DAILY CONSTRUCTION PROGRESS REPORT ESR DIVISION - RAS LAFFAN (summary sheet 1) DATE: 30-June-2015 WEATHER: Sunny & Hot PROJECT / CONTRACT CONTRACTOR DISCIPLINEWISE PUNCH ITEMS TOTAL Cleared ELECTRICAL Issued closed Issued closed Issued closed Issued closed Issued closed Issued closed Issued closed Issued closed 6 Security Bldgs /Boundary LS Al Musaire 7/5/2014 2/5/2016 580 673 8 8 1 1 9 0 5/8/2016 TOTAL PROJECT / CONTRACT CONTRACTOR Contract Start date DISCPLINE WISE RED LINE MARK UPS & AS BUILTs REVIEWED & Endorsed ARCHITECTURE ELECTRICAL PROCESS RLM RLM RLM RLM RLM RLM RLM RLM RLM RLM RLM 6 Security Bldgs /Boundary LS Al Musaine 7/5/2014 2/5/2016 0 0 0 0 TOTAL Sr No Contract Start date Completion date (post VTC) Contract Period (days) Actual Period on 30 June 2015 (days) Cumulative Oustanding CIVIL / STRUCT HVAC / BLDG SERVICES INST / AUTOMATION MECH / PIPING SCADA / TELECOM Operational Handover PL Warranty Punch List Sr No Completion date (post VTC) CIVIL / STRUCT HVAC / BLDG SERV INST / AUTOMATION MECH / PIPING SAFETY / LOSS PREVENTION SCADA / TELECOM TOTAL Cleared Cumulative Oustanding AS BUIL T AS BUIL T AS BUIL T AS BUIL T AS BUIL T AS BUIL T AS BUIL T AS BUIL T AS BUIL T AS BUIL T AS BUIL T

Dpr Esr July 01 2015

Embed Size (px)

Citation preview

Page 1: Dpr Esr July 01 2015

DAILY CONSTRUCTION PROGRESS REPORT ESR DIVISION - RAS LAFFAN (summary sheet 1) DATE: 30-June-2015 WEATHER: Sunny & Hot

PROJECT / CONTRACT CONTRACTOR

DISCIPLINEWISE PUNCH ITEMS

TO

TAL

C

leare

d

ELECTRICAL

Issu

ed

close

d

Issu

ed

close

d

Issu

ed

close

d

Issu

ed

close

d

Issu

ed

close

d

Issu

ed

close

d

Issu

ed

close

d

Issu

ed

close

d

6 Security Bldgs /Boundary LS Al Musaire 7/5/2014 2/5/2016 580 673 8 8 1 1 9 0

5/8/2016 TOTAL

PROJECT / CONTRACT CONTRACTOR

Contr

act

S

tart

date DISCPLINE WISE RED LINE MARK UPS & AS BUILTs REVIEWED & Endorsed

ARCHITECTURE ELECTRICAL PROCESS

RLM

RLM

RLM

RLM

RLM

RLM

RLM

RLM

RLM

RLM

RLM

6 Security Bldgs /Boundary LS Al Musaine 7/5/2014 2/5/2016 0 0 0 0

TOTAL

Sr No

Contr

act

S

tart

date

Com

ple

tion

date

(

post

V

TC)

Contr

act

Pe

riod

(days)

Act

ual Pe

riod o

n

30 June 2

015

(days)

Cum

ula

tive

Oust

and

ing

CIVIL / STRUCT

HVAC / BLDG SERVICES

INST / AUTOMATION

MECH / PIPING

SCADA / TELECOM

Operational Handover PL

Warranty Punch List

Sr No

Com

ple

tion d

ate

(p

ost

VTC

)

CIVIL / STRUCT

HVAC / BLDG SERV

INST / AUTOMATION

MECH / PIPING

SAFETY / LOSS PREVENTION

SCADA / TELECOM

TO

TAL

Cle

are

d

Cum

ula

tive

Oust

and

ing

AS

BU

ILT AS

B

UIL

T AS

BU

ILT AS

BU

ILT AS

BU

ILT AS

BU

ILT AS

BU

ILT AS

BU

ILT AS

B

UIL

T AS

BU

ILT AS

BU

ILT

Page 2: Dpr Esr July 01 2015

DAILY CONSTRUCTION PROGRESS REPORT ESR DIVISION - RAS LAFFAN (summary sheet 2) DATE: 30-June-2015

Sr No PROJECT / CONTRACT CONTRACTOR

Con

tract

S

tart

date DISCIPLINEWISE Daily RFIs Inspection

TO

TAL

C

leare

d

CIVIL / STRUCT ELECTRICAL MECH / PIPING PROCESS SCADA / TELECOM

Rece

ived

Clo

sed

Rece

ived

Clo

sed

Rece

ived

Clo

sed

Rece

ived

Clo

sed

Rece

ived

Clo

sed

Rece

ived

Clo

sed

Rece

ived

Clo

sed

Rece

ived

Clo

sed

6 Security Bldgs /Boundary LS Al Musaire 7/5/2014 2/5/2016 0 2 39 8

TOTAL

DAILY DOSSIERS & DOCUMENT (in ASSAI) REVIEWED & Endorsed

Sr No PROJECT / CONTRACT CONTRACTOR

DISCIPLINE

ARCHITECTURE CIVIL / STRUCT ELECTRICAL HVAC / BLDG SERV MECH / PIPING PROCESS SCADA / TELECOM

Clo

sed

Clo

sed

Clo

sed

Clo

sed

Clo

sed

Clo

sed

Clo

sed

Clo

sed

Clo

sed

Clo

sed

RLM

6 Security Bldgs /Boundary LS Al Musaire 0 0 0 0

TOTAL

Com

ple

tion

date

(p

ost

VTC

)

Cu

mu

lati

ve

Ou

stan

din

g

HVAC / BLDG SERVICES

INST / AUTOMATION

SAFETY / LOSS PREVENTION

INST / AUTOMATION

SAFETY / LOSS PREVENTION

TO

TAL

Cle

are

d

Cu

mu

lati

ve

Ou

stan

din

g

Rece

ive

d

Rece

ive

d

Rece

ive

d

Rece

ive

d

Rece

ive

d

Rece

ive

d

Rece

ive

d

Rece

ive

d

Rece

ive

d

Rece

ive

d AS

B

UIL

T

Page 3: Dpr Esr July 01 2015

1 2 3 4 5 6 7DAILY CONSTRUCTION REPORT (Contractor : AL MUSAIRIE) DATE: 30-June-2015

CIVIL / STRUCTURAL MANPOWER

Sr. Staf Sr. Supervisor Foreman Chargehand Skilled Labour

3 10 7 5 32 15 541 Temporary works (Milestone 1)

Work Completed

2 Gate Security Building (Milestone 2)

Dewatering in progress3 Boundary Fence

Setting-out of line posts in progress (280 nos. out of 946 nos.)

PCC Completed for Fence Boundary Line post foundations ( 50 nos. out of 946 nos.)Curing is going on in Lean concrete of said casted area ( from Pt.8 to Pt.9)

4 Ground Improvement

5 Canopy Area

6 Next Day Activity(01-07-2015):a. Compaction and Subgrade preparation of Line post footings(50 nos)b. Excavation and site preparation for Plate load bearing test on GS Building.

e. Excavation of fence gate foundation in MS02.

Note:1. Excavator was breakdown @10 A.M., that's why we could not complete excvation in GSB area.Areas of Concern:

Contract No. GC - 13 111100 – EPIC for Security Buildings and Boundary & Landscaping Works

Operators / Drivers

Unskilled Labour

Rock excavation up to blinding level in progress. 96% complete

Excavation/compaction of line post footing in progress (87 nos. out of 946 nos.)

Site grading in progress (800 meters out of 2849 meters)

Removal of existing interlock paving in progress (70% Completed)

c. Removal and shifting of interlock in Canopy area(15% has to be finished)d. Excavation of line post foundations from Pt. 9 to Pt.12.(40 Nos)

Page 4: Dpr Esr July 01 2015

8 9 10DAILY CONSTRUCTION REPORT (Contractor : AL MUSAIRIE) DATE: 30-June-2015

MANPOWER

Subcontractor TOTAL

0 126Temporary works (Milestone 1)Work Completed

Gate Security Building (Milestone 2)

Dewatering in progressBoundary FenceSetting-out of line posts in progress (280 nos. out of 946 nos.)

PCC Completed for Fence Boundary Line post foundations ( 50 nos. out of 946 nos.)Curing is going on in Lean concrete of said casted area ( from Pt.8 to Pt.9)Ground Improvement

Canopy Area

Next Day Activity(01-07-2015):a. Compaction and Subgrade preparation of Line post footings(50 nos)b. Excavation and site preparation for Plate load bearing test on GS Building.

1. Excavator was breakdown @10 A.M., that's why we could not complete excvation in GSB area.

– EPIC for Security Buildings and Boundary & Landscaping Works

87 nos. out of 946 nos.)

out of 2849 meters)

% has to be finished)d. Excavation of line post foundations from Pt. 9 to Pt.12.(40 Nos)