8/12/2019 Drain Desilting Division I
1/3
Sl NO Ward
No Name of the drain
length in
Mtr. Estimated cost Present status
1
1
Sailashree vihar vending zone back side up to
disposal point of channel no near Padmavati
vihar and internal drain of VIM lane in wardno.1 2500 50000.00 60% completed
2
2
Drain desilting of internal drain of patia village
damana village and kanan vihar back side PH-
II in ward no.2 2500 50000.00
work under
progress
33
From Manchanath Dev high school to Gangua
nalla 1500 Not started
4 3 From Prahallad Routs house to Ganua nalla 2000 Not started
5 3 From Bazar to R.D Road 1700 Not started
6 4 Hanspal village drain 600 Not started
7 4 Pahala village drain 100 (Ward 3 to 7- Not started
8 5 From GGP Bridge to GGP colony 400 Rs 581000) completed9 5 From GGP Dispensary to Mirakutir 550 completed
10 5 Old bank colony drain 350 completed
11 5 New bank colony drain 475 completed
126
From Jogi Champati house to Pratap Routray
house 450 completed
13 6 From Palamandop to GGP Bridge 480 completed
14 6 From Rasulgarh out post to canal road 600 completed
15 6 From Raju Sahoo house to Sivasakti club 450 completed
166
From Pabitra pradhan house to Bansidhar
sahoo house 700 completed
17 6 Rasulgarh nua sahi drain 900 completed
186 From NH-5 to GGP Bridge 1200
work underprogress
19 7 Rangamatia Talasahi drain 1600 Not started
20 7 Rangamatia Upper sahi drain 2000 Not started
21 7 Gadakana village drain 2200 Not started
22
8
Drain desilting from Kalinga cottage towards
channel no.1 and internal drain of District
centre and HB colony in ward no.8 2000 50000.00
50% work
completed
239
Drain desilting from Maa mangala temple
chhak towards GA plot area (both side) 500 50000.00
75% work
completed
24
10
Drain desilting from main culvert near
baramunda high school front towards water
tank and other internal drain of Rental colonyin ward no.10 2000 50000.00
90% work completed
25
11
Vivekananda school to Main drain around LIG
opark BDA colony Nilamadhab basti to main
road 450
(ward 11 to
15-Rs
230100) To be desilted
2612
Gajapati nagar, CMPDI front, Gajapati nagar
east side, Adimata colony 1200 200m completed
27
13
VSS nagar Kalyan Mandop to Sainik school
Back side gate Kuntal medicine front drain
prabhujee E.M.School to Govt. high school
and GL colony area 1500 870m completed
Desilting of drain in Bhubaneswar Municipal Corporation as on 10.06.2012
8/12/2019 Drain Desilting Division I
2/3
28
14
VSS nagar main road near Telecom training
centre to satsang utkal university to Satsang
temple inside puthorobamona Basti 1100 200m completed
29
15
Mundasahi chhak to Dasarathi enclave, Plot
No.33082550 front to may fair back side road,
Maitree vihar, Plot no.353/51 to 867(P) 928 605m completed
30
19 Drain from N3 square to Bikash omfed 550
(ward no-
19,20,24,25
Rs482000) To be desilted
3119
Drain from IRC high school to salia sahi
square 200 40% completed
32 19 Drain from N3 square to sub station 350 40% completed
33 19 Drain around E type quarters 400 40% completed
3419
Drain from N4 area to Nayapalli P.S via
Gajalaxmi vending zone 300 30% completed
3519 Drain from Gajalaxmi mandira to Petrol pump 270 40% completed
3619
Drainf rom N3 are to salia sahi square via
Behera sahi 350 Not started
37 20 Drain from May fair hotel at pal height 275 80% completed
38 20 Drain at Jayadev vihar private plot area 200 Not started
39 20 Drain at N-5 area 450 Not started
40 20 Drain at N-6 area 700 Not started
4120 Drain from Allahbad bank to Parbati mandop 150 Not started
4220 Drain from ID market front ot Parbati mandop 270 Not started
4320
Drain from Munda sahi square to Jayadev
vihar 350 Not started
44
22
Drain desilting from Sahid nagar Kalyan
mandop towards Happy hour school and
other internal drain of sahidnagar in wardno.22 50000.00
work underprogress
4524
Drain from Acharya vihar to Drainage channel
no.3 150 90% completed
4624
Drain from police colony to towards science
park basti 120 Not started
47 24 Small drain inside science park basti 90 Not started
4825
Drain from Damayanti apartment to mangala
mandira 250 482000.00
work under
progress
4925
Drain from Damayanti appartment to old
culvert 150 95% completed
50
25
Drain from mangala mandira to
Akhandalamani mandira 160 95% completed
51 25 Drain from NH to Damayanti appartment 250 80% completed
52 25 Drain from Golap resort to Eureka club 550 60% completed
53 25 Drain around Sastri nagar 450 Not started
54 25 Drain at back side of RBI colony 250 80% completed
55 25 Small drain inside Behera sahi 350 40% completed
8/12/2019 Drain Desilting Division I
3/3
56
26
Drain from Mamtaj alli high school chhak to
culvert, Damayanti appartment towards Bhoi
sahi open well, Jaleswar basti towards BDA
market at Devaray college 830
(ward no
26,27,29,30,
Rs538000) completed
5727
Drain of lane-1, lane-2 and west paika nagar
main drain of Paikanagar 750 completed
5829
Drain from Mahuria zora towards Jagamara
bazar both side at Barabari 800 completed
5929
Drain from jagamara chhak towards
gandamunda drain 400 134000.00 completed
6029
Internal drain and main drain at |Jagamohan
nagar 1500 completed
6129
Internal drain of pabani complex at
Jagamohan nagar 350 To be Desilted
6230 Internal drain of Ananata vihar pokhariput 250
work under
progress
63 30 Internal drain at palasa palli 300 To be desilted
64 30 Internal drain of Bhimpur 250 To be desilted