SAI BABA RATI SUPPLIERS
1
Form 1 M
APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY ‘B2’ FOR LESS THANAND EQUAL TO FIVE HECTARE
• Basic Information1 Name of the Mining Lease site: Sai Baba Rati Suppliers
Lagu Sur. No. 511, 512, Goma River,Vill: Simaliya
Tal: Ghoghamba ; Dist: Panchmahal2 Location / site (GPS Co-ordinates): 22° 40’ 57.13” N 73° 43’ 45.29” E
22° 40’ 58.95” N 73° 43’ 51.51” E22° 40’ 43.89” N 73° 44’ 17.95” E22° 40’ 42.41” N 73° 44’ 17.95” E22° 40’ 45.31” N 73° 44’ 11.96” E22° 40’ 45.79” N 73° 44’ 09.01” E22° 40’ 53.43” N 73° 43’ 55.68” E22° 40’ 55.48” N 73° 43’ 54.56” E22° 40’ 56.75” N 73° 43’ 52.56” E22° 40’ 56.95” N 73° 43’ 48.56” E22° 40’ 55.63” N 73° 43’ 45.30” E
3 Size of the Mining Lease (Hectare): 4.904 Capacity of Mining Lease (TPA): 800005 Period of Mining Lease: Letter of Intent (LOI) No: AGG/652 dtd:
1 April 2016. Letter is enclosed.6 Expected cost of the Project: Project expected cost shall be Rs. 15.00
lakhs7 Contact Information: Jasubhai Kaladi Vanzara
D-9, Satkar Appartment,K. K. Nagar, Ghatlodia
AhmedabadEmail: [email protected]
(M) +91 9624466166
• Environmental Sensitivity
Sr. No. Areas Distance inkilometers / Details
1Distance of project site from nearest rail orroad bridge over the concerned River,Rivulet, Nallah etc.
Road: SH150@ 0.70 kmRailway Line: @ 18.00 km
2 Distance from infrastructural facilities
SAI BABA RATI SUPPLIERS
2
Railway line 18.00 kmNational Highway NH 59 @ 14.50 kmState Highway SH150 @ 0.70 kmMajor District Road SH150 @ 0.70 kmAny Other Road --Electric transmission line pole or tower --Canal or check dam or reservoirs or lake orponds None within 5 km
In-take for drinking water pump house --Intake for Irrigation canal pumps --
3
Areas protected under internationalconventions, national or local legislation fortheir ecological, landscape, cultural or otherrelated value
None
4
Areas which are important or sensitive forecological reasons - Wetlands, watercoursesor other water bodies, coastal zone,biospheres, mountains, forests
None
5
Areas used by protected, important orsensitive species of flora or fauna forbreeding, nesting, foraging, resting, overwintering, migration
None
6 Inland, coastal, marine or undergroundwaters None
7 State, National boundaries State Boundary: 36.15 km
8Routes or facilities used by the public foraccess to recreation or other tourist, pilgrimareas
By road
9 Defence installations None
10 Densely populated or built-up area, distancefrom nearest human habitation Simaliya @ 1.90 km
11Areas occupied by sensitive man-made landuses (hospitals, schools, places of worship,community facilities)
Temple (Simaliya – @ 2.01 km)
12
Areas containing important, high quality orscarce resources (ground water resources,surface resources, forestry, agriculture,fisheries, tourism, minerals)
Ordinary Sand
13
Areas already subjected to pollution orenvironmental damage. (those whereexisting legal environmental standards areexceeded)
Not Applicable
SAI BABA RATI SUPPLIERS
3
14
Areas susceptible to natural hazard whichcould cause the project to presentenvironmental problems (earthquakes,subsidence, landslides, erosion, floodingor extreme or adverse climatic conditions)
Not Applicable
15 Is proposed mining site located over or nearfissure / fracture for ground water recharge None
16
Whether the proposal involves approval orclearance under the following Regulationsor Acts, namely:-(a) The Forest (Conservation) Act, 1980;(b) The Wildlife (Protection) Act, 1972;(c) The Coastal Regulation Zone Notification,2011.If yes, details of the same and their status tobe given.
Not Applicable
17 Forest land involved (hectares) None
18
Whether there is any litigation pendingagainst the project and/or land in which theproject is propose to be set up?(a) Name of the Court(b) Case No.(c) Orders or directions of the Court, if any,and its relevance with the proposedproject.
None
Signature of the Applicant(Sai Baba Rati Suppliers)
SAI BABA RATI SUPPLIERS
1
PROJECT DETAILS – SAND MINING PROJECTS
Sr. No. Details Particulars1 Name of Lease Holder Sai Baba Rati Suppliers
2 Location addressLagu Sur. No. 511, 512, Goma River,
Vill: SimaliyaTal: Ghoghamba ; Dist: Panchmahal
3 Applicability of the CRZ Notification,2011 Not Applicable
4 Lease Area (Hectares) 4.90 hectare
5 Co-ordinates of the lease area
22° 40’ 57.13” N 73° 43’ 45.29” E22° 40’ 58.95” N 73° 43’ 51.51” E22° 40’ 43.89” N 73° 44’ 17.95” E22° 40’ 42.41” N 73° 44’ 17.95” E22° 40’ 45.31” N 73° 44’ 11.96” E22° 40’ 45.79” N 73° 44’ 09.01” E22° 40’ 53.43” N 73° 43’ 55.68” E22° 40’ 55.48” N 73° 43’ 54.56” E22° 40’ 56.75” N 73° 43’ 52.56” E22° 40’ 56.95” N 73° 43’ 48.56” E22° 40’ 55.63” N 73° 43’ 45.30” E
6 Ownership of Land(Govt. / Private Land) Government Land
7 Status of Operation (New Project orExisting project operating since _____ New Project
8Status of Lease (Lease no., date ofissues / renewal, lease period, date ofapplication for lease renewal, etc.)
Letter of Intent (LOI) No: AGG/652 dtd: 1 April2016. Letter is enclosed.
9 Sand Reserve (MT) 392490 MT10 Rate of Mining of Sand (MT/Month) 80000 MT/Year
ENVIRONMENTAL SETTING
11 If located within 15 km, aerial distanceof the lease area from the nearest: --
i. National Park / WildlifeSanctuary / Biosphere Reserve
No National Park / Wildlife Sanctuary within 15km of the lease area.
ii. Reserve Forest / ProtectedForest: No Forest within 15 km of the lease area.
iii. Human Habitation: Simaliya @ 1.90 kmiv. Railway Line: 18.00 kmv. Road: SH 150 @ 0.70 kmvi. Notified / Protected
Archaeological sites: None
vii. Social infrastructures, e.g. Temple (Simaliya – @ 2.01 km)
SAI BABA RATI SUPPLIERS
2
School, hospital, historic /cultural / religious places etc.:
12 Width of riverbed (meters) 130 – 170 m
13 Average depth of water at lease area(meters) 10.0 m avg. depth
14 Average thickness of sand deposit atlease area (meters) 3.00 m sand deposit thickness.
15Details on riparian vegetation,endemic / endangered species offlora / fauna in the area
Flora: Mahua, Mango, Amali, Babul, Neem,Baval, Vad, Peeple
Fauna: Cow, Buffalo, Dog, Goat, Pigeon,Garden, Lizard.
No endangered species of flora / fauna in thearea.
16Geo-hydrological of the river, flow(perennial, seasonal, etc.),replenishment potential, etc.
Goma River is a seasonal river.
The district Panchmahals is a part of Eastern Hilly Region and is sub-divided into two sub-microregions namely, Mahi plain and Forested and scrub zone on the basis of topography, climate,geology, soils and natural vegetation.
Mahi plain :The region covers the western part of the district and includes Lunawada, Santrampur, Godhra,Kalol, Shehera and Halol talukas. It is enclosed by Forested and scrub zone from north and eastwhile Kheda and Vadodara districts surround it from south and west. The general slope of theregion is from south and the general elevation is 100 metres above M.S.L. The region receivessufficient rainfall in the rainy season and supports a healthy growth of trees. Summers are hot anddry. Geologically, the rocks found in this region are alluvium, blown sand, etc., Deccan trap,Erinpurru Granite, Gneiss Aravalli and associated rocks. The soils of this region are medium black inthe north and grey blown in the south.
Forested and scrub zone:The region spreads over Halol, Godhra, Shehera, Lunawada, Santrampur and Jambughodatalukas of the district. It makes its boundaries with Rajasthan state in the north and north-east.Dohad Upland in the east, Vadodara district in the south and Mahi plain in the west.Topographically, this region is relatively higher in elevation than Mahi plain. The general elevationof this region is 150 metres above M.S.L. During monsoon season it receives good amount ofrainfall while summers are generally hot and dry. The higher areas of this region are covered withforests. Geologically this region consists mainly of Aravally with associated rocks and DeccanTraps formations.
The district is rich in water resources. It is drained by several rivers like Mahi, Goma, Kun, Panam,Karad, Kali and Meshri. Mahi is the longest river. Mahi rises in Malwa hills and passes throughLunawada, Shehera and Godhara talukas
SAI BABA RATI SUPPLIERS
3
17 Width and condition of access road(kutcha / pucca) t the lease area. 4.0 m access (Kutcha / pucca )road
DETAILS ON MINING / EXCAVATION ACTIVITIES
18 Type of mining (Manual / Semi –mechanized / Mechanized) Semi - mechanized
19Equipments to be used (bulldozers,hydraulic excavators, JCB, scrapers,loaders, diesel pumps, etc)
Hydraulic Excavators / JCB
20 Minimum setbacks distance from riverbanks (meters)
10 m minimum setback from the river bank.
21Minimum buffer distance from bridgepiers / water intake wells / irrigationstructures
No such structure exists
22Minimum distance of stockpiles /vehicles loading place from the riverbank
No stockpile of sand on the bank of river. Thetransportation of sand will be done by coveredvehicles
23 Maximum depth of sand removal (3 mor water depth whichever is less)
3.00 m will be the maximum depth of sandremoval. Removal of sand will be carried in 1 mlayer depth.
24 Man power Requirement 8 person25 No. of working days in year 200 days26 Time of working hours in a day 8.00 a.m to 6.00 p.m
ENVIRONMENTAL MANAGEMENT PLAN AND C.S.R. ACTIVITES
27
Measures proposed for protection ofenvironmental attributes like riverbed,riparian vegetation, water, air , humanhealth etc.
The precaution will be taken for nature of riverbed and ensure that it would not be disturbeddue to mining. No riverbed vegetation hasbeen found in the lease area. The depth of themining will be restricted to 3 m or water level,whichever is less. Domestic wastewater ifgenerated will be disposed off through soakpit/septic tank. Approach road & lease area willbe water sprinkled regularly. Speed of vehicleentering in to the lease is will be restricted up to20 km/hr. Overloaded vehicles will be coveredwith tarpaulin.
28Details on transportation route &measures proposed for control offugitive emission during transportation
The project site is connecting State Highway SH-150 to the mine site approximately 0.95 km,road distance.
Mitigation:• Water is sprayed periodically to wet the road.• Ensure that the loader bucket is close to thetruck to minimize drop height while loading.• Plantation of trees along the roads to helpreduce the impact of dust in the nearbyvillages.• PUC certified heavy vehicles will be used for
SAI BABA RATI SUPPLIERS
4
transportation.
29
Plan for tree plantation in riparian area/ road sides in at least 20% of leasearea, numbers & types of species andbudgetary outlay for the same.
The area of plantation is proposed a t t h eb a n k o f r i v e r a n d n e a r b y v i l l a g e inconsultation with local authority/Govt. Body.
30 Plan, if any, for restoration /reclamation
Running river is main agent responsible forreplenishment and it is significant at the time ofrainy season and carries huge quantity of riversand which deposited at the bottom of theriver. The river bed will replenish during therainy season.
31 Proposed CSR Activities andbudgetary outlay for the same.
The proposed project will generateemployment opportunity for the localinhabitants. As a part of CSR activity, theproponent will expend approx. Rs.15000.00annually for medical checkup camp,scholarship to school students, drinking watercooler etc.
Signature of the Applicant(Sai Baba Rati Suppliers)