchwall cladding colour

    74.05 Dimond 300 Box External GutterColorsteel Endura Dimond 300 Box external gutter with externalgutter brackets fixed at 600mm CRS max laid to fall; finish to matchgutter

    8 EXTERNAL84.02 Shrouds

    1m high galv steel shroud downpipe protectors to all downpipes inyard and warehouse area

    SOUTH ELEVATIONscale 1:100

    NORTH ELEVATIONscale 1:100

    WEST ELEVATIONscale 1:100

    EAST ELEVATIONscale 1:100

    E

  • A301

    AS SHOWN @ A1

    dwg No

    Sections: Warehouse

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 2/05/2019

    C

    rev date details

    ABDE C

    S03A701

    S04#LayID

    S05A702

    S06A703

    S07A703

    S08A703

    2,40

    06,

    000

    9,00

    0 10,8

    20

    2,200 9,000 4,000 7,200

    42.01

    74.01

    74.05

    74.02

    84.0131.0145.02

    45.01

    42.0142.01

    31.03

    51.14

    31.03 31.03

    FFL + 32.550

    RL + 34.950

    RL + 38.550

    RL + 41.550

    Top of precast

    u/s canopy beam

    u/s portal knee

    RL + 43.370Apex

    1 2 3 4 5

    S10A703 S11

    A703

    9,00

    0

    2,70

    03,

    700

    6,40

    0 7,70

    0

    9,9007,700 9,900 9,900 9,900 9,900

    42.03

    74.0742.05

    42.06

    45.03

    45.01

    84.01

    51.14

    31.03

    45.01

    84.0131.01

    31.0345.03

    31.0331.03 31.03 31.03 31.03

    42.01

    45.02FFL + 32.550

    RL + 41.550

    u/s portal knee

    FFL + 32.550

    FCL + 35.250

    FFL + 36.250

    FCL + 38.950

    RL + 40.250Top of parapet

    A

    6,00

    0

    9,00

    0 10,8

    20

    2,40

    0

    42.0174.05

    74.01

    74.02

    84.01

    45.01

    42.01

    31.03

    31.03

    FFL + 32.550

    RL + 34.950

    RL + 38.550

    RL + 41.550

    Top of precast

    u/s canopy beam

    u/s portal knee

    RL + 43.370Apex

    A

    S09A703

    6,00

    0

    9,00

    0 10,8

    20

    2,40

    0

    42.0174.05

    74.01

    74.02

    84.01

    45.01

    42.01

    31.03

    31.03

    FFL + 32.550

    RL + 34.950

    RL + 38.550

    RL + 41.550

    Top of precast

    u/s canopy beam

    u/s portal knee

    RL + 43.370Apex

    3 STRUCTURE31.01 Concrete Slab

    Concrete floor slab on DPC on sand blinding on metal; ReferEngineer's draw ings for details.

    31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel(Natural Finish)165mm thick 240 min Fire rated precast concrete wall panel;Natual finish; Refer Engineer's drawings for details.

    4 ENCLOSURE42.01 Warehouse Roof: Profiled Metal Roofing

    0.55mm BMT Colorsteel Endura Dimond Roofing DP955 overroof underlay on wire netting on DHS purlins; Colour:Ironsand

    42.03a Warehouse Wall: Profiled Metal Cladding0.40mm BMT Colorsteel Endura Dimond Cladding LT7 onsteel girts; Colour: Ironsand

    42.05 Office Roof: Profiled Metal Roofing

    0.55mm BMT Colorsteel Endura Dimond Roofing DP955 overbuilding paper over white sizalation and wire netting; Colour:Ironsand

    42.06 Office Wall: Profiled Metal Cladding0.55mm BMT Colorsteel Endura Dimond Heritage Traycladding over building paper over cavibat battens @ 600 crsmax over building paper over timber framing; Colour:Ironsand

    45.01 Roller DoorNew Metabuilt Warehouse roller door; 5m high, 0.75mmpowdercoat frame and door finish; Motorised (3 phase) rollershutter doors, Automatic operation, spring balanced, standardguide to jambs & birdproofing to door head, complete withwind lock guides; Colour to match Colorsteel Ironsand

    45.02 Exterior DoorsSolid panel security door, powdercoated aluminium facedtimber; Refer Door Hardware Schedule for details; Colour tomatch Colorsteel Ironsand

    45.03 Shopfront glazing

    Powdercoated 125mm Front Glazed Firvie Suite aluminiumtinted double glazed joinery; Colour to match colorsteelIronsand

    5 INTERIOR51.12 16mm Plywood lining

    16mm Plywood Lining; Polyurethane finish51.14 16mm Plywood lining on GBTL 60 fire rated system

    (60/60/60)16mm Plywood wall lining on 13mm GIB fyreline to each sideof the timber framing; clear polyurathane finish

    7 SERVICES74.01 Warehouse DPs: 150 uPVC Downpipes

    150 dia. uPVC downpipes with DP protectors; paint finish;Refer A103 for typical DP & protector layouts

    74.02 Warehouse Canopy DPs: 100 uPVC Downpipes

    100 dia. uPVC downpipes with DP protectors; paint finish;Refer A103 for typical DP & protector layouts

    74.05 Dimond 300 Box External GutterColorsteel Endura Dimond 300 Box external gutter withexternal gutter brackets fixed at 600mm CRS max laid to fall;finish to match gutter

    74.07 Membrane GutterNuraply 3PM two layer membrabe system gutter on 17mmCDH3 ply on 45x45mm SG6 H3.2 timber framing @400 crsmax laid to fall

    8 EXTERNAL84.01 Bollards

    150mm NB dia. x 1200mm high concrete filled galv steelbollards painted yellow. Fixed to concrete slab at exposedcorners of building, roller doors (int & ext) and at services.

    SECTION A-Ascale 1:100

    SECTION B-Bscale 1:100

    SECTION C-Cscale 1:100

    SECTION D-Dscale 1:100

    D

    https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452096https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452095https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436619

  • A302

    AS SHOWN @ A1

    dwg No

    Sections: Office

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 2019/4/2

    C

    rev date details

    S12A705

    S13A706

    6,40

    07,

    700

    3,70

    0

    2,70

    0

    FFL + 32.550

    FCL + 35.250

    FFL + 36.250

    FCL + 38.950

    RL + 40.250Top of parapet

    51.0151.11

    51.0351.11

    51.01 45.0351.0251.02 45.03

    53.01

    45.0345.03 45.03

    51.01

    51.0151.01

    42.05

    51.1053.01

    42.06

    53.0153.03

    51.06

    45.0351.02

    31.05

    31.05

    WC 1

    GROUND FLOOROFFICE

    FIRST FLOORWAREHOUSE

    OFFICE

    S14A706

    S15A706

    S16A707

    2,70

    01,

    000

    2,70

    0

    7,70

    0

    7,200 4,000 9,000 2,200

    170

    135

    220

    190 42.01 74.05

    74.01

    84.01

    45.06

    42.05

    FFL + 32.550

    FCL + 35.250

    FFL + 36.250

    RL + 40.250Top of parapet

    FCL + 38.950

    RL+35.420

    RL+36.115

    RL+39.170

    RL+40.060

    31.03

    42.06

    45.03

    51.1053.01

    53.01

    51.02

    51.02

    42.06

    45.03

    31.05

    51.0151.11

    42.03

    42.01

    53.01 53.03

    51.03

    GROUND FLOOROFFICE

    FIRST FLOORWAREHOUSE OFFICE

    WC 2

    BDE C

    2,200 9,000 4,000

    A B D EC

    3 STRUCTURE31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel

    (Natural Finish)165mm thick 240 min Fire rated precast concrete wall panel;Natual finish; Refer Engineer's drawings for details.

    31.05 150mm Precast Concrete Wall Panel (Concretebandsawn panels)150mm thick precast concrete wall panel; Shutter finish (use150mm wide x 25mm thick oregon pine boards) to exteriorface; Refer Engineer's drawings for details.

    4 ENCLOSURE42.01 Warehouse Roof: Profiled Metal Roofing

    0.55mm BMT Colorsteel Endura Dimond Roofing DP955 overroof underlay on wire netting on DHS purlins; Colour:Ironsand

    42.03a Warehouse Wall: Profiled Metal Cladding0.40mm BMT Colorsteel Endura Dimond Cladding LT7 onsteel girts; Colour: Ironsand

    42.05 Office Roof: Profiled Metal Roofing0.55mm BMT Colorsteel Endura Dimond Roofing DP955 overbuilding paper over white sizalation and wire netting; Colour:Ironsand

    42.06 Office Wall: Profiled Metal Cladding0.55mm BMT Colorsteel Endura Dimond Heritage Traycladding over building paper over cavibat battens @ 600 crsmax over building paper over timber framing; Colour:Ironsand

    45.03 Shopfront glazingPowdercoated 125mm Front Glazed Firvie Suite aluminiumtinted double glazed joinery; Colour to match colorsteelIronsand

    45.06 Office Entry CanopyEuroglass Canopy Structure with stainless steel gutter anddownpipe

    5 INTERIOR51.01 13mm GIB Standard on timber framing

    13mm GIB Standard on timber framing; Level 4 stopped &selaed, paint finish

    51.02 13mm GIB Standard on timber strapping on precast wall13mm GIB Standard on 90x45mm timber strapping on DPCon precast concrete wall; Level 4 stopped & selaed, paintfinish. 140mm further strapping to bathroom area.

    51.03 13mm GIB Aqualine on timber framing13mm GIB Aqualine on timber framing; Level 4 stopped &selaed, paint finish

    51.06 GBUW 60a Fire Rated Syatem (60/60/60)2 layers of 13mm GIB Fyreline to interior side of timberframing or on timber strapping or on PC panel; Level 4stopped & sealed, paint finish

    51.10 R2.9 roof insulation150mm R2.9 Retrofit ceiling insulation with 20mm thermaxcavity

    51.11 Pink Batts SilencerPink Batts Silencer wall acoustic insulation

    53.01 Suspended Ceiling TilesRH99 Mineral fibre fissured square edge 1200 x 600mmceiling tiles on exposed seismic grade suspended gridsystem.

    53.03 Suspended GIB Aqualine CeilingSuspended 13mm GIB Aqualine ceiling on seismicsuspended grid system; level 4 stopped, sealed & paint finish.

    7 SERVICES74.01 Warehouse DPs: 150 uPVC Downpipes

    150 dia. uPVC downpipes with DP protectors; paint finish;Refer A103 for typical DP & protector layouts

    74.05 Dimond 300 Box External GutterColorsteel Endura Dimond 300 Box external gutter withexternal gutter brackets fixed at 600mm CRS max laid to fall;finish to match gutter

    8 EXTERNAL84.01 Bollards

    150mm NB dia. x 1200mm high concrete filled galv steelbollards painted yellow. Fixed to concrete slab at exposedcorners of building, roller doors (int & ext) and at services.

    SECTION E-Escale 1:50

    SECTION F-Fscale 1:50

    https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436616https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452098https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452098https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452098https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043351

  • A303

    AS SHOWN @ A1

    dwg No

    Sections: Office

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 2019/4/2

    C

    rev date details

    S18A707

    6,40

    0

    7,70

    0

    3,70

    0

    2,70

    0

    51.1053.01

    42.05

    53.01

    45.03

    51.01

    42.06

    45.03

    51.01

    45.0351.01

    45.0351.01

    FFL + 32.550

    FCL + 35.250

    FFL + 36.250

    RL + 40.250Top of parapet

    FCL + 38.950

    RL+35.420

    RL+36.115

    RL+39.170

    RL+40.060

    GROUND FLOOROFFICE

    FIRST FLOORWAREHOUSE

    OFFICE

    S19A708

    6,40

    0

    7,70

    0

    4,000 7,200

    6,00

    0

    2,70

    0

    51.01

    51.1053.01

    42.05

    53.01

    45.0351.01 45.03

    45.03 45.0351.01 51.01

    42.06

    45.03

    FFL + 32.550

    FCL + 35.250

    FFL + 36.250

    RL + 40.250Top of parapet

    FCL + 38.950

    RL+35.420

    RL+36.115

    RL+39.170

    RL+40.060

    GROUND FLOOROFFICE

    FIRST FLOORWAREHOUSE

    OFFICE

    S20A708

    S21A708

    S22A709

    S23A709

    S17A707

    51.0351.11

    51.01 51.0351.11

    31.04

    51.0251.08

    51.0251.08

    51.01

    51.1053.01

    42.05

    42.06

    53.01

    51.01

    45.03

    45.03

    51.0251.08

    51.0351.11

    53.03 53.03 53.03

    FFL + 32.550

    FCL + 35.250

    FFL + 36.250

    RL + 40.250Top of parapet

    FCL + 38.950

    RL+35.420

    RL+36.115

    RL+39.170

    RL+40.060

    GROUND FLOOROFFICE

    FIRST FLOORWAREHOUSE

    OFFICE

    WC 2WC 1 ACC. WC WAREHOUSELUNCHROOM

    E D BC A

    1 2

    3 STRUCTURE31.04 150mm Precast Concrete Wall Panel

    (Exposed aggregate Finish)150mm thick precast concrete wall panel;Exposed aggregate finish; Refer Engineer'sdrawings for details.

    4 ENCLOSURE42.05 Office Roof: Profiled Metal Roofing

    0.55mm BMT Colorsteel Endura DimondRoofing DP955 over building paper overwhite sizalation and wire netting; Colour:Ironsand

    42.06 Office Wall: Profiled Metal Cladding0.55mm BMT Colorsteel Endura DimondHeritage Tray cladding over building paperover cavibat battens @ 600 crs max overbuilding paper over timber framing; Colour:Ironsand

    45.03 Shopfront glazingPowdercoated 125mm Front Glazed FirvieSuite aluminium tinted double glazed joinery;Colour to match colorsteel Ironsand

    5 INTERIOR51.01 13mm GIB Standard on timber framing

    13mm GIB Standard on timber framing;Level 4 stopped & selaed, paint finish

    51.02 13mm GIB Standard on timber strappingon precast wall13mm GIB Standard on 90x45mm timberstrapping on DPC on precast concrete wall;Level 4 stopped & selaed, paint finish.140mm further strapping to bathroom area.

    51.03 13mm GIB Aqualine on timber framing13mm GIB Aqualine on timber framing;Level 4 stopped & selaed, paint finish

    51.08 R1.4 wall insulation with timberstrapping on PC conc wall45mm thick R1.48 Expol-x polystyreneinsulation with timber strapping on PC concwall

    51.10 R2.9 roof insulation150mm R2.9 Retrofit ceiling insulation with20mm thermax cavity

    51.11 Pink Batts SilencerPink Batts Silencer wall acoustic insulation

    53.01 Suspended Ceiling TilesRH99 Mineral fibre fissured square edge1200 x 600mm ceiling tiles on exposedseismic grade suspended grid system.

    53.03 Suspended GIB Aqualine CeilingSuspended 13mm GIB Aqualine ceiling onseismic suspended grid system; level 4stopped, sealed & paint finish.

    SECTION G-Gscale 1:50

    SECTION H-Hscale 1:50

    SECTION I-I

    https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436618https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436618https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/65436618https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043356https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043356https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043351https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043351

  • A400

    AS SHOWN @ A1

    dwg No

    Stairs

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 2019/4/2

    C

    rev date details

    176.

    2

    285 25310

    Timber stringer (sides)

    20mm high density particle board treads and risers

    Stair nosing; Tredsafe AA123 or equal approvedPitch line

    Undercut timber stringer (middle)

    Tread: 310mmRiser: 176.2mmNosing: 25mm

    Direct stuck commercial grade carpet tiles; refer toA500 for details

    GBUW 60a 2x13mm GIB Fyreline lining(60/60/60) on 70x35 timber battens fixedto underside of stairs; paint finish

    200

    50 65 13 600

    13mm GIB Standardlining

    13mm GIB Standardlining to on 90x45mmtimber wall; studs @400crs; Level 4stopped & sealed,paint finish TBA

    50mm stainless steelhandrail on Drake &Wrigley handrailbracket; 1032 flatcurved fixed totimber frame; chromeplate finish

    Precast panel; paint finish

    D07

    D11

    D09

    D10

    165 1,928 140

    150 477 140 1,326 140

    195

    9,75

    52,

    320

    1,45

    42,

    540

    900

    2,82

    561

    01,

    285

    140

    5,63

    914

    01,

    285

    1,10

    1

    S02A401

    S02A401

    Top of stairs: edge of nosing

    Bottom of stairs1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    19

    20

    21

    D12

    140

    2,41

    014

    09,

    245

    140

    63 50 1,100 5063

    140

    E01#LayID

    51.02

    74.03

    51.0951.14

    51.0751.09

    51.0251.08

    51.0751.09

    51.01

    51.01

    51.07

    51.0951.14

    51.01

    51.0151.0951.14

    51.07

    51.02

    51.01

    31.3a

    51.0951.14

    31.03

    CLEANERSROOM

    D18

    S02A401

    S02A401

    140

    11,7

    8914

    0

    140

    1,10

    090

    195 1,943 14045 150 477 140 1,326 140

    140 63 50 1,100 50 63 140

    2,54

    090

    02,

    824

    610

    9,75

    52,

    320

    Top of stairs: edge of nosing

    Bottom of stairs

    E01#LayID

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    51.0251.08

    51.0251.08

    51.0251.08

    31.05

    51.0951.14

    51.0751.09

    51.02

    51.0751.09

    51.01

    51.01

    51.01

    51.0151.0751.0951.14

    51.0751.09

    31.3a

    51.0951.14

    51.0951.14

    B

    C

    B

    C

    2

    Timber stringer (sides)

    20mm high density particle board treads and risers

    140x45mm H1.2 SG8 timber wall framing

    70x35mm H1.2 timber battens

    GBUW 60a 2x13mm GIB Fyreline lining (60/60/60) on70x35 timber battens fixed to underside of stairs; paint

    finish

    GBTL 60 fire rated system (60/60/60): 13mm GIBFyreline lining to each side of the frame on 140x45mmtimber wall; Level 4 stopped & sealed, paint finish TBA

    Direct stuck commercial grade carpet tiles; refer toA500 for details

    16mm Plywood lining; Polyurathane finish

    2

    3 STRUCTURE31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel

    (Natural Finish)165mm thick 240 min Fire rated precast concrete wall panel;Natual finish; Refer Engineer's drawings for details.

    31.3a 165mm Precast Concrete 240/240/240 FRR Wall Panel(Paint Finish)165mm thick 240 min Fire rated precast concrete wall panel;Paint finish; Refer Engineer's drawings for details.

    31.05 150mm Precast Concrete Wall Panel (Concretebandsawn panels)150mm thick precast concrete wall panel; Shutter finish (use150mm wide x 25mm thick oregon pine boards) to exteriorface; Refer Engineer's drawings for details.

    5 INTERIOR51.01 13mm GIB Standard on timber framing

    13mm GIB Standard on timber framing; Level 4 stopped &selaed, paint finish

    51.02 13mm GIB Standard on timber strapping on precast wall13mm GIB Standard on 90x45mm timber strapping on DPCon precast concrete wall; Level 4 stopped & selaed, paint

    finish. 140mm further strapping to bathroom area.51.07 GBTL 60 fire rated system (60/60/60)

    13mm GIB Fyreline to each side of the frame on timberframing; Level 4 stopped & selaed, paint finish

    51.08 R1.4 wall insulation with timber strapping on PC concwall45mm thick R1.48 Expol-x polystyrene insulation with timberstrapping on PC conc wall

    51.09 R3.2 wall insulation on timber framing140mm thick batt R3.2 on timber framing

    51.14 16mm Plywood lining on GBTL 60 fire rated system(60/60/60)16mm Plywood wall lining on 13mm GIB fyreline to each sideof the timber framing; clear polyurathane finish

    7 SERVICES74.03 Office DPs: 100 uPVC Downpipes

    100 dia. uPVC downpipes with DP protectors; paint finish;Refer A103 for typical DP & protector layouts

    01A401

    STAIR DETAILscale 1:5

    03A401

    STAIR DETAILscale 1:5

    02A401

    STAIR DETAILscale 1:5

    GROUND FLOOR STAIR PLANScale 1:25

    FIRST FLOOR STAIR PLANScale 1:25

    Ref

    eren

    ceN

    orth

    W

    S E

    N

    W i n t e r S u n r i s e

    Summe r S u n r i s e

    W i n t e r S u n s e tS u m m e r S u n s e t

    https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70444154https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/67043345https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452099https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/70452099

  • 3/9/2018

    DETAILED DESIGNTE RAPA GATEWAY WAREHOUSE & OFFICEDEVELOPMENT LOT 18 (SPEC BUILDING)HAMILTON JV INDUSTRIAL PARK

    C

    rev date details24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    design

    drawn

    job no.

    cad file

    checked

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    job title dwg title

    A401

    dwg Nostatus rev

    Stairsdate

    #Pln

    AS SHOWN @ A1scale

    900

    200

    1,10

    0

    2,70

    0

    210

    210

    2,70

    0

    25310

    176

    300

    90x45mm H1.2 SG8 timber joists@ 1200crs

    Stair way ceiling: GBTL 60 firerated system (60/60/60): 13mm

    GIB Fyreline lining to each side ofthe timber joists; Level 4 stopped

    & sealed, paint finish TBA

    FFL + 32.550

    FFL + 36.250

    LandingRL + 34.490

    CL + 38.950

    GBTL 60 fire rated system(60/60/60): 13mm GIBFyreline lining (60/60/60) toeach side of the frame on90x45mm timber framing;Level stopped & selaed,paint finish

    1

    2

    3

    4

    5

    67

    89

    10

    1112

    13

    14

    15

    16

    17

    18

    19

    20

    21

    03A401

    01403

    1,10

    090

    020

    0

    2,70

    0

    51.01

    31.03

    31.3a

    31.3a

    51.01

    51.01

    31.03

    31.03

    51.0751.09

    31.03

    51.01 51.01

    51.0951.14

    51.0951.14

    51.0951.14

    51.0751.09

    20mm HD particle board onfloor joists to form landing;GBUW 60 2x13mm GIBFyreline lining (60/60/60) on70x35mm timber battens tounderside of landing and stair;Paint finish TBA Undercut timber

    stringer (middle)

    GBUW 60a fire rated system(60/60/60): 2x13mm GIBFyreline lining (60/60/60) on70x35 timber battens fixed tounderside of stairs; paintfinish

    20mm high density particleboard treads and risers;direct stuck commercialgrade carpet tiles

    50mm stainless steelhandrail on Drake &Wrigley handrail bracket;1032 flat curved fixed totimber frame; chrome platefinish

    CLEANER'S ROOM

    Specific Engineered timberframing; Refer to Structuralengineer's docs for details

    C B

    65 50 1,000 50 65

    FFL + 32.550

    FFL + 36.250

    LandingRL + 34.490

    Undercut timber stringer (middle)

    Timber stringer (sides of stair)

    20mm high density particle board treadsand risers; direct stuck commercial gradecarpet tiles

    GBUW 60a fire rated system (60/60/60):2x13mm GIB Fyreline lining on 70x35timber battens fixed to underside of stairs;Level 4 stopped & sealed, paint finish TBA

    GBTL 60 fire rated system (60/60/60):13mm GIB Fyreline lining to each side ofthe frame on timber wall; Level 4 stopped& sealed, paint finish TBA

    Stainless steel handrail on stainless steelbrackets

    GBTL 60 fire rated system (60/60/60):13mm GIB Fyreline lining to each side ofthe timber joists; Level 4 stopped & sealed,paint finish TBA

    13mm GIB Standard on timber framing;Level 4 stopped & selaed, paint finish.

    Specific Engineered timber framing; Referto Structural engineer's docs for details

    Precast conc wall; natural finish

    02403

    03401

    2

    3 STRUCTURE31.03 165mm Precast Concrete 240/240/240 FRR Wall Panel (Natural

    Finish)165mm thick 240 min Fire rated precast concrete wall panel; Natualfinish; Refer Engineer's drawings for details.

    31.3a 165mm Precast Concrete 240/240/240 FRR Wall Panel (PaintFinish)165mm thick 240 min Fire rated precast concrete wall panel; Paintfinish; Refer Engineer's drawings for details.

    5 INTERIOR51.01 13mm GIB Standard on timber framing

    13mm GIB Standard on timber framing; Level 4 stopped & selaed,paint finish

    51.07 GBTL 60 fire rated system (60/60/60)13mm GIB Fyreline to each side of the frame on timber framing;Level 4 stopped & selaed, paint finish

    51.09 R3.2 wall insulation on timber framing

    140mm thick batt R3.2 on timber framing51.14 16mm Plywood lining on GBTL 60 fire rated system (60/60/60)

    16mm Plywood wall lining on 13mm GIB fyreline to each side of thetimber framing; clear polyurathane finish

    STAIRS SECTION S01scale 1:25

    STAIRS SECTION S02scale 1:25

  • A402

    AS SHOWN @ A1

    dwg No

    Internal Elevations:Ground Floor Office

    design

    drawn

    job no.

    dwg title

    cad file

    scale

    status

    CPL0642.00 Te Rapa Lot 18_Mainfile.pln

    DETAILED DESIGN

    TE RAPA GATEWAYWAREHOUSE & OFFICEDEVELOPMENTLOT 18(SPEC BUILDING)HAMILTON INDUSTRIALPARK

    24 GUNDRY STREET,NEWTONPO BOX 7539,AUCKLAND 1141

    p. +64 9 303 4759www.eclipsearchitecture.co.nz

    rev

    checked

    job title

    CPL0471.00

    date 2019/4/2

    C

    rev date details

    750

    1,600

    2,77

    0

    3,38

    0

    2,340

    71.07

    71.08

    51.07

    HWC

    ELEVATION 09: CLEANER'S ROOMscale 1:25

    600

    1,900

    500

    450900

    1,00

    0

    1,660

    700

    750

    750 155

    450

    1,660 1,900

    71.05

    55.09

    51.0351.11

    66.03 66.03

    51.0351.11

    51.0351.11

    66.03

    51.0351.11

    55.02

    71.06

    55.09

    55.07

    71.05

    66.03

    53.03 53.03 53.03 53.03

    ELEVATION 04: WCscale 1:25

    ELEVATION 03: WCscale 1:25

    ELEVATION 01: WCscale 1:25

    ELEVATION 02: WCscale 1:25

    800

    100

    1,00

    0

    600

    500

    9501,600 950

    2,70

    0

    66.03

    55.07

    51.0351.11

    71.03

    55.02

    71.04 71.03

    66.03

    51.0351.11

    51.0351.11

    66.03

    53.03 53.03 53.03

    ELEVATION 06: WCscale 1:25

    ELEVATION 05: WCscale 1:25

    ELEVATION 07: WCscale 1:25

    DW

    F

    #DrgID#LayID

    290

    140

    2,41

    014

    0

    150

    140

    1,70

    090

    1,30

    090

    140

    51.01

    51.01

    51.1a

    51.0351.11

    51.0151.11

    51.0351.11

    51.0351.11

    51.0151.11

    51.0351.11

    71.03

    51.0351.11

    Top of stairs: edge of nosing

    19

    20

    21

    640 90 950 90 950 90 1,950 140 150

    51.07

    51.0251.08

    51.07

    51.02

    51.01

    71.05

    55.09

    71.06

    71.03

    71.04 71.04

    09

    HWC

    OFFICE

    0402

    0301

    07

    0605

    5 INTERIOR51.01 13mm GIB Standard on timber framing

    13mm GIB Standard on timber framing; Level 4stopped & selaed, paint finish

    51.02 13mm GIB Standard on timber strapping onprecast wall13mm GIB Standard on 90x45mm timberstrapping on DPC on precast concrete wall; Level4 stopped & selaed, paint finish. 140mm furtherstrapping to bathroom area.

    51.03 13mm GIB Aqualine on timber framing13mm GIB Aqualine on timber framing; Level 4stopped & selaed, paint finish

    51.07 GBTL 60 fire rated system (60/60/60)13mm GIB Fyreline to each side of the frame on

    timber framing; Level 4 stopped & selaed, paintfinish

    51.08 R1.4 wall insulation with timber strapping onPC conc wall45mm thick R1.48 Expol-x polystyrene insulationwith timber strapping on PC conc wall

    51.11 Pink Batts SilencerPink Batts Silencer wall acoustic insulation

    53.03 Suspended GIB Aqualine CeilingSuspended 13mm GIB Aqualine ceiling onseismic suspended grid system; level 4 stopped,sealed & paint finish.

    55.02 ACC Mirror: 1000x500mm mirrorACC Mirror: 1000x500mm mirror

    55.07 Toilet roll holder: by tenant, contractor toinstallToilet roll holder: by tenant, contractor to install

    55.09 Acc. RailsStainless steel grab rails 750x750x32mm dia tocomply with NZS4121:2001

    6 FINISH66.03 Selected Commercial Grade Vinyl Flooring

    Polyflor XL PU with welded seams & 150mmaluminium capped coving

    67.02 Stainless Steel BenchtopStainless steel benchtop 40mm with anti-spillsquare edge and 150mm upstand to all verticalsurfaces

    67.03 Laminex MeltecaLaminex Melteca laminate on 16mm MDFsubstrate; 2mm rigid PVC clashing to all exposededges. Colour TBA by Architect

    67.04 Enko Group HandleEnko Group handles; TBA by architect

    7 SERVICES71.01 Kitchen Sink + Mixer

    Mercer EH102 Horizon 850 kitchen sink with righthand drainer. 860W x 510D with Model 65continuous feed heavy duty Insinkerator insert +Marketti blade sink mixer

    71.03 WC PanCaroma Profile 4 Trident Connector Toilet Suite

    71.04 WC WHB + MixerCaroma Compact Wall Basins with Marketti Bladefixed Basin Mixers; Angle cistern taps

    71.05 ACC WC PANCaroma Disabled Suite or Dux ViennaCommercial Care Toilet Suite

    71.06 ACC WHB + MixerCaroma 450 wall basins withwith Marketti Bladefixed Basin Mixers; Angle cistern taps

    71.07 HWCRheem 135Ltr hot water cylinder mounted to wall.HWC on drip tray on floor/shelf 20mm particleboard on 140x45mm timber joists at 400crs

    71.08 Cleaners Sink + Mixer

    Burns & Ferrall Cleaners sinks with Markettiproject exposed sink faucet; Angle cisetern taps

    GROUND FLOOR REFERENCE PLANscale 1:25

    Ref

    eren

    ceN

    orth

    W

    S E

    N

    W i n t e r S u n r i s e

    Summe r S u n r i s e

    W i n t e r S u n s e tS u m m e r S u n s e t

    https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/55380984https://app.procore.com/665164/project/drawing_areas/456969/drawing_log/55380984

  • 6. Outline Specifications

  • Lot 18, Te Rapa Gateway Development, Te Rapa, Hamilton

    OUTLINE SPECIFICATION

    Version 1.0: 9th

    August 2018

    1.0 GENERAL

    1.1 Document Control. This outline specification is to be read in conjunction with

    the following drawings: eclipse architecture B&L Plan dated 8/8/18.

    1.2 Location is Lot 18, Clem Newby Drive, Te Rapa Gateway, Hamilton. Approx. 2,369m2 land area.

    2.0 MATERIALS AND WORKMANSHIP

    2.1 All materials and workmanship shall comply with the New Zealand Building Act, all relevant New Zealand Standard Specifications and with Local Authority and Statutory Body Requirements. In particular:

    The NZ Building Act Local Authority Bylaws NZ Building Code: Acceptable Solutions Health and Safety and the Employment Act Appropriate NZ Standards Statutory laws and regulations

    3.0 PROJECT OUTLINE

    3.1 The site is approximately 2,369 which consist of the following:

    Lot 18:

    Site Area - circa 2,369m2 Warehouse - 992m2 Office – 221m2 Canopy 150m2 Parking – 14 spaces (subject to final design approval)

    3.2 Warehouse:

    a. Lot 18 – Circa 2,369m2 – 992m2 Warehouse.

    b. Interior height approximately 9.0m under purlin at knee.

    c. Floor slab to be designed in accordance with loadings as per drawings or thickness specified.

    3.3 Offices and amenities approximately 2.7m stud height below ceilings. 3.4 Office area approximately – 221m2

    3.5 Site Works – pavement to be designed for heavy duty use.

  • 4.0 SITE

    4.1 Cleared site with services capped and located at boundaries. 5.0 EXCAVATION

    5.1 Excavate to required levels and remove surplus material from site.

    5.2 Excavate to form column foundations.

    5.3 Excavate to form perimeter foundations.

    6.0 GROUND REMEDIATION

    6.1 Backfill excavated site with engineered fill in accordance with the engineer’s instructions.

    7.0 CONCRETE WORK AND PRE-CAST PANELS

    7.1 Reinforced Mass concrete foundations to suit building structure.

    7.2 30MPa reinforced concrete in pads, floor slab and thickening of floor slab

    (Canopy slab 175mm thick, warehouse slab 175mm thick, office slab 125mm thick). Subject to developers engineers final design.

    7.3 Saw cuts around all columns and at 5 metre interval in both directions for the

    floor slab.

    7.4 We have allowed to construct the office first floor out of Comflor Tray Deck, including for the supply, installation of all Tray Deck, concrete topping, reinforcing, all associated trims, formwork, castings and propping.

    7.5 Precast concrete walls to all ground perimeter walls (150mm unless

    otherwise specified by the fire engineer):

    Warehouse - Supply and install 150mm thick precast panels to all external walls (Heights as required by Fire Report).

    Office walls – Exterior walls shall be precast concrete, integrated

    with aluminium framed windows and selected cladding system plus allowance for some architectural finish to office precast walls).

    7.6 Ground floor slabs to be laid on 1 layer of 0.25 micron Polythene. 7.7 Concrete slabs to be saw cut to comply with NZBC. No sealed joints. 7.8 Minimum 150mm compacted hard fill under all ground floor slabs. 7.9 Sealant to both sides of pre-cast walls.

    8.0 STRUCTURAL STEEL

    8.1 Structural steel generally comprises UC/UB columns and rafters. Allow for

    bolted connections (to minimise on-site welding).

  • 8.2 All structural steel blasted to SA2.5 and primed with inorganic zinc primer DFT75. Topcoat all visible steel work.

    8.3 Cold rolled steel purlins and girts. All purlins and girts Z275 zinc coated.

    (Z450 to loading canopy purlins, if any).

    9.0 METAL ROOFING AND CLADDING

    9.1 Warehouse and Office:

    a. 0.55mm coloursteel roofing or equivalent fixed over building paper over white sizalation and wire netting with flashings to match.

    b. Alsynite clearlite roof lights to approximately 10% of the Warehouse

    roof area.

    c. 0.55mm Colorcote flashing’s to provide a weathertight building.

    d. Colorcote 125 industrial eaves gutters.

    e. Colorcote rainwater heads to painted PVC downpipes fixed to warehouse wall taken to ground level.

    f. Allow for flashings to ventilators if required. Timber trimmers with roof

    underlay to run over the top of the trimmer and 0.55 coloursteel back flashings.

    g. 0.40mm coloursteel vertical laid cladding fixed to girts to Warehouse

    external walls as per drawings. Bottom of cladding fixed to galvanised folded plate fixed to concrete panel (through each trough). Allow for cavity closer.

    h. Calder Stewart Euro-tray or equivalent wall cladding to front facade of offices as per drawings. Laid over solid ply sarking complete with associated fixings and flashings.

    9.2 Ladder access and walkway to roof access not applicable.

    10.0 ALUMINIUM JOINERY

    10.1 Powder coated commercial aluminium joinery to front façade of offices.

    10.2 1 No. aluminium automatic entry double doors for office as per drawings with

    glazed exterior canopy over.

    10.3 Clear Double glazing to all external glazed areas.

    11.0 CARPENTRY AND JOINERY

    11.1 Aluminium (or similar) clad solid core external egress doors in matching

    frames with powdercoat finish. (Egress doors 1980 x 910mm wide)

  • 11.2 Internal doors:

    a. All interior doors 1980 x 810mm wide.

    b. Hollow core interior doors with paint finish in timber reveals to Office to Warehouse (complete with latch/locksets and door closers where required). Prepared for electronic locking systems.

    c. Hollow core timber cavity slider to accessible toilet (complete with

    accessible privacy set).

    d. Timber hollow core doors with paint finish to all internal areas.

    11.3 All hardware commercial grade SCP finishes. Door closers to all exterior doors.

    11.4 Internal partition walls:

    a. Toilets – 90 x 45 timber framing at 600 centres with fibreglass batts to walls (for acoustic purposes) lined with 10mm Gib board with paint finish (Aqualine to accessible toilet and shower).

    b. Generally

    Steel partitions or timber framing to all internal office walls, with 13mm Gib board linings and paint finish to form the areas shown on the office plans (fire rated gib board linings if required by Fire Engineers Report).

    Allow for fibreglass batts (for acoustic purposes) to all internal walls.

    12.0 WALL FINISHES

    12.1 Warehouse - Warehouse walls shall generally be unlined and unpainted. Steelwork shall be factory prime paint finish.

    12.2 Office / Amenities Area - Area shall be gib lined, to a level 4 paint finish.

    13.0 INTERNAL DECORATION

    Office

    Concrete – Strapped and lined with gib. Board. Gib Board – Three coat acrylic paint finish. Timber Doors - Three coat enamel paint finish. Timber Trim - Three coat enamel paint finish.

    14.0 EXTERNAL DECORATION

    Outline external decoration

    Steelwork – One coat primer, one undercoat and one finish coat gloss enamel.

  • Warehouse – Natural (unpainted) precast concrete panel walls with selected Colourcote metal cladding over DHS girts.

    Office Cladding – Selected Colorcote Eurotray on timber frame precast panels (as per architectural plans/elevations).

    Colour scheme for building to be finalised later.

    15.0 CEILINGS

    15.1 Mineral fibre tile in 600 x 1200 exposed seismic grade suspended grid to open plan office.

    15.2 13mm Gib board lining on suspended steel grid to toilets and stairs

    (Aqualine to accessible toilet and showers) at 2.70m. 16.0 METALWORK

    16.1 Fixed concrete filled steel bollards to inside and outside of all Warehouse

    roller/sliding doors (4 No. per door), size 175mm dia. x 1200mm high.

    16.2 All bollards to be finished in safety yellow paint finish or equivalent.

    16.3 Downpipe protectors to all external gutters in high trafficable areas.

    16.4 Aluminium Balustrading to stair case. 16.5 Security gates will be double chain-link black powder coated manual gates

    as per drawings.

    17.0 ELECTRICAL AND DATA

    17.1 Mains Supply - A 3 phase 100-amp underground supply from Power Authority main shall be provided to The Main Distribution Board (MOB) and 1st floor office Sub Distribution board.

    17.2 Distribution Boards - Distribution Boards shall be provided to allow for sufficient capacity to supply to a normal office requirement. They shall have sheet metal cabinets complete with MCB's with metering facilities to local supply authority standards.

    17.3 Lighting - Office lighting shall be recessed Thorn flat panel LED 1200 x

    600mm 5540 lumens. Warehouse to be fitted with