7/30/2019 Finishing Breakdown
1/20
Project Title :
Date Prepared :
Schedule Actual Schedule Actual
Specs Reference
Concrete Works 45 3/1/2012 4/14/2012
Concrete Finishes
Sub - Structure
Basement Level
1 Column 6,422.00 sqm
2 Beam 6,755.00 sqm3 Detached Retwall 2,160.80 sqm
Super structure
Basement Level
1 Column 6,422.00 sqm
2 Beam 6,755.00 sqm
3 Detached Retwall 2,160.80 sqm
Notes :
Rem
Avel
verify linear met
verify attached &
Duration
Days
Start Finish LaborQuantity
Materials
Quality RequirementsQuantity
verify linear met? L.M
verify attached &
Pre-cast Concrete at Canopy
Pre-cast Concrete at Canopy
? L.M
7/30/2019 Finishing Breakdown
2/20
7/30/2019 Finishing Breakdown
3/20
arks
er
detached
er
detached
7/30/2019 Finishing Breakdown
4/20
7/30/2019 Finishing Breakdown
5/20
Project Title : Holy Angel Proffesional Building
Date Prepared :
Schedule Actual Schedule Actual
Specs Reference
Masonry Works
CHB Wall
150mm thick 131 days 9/2/2012 1/9/2013 23.74 350 psi S-01
100mm thick 132 days 9/2/2012 8/21/2012 1/9/2013 50 961.27 592.09 61.59% 350 psi S-01
Masonry Works
CHB Wall150mm thick 131 days 646.67 350 psi S-01
100mm thick 132 days 50 248.418 350 psi S-01
Masonry Works
CHB Wall
150mm thick
100mm thick
Masonry Works
CHB Wall
150mm thick
100mm thick
Masonry Works
CHB Wall
150mm thick
100mm thick
Masonry Works
CHB Wall
Ground Floor Level
Avel
Updated as of
RemQuality RequirementsDuration
Days
Start Finish LaborQuantity
Materials
Basement Floor Level
27-Sep-12
Required Actual Percentage
3rd Floor Level
4th Floor Level
5th Floor Level
6th Floor Level
7/30/2019 Finishing Breakdown
6/20
150mm thick
100mm thick
Masonry Works
CHB Wall
150mm thick
100mm thick
Notes :
6th Floor Level
7/30/2019 Finishing Breakdown
7/20
ep. 27, 2012.
arks
7/30/2019 Finishing Breakdown
8/20
7/30/2019 Finishing Breakdown
9/20
Project Title :
Date Prepared :
Schedule Actual Schedule Actual
No/Pc. Unit Ref . Specs Reference
Metal Works 230 7/19/2012 3/5/2013
Structural Steel Framing 45 12/14/2012 1/27/2013
Metal Decking 160 7/19/2012 12/25/2012
Ground Floor
Phase 1 Marielle
Phase 2
Second Floor
Phase 1
Phase 2
Third Floor
Phase 1 Check Area
Phase 2 Check Area
Metal Stairs 60 12/14/2012 2/11/2013
Basement
Ground
First Floor
Metal Fabrications 75 12/14/2012 2/26/2013
Metal Grating 7 2/27/2013 3/5/2013
Baseboard 30 1/10/2013 2/8/2013
Notes :
Rem
Avel
Avel
Separate G
Duration
Days
Start Finish LaborQuantity
Materials
Quality RequirementsQuantity
7/30/2019 Finishing Breakdown
10/20
arks
roup/Team
7/30/2019 Finishing Breakdown
11/20
Project Title :
Date Prepared :
Schedule Actual Schedule Actual
Specs Reference
190 6/19/2012 12/25/2012
Damproofing
Water Proofing
Attached Ret Wall1,023.00
sqmDetached Ret Wall 210.00 sqm
90 11/29/2012 2/26/2013
45 1/13/2013 2/26/2013
Notes :
Thermal Protection
Flashing and Sheet Metal
Mari
Damproofing and Waterproofing
Thermal and Moisture
Protection253 6/19/2012 2/26/2013
RemQuantity
Quality Requirements
Duration
Days
Start Finish LaborQuantity
Materials
7/30/2019 Finishing Breakdown
12/20
nell
arks
7/30/2019 Finishing Breakdown
13/20
Project Title :
Date Prepared :
Schedule Actual Schedule Actual
Specs Reference
30 3/1/2012 3/30/2012 2,042.60 sq.
Notes :
Geotextile Water proofing
3/30/2012 MariSite Work And Earth Works30
3/1/2012
RemQuantity
Quality Requirements
Duration
Days
Start Finish LaborQuantity
Materials
7/30/2019 Finishing Breakdown
14/20
nell
arks
7/30/2019 Finishing Breakdown
15/20
Project Title :
Date Prepared :
Schedule Actual Schedule Actual
Specs Reference
Basement 10/12/2012 3/10/2013
Portland Cement Plaster
Portland Cement Plaster interior walls 1,871.73 S-01 interior = 7,24
Perimeter Walls with Cementitious Water proofing 70.48 213-A 213-A exterior = 10,
Plastering - Perimeter Walls including openings 590.31 n/a A.201
Numbers - Doors
Numbers - Windows
Gypsum Board Wall 0.00
Glass Walls
Graphic Wall Films
Ground Floor
Portland Cement Plaster interior = 7,24
Portland Cement Plaster interior walls 1,346.38 exterior = 10,
Perimeter Walls with Cementitious Water proofing 646.64
Plastering - Perimeter Walls including openings 443.36
Perimeter - Doors and Windows
Gypsum Board Wall
Glass Walls
Graphic Wall Films
Notes :
ReQuality RequirementsDuration
Days
Start Finish LaborQuantity
Materials
Required Actual Percentage
Finishes
Cement Plas
Cement Plas
Wall Finishes
7/30/2019 Finishing Breakdown
16/20
7/30/2019 Finishing Breakdown
17/20
21 sqm
2.17 sqm
21 sqm
2.17 sqm
arks
r :
r :
el
7/30/2019 Finishing Breakdown
18/20
7/30/2019 Finishing Breakdown
19/20
Project Title :
Date Prepared :
Schedule Actual Schedule Actual
Specs Reference
150 10/12/2012 3/10/2013
Basement needs to be separate per floor
Tiling Works
Wood Flooring
Stone Works
Non- Skid concrete
Ground Floor
Tiling Works
Wood Flooring
Stone Works
Non- Skid concrete
Notes :
RemarksQuantity
Quality Requirements
Duration
Days
Start Finish LaborQuantity
Materials
Finishes Avel
Floor Finishes see attachements
7/30/2019 Finishing Breakdown
20/20
Project Title :
Date Prepared :
Schedule Actual Schedule Actual
Specs Reference
150 10/12/2012 3/10/2013
Basement needs to be separate per floor
Tiling Works
Wood Flooring
Stone Works
Non- Skid concrete
Ground Floor
Tiling Works
Wood Flooring
Stone Works
Non- Skid concrete
Notes :
RemarksQuantity
Quality Requirements
Duration
Days
Start Finish LaborQuantity
Materials
Finishes Avel
Floor Finishes see attachements