Page 1: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Economic Stimulus Information Meeting

Project Information Overview

March 18, 2009W. H. Stuart Center

Page 2: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Presentation Agenda• Project Categories• Contract Types• Project Overviews

– Capacity– Resurfacing– Bridge– Operational– Enhancement

• Sidewalk• Trail• Landscaping

• CEI

Page 3: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Project Categories• State Priorities

• Local Priorities

• Enhancements

• Transit

• Aviation

Page 4: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Project Categories• State Priorities

– Smaller number, larger cost, capacity

• Local Priorities

• Enhancements

• Transit

• Aviation

Page 5: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Project Categories• State Priorities

• Local Priorities– Larger number, districtwide, different types

• Enhancements

• Transit

• Aviation

Page 6: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Project Categories• State Priorities

• Local Priorities

• Enhancements– Local roadways, smaller amounts, primarily sidewalks

• Transit

• Aviation

Page 7: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Project Categories• State Priorities

• Local Priorities

• Enhancements

• Transit– Mostly bus and other vehicle purchases

• Aviation

Page 8: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Project Categories• State Priorities

• Local Priorities

• Enhancements

• Transit

• Aviation– Grants directly through FAA to airports

Page 9: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Contract Types

• Local Agency Program Projects

• State Produced– Design/Build– Construction– CEI

Page 10: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Projects• More detailed project descriptions on disc

• Consist primarily:– Capacity– Resurfacing– Bridge– Operational– Enhancement

Page 11: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Capacity Projects• Projects likely

let Design/Build• Most are in final

stages of Design• May be required

to obtain permits

• Construction must be complete within 3 years SR 559 in Aurburndale

Page 12: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Capacity Projects• Projects likely

let Design/Build• Most are in final

stages of Design• May be required

to obtain permits

• Construction must be complete within 3 years US 301 in Sarasota County

Page 13: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Capacity Projects• Projects can be

conventionally let as a construction bid

• Likely have 5-10 capacity projects districtwide

• Cost range from $12 M to $60 M

SR 739 in Lee County

Page 14: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Resurfacing Projects• Most will be let

as a Design/Build

• Construction must be complete within 3 years

• A few will have distance defined by bid CR 832 from SR 29 East

Page 15: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Resurfacing Projects• Most will be let

as a Design/Build

• Construction must be complete within 3 years

• Others have defined limits

CR 17 from Poinsettia St to W Interlake

Page 16: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Resurfacing Projects• Most will be let

as a Design/Build

• Construction must be complete within 3 years

• Scopes will define curb and gutter, shoulders,or edge of pavement

10th St from 8th Ave to 14th Ave

Page 17: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Resurfacing Projects• Most will be let

as a Design/Build

• Projects can be several miles or couple hundred feet

• Between 15-20 resurfacing projects expected

Home Ave Resurfacing

Page 18: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Bridge Projects

• Most will be let as conventional, some design build

• Projects may be culvert replacement/ improvement

9th Ave W bridge replacement at Wares Creek

Page 19: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Bridge Projects

• Most will be let as conventional, some design build

• Projects may be culvert replacement/ improvement

SE 43rd Ave bridge replacement

Page 20: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Bridge Projects

• Most will be let as conventional, some design build

• Projects may be culvert replacement/ improvement

Cape Haze Bridge Culvert Replacement

Page 21: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Bridge Projects

• Most will be let as conventional, some design build

• Projects may be culvert replacement/ improvement

• Between 5-7 bridge jobs

Jolley Bridge Replacement

Page 22: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Operational Projects• Most will be let

as conventional, some design build

• Consist of intersection improvements, turn lanes, resurfacing, mast arms,

SR 776 at Coliseums Blvd

Page 23: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Operational Projects• Most will be let

as conventional, some design build

• Consist of intersection improvements, turn lanes, resurfacing, mast arms,

US 41 at Midway Blvd

Page 24: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Operational Projects• Most will be let

as conventional, some design build

• Consist of intersection improvements, turn lanes, resurfacing, mast arms,

Murdock Circle add turn lanes

Page 25: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Operational Projects• Most will be let

as conventional, some design build

• Consist of intersection improvements, turn lanes, resurfacing, mast arms,

East Bay Dr./Gulf Dr. Signal upgrade

Page 26: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Operational Projects• Most will be let

as conventional, some design build

• Consist of intersection improvements, turn lanes, resurfacing, mast arms,

Siesta Drive Drainage Improvements

Page 27: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Operational Projects• Most will be let as

conventional, some design build

• ITS Improvements also possible

• Between 15-20 projects districtwide

Manatee County Phase 2 ATMS System

Page 28: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Enhancement Projects• Most will be let

as design build

• Consist of sidewalk, bikepath/trails, or landscaping

City of Bradenton on 23rd Ave between 26th St. and 27th St. W

Page 29: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Enhancement Projects• Most will be let

as design build

• Consist of sidewalk, bikepath/trails, or landscaping

Gulf Blvd from Palm to Magnolia

Page 30: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Enhancement Projects• Most will be let

as design build

• Consist of sidewalk, bikepath/trails, or landscaping

Bald Eagle Pathway Shared Use Path

Page 31: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Enhancement Projects• Most will be let

as design build

• Consist of sidewalk, bikepath/trails, or landscaping

• Between 15-25 projects

Ft. Fraser Trail in Polk County

Page 32: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Example Project Summary• Mix of Design/Build and Conventionally Let

construction projects

• Wide range of projects available from bridge, resurfacing, sidewalks, landscaping, minor intersection improvements, drainage, and capacity

• Spread over all the district and most municipalities

• Project costs also range from several thousand to multi million

Page 33: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

CEI• Consultant CEI’s will be used for all Stimulus Projects

• Contracts will be competitively selected using Expanded Letter of Response

• Number of CEI contracts will be based on number of construction projects

• Email notification will go to all firms on our CEI Contact List when contract groupings are confirmed

• If you have not met our Operation Center Staff, please schedule time with them before project advertisements