DAILY CONSTRUCTION PROGRESS REPORT ESR DIVISION - RAS LAFFAN (summary sheet 1) DATE: 30-June-2015 WEATHER: Sunny & Hot
PROJECT / CONTRACT CONTRACTOR
DISCIPLINEWISE PUNCH ITEMS
TO
TAL
C
leare
d
ELECTRICAL
Issu
ed
close
d
Issu
ed
close
d
Issu
ed
close
d
Issu
ed
close
d
Issu
ed
close
d
Issu
ed
close
d
Issu
ed
close
d
Issu
ed
close
d
6 Security Bldgs /Boundary LS Al Musaire 7/5/2014 2/5/2016 580 673 8 8 1 1 9 0
5/8/2016 TOTAL
PROJECT / CONTRACT CONTRACTOR
Contr
act
S
tart
date DISCPLINE WISE RED LINE MARK UPS & AS BUILTs REVIEWED & Endorsed
ARCHITECTURE ELECTRICAL PROCESS
RLM
RLM
RLM
RLM
RLM
RLM
RLM
RLM
RLM
RLM
RLM
6 Security Bldgs /Boundary LS Al Musaine 7/5/2014 2/5/2016 0 0 0 0
TOTAL
Sr No
Contr
act
S
tart
date
Com
ple
tion
date
(
post
V
TC)
Contr
act
Pe
riod
(days)
Act
ual Pe
riod o
n
30 June 2
015
(days)
Cum
ula
tive
Oust
and
ing
CIVIL / STRUCT
HVAC / BLDG SERVICES
INST / AUTOMATION
MECH / PIPING
SCADA / TELECOM
Operational Handover PL
Warranty Punch List
Sr No
Com
ple
tion d
ate
(p
ost
VTC
)
CIVIL / STRUCT
HVAC / BLDG SERV
INST / AUTOMATION
MECH / PIPING
SAFETY / LOSS PREVENTION
SCADA / TELECOM
TO
TAL
Cle
are
d
Cum
ula
tive
Oust
and
ing
AS
BU
ILT AS
B
UIL
T AS
BU
ILT AS
BU
ILT AS
BU
ILT AS
BU
ILT AS
BU
ILT AS
BU
ILT AS
B
UIL
T AS
BU
ILT AS
BU
ILT
DAILY CONSTRUCTION PROGRESS REPORT ESR DIVISION - RAS LAFFAN (summary sheet 2) DATE: 30-June-2015
Sr No PROJECT / CONTRACT CONTRACTOR
Con
tract
S
tart
date DISCIPLINEWISE Daily RFIs Inspection
TO
TAL
C
leare
d
CIVIL / STRUCT ELECTRICAL MECH / PIPING PROCESS SCADA / TELECOM
Rece
ived
Clo
sed
Rece
ived
Clo
sed
Rece
ived
Clo
sed
Rece
ived
Clo
sed
Rece
ived
Clo
sed
Rece
ived
Clo
sed
Rece
ived
Clo
sed
Rece
ived
Clo
sed
6 Security Bldgs /Boundary LS Al Musaire 7/5/2014 2/5/2016 0 2 39 8
TOTAL
DAILY DOSSIERS & DOCUMENT (in ASSAI) REVIEWED & Endorsed
Sr No PROJECT / CONTRACT CONTRACTOR
DISCIPLINE
ARCHITECTURE CIVIL / STRUCT ELECTRICAL HVAC / BLDG SERV MECH / PIPING PROCESS SCADA / TELECOM
Clo
sed
Clo
sed
Clo
sed
Clo
sed
Clo
sed
Clo
sed
Clo
sed
Clo
sed
Clo
sed
Clo
sed
RLM
6 Security Bldgs /Boundary LS Al Musaire 0 0 0 0
TOTAL
Com
ple
tion
date
(p
ost
VTC
)
Cu
mu
lati
ve
Ou
stan
din
g
HVAC / BLDG SERVICES
INST / AUTOMATION
SAFETY / LOSS PREVENTION
INST / AUTOMATION
SAFETY / LOSS PREVENTION
TO
TAL
Cle
are
d
Cu
mu
lati
ve
Ou
stan
din
g
Rece
ive
d
Rece
ive
d
Rece
ive
d
Rece
ive
d
Rece
ive
d
Rece
ive
d
Rece
ive
d
Rece
ive
d
Rece
ive
d
Rece
ive
d AS
B
UIL
T
1 2 3 4 5 6 7DAILY CONSTRUCTION REPORT (Contractor : AL MUSAIRIE) DATE: 30-June-2015
CIVIL / STRUCTURAL MANPOWER
Sr. Staf Sr. Supervisor Foreman Chargehand Skilled Labour
3 10 7 5 32 15 541 Temporary works (Milestone 1)
Work Completed
2 Gate Security Building (Milestone 2)
Dewatering in progress3 Boundary Fence
Setting-out of line posts in progress (280 nos. out of 946 nos.)
PCC Completed for Fence Boundary Line post foundations ( 50 nos. out of 946 nos.)Curing is going on in Lean concrete of said casted area ( from Pt.8 to Pt.9)
4 Ground Improvement
5 Canopy Area
6 Next Day Activity(01-07-2015):a. Compaction and Subgrade preparation of Line post footings(50 nos)b. Excavation and site preparation for Plate load bearing test on GS Building.
e. Excavation of fence gate foundation in MS02.
Note:1. Excavator was breakdown @10 A.M., that's why we could not complete excvation in GSB area.Areas of Concern:
Contract No. GC - 13 111100 – EPIC for Security Buildings and Boundary & Landscaping Works
Operators / Drivers
Unskilled Labour
Rock excavation up to blinding level in progress. 96% complete
Excavation/compaction of line post footing in progress (87 nos. out of 946 nos.)
Site grading in progress (800 meters out of 2849 meters)
Removal of existing interlock paving in progress (70% Completed)
c. Removal and shifting of interlock in Canopy area(15% has to be finished)d. Excavation of line post foundations from Pt. 9 to Pt.12.(40 Nos)
8 9 10DAILY CONSTRUCTION REPORT (Contractor : AL MUSAIRIE) DATE: 30-June-2015
MANPOWER
Subcontractor TOTAL
0 126Temporary works (Milestone 1)Work Completed
Gate Security Building (Milestone 2)
Dewatering in progressBoundary FenceSetting-out of line posts in progress (280 nos. out of 946 nos.)
PCC Completed for Fence Boundary Line post foundations ( 50 nos. out of 946 nos.)Curing is going on in Lean concrete of said casted area ( from Pt.8 to Pt.9)Ground Improvement
Canopy Area
Next Day Activity(01-07-2015):a. Compaction and Subgrade preparation of Line post footings(50 nos)b. Excavation and site preparation for Plate load bearing test on GS Building.
1. Excavator was breakdown @10 A.M., that's why we could not complete excvation in GSB area.
– EPIC for Security Buildings and Boundary & Landscaping Works
87 nos. out of 946 nos.)
out of 2849 meters)
% has to be finished)d. Excavation of line post foundations from Pt. 9 to Pt.12.(40 Nos)