Drain Desilting Division I

Embed Size (px)

Citation preview

  • 8/12/2019 Drain Desilting Division I

    1/3

    Sl NO Ward

    No Name of the drain

    length in

    Mtr. Estimated cost Present status

    1

    1

    Sailashree vihar vending zone back side up to

    disposal point of channel no near Padmavati

    vihar and internal drain of VIM lane in wardno.1 2500 50000.00 60% completed

    2

    2

    Drain desilting of internal drain of patia village

    damana village and kanan vihar back side PH-

    II in ward no.2 2500 50000.00

    work under

    progress

    33

    From Manchanath Dev high school to Gangua

    nalla 1500 Not started

    4 3 From Prahallad Routs house to Ganua nalla 2000 Not started

    5 3 From Bazar to R.D Road 1700 Not started

    6 4 Hanspal village drain 600 Not started

    7 4 Pahala village drain 100 (Ward 3 to 7- Not started

    8 5 From GGP Bridge to GGP colony 400 Rs 581000) completed9 5 From GGP Dispensary to Mirakutir 550 completed

    10 5 Old bank colony drain 350 completed

    11 5 New bank colony drain 475 completed

    126

    From Jogi Champati house to Pratap Routray

    house 450 completed

    13 6 From Palamandop to GGP Bridge 480 completed

    14 6 From Rasulgarh out post to canal road 600 completed

    15 6 From Raju Sahoo house to Sivasakti club 450 completed

    166

    From Pabitra pradhan house to Bansidhar

    sahoo house 700 completed

    17 6 Rasulgarh nua sahi drain 900 completed

    186 From NH-5 to GGP Bridge 1200

    work underprogress

    19 7 Rangamatia Talasahi drain 1600 Not started

    20 7 Rangamatia Upper sahi drain 2000 Not started

    21 7 Gadakana village drain 2200 Not started

    22

    8

    Drain desilting from Kalinga cottage towards

    channel no.1 and internal drain of District

    centre and HB colony in ward no.8 2000 50000.00

    50% work

    completed

    239

    Drain desilting from Maa mangala temple

    chhak towards GA plot area (both side) 500 50000.00

    75% work

    completed

    24

    10

    Drain desilting from main culvert near

    baramunda high school front towards water

    tank and other internal drain of Rental colonyin ward no.10 2000 50000.00

    90% work completed

    25

    11

    Vivekananda school to Main drain around LIG

    opark BDA colony Nilamadhab basti to main

    road 450

    (ward 11 to

    15-Rs

    230100) To be desilted

    2612

    Gajapati nagar, CMPDI front, Gajapati nagar

    east side, Adimata colony 1200 200m completed

    27

    13

    VSS nagar Kalyan Mandop to Sainik school

    Back side gate Kuntal medicine front drain

    prabhujee E.M.School to Govt. high school

    and GL colony area 1500 870m completed

    Desilting of drain in Bhubaneswar Municipal Corporation as on 10.06.2012

  • 8/12/2019 Drain Desilting Division I

    2/3

    28

    14

    VSS nagar main road near Telecom training

    centre to satsang utkal university to Satsang

    temple inside puthorobamona Basti 1100 200m completed

    29

    15

    Mundasahi chhak to Dasarathi enclave, Plot

    No.33082550 front to may fair back side road,

    Maitree vihar, Plot no.353/51 to 867(P) 928 605m completed

    30

    19 Drain from N3 square to Bikash omfed 550

    (ward no-

    19,20,24,25

    Rs482000) To be desilted

    3119

    Drain from IRC high school to salia sahi

    square 200 40% completed

    32 19 Drain from N3 square to sub station 350 40% completed

    33 19 Drain around E type quarters 400 40% completed

    3419

    Drain from N4 area to Nayapalli P.S via

    Gajalaxmi vending zone 300 30% completed

    3519 Drain from Gajalaxmi mandira to Petrol pump 270 40% completed

    3619

    Drainf rom N3 are to salia sahi square via

    Behera sahi 350 Not started

    37 20 Drain from May fair hotel at pal height 275 80% completed

    38 20 Drain at Jayadev vihar private plot area 200 Not started

    39 20 Drain at N-5 area 450 Not started

    40 20 Drain at N-6 area 700 Not started

    4120 Drain from Allahbad bank to Parbati mandop 150 Not started

    4220 Drain from ID market front ot Parbati mandop 270 Not started

    4320

    Drain from Munda sahi square to Jayadev

    vihar 350 Not started

    44

    22

    Drain desilting from Sahid nagar Kalyan

    mandop towards Happy hour school and

    other internal drain of sahidnagar in wardno.22 50000.00

    work underprogress

    4524

    Drain from Acharya vihar to Drainage channel

    no.3 150 90% completed

    4624

    Drain from police colony to towards science

    park basti 120 Not started

    47 24 Small drain inside science park basti 90 Not started

    4825

    Drain from Damayanti apartment to mangala

    mandira 250 482000.00

    work under

    progress

    4925

    Drain from Damayanti appartment to old

    culvert 150 95% completed

    50

    25

    Drain from mangala mandira to

    Akhandalamani mandira 160 95% completed

    51 25 Drain from NH to Damayanti appartment 250 80% completed

    52 25 Drain from Golap resort to Eureka club 550 60% completed

    53 25 Drain around Sastri nagar 450 Not started

    54 25 Drain at back side of RBI colony 250 80% completed

    55 25 Small drain inside Behera sahi 350 40% completed

  • 8/12/2019 Drain Desilting Division I

    3/3

    56

    26

    Drain from Mamtaj alli high school chhak to

    culvert, Damayanti appartment towards Bhoi

    sahi open well, Jaleswar basti towards BDA

    market at Devaray college 830

    (ward no

    26,27,29,30,

    Rs538000) completed

    5727

    Drain of lane-1, lane-2 and west paika nagar

    main drain of Paikanagar 750 completed

    5829

    Drain from Mahuria zora towards Jagamara

    bazar both side at Barabari 800 completed

    5929

    Drain from jagamara chhak towards

    gandamunda drain 400 134000.00 completed

    6029

    Internal drain and main drain at |Jagamohan

    nagar 1500 completed

    6129

    Internal drain of pabani complex at

    Jagamohan nagar 350 To be Desilted

    6230 Internal drain of Ananata vihar pokhariput 250

    work under

    progress

    63 30 Internal drain at palasa palli 300 To be desilted

    64 30 Internal drain of Bhimpur 250 To be desilted