Casestudy
Cordova,Alaska
EnergyStorageofRenewablePowerinIslandedMicrogrids
Heike Merkel, Data and Project Manager, Alaska Center for Energy and Power Dec 3th, 2016
LocationofMap
Cordova
HumpbackCreekHydroPlant
PowerCreekHydroPlant
CraterLake
OrcaPowerPlant
CECSubstation
OrcaPowerPlant:5Units:2x1125kW1x2450kW1x2500kW1x3800kWTOTAL:10.8MWProduced10GWh(2011)
PowerCreekHydroPlant
2x3MWturbinesTotal:6MW
Produced15.7GWh(2011)
Potential~21GWhSpilled~5.3GWh
HumpbackCreekHydroPlant3Units:2x500kWFrancis1x250kWTurgoTotal:1.25MWProduced1.6GWh(2011)Nospillage,plantrunsatfullcapacity
PowerCreekGenerationandLoads
AnimationbyMarcMueller-Stoffels(ACEP)
ObjectiveandApproach
• EnergyStorageanalysisandoptimizationmodelingto:– Recoverspilledpower– Reducediesel
consumption– ReducedieselO&M– Supportgridstability
• Deliverables– Technicalspecificationfor
RFPbyCEC– Projectblueprintfor
otherAKutilities
CordovaEnergyMixin2011• 18GWhHydropower• 10GWhDiesel• 781,000GalDiesel@$3.55/gal
• $2.77MFuelbill• Costofgeneration:
• Hydro:~$0.06/kWh• Diesel:~$0.35/kWh
• Estimate:~5.3GWhspilledhydro
Cansomeofthespilledhydroberecoveredtodisplacedieselfuel?
ESSPotentialin2011
Diminishingreturnsofreductionofdieselfuel.LowpowerESS(<1MW)oflimitedvalue.
Rangeincludedinthesimulation
TorecoverALLspilledhydropowerwould
requirea10MW/2.5GWh
battery!
Red
uctio
n in
die
sel c
onsu
mpt
ion
DieselchargingESS:YES DieselchargingESS:NO
ReductioninDieselConsumption
ReductioninDieselRunTime
DieselchargingESS:YES DieselchargingESS:NO
DieselCapacityFactor
DieselchargingESS:YES DieselchargingESS:NO
DieselSwitching
DieselchargingESS:YES DieselchargingESS:NO
ESSCycles/CycleAmplitude
DieselchargingESS:YES DieselchargingESS:NO
ESSasSRCSupport
DieselchargingESS:YES DieselchargingESS:NO
PreliminaryResultsandNextSteps
• Replacementof1GWhofdieselwithhydroresultsinapotentialsavingsindieselfuelof~$300k
• EstimatedieselO&Mcost• Mergeourdatawithdynamic
systemmodelbySandiaNationalLabtodeterminetheoptimalESSlocation
• DeveloptechnicalspecificationfortheESS
• CEC:IssueRFPwithoptiontoown/operateorbidirectionalPPA.
Thankyou!
ACEPProjectteam:Dr.MarcMueller-Stoffels(PI),Dr.HendrikSchaede,JeremyVandermeer,LuisMiranda,HeikeMerkel