E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
AGATA Campaign at GANIL
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
Outline
Status of AGATA
Preparation to the GANIL campaign
Performances simulations of the AGATA array
AGATA@GANIL: Project Organization and Planning
Report of the working Group
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
2010 2012 LNL : 5TC
AGATA D.+PRISMATotal Eff (compact). ~6%
Status of AGATA: LNL Campaign in 2010-2012
Lifetime measurement of the 6.79 MeV state in 15O.
The energy and angular resolution of the AD will allow to reach a lifetime measurement in the fs range
C. Michelagnoli et, in preparation
C. Louchard et al, to be submitted
Successful demonstration phase with a limited number of detectors concluding a long period of R&D (~70 NIMA papers in ~ 10 years (2002-2012) )
First physics results are submitted or drafted within the collaboration
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
2012 GSI/FRS5TC+3 DC
AGATA D.+PRISMA AGATA @ FRS
Total Eff. (b=0.5) ~ 10% Total Eff (compact). ~6%
35 LoI have been submitted in May 2010Conveners: M. Bentley, W. Korten
144 shifts (46 days) have been allocated
4 Weeks of data taking from October to November 2012 + several commissioning runs
Workshop hold in December for the second beam periodNew proposals submitted for 6 weeks Next beam time in November-December 2013 (…2014)
Quadratic evolution of collectivity in the 208Pb vicinity (S429) The Pygmy Dipole Resonance in 64Fe and the properties of neutron skin (S430) Coulomb-excitation of the band-terminating 12+ yrast trap in 58Ni (S433) Shape evolution in very-neutron rich Zr isotopes (S428)
2010 2012 LNL : 5TC
Status of AGATA: GSI Campaign in 2012-2014
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
GSI Beam time•19/20 crystals running•21 channel fully instrumented 29th of January 2013
32 capsules have been produced 24 are operational 3 to be fixed after failure 5 waiting to be fixed after LNL annealing
Status of AGATA: the array
The remaining 4 electronic chains in final stage of test 25 capsules fully instrumented with electronic version 1 for 2013
End 2012 : 3 more capsules have been ordered by IN2P3 (2) and Spain (1)
By end of 2013 : 35 capsules By the end of the GANIL phase 1 (p 45 capsules)
New electronic to equip the next 20 capsules (1p)Padova and Orsay designs evaluated by 7 international expertsPadova electronic choosen in Autumn 2012; to be delivered in mid-2013
E.Clément Novembre 2011
Preparation to the GANIL campaign
E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
:
Campaign spokesperson : S. Lenzi (Univ. Padova)
Call for LOI sent in October 2012: dead line 8th February 2013
1st workshop on the18th - 20th of February organized at GANIL ,dedicated to the physics of the GANIL Campaign using stable and radioactive beams (SPIRAL1)
Create the basis for defining the priorities for a detailed scientific program of the campaign
Assess the technical feasibility, constrain the infrastructure and ancillary detectors integration.
Identify common setup to be run in a row or physics case and collaborations
A summary of the physics objectives will be presented at the next SC for evaluation
1st PAC including AGATA proposal
13th AGATA week organized on the next 20th-22nd of March at GANIL
The GANIL Campaign 2014 VAMOS cave toward 1p
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
g-ray spectroscopy of very neutron-rich nuclei populated in Deep Inelastic Collisions or induced fission using VAMOS to identify the reaction products in Q, A and Z.
Spectroscopy of heavy elements towards SHE and N=Z nuclei populated by fusion –evaporation with VAMOS in gas-filled mode.
Spectroscopy at high spins after fusion-evaporation
Spectroscopy of p-rich nuclei at the N=Z line using the Nwall and DIAMANT
Spectroscopy using existing and new SPIRAL1 beams
Ensuring these physics cases with the appropriate ancillaries detectors
Mechanical integration
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
Charged particle array for transfer reaction MUST2/TIARA : (d,p) etc … program with SIB and RIB
Charged particle array for prompt tagging : DIAMANT Neutron detector (Nwall) Charged particle array for Recoil Decay Tagging : MUSETT
Scintillator : BaF2 array, LaBr3 Future detector : NEDA (n) , GASPARD ( ?), PARIS (LaBr3)
In G1 coupled to VAMOS (+ EXOGAM2): SIBs, RIBs
AGATA 1p at GANIL : Ancillary devices
At 0° as separator (vaccum/gas-filled)
Angles >10 deg for fission & MNT
E.Clément Novembre 2011
VAMOS
The VAMOS spectrometer is expected to play a major role in the campaign
Upgrades are still possible in the dispersive mode as magnetic spectrometer
Fully operational now (M. Rejmund et al, NIM A 646 (2011) 184-191 )
A test in gas-filled mode has shown the competitivity of the setup
Optimum configuration to be fundedANR (French Research Funding Agency) request for the gas-filled mode submitted by the Saclay and GANIL group (PI : Ch. Theisen & Ch. Schmitt)
If funded in 2013, should be operational mid-2015
E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011
Performances simulations of the AGATA array
E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
J. Ljungvall (CSNSM) M. Labiche (STFC)for the AGATA collaboration - Preliminary
× ~ 1.25
× ~ 1.5
AGATA nominal 233 mmEXOGAM nominal 145 mm
Performance of the AGATA array AGATA should leave GSI with a minimum of 25 capsules (5ATC + 5ADC) fully instrumented Additional detectors will be delivered during the campaign End of the campaign : 45 capsules covering 1p
LNL phase
GSI phase
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
b =12%
More than efficiency , AGATA provides higher sensitivity
× ~ 4.7
× ~ 12
Performance of the AGATA array
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
EXOGAM, LaBr3, BaF2 …
AGATA Configurations at GANILE
. Farnea et al, N
uclear Instruments and
Methods in P
hysics Research A
621 (2010) 331–343
E.Clément Novembre 2011
AGATA@GANIL Project Organization and Planning
E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
Local organization doneTasks distribution and their detailed description were distributedGANIL project :
Set of spec delivered, detailed planning, resources evaluation, budget, development plan, PBS, WBS distributed
Security/safety : Installation description for DIRC01 :
1st draft released, risk analysis beginning of 2013
The call for tender, to be launched by May 2013 after GANIL management review, are under preparation
Specific infrastructure to be delivered in December 2013
In 2012, ~4 FTE have worked on the project (20 persons involved at GANIL)For 2013-2014, ~80 m.month are evaluated
Organisation
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
Schedule (assuming that material from GSI arrive on Jan-Feb 2014)
Gas-filled installation expected in mid-2015 if funded in 2013 GANISOL beams available for physics beginning of 2016 No SPIRAL1 beam in 2014-2015
GANIL has requested the host of AGATA until end of 2016
T2-12 T3-12 T4-12 T1-13 T2-13 T3-13 T4-13 T1-14 T2-14 T3-14 T4-14 … T4-16
Mechanics STFC Design
GANIL Impl
IPHC construc
Mounting
Infrastructure det
GANIL Studies
Collecting items
Installation
LN2, AF
GANIL Studies Collecting items
Installation Test
DAQ Hardware
GANIL Studies
Collecting items
Installation Test
DAQ Software
Prep.
Test
Processing Room
Renov Aire Proj AGATA
infra
Detector
Mounting
Source & Commi Expt …
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
~150 k€
~17k€
Processing room 019Upgrade ~ 102k€
Detector lab infrastructure ~15 k€
Cryogenic upgrade, connection ~25 k€
Total investment cost ~380 k€
Optical fibers links ~70k€
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
Budget : Total cost investment ~380k€
237 k€ guaranteed by GANIL for 2013 to be completed in the 2014 request
IPHC requested 90k€ from IN2P3-AP for the mechanic
ANR (French Research Funding Agency) request for the gas-filled mode submitted by the Saclay and GANIL group (PI : Ch. Theisen & Ch. Schmitt)
Loan of material from LNL & GSI (cooled cabinet, racks, water distribution, Optical link) under evaluation
E.Clément Novembre 2011
Report of the working Groups
E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
Detectors support design done by STFC Daresbury in close collaboration with GANIL GANIL designs the additional platform GANIL takes in charge the integration work Projection T1 -2013 9 months of construction estimated starting by T1-2013
On-going collaboration with the IPHC workshop for the construction of the support
Workshop for the extended platform not yet defined
I. Burrows (STFC) M. Ozille, P. Gangnant (GANIL)
Mechanic
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013I. Burrows (STFC) M. Ozille (GANIL) G. Gaudiot (IPHC)
Mechanic
First 2D projections have been released in January On-going validation and fine cost estimate Mechanical stress and rigidity calculations validated
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 M. Ozille (GANIL)
Mechanic
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
M. Ozille, P. Gangnant, G. Fremont (GANIL)
GANIL is in charge of the beam section and target chamber design for most of the experiment
Specific configuration will be treated case by case
Target loader :Detailed design on going by GANILFinal decision will be taken after the
physics workshop
Target loader and beam line
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
Salle G1
AGATA
EXOGAM Elec.
AGATA Elec.
DSS
300 optical wires
Water cooling 26° 8 bars
27 kW UPS
L. Menager, J. Ropert, JL. Foucher (GANIL)
Integration
Cryogenic distribution
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
L. Menager, M. Jean , N. Menard (GANIL)
The foreseen room required important investment (refurbishment, electricity, water cooling, air conditioning …)
G1 cave
Integration
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
Performance simulations : on-going (final release in February)
Electronic coupling: on-going (several meeting already done, transfer of knowledge in GSI during 2013)
Detector: starting (transfer of knowledge in GSI during 2013)
Data flow, DAQ: on-going (several meeting already done, no problem anticipated)
Mechanic design : on-going (final design review)
Optical link : on-going (purchase order expected on April)
Data analysis : starting (first meeting on the first week of Dec.)
AutoFill-cryogenic : on-going (definition of the installation, call for tender in April)
Infrastructure : on-going (needs identified, final design review on going)
E.Clément Novembre 2011
Conclusion
E.Clément GANIL Scientific Council February 2013
The AGATA physics prospective is on-going and physics objectives will be presented at the next CS for evaluation after the workshop organized in February
2014-mid 2015 : AGATA-VAMOS+ “light” ancillary2015 : gas-filled, NWALL2016 : SPIRAL1 beams
The AGATA project at GANIL made progress in all different items with a particular attention on the mechanic and the integration
The transfer of knowledge on detectors and electronic will be organized in 2013 during off and on-beam period at GSI with GANIL technical staff.
Mechanical construction should start soon, delivery by end of 2013
Call for tender are expected to be sent by May 2013 for infrastructure
Data Acquisition and Data analysis preparation will progress over 2013
GANIL technical involvement is already significant
Budget guaranteed by GANIL for 2013 to be completed in the 2014 request
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
5TC1pWithout tracking
E. Farnea et al, Nuclear Instruments and Methods in Physics Research A 621 (2010) 331–343
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013