Transcript
Page 1: Energy Centre, Ipswich Hospital - Lawson Planning Partnership · 2018. 7. 27. · Instruction LPP Planning strategy and project management advice in support of a planning application

Instruction

Planning strategy and project management advice in support of a planning application to develop an Energy Centre at Ipswich Hospital as part of a carbon footprint reduction initiative being progressed by the Hospital Trust

Client

Ipswich Hospital NHS Trust

Project Details

Planning permission for an Energy Centre was required to support the Hospital Trust’s initiative to reduce its carbon footprint. The Energy Centre would be capable of generating approximately 80% of the Hospital’s electricity requirements from used cooking oil, a non-toxic low carbon bio-degradable fuel source. Planning permission was granted in 2013 and the Energy Centre is due to be constructed in 2015.

LPP’s Role

• Project management of planning application process including coordination of specialist technical inputs covering Architectural drawings, Visual Impact Analysis, Acoustic and Air Quality assessments and an Environmental Report.

• Pre-application discussions with the LPA including scoping of the form of the planning application

• Organising a community engagement exercise

• Preparation and submission of planning application and liaison with LPA and consultees

• Securing planning consent with no pre-commencement conditions

www.lppartnership.co.uk

For further information please contact John Lawson tel 01206 835150 or email [email protected]

Energy Centre, Ipswich Hospital

CHARTERED TOWN PLANNERS