E-government reference model
Alexander SAMARIN
e-Government Symposium
4 November, 2014, Bern, Switzerland
http://www.egovernment-symposium.ch/
• A digital enterprise architect– from a programmer to a systems architect – creator of systems that work without me– broad experience: company, canton, confederation, country, continent
• I believe that many improvements in operational excellence and strategy execution are achievable relatively easy
• HOW I do what I do– architecting synergy between strategies, technologies, tools and good
practices for the client’s unique situation, and knowledge transfer
• WHAT is the result of my work for clients– less routine work, less stress, higher performance, higher security,
less risk, higher predictability of results, better operations, less duplication and liberation of business potentials
© A. Samarin 2014 E-government reference model v1 2
About me
2014-11-05
2
• Context
• E-government reference model
• Views
© A. Samarin 2014 E-government reference model v1 3
Agenda
• Unlimited life-cycle (unpredictable and incremental evolution)
• Socio-technical system
• Collaborative system
• Industrialised system
• Ability for rapid innovation is important
• Variety of services (several hundred governmental services are listed in the Swiss e-government catalogue)
• High level of security for personal data
© A. Samarin 2014 E-government reference model v1 4
Complexity of e-government
2014-11-05
3
• Digital triumphs physical: Everything becomes digital: products, information, content, documents, records, processes, money, rights, communications.
• Fast triumphs slow: As digital is intangible thus news tools and new execution speed immediately.
• Group triumphs single: It is mandatory to collaborate to address modern complex problems.
• Big triumphs small: Digital things are at new scale.
• With this new speed and scale, there is no time for human intervention and errors in routine operations and at interfaces
© A. Samarin 2014 E-government reference model v1 5
Digital age (1)
• Transparency is increasing with bad and good effects
• In addition to being
– cheaper, faster, better
• it is mandatory to become
– cleaner, greener, more agile, more synergetic (i.e. IoT), more comprehensive
• In systems architecting the focus is changing– FROM the thing– TO how the thing changes – SUBJECT how things change together
• To enable innovations
– “in the digital age innovation depends on process automation”
© A. Samarin 2014 E-government reference model v1 6
Digital age (2)
2014-11-05
4
• Context
• E-government reference model
• Views
© A. Samarin 2014 E-government reference model v1 7
Agenda
• Many governmental entities deliver the same services, albeit in a different manner
• Many potential similarities
• Realisation of the e-government need a systemic approach
© A. Samarin 2014 E-government reference model v1 8
WHY e-Gov reference model (1)
Technical
architecture
Data
architecture
Application
architecture
Business
architecture
Communal 100 % 100 % 100 % 100 %
Provincial 100 % 100 % 100 % 80 %
Ministerial 90 % 100 % 60-80 % 70 %
National 90 % 100 % 70 % 50 %
2014-11-05
5
• There is a way to combine diversity and uniformity
• The problem of combining them is also known in the business as “shared services”
• Example - Business units (BUs) have different levels of computerisation
– a standard solution from the IT department is not always good for everyone
© A. Samarin 2014 E-government reference model v1 9
WHY e-Gov reference model (2)
BU1 BU2 BU3
Standardsolution
Level of computerisation
IT department
© A. Samarin 2014
WHY e-Gov reference model (3)
BU1 BU2 BU3
Level of computerisation
A CBB BAC
1) Standardsolution is based on processes and
shared services
2) Each BU is moving to a similar architecture
IT department
E-government reference model v1 10
2014-11-05
6
• Considers together all implementations and develops the ability to reproduce results
– ready-to-use solutions, tools, patterns and architectures
– offers the best possible services for each citizen
– becomes the centre of societal transformation
– seamlessly incorporates innovations
– implementable at your pace
– secure by design
© A. Samarin 2014 E-government reference model v1 11
WHY e-Gov reference model (4)
• Apply the power of Enterprise Architecture (EA)
– commonly-agreed model
– platform-based implementation
– enterprise-as-a-system-of-processes
– modernisation of legacy applications
• Bring EA group into an e-Gov programme
• EA group as a seed for an e-Gov competence centre
© A. Samarin 2014 E-government reference model v1 12
HOW does e-Gov reference model work
2014-11-05
7
• Architect is a person who translates a customer’s requirements into a viable plan and guides others in its execution
• Enterprise Architecture (EA) is the process of translating business vision and strategy into effective enterprise change by creating, communicating, and improving the key requirements, principles, and models that describe the enterprise's future state and enable its evolution and transformation.
© A. Samarin 2014 E-government reference model v1 13
EA explained (1)
• EA is the right “tool” to address the challenge of diversity & uniformity because EA is a systemic coordinator of people, processes, products and projects in 4 dimensions:
– Business zones span – organisational unit, segment, enterprise, supply chain, municipality, governorate, ministry, country, region, continent, etc.
– Architectural domains span – business, data, application, security, information, technology, etc.
– Time span – solution life-cycle, technology life-cycle, tool life-cycle, project life-cycle, enterprise life-cycle, etc.
– Sector span – detecting and re-using common patterns (good business practices) in unique processes from different sectors
© A. Samarin 2014 E-government reference model v1 14
EA explained (2)
2014-11-05
8
© A. Samarin 2014 E-government reference model v1 15
EA group in a national e-Gov program
Steering Committee
PMO EA group Budget
Administrative coordination Technical coordination Financial control
Degree of involvement
Time
External team
Localteam
Initiation phase Projects-based phase Maintenance phase
• Chief Architect
• Governance group
– review board
– quality assurance
– budget
– librarian
• Solution group
– solution architects
– business analysts
• PMO group
– project leaders
© A. Samarin 2014 E-government reference model v1 16
EA group structure by main roles
• Domain group
– business architects
– application architects
– information architects
– security architects
– infrastructure architects
• Vertical group
– healthcare
– smart-cities
– tourism
– …
2014-11-05
9
• Potential structure of the e-Gov competence centre
– EA group
– Communication group
– Application Development group
– Operations group
– Knowledge Management group
– Education services
– Training services
© A. Samarin 2014 E-government reference model v1 17
EA group as a seed for ane-Gov competence centre
© A. Samarin 2014 E-government reference model v1 18
EA - Many stakeholder (participants)
• Citizens• Local businesses• Global businesses• Government authorities• Local government stakeholders• National regulatory agencies• Political parties• Local NGOs• External NGOs• Funding bodies• Public service providers• IT vendors• Architects• Project managers
2014-11-05
10
© A. Samarin 2014 E-government reference model v1 19
Matrix between stakeholders and views
An example
• Partner – governmental entity interaction view
• Partner view
• Evolution of implementation view
• The governmental entities integration view
• Platform-based implementation view– Platform-based approach
– Platform-based implementation practices
– Project management practices
– Implementation governance view
– Architecture-based procurement view
© A. Samarin 2014 E-government reference model v1 20
WHAT RM - many views (1)
2014-11-05
11
• Enterprise as a system of processes
• Enhancing information security by the use of processes
• Enterprise Risk Management reference model
• Records management as an BPM application
• Multi-layered implementation model
• Agile solution delivery practices
• Microservices
• Various technologies around the implementation model
• Modernisation of applications to become process-centric
• Moving services to clouds
© A. Samarin 2014 E-government reference model v1 21
WHAT RM - many views (2)
• Context
• E-government reference model
• Views
© A. Samarin 2014 E-government reference model v1 22
Agenda
2014-11-05
12
• Partner and governmental-entity interaction view
• Partner view
• Evolution of implementation view
• The governmental entities integration view
• Paperless or digital work view
• Platform-based implementation view– Platform-based approach
– Platform-based implementation practices
– Project management practices
– Implementation governance view
– Architecture-based procurement view
© A. Samarin 2014 E-government reference model v1 23
VIEWS (1)
Four communication patterns for exchanges between a partner and the
government
Government
2. Patrner-declaration
1. Government-announce
4. Partner-demand
Spread in time
3. Government-demand
Spread in time
Partners (citizen, business, and other organisations)
1. Government-announcement, e.g. broadcasting changes in a law2. Partner-declaration, e.g. communicating a change of the partner’s address3. Government-demand, e.g. inviting to pay taxes4. Partner-demand, e.g. requesting a certificate (fishing license)
© A. Samarin 2014 E-government reference model v1 24
2014-11-05
13
A partner-initiated-demand may required several exchanges between the
partner and the government
Government
Time© A. Samarin 2014 E-government reference model v1 25
The partner may need to deal with some ministries
Government
Ministry A Ministry B Ministry C
Time
Methodologies:+ data modelling+ electronic document exchange
Tools:+ standard data schemas+ electronic signature
• data flow (black dashed lines)
© A. Samarin 2014 E-government reference model v1 26
2014-11-05
14
Process
+ + + +
E-gov coordinates partner’s interactions with the government
Government
• control flow (black solid lines)
• data flow (black dashed lines)
Ministry A Ministry B Ministry C
Time
Methodologies:• data modelling• electronic document
(ED) exchange+ BPM discipline+ process modelling
Technologies:• standard data schemas• electronic signature+ BPM suite
© A. Samarin 2014 E-government reference model v1 27
Process --
E-gov unifies the communication between the partner and the ministries
Government
Ministry B
Time
2a 2cx
2b
• control flow (black solid lines)
• data flow (black dashed lines)
Methodologies:• data modelling• electronic document
(ED) exchange+ BPM discipline+ process modelling
Technologies:• standard data schemas• electronic signature+ BPM suite
© A. Samarin 2014 E-government reference model v1 28
……
2014-11-05
15
Process
+ + + +
E-gov provides a social collaborative extranet for partners
Government
Ministry A Ministry B Ministry C
Time
Methodologies:• data modelling• ED exchange• BPM discipline• process modelling+ ED management+ records management+ collaboration+ social
Technologies:• standard data schemas• electronic signature• BPM suite+ ECM
Social collaborative extranet
• control flow (black solid lines)
• data flow (black dashed lines)
© A. Samarin 2014 E-government reference model v1 29
• Partner – governmental entity interaction view
• Partner view
• Evolution of implementation view
• The governmental entities integration view
• Platform-based implementation view– Platform-based approach
– Platform-based implementation practices
– Project management practices
– Implementation governance view
– Architecture-based procurement view
© A. Samarin 2014 E-government reference model v1 30
VIEWS (1)
2014-11-05
16
Partner’s view
© A. Samarin 2014 E-government reference model v1 31
• Partner – governmental entity interaction view
• Partner view
• Evolution of implementation view
• The governmental entities integration view
• Platform-based implementation view– Platform-based approach
– Platform-based implementation practices
– Project management practices
– Implementation governance view
– Architecture-based procurement view
© A. Samarin 2014 E-government reference model v1 32
VIEWS (1)
2014-11-05
17
Partners
Existing application
Coordination and integration backbone
e-Government
© A. Samarin 2014 33
E-gov application architecture view
Social collaborative extranet
e-gov service
Existing application
Existing application
Government
Technologies:• BPM suite• SOA orientation• ECM
e-gov service
e-gov service
E-government reference model v1
Partners
Existing application
© A. Samarin 2014 34
E-gov traditional application architecture
Portal
Existing application
Existing application
Government
Ap
plic
atio
n
Ap
plic
atio
n
Ap
plic
atio
n
E-government reference model v1
2014-11-05
18
Partners
Existing application
Coordination and integration backbone
e-Government
© A. Samarin 2014 35
E-gov introductory application architecture
Social collaborative extranet
e-gov service
Existing application
Existing application
Government
e-gov service
e-gov service
E-government reference model v1
Partners
Existing application
Coordination and integration backbone
e-Government
© A. Samarin 2014 36
E-gov transitional application architecture
Social collaborative extranet
e-gov service
Existing application
Government
e-gov service
e-gov service
Coordination backbone
Service Service
E-government reference model v1
Existing application
2014-11-05
19
Partners
Coordination and integration backbone
e-Government
© A. Samarin 2014 37
E-gov target application architecture
Social collaborative extranet
e-gov service
e-gov service
e-gov service
ServiceService Service
E-government reference model v1
Partners
Coordination and integration backbone
E-social system
© A. Samarin 2014 38
E-social system application architecture
Social collaborative extranet
Public service
Private service
Professionalservice
Social service
Voluntary service
E-government reference model v1
2014-11-05
20
© A. Samarin 2014 E-government reference model v1 39
Steps of evolution in application architecture
Introductory architecture
Target architecture
E-Social system architecture
Portal-centric architecture
Transitional architecture
• Partner – governmental entity interaction view
• Partner view
• Evolution of implementation view
• The governmental entities integration view
• Platform-based implementation view– Platform-based approach
– Platform-based implementation practices
– Project management practices
– Implementation governance view
– Architecture-based procurement view
© A. Samarin 2014 E-government reference model v1 40
VIEWS (1)
2014-11-05
21
© A. Samarin 2014 E-government reference model v1 41
Integration process instead of N-to-N connectivity
• Partner – governmental entity interaction view
• Partner view
• Evolution of implementation view
• The governmental entities integration view
• Platform-based implementation view– Platform-based approach
– Platform-based implementation practices
– Project management practices
– Implementation governance view
– Architecture-based procurement view
© A. Samarin 2014 E-government reference model v1 43
VIEWS (1)
2014-11-05
22
• Faster and more systematic implementation of business solutions
• Agile and easier introduction of small modifications
• Less non-justified variations of tools
• Liberation of people for innovations
• Clear path to clouds
• Solutions convergence for the business (similar GUI, ECM, processes, security, etc.)
© A. Samarin 2014 44
Platform-based architecture drivers
E-government reference model v1
• Standardise and simplify core elements of future enterprise-wide system
• For any elements outside the platform, new opportunities should be explored using agile principles (low-code)
© A. Samarin 2014 45
Platform pattern
A2
A1A3
Platform
S2…
S1S3
Functionality
Delivery by solutions Delivery by applications
Scope
E-government reference model v1
2014-11-05
23
• The platform frees up resource to focus on new opportunities
• Successful agile innovations are rapidly scaled up when incorporated into the platform
• An agile approach requires coordination at a system level
• To minimise duplication of effort in solving the same problems, there needs to be system-wide transparency of agile initiatives
• Existing elements of the platform also need periodic challenge
© A. Samarin 2014 46
Platform practices
E-government reference model v1
© A. Samarin 2014 47
What – platform functional structure
Dev env 1 Dev env 2
Development environment 3Generic development
environments
DEVELOPMENT
Functionality
Basic off-the-shelf features
of the platform
Advanced off-the-shelf
features of the platform
Company-specific features
Process-centricity
E-government reference model v1
2014-11-05
24
© A. Samarin 2014 48
Financial benefits
N applications
N≈5-6
Without common platform
With common platform
Cumulative cost
E-government reference model v1
Platform cost
• There are three primary types of activity
1. Agile implementation of business solutions as mini-projects (low code)
2. Classic projects for new versions of platform components
3. Absorption of new mini-processes and micro-services by the platform
4. On-going and centralised planning platform evolution
© A. Samarin 2014 49
Impact - governance
E-government reference model v1
2014-11-05
25
• The platform governance is carried out by an inter-organisational-units coordination committee
• Mini-projects are carried-out by platform solution architects
• Platform implementation resources are provided by the ICT department and by a set of authorised service providers
• Platform configuration management supports the full life-cycle of common mini-processes and micro-services
• Operational team provides integration and release of solutions into production
© A. Samarin 2014 E-government reference model v1 50
Impact – platform team structure
• Partner – governmental entity interaction view
• Partner view
• Evolution of implementation view
• The governmental entities integration view
• Platform-based implementation view– Platform-based approach
– Platform-based implementation practices
– Project management practices
– Implementation governance view
– Architecture-based procurement view
© A. Samarin 2014 E-government reference model v1 51
VIEWS (1)
2014-11-05
26
• Entities are permitted to advance at different paces in their ascent to the top of the “ladder”.
© A. Samarin 2014 E-government reference model v1 52
Ladder of maturity meta-pattern
• The platform is designed to be tools-independent by standardizing data, information, interfaces and coordination between various capabilities.
© A. Samarin 2014 E-government reference model v1 53
Component-oriented design
2014-11-05
27
• Partner – governmental entity interaction view
• Partner view
• Evolution of implementation view
• The governmental entities integration view
• Platform-based implementation view– Platform-based approach
– Platform-based implementation practices
– Project management practices
– Implementation governance view
– Architecture-based procurement view
© A. Samarin 2014 E-government reference model v1 54
VIEWS (1)
• It combines decomposition with agile implementation of “architected” components
© A. Samarin 2014 E-government reference model v1 55
Architecture-based agile project management
2014-11-05
28
• Partner – governmental entity interaction view
• Partner view
• Evolution of implementation view
• The governmental entities integration view
• Platform-based implementation view– Platform-based approach
– Platform-based implementation practices
– Project management practices
– Implementation governance view
– Architecture-based procurement view
© A. Samarin 2014 E-government reference model v1 56
VIEWS (1)
© A. Samarin 2014 E-government reference model v1 57
Structural dependencies between various artefacts
2014-11-05
29
Business initiatives (business-specific demand)
Business capabilities(business-generic demand)
IT capabilities (IT-generic supply)
Roadmap programmes(from AS-IS to TO-BE)
Business demand IT supply
Business strategicobjectives
Governance
Maturity improvement Requested maturity Business priority
1
2
3
2
2->5
2->4
1->3
1->4
2->4
1->3
2->5
2->4
3->4
4
4
5
3
1
2
3
4
4
1
1
2
3
2
2
4
4
5
3
3->4
1->4
3->5
3->4
2->4
IT tools(IT-specific supply)
3
Programme priority
5
4
3
4
4
Dynamic relationships between various artefacts
© A. Samarin 2014 E-government reference model v1 58
Manage business by processes
Manage processes BPM suite
• Implications
– A formal way to discover points of the most leverage
– The decision-making process is explicit and transparent
– A strategy adjustment and validation becomes a routine on-going activity during its implementation (like functioning of the GPS navigator)
© A. Samarin 2014 E-government reference model v1 59
Implications and example
2014-11-05
30
• Partner – governmental entity interaction view
• Partner view
• Evolution of implementation view
• The governmental entities integration view
• Platform-based implementation view– Platform-based approach
– Platform-based implementation practices
– Project management practices
– Implementation governance view
– Architecture-based procurement view
© A. Samarin 2014 E-government reference model v1 60
VIEWS (1)
• Separation of duties
• Architecture group: selection of IT
• Procurement group: acquisition of such IT components (licensees, installation, training, documentation, operations, etc.)
• Of course, the architecture group must make the selection logic as explicit as possible.
© A. Samarin 2014 E-government reference model v1 61
Architecture-based procurement
2014-11-05
31
• Enterprise as a system of processes
• Enhancing information security by the use of processes
• Enterprise Risk Management reference model
• Records management as an BPM application
• Multi-layered implementation model
• Agile solution delivery practices
• Microservices
• Various technologies around the implementation model
• Modernisation of applications to become process-centric
• Moving services to clouds
© A. Samarin 2014 E-government reference model v1 62
VIEWS (2)
• In the context of enterprise functioning, business activities must be coordinated
• Coordination maybe strong (e.g. as in the army) or weak (e.g. as in an amateurs football team)
• Coordination maybe implicit or explicit
• Coordination maybe declarative (laws) and imperative(orders)
• Based on coordination, let us think about “levels of cohesion” 1. process patterns (coordination within processes)2. processes3. cluster of processes (coordination between processes)4. system of processes (coordination between clusters of processes)
© A. Samarin 2014 E-government reference model v1 63
Enterprise as a system of processes
2014-11-05
32
• Business case: typical “claim processing” process – claim, repair, control, invoicing, and assurance to pay
© A. Samarin 2014 E-government reference model v1 64
Process fragments – patterns
SI
PAR
SI
IPS
Click for animation
© A. Samarin 2014 E-government reference model v1 65
SI animated diagram
Click for animation
2014-11-05
33
• Simple event-based (which looks like a state machine)
© A. Samarin 2014 E-government reference model v1 66
Coordination between processes (1)
© A. Samarin 2014 E-government reference model v1 67
Coordination between processes (2)
1. state-machine
2. synchronous invocation
3. asynchronous invocation
4. fire and forget
5. parallel processes
6. co-processes (pattern SI)
2014-11-05
34
• CLOPs are usually formed with functional processes which are implemented a particular business function, e.g. Field Services
• And a “halo” of extra processes
1. monitoring
2. operating
3. governance
© A. Samarin 2014 E-government reference model v1 68
CLuster Of Processes (CLOP)
© A. Samarin 2014 E-government reference model v1 69
Enabler group, supporting group and customer group of clusters
2014-11-05
35
© A. Samarin 2014 E-government reference model v1 70
Implicit coordination between CLOPs (1)
© A. Samarin 2014 E-government reference model v1 71
Implicit coordination between CLOPs (2)
2014-11-05
36
© A. Samarin 2014 E-government reference model v1 72
Implicit coordination between CLOPs (3)
• Business Object (BO) lify-cycle as a process
© A. Samarin 2014 E-government reference model v1 73
Make coordination between CLOPs explicit (1)
2014-11-05
37
• Add enterprise-wide event dispatcher
© A. Samarin 2014 E-government reference model v1 74
Make coordination between CLOPs explicit (2)
© A. Samarin 2014 E-government reference model v1 75
Make coordination between CLOPs explicit (3)
2014-11-05
38
© A. Samarin 2014 E-government reference model v1 76
Functional view at a system of processes (1)
© A. Samarin 2014 E-government reference model v1 77
Functional view at a system of processes (2)
2014-11-05
39
© A. Samarin 2014 E-government reference model v1 78
Functional view at a system of processes (3)
• Enterprise as a system of processes
• Enhancing information security by the use of processes
• Enterprise Risk Management reference model
• Records management as an BPM application
• Multi-layered implementation model
• Agile solution delivery practices
• Microservices
• Various technologies around the implementation model
• Modernisation of applications to become process-centric
• Moving services to clouds
© A. Samarin 2014 E-government reference model v1 79
VIEWS (2)
2014-11-05
40
© A. Samarin 2014 E-government reference model v1 80
Dynamic provision of the access
© A. Samarin 2014
Extra relationships between activities (1)
Mandatory: different actors because of the separation of duties
Potentially: different actors because of performance impact – avoid assigning mechanical (low-qualified “red”)activities and added-value (“green”) activities to the same actors
E-government reference model v1 81
2014-11-05
41
• There are security-related relationships between activities
• Example
– “Activitiy_B” relates to Activity_A as “Validating the work”
– These activities may be in different processes
– No actors must be assigned to both “Role_1” and “Role_2”
© A. Samarin 2014
Extra relationships between activities (2)
Activity_A
Activity_B
Carry out the work
Carry out the work Validating the work
Role_1
Role_2
E-government reference model v1 82
• Doing the work
– To which ROLES the work can be delegated
– To which ROLES the work can be send for review
• Assuring the work
– other ACTIVITIES to audit (1st, 2nd and 3rd party auditing)
– other ACTIVITIES to evaluate the risk (before the work is started)
– other ACTIVITIES to evaluate the risk (after the work is completed)
• Validating the work
– Other ACTIVITIES to check the output (errors and fraud prevention)
• Some ACTIVITIES must be carried out by the same actor, some ACTIVITIES must not
© A. Samarin 2014
Extra relationships between activities (3)
E-government reference model v1 83
2014-11-05
42
© A. Samarin 2014 E-government reference model v1 84
Process-enhanced security for electronic medical records
• Enterprise as a system of processes
• Enhancing information security by the use of processes
• Enterprise Risk Management reference model
• Records management as an BPM application
• Multi-layered implementation model
• Agile solution delivery practices
• Microservices
• Various technologies around the implementation model
• Modernisation of applications to become process-centric
• Moving services to clouds
© A. Samarin 2014 E-government reference model v1 85
VIEWS (2)
2014-11-05
43
• Normal activities are enriched by “check-points”
© A. Samarin 2014
Embed risk management into functional processes
E-government reference model v1 86
© A. Samarin 2014
ERM reference model
E-government reference model v1 87
2014-11-05
44
• Common functional capabilities
• Enterprise as a system of processes
• Enhancing information security by the use of processes
• Enterprise Risk Management reference model
• Records management as an BPM application
• Multi-layered implementation model
• Agile solution delivery practices
• Microservices
• Various technologies around the implementation model
• Modernisation of applications to become process-centric
• Moving services to clouds
© A. Samarin 2014 E-government reference model v1 88
VIEWS (2)
• Symptoms of becoming legacy
– ad-hoc integration
– difficult incorporation of new technologies
– old programming techniques
– expensive maintenance
– heavy releases and upgrades
– availability of industrial products for previously unique functionality (e.g. event management)
– some functionality is a commodity right now (e.g. BPM and BRM)
– just slow to evolve
• What is the root cause?
– Emergent/historical grow and not architected evolution
© A. Samarin 2014 E-government reference model v1 89
Typical problems with legacy software
2014-11-05
45
• Implement end-to-end processes with the maximum reuse of existing IT applications and infrastructure
• Agile (with the pace of business) provisioning of business solutions
• From disparate IT applications to a coherent business execution platform which will “liberate” people for business innovations
• Business evolution to drive technical transformation
• BUT Application as a unit of deployment is too big
© A. Samarin 2014 E-government reference model v1 90
The goal of modernisation
• Step-by-step technical transformation by:
1. Disassemble into services
2. Add, if necessary, more services
3. Assemble via processes
• Combine various tactics: assemble, rent, buy, build, outsource, standardised, re-engineered
• Incremental improvements and refactoring within a well-defined big picture
• Intermix business evolution and technical transformation
• Keep the users happy and feel secure
© A. Samarin 2014 E-government reference model v1 91
How to carry out the modernisation
2014-11-05
46
© A. Samarin 2014 E-government reference model v1 92
Monolithic applications are decomposed into interconnected services
Monolith
application
GUI screen 2GUI screen 1 GUI screen 3
Business logic
BO1 persistence BO2 persistence
Business
logic service
Interactive
service 1
Interactive
service 2
Interactive
service 3
Coordination
BO1
persistence serviceBO2
persistence service
Assembled
solution
GUI screen 2GUI screen 1 GUI screen 3
Business logic
BO1 persistence BO2 persistence
• Only the flow of data is traceable
• Flow of control is explicit, becausethe primary importance is the result of working together, but not individual exchanges(think about football)
© A. Samarin 2014 E-government reference model v1 93
How to coordinate?
2014-11-05
47
• By processes
• By events (EPN)
• By rules, work-load, etc.
© A. Samarin 2014 E-government reference model v1 94
Several coordination techniques may be used together
© A. Samarin 2014 E-government reference model v1 95
Transformation from typical inter-application data flows to end-to-end
coordination of services
2014-11-05
48
• To externalise the flow of control from existing monolith applications
© A. Samarin 2014 E-government reference model v1 96
Using events
• The danger of “DOUble Master” (DOUM) anti-pattern –particular data (actually a business object) are modified via application or process but not either
• Few techniques
– lock-down the data manipulation interface in the application (a screen) and provide a similar functionality in the process
– dynamic provisioning of the access to a screen for a staff member who is carrying out a related activity (see next slide)
– decomposition of a screen into separate functions, e.g. Create (out-of-process), Update (within-process) and Delete (separate-process)
– combination of previous ones
© A. Samarin 2014 E-government reference model v1 97
Co-existence of a legacy application and a process solution
2014-11-05
49
• Business processes make bigger services from smaller services
• The relationship between services and processes is “recursive”
– All processes are services
– Some operations of a service can be implemented as a process
– A process includes servicesin its implementation
© A. Samarin 2014 E-government reference model v1 98
Process-centric solutionsAssemble via processes (1)
• Who (roles) is doing What (business objects), When (coordination of activities), Why (business rules), How (business activities) and with Which Results (performance indicators)
• Make these relationships explicit and executable
What you model is what you execute
“The map is the app”
© A. Samarin 2014 E-government reference model v1 99
Process-centric solutionsAssemble via processes (2)
2014-11-05
50
© A. Samarin 2014 E-government reference model v1 100
Process-centric solutionsMulti-layer implementation model (1)
© A. Samarin 2014 E-government reference model v1 101
Process-centric solutionsMulti-layer implementation model (2)
B C
A
A - SharePoint
B – in-house development
C – SAP ECC6
2014-11-05
51
© A. Samarin 2014 E-government reference model v1 102
Process-centric solutionsMulti-layer implementation model (3)
SAP BW/BI, etc.
NetWeaver PI, SolMan, etc.
NetWeaver BPM, etc.
NetWeaver BRM, Java, ECC6, etc.
XSD, Java, .Net
SQL Server, Oracle, etc.
© A. Samarin 2014 E-government reference model v1 103
Multi-layer implementation model and other technologies
2014-11-05
52
• Healthcare
© A. Samarin 2014 E-government reference model v1 104
ANNEX
N
E
E
D
S
R
E
S
U
L
T
S
Enrich Knowledge
Improve Operations
acquisition channels for external data/information/ knowledge
disseminationchannels of internal data/information/ knowledge
Methods, practices, laws, international regulations, etc.
Knowledge for Healthcare
Processes & Services
… … …
DiagnosticPreliminary
analysisTreatment Recovery
PartnerPartnerPartnerPartnerPartners
Coordination
© A. Samarin 2014 E-government reference model v1 105
Healthcare reference model (1)
2014-11-05
53
Healthcare Platform
acquisition channels
disseminationchannels
Specialised Apps.
Specialised Apps.
Specialised Apps.
Web access
Mobile access
Patient
CRM
Web access
Mobile access
DoctorCRM
Access
EDI
Enrichment
RBAC
Knowledge Mgmt. Procedures
BPMECM
Storage
ECMCoordination
BPMsBI
PartnerPartnerPartnerPartnerPartners
Healthcare reference model (2)
© A. Samarin 2014 E-government reference model v1 106
Healthcare reference model (3)Modern Healthcare System (MHS)
Hospitals Clinics
MHS
Virtual Doctor’s Offices
MHS
MHS
MHS
Insurance Social
PatientsMHS WEB & Cloud
MHS
Labs
© A. Samarin 2014 E-government reference model v1 107
2014-11-05
54
• All smart-cites deliver the same services, albeit in a different manner
• Realisation of smart-city potentials would benefit from a holistic approach
• BSI standard PAS 181:2014
© A. Samarin 2014 E-government reference model v1 108
ANNEX Smart-city implementation reference model
• Let us use the power of modern technologies to enable and drive societal transformation
© A. Samarin 2014 E-government reference model v1 109
Conclusion
2014-11-05
55
• QUESTIONS?
• Personal website: http://www.samarin.biz
• Blog http://improving-bpm-systems.blogspot.com
• LinkedIn: http://www.linkedin.com/in/alexandersamarin
• E-mail: [email protected]
• Twitter: @samarin
• Mobile: +41 76 573 40 61
• Book: www.samarin.biz/book
E-government reference model v1 110
Thanks
© A. Samarin 2014