Finishing Breakdown

Embed Size (px)

Citation preview

  • 7/30/2019 Finishing Breakdown

    1/20

    Project Title :

    Date Prepared :

    Schedule Actual Schedule Actual

    Specs Reference

    Concrete Works 45 3/1/2012 4/14/2012

    Concrete Finishes

    Sub - Structure

    Basement Level

    1 Column 6,422.00 sqm

    2 Beam 6,755.00 sqm3 Detached Retwall 2,160.80 sqm

    Super structure

    Basement Level

    1 Column 6,422.00 sqm

    2 Beam 6,755.00 sqm

    3 Detached Retwall 2,160.80 sqm

    Notes :

    Rem

    Avel

    verify linear met

    verify attached &

    Duration

    Days

    Start Finish LaborQuantity

    Materials

    Quality RequirementsQuantity

    verify linear met? L.M

    verify attached &

    Pre-cast Concrete at Canopy

    Pre-cast Concrete at Canopy

    ? L.M

  • 7/30/2019 Finishing Breakdown

    2/20

  • 7/30/2019 Finishing Breakdown

    3/20

    arks

    er

    detached

    er

    detached

  • 7/30/2019 Finishing Breakdown

    4/20

  • 7/30/2019 Finishing Breakdown

    5/20

    Project Title : Holy Angel Proffesional Building

    Date Prepared :

    Schedule Actual Schedule Actual

    Specs Reference

    Masonry Works

    CHB Wall

    150mm thick 131 days 9/2/2012 1/9/2013 23.74 350 psi S-01

    100mm thick 132 days 9/2/2012 8/21/2012 1/9/2013 50 961.27 592.09 61.59% 350 psi S-01

    Masonry Works

    CHB Wall150mm thick 131 days 646.67 350 psi S-01

    100mm thick 132 days 50 248.418 350 psi S-01

    Masonry Works

    CHB Wall

    150mm thick

    100mm thick

    Masonry Works

    CHB Wall

    150mm thick

    100mm thick

    Masonry Works

    CHB Wall

    150mm thick

    100mm thick

    Masonry Works

    CHB Wall

    Ground Floor Level

    Avel

    Updated as of

    RemQuality RequirementsDuration

    Days

    Start Finish LaborQuantity

    Materials

    Basement Floor Level

    27-Sep-12

    Required Actual Percentage

    3rd Floor Level

    4th Floor Level

    5th Floor Level

    6th Floor Level

  • 7/30/2019 Finishing Breakdown

    6/20

    150mm thick

    100mm thick

    Masonry Works

    CHB Wall

    150mm thick

    100mm thick

    Notes :

    6th Floor Level

  • 7/30/2019 Finishing Breakdown

    7/20

    ep. 27, 2012.

    arks

  • 7/30/2019 Finishing Breakdown

    8/20

  • 7/30/2019 Finishing Breakdown

    9/20

    Project Title :

    Date Prepared :

    Schedule Actual Schedule Actual

    No/Pc. Unit Ref . Specs Reference

    Metal Works 230 7/19/2012 3/5/2013

    Structural Steel Framing 45 12/14/2012 1/27/2013

    Metal Decking 160 7/19/2012 12/25/2012

    Ground Floor

    Phase 1 Marielle

    Phase 2

    Second Floor

    Phase 1

    Phase 2

    Third Floor

    Phase 1 Check Area

    Phase 2 Check Area

    Metal Stairs 60 12/14/2012 2/11/2013

    Basement

    Ground

    First Floor

    Metal Fabrications 75 12/14/2012 2/26/2013

    Metal Grating 7 2/27/2013 3/5/2013

    Baseboard 30 1/10/2013 2/8/2013

    Notes :

    Rem

    Avel

    Avel

    Separate G

    Duration

    Days

    Start Finish LaborQuantity

    Materials

    Quality RequirementsQuantity

  • 7/30/2019 Finishing Breakdown

    10/20

    arks

    roup/Team

  • 7/30/2019 Finishing Breakdown

    11/20

    Project Title :

    Date Prepared :

    Schedule Actual Schedule Actual

    Specs Reference

    190 6/19/2012 12/25/2012

    Damproofing

    Water Proofing

    Attached Ret Wall1,023.00

    sqmDetached Ret Wall 210.00 sqm

    90 11/29/2012 2/26/2013

    45 1/13/2013 2/26/2013

    Notes :

    Thermal Protection

    Flashing and Sheet Metal

    Mari

    Damproofing and Waterproofing

    Thermal and Moisture

    Protection253 6/19/2012 2/26/2013

    RemQuantity

    Quality Requirements

    Duration

    Days

    Start Finish LaborQuantity

    Materials

  • 7/30/2019 Finishing Breakdown

    12/20

    nell

    arks

  • 7/30/2019 Finishing Breakdown

    13/20

    Project Title :

    Date Prepared :

    Schedule Actual Schedule Actual

    Specs Reference

    30 3/1/2012 3/30/2012 2,042.60 sq.

    Notes :

    Geotextile Water proofing

    3/30/2012 MariSite Work And Earth Works30

    3/1/2012

    RemQuantity

    Quality Requirements

    Duration

    Days

    Start Finish LaborQuantity

    Materials

  • 7/30/2019 Finishing Breakdown

    14/20

    nell

    arks

  • 7/30/2019 Finishing Breakdown

    15/20

    Project Title :

    Date Prepared :

    Schedule Actual Schedule Actual

    Specs Reference

    Basement 10/12/2012 3/10/2013

    Portland Cement Plaster

    Portland Cement Plaster interior walls 1,871.73 S-01 interior = 7,24

    Perimeter Walls with Cementitious Water proofing 70.48 213-A 213-A exterior = 10,

    Plastering - Perimeter Walls including openings 590.31 n/a A.201

    Numbers - Doors

    Numbers - Windows

    Gypsum Board Wall 0.00

    Glass Walls

    Graphic Wall Films

    Ground Floor

    Portland Cement Plaster interior = 7,24

    Portland Cement Plaster interior walls 1,346.38 exterior = 10,

    Perimeter Walls with Cementitious Water proofing 646.64

    Plastering - Perimeter Walls including openings 443.36

    Perimeter - Doors and Windows

    Gypsum Board Wall

    Glass Walls

    Graphic Wall Films

    Notes :

    ReQuality RequirementsDuration

    Days

    Start Finish LaborQuantity

    Materials

    Required Actual Percentage

    Finishes

    Cement Plas

    Cement Plas

    Wall Finishes

  • 7/30/2019 Finishing Breakdown

    16/20

  • 7/30/2019 Finishing Breakdown

    17/20

    21 sqm

    2.17 sqm

    21 sqm

    2.17 sqm

    arks

    r :

    r :

    el

  • 7/30/2019 Finishing Breakdown

    18/20

  • 7/30/2019 Finishing Breakdown

    19/20

    Project Title :

    Date Prepared :

    Schedule Actual Schedule Actual

    Specs Reference

    150 10/12/2012 3/10/2013

    Basement needs to be separate per floor

    Tiling Works

    Wood Flooring

    Stone Works

    Non- Skid concrete

    Ground Floor

    Tiling Works

    Wood Flooring

    Stone Works

    Non- Skid concrete

    Notes :

    RemarksQuantity

    Quality Requirements

    Duration

    Days

    Start Finish LaborQuantity

    Materials

    Finishes Avel

    Floor Finishes see attachements

  • 7/30/2019 Finishing Breakdown

    20/20

    Project Title :

    Date Prepared :

    Schedule Actual Schedule Actual

    Specs Reference

    150 10/12/2012 3/10/2013

    Basement needs to be separate per floor

    Tiling Works

    Wood Flooring

    Stone Works

    Non- Skid concrete

    Ground Floor

    Tiling Works

    Wood Flooring

    Stone Works

    Non- Skid concrete

    Notes :

    RemarksQuantity

    Quality Requirements

    Duration

    Days

    Start Finish LaborQuantity

    Materials

    Finishes Avel

    Floor Finishes see attachements